Hello Experts,
Can some tell me where we enter the start and end dates of a posting period in a fiscal year which is a year dependent and a non-calendar year?
For ex: Jan 2008, I have to mention the start and end dates of the fiscal period January, because ours is not a calendar year and so the jan 1st and Jan 31st do not correspond with the January's posting period dates.
Regards,
Sriram

Hi Sriram,
As Vj suggested, go to transaction OB29.  Then select the fiscal year variant and upon selection the variant, click on "Period".  This will open up dialog box asking for the fiscal year for which you want to configure.  Enter the fiscal year and hit enter.  This will open up the calendar table to enter the period entry which has 4 columns: Month, Day, Period and Year Shift.
Make sure you are entering the correct Year Shift.  Logic for the Year Shift is as follows.
+1 if the fiscal year is later than the calendar year
-1 if the fiscal year is before the calendar year.
0 if the fiscal year is same as the calendar year.
One example of year shift:
Say, if you are configuring the fiscal year 2007 (April 2007 to March 2008), then January 2008 is your 10th period.  Here you hare to enter -1 in Year Shift Column only for January to March (10-12 period) as your fiscal year 2007 is less than the calendar year 2008.
Hope this helps.
Pls. award points if this is useful.
With Regards,
Chirag

Similar Messages

  • How to determine current period start and end dates

    Hi All,
    If given previous period start date and end date, how to determine current period start date and end date?
    Suppose if given previous period start and end dates are 12/28/08 - 01/30/09, then current period start date and end date will be 01/30/09 - 02/27/09. (where 12 is the previous period, 28 is the day, 08 is the year......)
    Can you please suggest an FM to determine the current period dates?
    Thanks & Regards
    Gowthami

    >
    gowthami karunya wrote:
    > If given previous period start date and end date, how to determine current period start date and end date?
    > Suppose if given previous period start and end dates are 12/28/08 - 01/30/09, then current period start date and end date will be 01/30/09 - 02/27/09. (where 12 is the previous period, 28 is the day, 08 is the year......)
    Hello,
    I am assuming you have the Company Code with you & proposing this solution.
    TABLES: bkpf.
    PARAMETERS:
    p_bukrs TYPE bukrs.
    SELECT-OPTIONS:
    s_date FOR bkpf-budat.
    DATA :
    l_perio LIKE bkpf-monat,
    l_poper TYPE poper,
    l_year  LIKE bkpf-gjahr,
    l_spmon TYPE spmon,
    l_periv TYPE periv,
    l_date1 TYPE datum,
    l_date2 TYPE datum.
    CALL FUNCTION 'BAPI_COMPANYCODE_GET_PERIOD'
      EXPORTING
        companycodeid = p_bukrs
        posting_date  = s_date-high
      IMPORTING
        fiscal_year   = l_year
        fiscal_period = l_perio.
    CONCATENATE l_year l_perio INTO l_spmon.
    * Get the next period
    IF l_perio < 12.
      l_perio = l_perio + 1.
    ELSE.
      l_perio = '01'.
      l_year = l_year + 1.
    ENDIF.
    MOVE l_perio TO l_poper.
    SELECT SINGLE periv INTO l_periv
    FROM t001
    WHERE bukrs = p_bukrs.
    IF sy-subrc = 0.
      CALL FUNCTION 'FIRST_DAY_IN_PERIOD_GET'
        EXPORTING
          i_gjahr        = l_year
          i_periv        = l_periv
          i_poper        = l_poper
        IMPORTING
          e_date         = l_date1
        EXCEPTIONS
          input_false    = 1
          t009_notfound  = 2
          t009b_notfound = 3
          OTHERS         = 4.
      IF sy-subrc <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
      CALL FUNCTION 'LAST_DAY_IN_PERIOD_GET'
        EXPORTING
          i_gjahr        = l_year
          i_periv        = l_periv
          i_poper        = l_poper
        IMPORTING
          e_date         = l_date2
        EXCEPTIONS
          input_false    = 1
          t009_notfound  = 2
          t009b_notfound = 3
          OTHERS         = 4.
      IF sy-subrc <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
      WRITE: / l_date1, l_date2.
    ENDIF.

