Order of BW objetcs for transporting

HAI
i need to transport the infoobjects , transfer rules , trasnfer structure , communication structure , update rules for ODS , ODS , Update Rules for InfoCube , InfoCube from DEVLOPMENT Phase to QA system .
1) so what is the order of objects for transaporting
2) pls telll me how to transport .
i ll assing the points
bye
rizwan

I love this question ?
The transport connection tool if used properly can be of
great help! if used improperly can cause many issue's.
Transports should follow the same sequence as development.
1. Trans datasource's in source systems.
2. replicate source system datasources in subsequent
BW system (verify in overview).
3. Check Logical source system mappings.
4. Info objects are the building blocks, Place them
   in catalogs and transport only ness.
5. structure definitions IS's, ODS's IC's etc..
Only ness.
6. select data targets in flow before. to collect
update rules , transfer rules etc.. (Dataflow Connections)Caution- Check all objects selected when collecting auto. To ensure no unwanted config is included in transport.
also make sure the appropriate source system is selected
prior to selection.
7. select data targets after flow.
for Roles Web config etc.
8. Reporting and reporting elements if relevant last.
again expand all collected objects in the above process for review to ensure additional unwanted dependencies are not included in your transport.
Hope this Helps
George

Similar Messages

  • Asking for Transport Request while editing DTP in Quality - Client Open

    Hi Guru's,
    We have opened the client and trying to edit the DTP, but it is asking for transport request.
    Is there any other setting that we need to do in order not to prompt for transport request?
    Thanks & Regards.

    Hi Ganesh,
    One of the options would be to save it in a DUMMY request ,incase you do not want to transport such that you make changes next time it will by default get saved in that DUMMY request i.e it will not ask for a request next time.
    We usually save it in Dummy request,when we change a DTP in Quality or in Production.
    Rgds
    SVU123

  • PO for transport and connection with price of the materials

    Hi all,
    I have a little problem here and I would appreciate any kind of
    help and advice!
    If I make one PO for goods to one vendor, and differend PO for
    transport of goods to differend vendor how can I link this
    second PO with the first in order to increase the price of the
    materials?  I cannot use the transport as a condition in the PO
    for the goods, it is required to make second PO for the value of
    transport. Also it is required to increase the value of the
    materials with the price of the transport, so I can't just put
    the transport in cost center.
    Please, help! What can I do in this case?

    There is no standard way.
    Only way transport costs can be added is through 'Delivery condition types' in PO.
    Through custom programs, try this:
    1) Enter delivery condition type with minimum value (e.g. 1 USD or 1 INR).
    Indicate the Freight PO no & Item in some field in PO (or in a Z-table to link the freight PO)
    2) During MIRO (use INVOICE_UPDATE BADI), fill the values for freight condition from freight PO.
    Best regards
    Ramki

  • Work Flow & Procedure For Transportation Module Of SD

    Dear All,
    Currently, we have just got SD implemented. Now, we shall like to go for the Transportaion Module i.e. Order Booking, delivery and the PGI followed by Auto Invoicing. Now, we wants to go for Transportation Module  i.e. Shipment Creation, Shipment cost calculation , Service Order Creation etc. As we are quite new to this. So, we shall like to know the complete work flow & the procedure  for implementing the same. i.e. in what sequence the various transactions to be used for Master / Transaction.
    Please advise further.
    With Best Regards,
    Sanjeev Chugh

