Overlapping two operations

Dear All,
Up on making settings in customizing for reduction…
Can we overlap two operations that are in separate Routing? (For those Operations, which are in sequence but existing in separate routing)
Pavan

Hi,
Only in collective order scenario the operation of two routings can be overlapped.
i.e. In the last operation of the subordinate material routing, overlapping indicator is to be used.
This is possible from Release 4.5A onwards.Please refer the below link,
http://help.sap.com/saphelp_46c/helpdata/en/11/1a5313c48e11d1b5df0000e8359890/frameset.htm
Regards,
Senthilkumar

Similar Messages

  • Overlapping two JPanels on a JLayeredPane

    I am having some problems overlapping two JPanels on a JLayeredPane for some reason only one of them shows when I compile the program! Any help would be greatly appreciated
    The code is the following:
    import java.lang.*;
    import javax.swing.*;
    import java.awt.*;
    import java.awt.event.*;
    public class SpaceBall
    //To do the background just draw a JPanel inside another //JPanel just set the opacity of the outside one
    //to false and let
    //it hold all the components of the game
    public static void main(String[] args)
    //declaring the buttons
    JButton test=new JButton("test");
    JButton test1=new JButton("test1");
    JButton test2=new JButton("test2");
    //declaring and setting the properties of the frame
    JFrame SpaceBall= new JFrame("Space Ball");
    SpaceBall.setSize(700,650);
    //declaring the Panels
    JLayeredPane bgPanel= new JLayeredPane();
    JPanel fgPanel= new JPanel();
    JPanel topPanel= new JPanel();
    JPanel sidePanel= new JPanel();
    JPanel lowPanel= new JPanel();
    JPanel masterPanel= new JPanel();
    //adding the buttons to the corresponding panels
    fgPanel.add(test1);
    sidePanel.add(test2);
    topPanel.add(test);
    ImageIcon background= new ImageIcon("images/background.jpg");
    JLabel backlabel = new JLabel(background);
    backlabel.setBounds(0,0,background.getIconWidth(),background.getIconHeight());
    backlabel.add(test1);
    bgPanel.add(backlabel, new Integer(0));
    fgPanel.setOpaque(false);
    bgPanel.add(fgPanel, new Integer(100));
    bgPanel.moveToFront(fgPanel);
    //adding bgPanel and sidePanel to lowPanel
    lowPanel.setLayout(new GridLayout(1,2));
    lowPanel.add(bgPanel);
    lowPanel.add(sidePanel);
    //adding the Panels to the masterPanel
    masterPanel.setLayout(new GridLayout(2,1));
    masterPanel.add(topPanel);
    masterPanel.add(lowPanel);
    //getting the container of SpaceBall and adding the Panels to it
    Container cp=SpaceBall.getContentPane();
    cp.add(masterPanel);
    //displaying everything
    SpaceBall.show();
    WindowListener ClosingTheWindow=new WindowAdapter()
    public void windowClosing(WindowEvent e)
    System.exit(0);
    SpaceBall.addWindowListener(ClosingTheWindow);

    Take a look at the section from the Swing tutorial titled "How to Use Layered Panes". It has a sample program:
    http://java.sun.com/docs/books/tutorial/uiswing/components/layeredpane.html

  • Two operating systems in one computer - Running a program

    Hi.
    I have just installed two operating systems in my Thinkpad: windows 8 and windows 7. Is that possible to run a program, say Photoshop, MS Office, installed in windows 8 OS while I am running windows 7? I do not want to reinstall all the programs in windows 8 when using windows 7 because they are still in the same computer.
    I tried to clicked on a program (from W8 Program x86). It asks for serial keys. I entered but it said that i do not have sufficient priviledge???
    One more question:
    I have an external hard drive. Is that possible when I install a program on that external hard drive, instead of internal hard drive, and run from that external hard drive? I mean: I install a program on external hard drive, then run that program in external HD from other computer?
    I hope to have your insight solutions for this problem.
    Thank you
    Solved!
    Go to Solution.

    Basically all more advanced programs cannot be run this way. They utilize registry entries, app data, environment variables etc. hence are tied to the OS they are installed on. 
    Some simple applications, which don't require to be installed or have a portable version will work. This list does not include Office or Photoshop.
    The answer for the external hard drive is the same. You'll need a "portable" application, which doesn't store any OS or user specific information.
    You can look here http://portableapps.com/ for applications that are not tied to an OS.

  • Having Two Operating Systems on the same computer.