  • Define the start and end dates of an assigned academic period in fee calc.

    Define the start and end dates of an assigned academic period
    Message no. HRPIQ00ACCOUNTING132
    Diagnosis
    The academic calendar assigned to the top organizational unit does not contain a start or end date for the academic period (academic year and session) assigned to fee calculation period Z000.
    System Response
    The system will skip fee calculation period Z000 and continue processing with the next fee calculation period.
    Procedure
    1. Check which academic calendar is assigned to the top organizational unit.
    2. Check which academic period is assigned to fee calculation period Z000. You check this setting in Customizing for Campus Management in the IMG activity Assign Academic Years and Sessions to Fee Calculation Periods.
    3. In this academic calendar, create the start and end dates of the relevant academic period using standard time limit 0100 (standard duration of academic period) or a corresponding user-defined time limit.
    For more information, see
    Define Top Organizational Unit
    Define Mandatory Time Limits for Academic Calendar
    please give me the needful information to solve this problem.
    Regards
    Arun Rai

    Arun,
    Have you looked in the Student Accounting Cookbook  
    http://www.sdn.sap.com/irj/scn/advancedsearch?query=studentaccountingcookbook   on page 13? 
    Page 1-18 will help you setup the Oranizational unit, the academic calendar and the modules.
    Bev beck

  • Function module to derive start and end dates from fiscal year and period.

    Hi,
    I want to know a function module to derive start and end dates from fiscal year and period.
    ie: If I have say fiscal year '2010' and period '07', then the start date of this period would be '01.10.2010'.
    Thanks.
    Moderator Messge: Basic Date questions are not allowed.
    Edited by: kishan P on Oct 18, 2010 4:45 PM

    Hi,
    This is one of my exit that display the calmonth (offset -12). Usefull when I have to retrieve in a KF a complete rolling year depending one calmonth.
    S_VMUCMN is my selection variable
    S_TXTCMN_M12 is my text variable calmonth-12
    S_TXTCMN_M0 is my text variable for selected calmonth.
    WHEN 'S_TXTCMN_M12'.
        IF i_step = '2'.
          LOOP AT i_t_var_range INTO loc_var_range WHERE vnam = 'S_VMUCMN'.
            CLEAR l_s_range.
            " First day of the selected month
            CONCATENATE loc_var_range-low '01' INTO l_calday.
            CALL FUNCTION 'YFRBW_FUM_CAL_DATE_IN_INTERVAL'
              EXPORTING
                date      = l_calday
                months    = 12
                signum    = '-'
              IMPORTING
                calc_date = l_calday.
            l_s_range-low = l_calday+0(6).
            l_s_range-sign = 'I'.
            l_s_range-opt = 'EQ'.
            APPEND l_s_range TO e_t_range.
            EXIT.
          ENDLOOP.
        ENDIF.
    Thus, in KF header you have to put the two text variable to display the complete period.
    Hope it helps,

  • Report for Validity Start and End Date in PO

    Dear All
    Is there any report where I can get PO validity start and end date which user input in addtional data header tab of PO?
    Regards
    Satish Kumar

    Hi,
    Yes, It is available standard report using T-code ME2N - Purchasing Document (PO) Per Document Number, enter the T-code and provide the following input data's are as follows.
    Scope of List                 :  ALV ( for Ms-Excel format report)
    Plant                               :   __________ to __________ (if required)
    Document Date              : ____________ to ___________ (if Required)
    Execute the report shown by default in excel format and if required PO validity start and end data, you have to select Change Layout button and open new window options screen right side field option as Validity Per.Start, Validity Period End, Commutative number field data's are selected and click <--- arrow button and then click bottom tick marked button. Now, the report shown your requirement.
    Hope, it is useful for you,
    Regards,
    K.Rajendran