    Thanks for the reply. Definitely, i can share the details to the best of my knowledge about the transportation module.
    This module is basically meant for controlling purpose. Our main objective is to control the Transportaion Charges. Vendor Invoice must be cross verified from the sytem as well.
    Our Current Business Process : As per business process, we are having fixed rates per transporter for the type of vehicle and the source - destination combination. So, whenever, we are stock transferring the material from our mfg. plants to various depots, we are using various transporters (some one are specialised for south, some are spl. for east, so on and so forth). On the receipt of the material, receiver i.e. the destination branch , confirms the material receipt.. MIGO / MIRO etc. . We wants to capture the cost of the shipment as per the system and then on the receipt of the bill from transporter, the same must be cross verified.
    On going thru various documents from Web, I could gather the following details :
    1. After making deliveries, we have to make a shipment document. In our case, max. time it shall be an individual Shipment i.e. Tcode VT01N. Other type of shipment be Collective Shipment, which we use very less no. of times.
    2.  We have to prepare Shipment Cost document by using Tcode VI01
    3. We have to create a service Purchase Order By using ME21N.
    In our business scenario, we shall not be using legs concept as our shipments generally used to be from point to point basis.
    Sir, logically, i know our needs.. But getting stuck at a couple of points ... Like where to define various rates per transporter..That's why, i named the subject as the Work  Flow & Procedure for Tpt.Module.
    I shall like to request you to kindly advise further in this regard or kindly let me know if some study material is available from where i can comes to know about the exact work flow of the Transportation Module As Such.
    From Where I Can Get Help on Any Tcode Usage i.e How to use a Tcode and what be its basic functionality.
    With Best Regards,
    Sanjeev Chugh

  • Production Order Confirmation to a Stock Transport (UB) Order

    Hi, I'm interested to confirm production orders to a UB order, is this configurable or am I looking at a user exit? Essentially rather then confirm to warehouse stock if we could confirm to stock in transit onto a UB order. A production order is meeting the requirements of 1 or more UB orders and hence being able to settle to 1 or more UBs would be more efficient for our business.
    Your thoughts would be appreciated.
    Thank you
    Craig Wood

    Hi Vivek, thank you for your interest; let me better explain I hope...
    1/ we supply a branch betwork based on sales orders and forecast using mrp to generate UB stock transport orders.
    2/ mrp in the production plant generates a planned order based per material for one or many UB orders,
    3/ production planning schedules & converts planned orders to production orders.
    4/ Currently when a production order is confirmed the finished goods are receipted in the plant storage location for our despatch to supply to our branch network.
    5/ The end of our production line conveys our products direct to waiting trucks for immediate despatch.
    6/ So instead of confirming production orders to stock we would like to confirm the production directly to the outbound delivery for the UB order, by-passing the plant stock placing the stock immeadiately in "stock in-transit".
    7/ I have no doubt we can do this with abap however I would rather a configuration option if it exists?
    8/ I suspect there may be an order type with a profile that may allow settlement to a material and another order object (UB)? rather then the standard PP01 which settles to material only in the plant.
    I hope that is a little clearer.
    Thanks again...
    Craig

  • Payment order are not defined for extended withholding  tax

    Hi Gurus,
    Would you please help me with the message below. It appears on F110 when I try to pay a vendor open item with extended withholding tax:
    Message FZ626 -Payment orders are not defined for extended withholding tax
    In my company payment orders are created in F110 for accounts payable, as we use another ERP system (Baan) to perform the local accounts payments, and now I've just activated Extended withholding tax functionality With accumulation (necessary in Brazil) but I get this error.
    Is it not possible to user payment order with extended withholding tax + accumulation? I find it hard to believe...
    I've tried to unflag the payment order only for the payment method I'm using in FBZP t.code, but then no payment order were created but instead a payment document were posted with the withholding tax accumulation, but this is not the way we are working, and nothing is sent to Baan
    any help is welcome

    The payment method "Y" the option "payment order only" was marked?
    For a withholding tax type with accumulation in a company code with extended withholding tax payment
    methods that create only payment orders can´t be used. Payment orders can only be created only if there are
    no tax types with accumulation involved in the paid items of the payment run.
    The functionality extended withholding tax works fine for Brazil
    however, you can´t use the payment order with this functionality.
    Please, review your customizing for payment method 'Y" in transaction
    FBZP.
    Best regards,
    Leonardo Vedovelli
    FI Support Engineer
    SAP Active Global Support