    Is it possible to have two operating system on one computer?
    I would like to have both Mac OSX 10.411 and Mac OSX 10.5 on my Power Mac G4.
    I would like to be able to access each system independently. So that I may use my
    editing software which is 10.411 compatible but not compatible with 10.5. Is this possible?
    Thanks!

    Welcome To  Discussions stevevideo1!
    Yes if you Partition The Hard Drive.
    ali b

  • BPEL with two operations

    Hi,
    Can someone help me in the below mentioned requirement ?
    I want to develop a bpel having two operations . If any one operation is called then the process instance should be created and the flow should be completed.
    Example :
    BPEL - Postpaid
    Operation :
    1.Create
    2.Update
    Thanks and Regards,
    Sachin Thakkar.

    Hi,
    Please let me know whether i have understood correctly that you have conveyed.
    Steps to follow :
    1.I have to create a wsdl with two operations.
    2.Create a bpel process using the wsdl created in step 1.
    3.Use pick activity instead of receive activity.
    If possible , then please share some document.
    Thanks and Regards,
    Sachin Thakkar.

  • Is it Possible to Overlap Two or More Video Clips at Once?

    I'm wondering if it's possible to overlap two video clips onto each other (e.g. one video of someone singing and another one of someone playing guitar). This would be similar to overlapping tracks in Garageband. Is it also possible to record over a track (e.g. record a video of someone singing as the video of someone playing guitar is being played?) If so, I was wondering how this can be achieved. Thanks!
    Message was edited by: thedude15

    iMovie Help will lead you to these (and more topics that may be of interest):
      http://docs.info.apple.com/article.html?path=iMovie/8.0/en/23568.html
      http://docs.info.apple.com/article.html?path=iMovie/8.0/en/24545.html
    G5 DP 1.8GHz w/Mac OS X (10.5.6) PowerBook 1.67GHz (10.4.11)   iBookSE 366MHz (10.3.9)  External iSight

  • Two operating systems on X61s

    Can I install WinXP on a pre-installed Vsta Basic X61s? Any experience in having two operating systems on X61s?
    Please give me some thoughts on this, thanks.

    Here's the link to Apple's free Boot Camp, if you want to download and try that out:
    http://www.apple.com/macosx/bootcamp/
    You'll then need a copy of MS Windows to install.
    Hope that helps

  • Two operating systems with mountain lion

    Is it possible to install two operating systems on a mac running OS X Mountain Lion?
    I would like to setup Snow Leopard and keep Mountain Lion on seperate partitions.
    Can this work?

    As long as your Mac shipped with SL or less you can do it. You'll need to put SL on another drive or partition your existing hard drive. I prefer a seperate drive. Then when you need SL just boot from your SL drive.

  • Can Two Operating unit share one Inventory Org in Oracle 11i?

    Can Two Operating units share one Inventory Org in Oracle 11i?
    We have business scenario where we need to create multiple Operating unit but both of them uses a single Inventory Org.
    Is this possible in Oracle 11i?

    Thank You Pranit for your response.
    Can you please let me know the reason also?
    We are having only one master inventory Org.
    Thanks
    Vijesh CV

  • Assignment of single component of BOM on two operations

    Dear All,
    Can anybody guide me how can i assign a single component of BOM on two operations. i.e, suppose component A is used in a BOM and qty is 10 KG. now 7 kg os this component is used in operation 1 and 3 kg in other. so in routing how can i assign. Please dont give me the solution of two line items in BOM as i think it is not proper way. thanks

    May not be proper, but may be the only one...

  • Resource assignment for two operation

    People!!!
    Please help
    There are two operation:
    Check book duration 2 days
    Read book duration 2 days
    For 1<sup>st</sup> operation I would like to assign two Inst technicians
    For 2<sup>nd</sup>  operation I would like to assign two Inst technicians
    12 hours is working hours for both operation but two technicians work 6 hours for operation 1, and 6 hours for operation 2 on the second day of work
    How to assign them properly, the system currently calculated the total hours as 96 hours but it must be 72
    Your prompt feedback is highly desirable))))

    How many hours per day are working time in your schedule?  It sounds like you have a 24 hours scheduled set up.
    If I have a 12 hour per day schedule (8 am to 8 pm) Sunday through Saturday I show this:
    Check book - duration = 1.5 days  starts Jan 25 at 8:00 am ends Jan 26 at 2:00 pm
    Read book - duration = 1.5 days start Jan 26 at 2:00 pm ends Jan 27 at 8:00 pm
    Both resources are assigned to the task for 18 hours of work.
    In total there are 24 hours of work for Jan 25 (all on Check booK), 24 hours of Work on Jan 26 (12 hours on Check Book and 12 Hours on Read Book), and 24 hours of work on Jan 27 (all on read book).
    Task are auto scheduled.