  • Contract Start and End Dates in Sales Order

    Hi
    I have a situation where a service item is bundled with a deliverable item. The order is as follows
    Line Item    Mat                                                                 Qty            Higher Level Item               
    10              Item No.1 (Physical Item)                                  1             
    20              Item No.2 (Service Item)                                    1               10
    For the deliverable item 10 , Revenue is recognized immediately. For the Service item no.20 , revenue needs to be recognized over a period of 1 Year (It is a 1 year service contract).
    The whole order is created via BAPI from an external 3rd party order capture system.
    In order to do revenue recognition properly for service items , SAP I believe has 2 options
    1. Based on Billing plan dates
    2. Based on contract start dates
    Since order with both the line items need to produce 1 invoice, I cannot use billing plan . The only other option is to use contract start and end dates. I have enabled contract data at the sales order level. So when I enter the contract start and end dates manually at the line item level and set the item category to recognize revenue based on contract start and end dates based on time-based revenue recognition it is working fine.
    But I need a way to automate the population of contract start and end dates at the line item level. My ABAP guy is not able to find a user exit that can change the XVEDA or any VEDA structure in any of the user exits.
    I guess the SAP SD gurus out there would have definitely dealt with a situation of product bundling (Service and non-service items in the same sales order with one billing document , but seperate revenue recognition for service and non-service items)
    Please help.
    Thnx
    Siva

    Hi Siva,
    Kindly let me know what criteria you want to give for automatic population of start date of contract...
    Standard SAP comes with a few baseline dates for contract start date and we can control this from customization itself. 
    01     Today's date
    02     Contract start date
    04     Acceptance date
    05     Installation date
    06     Date contract signed
    07     Billing date/Invoice date
    08     CntrctStDate+contract duration
    09     Contract end date
    If you have some criteria which is not covered here, then let me know and i will try to provide some help then.
    Thanks
    Kapil Sharma

  • Hyperion Planning dynamic forms based on start and end date across years

    Hi All,
    I have a requirement where i need to be able to view a form showing periods across years that are dynamically built depending on the start and end dates. If i have a start date of 01/11/2009 and an end date of 31/7/2013 i want to be able to view a form that shows all of the periods (Jan,Feb etc) in a form that is driven by these dates, in addition it will need to show the actual scenario up to the current month and the forecast from the current month to the end date. So basically if a user inputs the start and end dates the form will display the relevant periods driven by these dates.
    Any tips very much appreciated!

    Hello,
    This is difficult to realize, but you can get quite far with a workaround. The first question is, where do you want to input your selection of time periods? Assuming you have a webform with the complete timeline in months and years and you type in the start period and end period.
    Webforms have the option to suppress rows and columns.
    This can be extended with option of empty cells or not empty cells.
    You will need to apply your creativity on this.
    Put every month-year combination in a column and add the suppression.
    Calculate the timeline between start period and end period with a dummy member, so data exists for these and columns will show.
    Maybe you will need to copy the required timeline into a separate version for this, to avoid having periods which were outside the selection and still have data.
    I hope these hints help a bit in this challenge.
    Regards,
    Philip Hulsebosch
    www.trexco.nl

  • Reduce Working Days by Emp Start and End Dates

    I'm banging my head trying to get this working. The set-up:
    DimResources table with various employee information including a Start and End Date.
    A Calendar table with FullDate, Year, Quarter....WorkingDays (1 for working and 0 for non-working) and WorkingDayNumber (working days increased by 1, weekends are not).
    Page View report with page view filters for Business, Role, Month, Week, Year.
    In the calculation the denominator is total working days for the period * 8. Works great. Further reduced by any submitted time off. Again, so far so good. The part I'm having trouble with is trying to further reduce total working days by
    the number of days the person wasn't available in a month, defined by the person's start or end date.
    The calculated field works great when only 1 person is selected. As soon as more than 1 person is selected or the slicer is cleared, an error is thrown.
    Any ideas on what is wrong or better ways to accomplish what's needed?
    TotalWorkingDays2CF=CALCULATE
     SUM(Calendar[WorkingDays]),
                    FILTER(Calendar,Calendar[WorkingDays]=1),
                    Calendar, DATESBETWEEN(Calendar[FullDate],SUM(DimResources[Start Date]),SUM(DimResources[End Date]))
    Error:
    <detail>
      <ErrorCode>rsErrorExecutingCommand</ErrorCode>
      <Message>Query couldn't run for dataset 'Tablix41DataSet'.</Message>
      <ProductName>Power View</ProductName>
      <ProductVersion>11.0.2150.3</ProductVersion>
      <MoreInfo>MdxScript(Model) (10, 27) Calculation error in measure 'Calendar'[TotalWorkingDays2CF]: An invalid numeric representation of a date value was encountered.</MoreInfo>
    </detail>
    Dennis DeRobertis