  • Table for open Purchase order and pending invoices for vendors

    Hi,
    Are there any table to know open Purchase orders and pending invoices for vendors.
    Quick response will be appreciated.
    Thanks & Regards

    hi,
    Purchase Order:
    S011:(PURCH: Purch. Group Statistics)
    Statistics (SSOUR)
    Version (VRSIO)
    Month (SPMON)
    Day (SPTAG)
    Week (SPWOC)
    Posting Period (SPBUP)
    Purchasing Org (EKORG)
    Purchasing Group (EKGRP)
    Vendor No (LIFNR)
    S012: (PURCHIS: Purchasing Statistics)
    Statistics (SSOUR)
    Version (VRSIO)
    Month (SPMON)
    Day (SPTAG)
    Week (SPWOC)
    Posting Period (SPBUP)
    Purchasing Org (EKORG)
    Purchasing Group (EKGRP)
    Material No (MATNR)
    Plant (WERKS)
    Info Record Category (ESOKZ)
    Material Group (MATKL)
    Info Record (INFNR)
    Country (LAND1)
    EINE: (Purchasing Info Record: Purchasing
    Organization Data)
    Info Record (INFNR)
    Purchasing Org (EKORG)
    Info Record Type (ESOKZ)
    Plant (WEKS)
    EKET: (Delivery Schedules)
    Purchasing Doc (EBELN)
    Item (EBELP)
    Delivery Schedule (ETENR)
    EKPO: (Purchasing Document Item)
    Purchasing Doc (EBELN)
    Item (EBELP)
    EKKN: (Account Assignment in Purchasing
    Document)
    Purchasing Doc (EBELN)
    Item (EBELP)
    Account Assignment (ZEKKN)
    EKKO: (Purchasing Document Header)
    Purchasing Doc (EBELN)
    EORD: (Purchasing Source List)
    Material No (MATNR)
    Plant (WERKS)
    Source List No (ZEORD)
    thx,
    Ganpat

  • Outbound Order Confirmation - Output control for incomplete sales orders

    Hi EDI Folks,
    I have a simple question. I want to send EDI 855 for only the completed sales orders.
    Whenever inbound sales order is processed and if the order is incomplete. I don't want to send the order confirmation for the order at that point of time. When that order is made complete, then only i want to send the order confirmation (EDI 855).
    How can we do it??
    What is the output determination requirement for this??
    Right now i am using requirement '02' which proposes EDI output for both complete and incomplete sales orders.
    Please respond to the above quesition.
    Thanks and waiting for your reply,
    Creasy Matt

    MxG,
    For both plant and pricing condition functional config was already done. If any of these two fields are missing, the status of sales order will be incomplete.For incomplete orders also, the EDI output is being proposed.
    Now just tell me, in which SAP program, do i have to put the break point?
    Where exactly ??
    Thanks and kind regards,
    Creasy Matt

  • You changed the order of the menu for "Open in a new window" or "Open in new Tab", How can I change it back? Or how can I omit any reference to tabs? I do not use them at all.

    You changed the order of the menu for "Open in a new window" or "Open in new Tab", How can I change it back? Or how can I omit any reference to tabs? I do not use them at all.

    You can use the Menu Editor add-on to rearrange or remove menu items - https://addons.mozilla.org/firefox/addon/menu-editor

  • Planned order not getting generated for FG

    Dear Experts,
    Planned orders not getting generated for the Finished Goods - X which is having MRP Type M0 - MPS fixing type strategy group 20 which is copied fron another FG - Y , its a new product and production plan has been updated through MC88 - Rough cut planning but the planned orders are not getting generated.
    And for the material valid production version exists with selection method 3 and individullcollective as 1.
    Please let me know what might be the possibalities and what all the key fields i need to check.
    Thanks & Regards,
    Sampath
    Edited by: sampath s on Jul 13, 2011 11:31 AM

    Dear,
    In general MPS is run for High value items ( if you use like Gold , Platimum or A class items. ).
    Always only single level is used for Explosion and planning. then only you can analyse the requirements at each stage before procurement.
    Otherwise if you run MPS to multi level, Bottom most high value will be procured without any notice to authorities. Even you may cancel the process in mid way. At that time what will happen to the procured high value material.
    So for that purpose only single item single level MPS concept is evolved.
    Fo that you run MPS at single level so that only for the first level MPS will be carried out.
    Check and revert back.\
    Regards,
    Alok Tiwari

  • Delivery 0080000276 is not relevant for transportation planning.