  • How can I overlap two clips in final cut

      I am shooting a music video and I want the actor to appear in two spots in the same shot. I shot some test footage today and I set the camera in one spot for both shots. Shot 1 I told him to stand on the right side of the frame for awhile, cut it and then took another shot with him on the left side of the frame. How can I now overlap the two clips in final cut so that i see him on both the right and left sides of the frame at the same time. Thank you so much in advance!!!!

    I apologize if I didn't originally understand your question.  It sounded like you had recorded two scenes with the same camera set in the same place for each scene; one scene with the talent on the left and the other scene with the talent on the right.  And now you wanted to show both shots at the same time so that the talent will be seen on both sides of the screen.  To do that, follow my original instructions above.
    But if I did misunderstand, please rephrase what it is you're trying to do.
    Thanks,
    -DH

  • Overlapping between operations in PPDS

    Hi,
    I have one finished product and it has 2 semifinished products as components.If we run PPDS.Now my finished product 1st operation starts after completion of 2nd semi-finished product.But my requirement is finished product should not wait till arrive all its components.Finished product also starts its planning along with its components with some overlap in time.How to acheive this in PPDS?What setting to be done to acheive this?
    Thanks&Regards
    Venkadesh

    try to use an offset in the ppm of the FERT to overlap with your semifinished components...in the FERT ppm select your components and enter an offset.

  • Overlapping two tables in adobe form

    Hi
    I have a requirement to print details based on different bill numbers in different pages. 
    I have two internal tables 
                    1. it_inrt  containing two fields 
                    2. it_prts containing four fields  .
    Tthese two tables are looping separately. during program execution it_inrt overlaps it_prts. my question is that how to prevent this overlapping i want to print it_prts only after printing all rows of it_inrt and the excess rows will continue in  the next page.
    Please help me to solve this problem.

    Hi,
    You have to 2 internal tables right,
    You have to print the data which is in First internal table and same for second internal table..
    Place thes to tables(one after another ) in Desgin page of - Adobe forms..
    Under page there is  Untitled content area and renamed as ( page area 1)
    In hierachy tab -  By default you will see the Untiled Subform page ( Here drag the First Internal table to here and change the   subflow as flowed ,pagiantaion as continued in untitled area). add another internal table to this form..
    create a new page with only Untitled content area and renamed as ( page area 2)
    Steps:
    Select Untitiled subform - under pagination - Place Select ( In content area of page area 1 )
                                              if dataset must be paginated -  overflow to ( Go to content area of Page area 2 )
                                            - under subform - make the content as flowed and check the allow page breaks within content.
    Regards,
    PraVeen
    Edited by: praveenreddys on Feb 21, 2012 3:53 PM

  • Install SSD, running macbook pro with two operating system and two hardrive

    I am currently running bootcamp with Window 8 and Mountain Lion. I am about to install a 256gb SSD, replacing the optical drive. The partition on my current setup is 125 gb for window 8 and 125 gb for OSX.  Since this is the first time I am running a computer with two hardrive and two different operating systems, how should I go by installing (software) my SSD. Should I just make one hardrive run window and the other one run OSX. Is it possible to move the OSX partition to the SSD. Should I just install both window and OSX again on the SSD? What are some other options?

    It is possible, use Target Disk Mode How to use and troubleshoot FireWire target disk mode - Apple Support

Maybe you are looking for

  • What's the difference between Action Objects and ActionListeners

    Hello, in the Introduction to JSF two ways handling action are demonstrated. One way is "Combining Component Data and Action Object" the other way is "Handling Events." What's the difference? When do I use this or that way? The one thing I understand

  • When manually creating delivery notes, the Actual GI time ?

    Hello, When manually creating delivery notes, the Actual GI time (used for pricing determination) is set to the document creation time (CPU time) but expressed in the UserId's local time zone. Regards, Neel

  • Two Sender System and two Recievers Systems

    Hi . 1) In my scenario I have 2 sender JMS  systems and one JDBC receiver and one File receiver system in a single scenario. 2) Based on a key field SEND_FLAG in the JMS message of the sender,data will be forwarded to  either JDBC or File . Hear i ca

  • Itunes won't open via wifi

    Anyone else have this issue or is it just a local issue on my end?

  • How to pass two parameters to sql query

    I try to create a sql script to update two columns in one table. I want to set it as parameter. When people execute this sql script, they need to pass parameter into sql query, then query will be executed successfully. The problem is I am only able t