    At the time of (delivery related) invoice creation, system throws a message "check the error log".
    Log says:
    " Error Log             0080000276 000010 Delivery 0080000276 is not relevant for transportation planning
                LongText
                    Detail
                     Diagnosis
                         Copying control for billing requires that shipment costs
                         are copied from the shipment belonging to this delivery.
                         No shipment costs could be determined, because this
                         delivery is not relevant for transportation planning.
                     System Response
                         The system assumes that no shipment costs are to be billed
                         in this case.
                Technical data
                    Tech. data details
                     Client                                 251
                     Group Number
                     Sales Document Number                  0080000276
                     Item Number of the SD Document         000010
                     Schedule Line Number                   0306
                     Counter in Control Tables              00
                     Message Identification                 VY
                     System Message Number                  306
                     Output Type                            I
                     Message Variable 01                    0080000276
                     Message Variable 02
                     Message Variable 03
                     Message Variable 04
                     Group Type                             F "
    Please advice if anyone have any idea for this error log.

    Error Log 0080000276 000010 Delivery 0080000276 is
    not relevant for transportation planning
    It is not necessary to assign the Transportation Planning to Delivery type.  Only recently, I completed a similar configuration and running successfully for a client.  The issue is  because of your copy control VTFL.  For more information, check note 713171.
    thanks
    G. Lakshmipathi

  • HT1688 I want to order a new housing for my iPhone 4 (mine is scrathced pretty bad) I just dont trust myself to take the phone apart to do it.. If i bring it to an apple store will they change it for me ?

    I really wanna order a new housing for my iphone 4 (at&t)Ive dropped my phone a million times, and its even gone swimming
    its SURPRISINGLY not shattered, but has a ton of deep scratches in it. i saw on Amazon.com you can buy complete new housings for them, and i watched a couple youtube videos on how to change them, but i really dont trust myself changing it. my luck it destroy it and it will be garbage, and ill be left with no phone...
    question is.. Will APPLE put a new housing on it, if i buy it and bring it to them? (*i dont have apple care, or any kind of insurance on my phone*)

    No, they will only sell you an out of warranty replacement, which for the iPhone 4 is $149 (US).

  • Creating a purchase order in web dynpro for java.........

    hello all,
    i am new to web dynpro for java.i have already done an application
    "Creating a Web Dynpro Application Accessing ABAP Functions" this application
    have good document on sdn.
    this application is working fine .
    Now i got an requiremnt for creating a purchase order in web dynpro for java.
    in normal report when i call  the bapi the parameter are the header, headerx,item, itemx is an internal table.
    CALL FUNCTION 'BAPI_PO_CREATE1'
      EXPORTING
        POHEADER                     = HEADER
        POHEADERX                    = HEADERX
      POADDRVENDOR                 =
      TESTRUN                      =
    IMPORTING
      EXPPURCHASEORDER             =
      EXPHEADER                    =
      EXPPOEXPIMPHEADER            =
    TABLES
       RETURN                       = RETURN
       POITEM                       = ITEM
       POITEMX                      = ITEMX.
    i just want to know how can i fill these internal table in web dynpro
    for java to create an application accessing "Bapi_po_create" .
    Thanks

    Hi Gopal,
    I'm not sure what is your issue, it seems you're not really understanding how the Model structure works in WDP.
    I'll assume few things here, like you know how to Import the Model into the WDP, and you know a little bit about what Java Classes will represent this Model in the Project.
    Try these steps:
    1. Import your Model into the Project;
    2. Open your Component Modeler, create a Data Link between your Model / Component (Or Custom Controller, as you prefer)
      - You can also use the "Apply Template -> Service Controler"
    3. Map the Input of your Model as the Main Node, check the Input Tables (you prob. will have two, POITEM = ITEM - POITEMX = ITEMX)
    4. Also, check the Return box, since this is BAPI return (You can use to display Backend messages)
    Now you have the Model mapped into your Controller, you need to develop the Java function to execute it.
    1. Create a new Input class, like
    BAPI_PO_CREATE1_Input purchaseOrderCreateInput = new BAPI_PO_CREATE1_Input();
    2. Bind your Input Node, in the Controller, with your Input Class;
    wdContext.nodeBAPI_PO_CREATE1().bind(purchaseOrderCreateInput);
    3. Set any Import parameters you need:
    purchaseOrderCreateInput.setEXPPURCHASEORDER(XXXX);
    4. To Add references to the Table, you will perform something like:
    First, you need to know what "Structure" you need to add (POItem Structure) - You have a Java class that represents that Structure..
    POITEM_Element poItemElement = new POITEM_Element();
    poItemElement.setPROPERTY();   /// Set your Properties
    purchaseOrderCreateInput.getPOITEM().add(poItemElement);
    5. Execute your Input,
    purchaseOrderCreateInput .execute();
    Hope it helps,
    Regards,
    Daniel

  • Difference amount in sales order and billing document (For one line item)

    Hi Experts,
    User created sales order with 3 line items and billing document. but problem is that there is difference in value of sale order and billing only for line item 10. The remaining items values are same in sales order & billing doc.if I check in sales order condition I found that VPRS condition is used and the value is 692.13and the amount is 3245.26in sales order. But if suppose I check the same value in billing doc the value is 0.69 and the amount is 3245.28. Can u suggest me which configuration I have to check for this.
    I also checked change lock but there is no change in sales and billing document & Material
    Regards
    Sunina agarwal

    Morning Sunina
    Now consider this scenario
    Item a - 10
    Item b - 20
    Item c - 30
    and the validity of condition rec for item C is 31st of Jan
    after 31st JAN the record changes or there isn't any.
    In Copy control the pricing type is 'B' i.e., carry out new pricing.
    Now if the document is created in January it will take all the above prices. and this document is then billed in Feb. Now the copycontrol, whilst copying the prices, will predetermine the same.
    Now your task is to check if there was user intervention, check the pricing in order and check what condition types got affected in order and in billing.
    If your scenario is still not amongst the above cases...
    I don't know what to do, if you figure out please let us also know, god know when we would face the same scenario....
    Take care

  • What are the settings for Transport?

    What are the settings for Transport?

    u will get three panel in transport connection in BW side
    here u need to collect object and drop them to 2nd panel
    then u need to select whether u want o select all objects or only necessary objects
    select as per ur requirement hten u need to write thse object in a NEw request
    now executte nad go to Se10 and relaease sub task and main task
    now ask basis team to impot it in QAS test it and again trnasport these to Production environemnt.
    assign points if helps

Maybe you are looking for

  • VOIP Design Question in reference to DHCP

    Background: I have setup VOIP at 3 different remote sites connected via Layer 3 routing and single mode fiber. Each site has it's own voice gateway. I have it setup that the DHCP scopes for data and voice are received from our central data center off

  • New Org structure

    Hi all SRM gurus: Once again i have a question, hope you can help me: In PPOMA_BBP we've only one Purchasing org and Purchasing group assing to a central purchasing unit, all companys should use this definitions. When creating the SC system is not re

  • Old .ecs files from Sony Ericsson P900

    Hi Everyone, I saved some voice recordings of my daughter learning to read on my Sony Ericsson P900 ages ago (2005). I have a variety of back-up files for this phone (the files are titled like this: My P910 2005-02-04 23.41.32.ecs). I can't open them

  • CD Drive is active but doesn't detect discs

    Hello, I'm working on my Thinkpad T41 with Windows XP Prof. SP3 (actual updates) since some years and it worked fine. Now the CD / DVD drive doesn't read any discs. Neither inside of Windows, nor at startup. - the drive is shown in the Windows XP dev

  • Reinstalling OS to fix h/w and s/w issues

    Hello all, I understand the general consensus is to reinstall the OS to fix the popping noises in iMovie transitions (which my iMovies suffer from). I also understand the general consensus is to reinstall the OS to fix pausing/skipping in movies burn