    ok, but this is not a running total but just a sub-total/grand-total
    so what you can do is the following:
    create two measures - first calculate the workdays per ressourcen and second use SUMX() to get the sub-/grand-total if multiple employees are selected (e.g. subgroups, groups,division, etc)
    WorkdaysRessource:=CALCULATE(
    COUNTROWS('Date'),
    FILTER('Date',
    'Date'[Date] >= CALCULATE(MIN('DimResources'[Start Date]))
    && 'Date'[Date] <= CALCULATE(MIN('DimResources'[End Date])))
    Workdays:=CALCULATE:=SUMX(
    'DimResources',
    [WorkdaysRessource]
    hth,
    gerhard
    Gerhard Brueckl
    blogging @ http://blog.gbrueckl.at
    working @ http://www.pmOne.com

  • How to change Validity Start and end dates on a lane ?

    Hi,
    I am trying to change Validity start and end dates on a lane for a product specific assignment.
    What I see is as follows
    1) Lane created by system /others I can delete and give the required start /end date ?
    I want to know if I can change the end date without deleting the lane as its tough to delete a lane in production.
    Thanks
    -Venky.

    Hi,
    we can change the start period and end period in the Transportation lane using the table /SAPAPO/TRPROD.
    And then using the update command you can change the start time and end time of the product.
    Regards,
    Hyma.

  • Product View - Start and End dates

    Hi,
             I have a material that is externally procured from a vendor to a location. In product view, I have few purchase requisitions. When i double click on it, it takes me to the details of PR. I am trying to understand what start and end dates of the PR are.
    For some PRs, the start and end dates are same but for some there are is some times a day or two and even 3 in some cases.
    I am wondering what makes the end date differ from start date.
    There is a safety day's supply of 2.5 days
    We have a transportation lane with transportation duration 23hrs.
    Any of these play any role in the end date delay?

    Hi,
          Thanks for the reply. The vendor and the receiving location have a transportation lane defined.
    What do you mean by the  time duration that shows up in the T Lane corresponding to the inforecord?
    Here are the times I see in transportation Lane;
    Product Specific Transportation lane:
    GR processing times (checked) : (No value defined) days
    Planning Horizon: 0 days
    Partner Horizon: 0 days
    Horizon for Expctd receipts: 0 days
    Horiz. Fut. Aval. Whse Stck: 0 days
    Planned Delivery time:  (No value Defined)
    Means of Transport
    Tsp. duration: 23 hrs
    Bucket offset: 0.5
    Period factor: 0.5
    and no other times defined.
    Are any of these effect the delay?
    My ECC is EST and the timestream is EST. Should I change the product view (also my own data) to EST or UTC??
    I have a product that has no delay between the start and end dates. The difference I see between the one that I am having problem (the start and end dates are apart ( I'm calling it bad one) by atleast a day) with and the one that has no delay(I'm calling this good one) between the start and end dates is the "Planned Delivery time.
    The good one has 1 day and the bad one has nothing defined.
    Does this make any difference?
    Thanks.
    Edited by: Raj G on Jul 17, 2008 3:36 PM

  • Effective start and end dates for a compensation workbench plan

    Hi all,
    We are having a requirement where we want to get the data respective to current plan for reporting purposes. What i have noticed is there is no such thing as effective_start_date and effective_end_date directly in all the cwb tables.
    The different dates we are looking at to capture the data are
    enrt_perd_start_dt and enrt_perd_end_dt
    upd_strt_dt and upd_end_dt
    within_yr_strt_dt and within_yr_end_dt
    But we have same plan with different enrollment period and start dates. We are planning to use max(data_freeze_date or lf_evt_occrd_dt) to get
    the records.
    select max(nvl(bcpdx.data_freeze_date, bcpdx.lf_evt_ocrd_dt))
    from ben_cwb_pl_dsgn bcpdx
    where bcpdx.pl_id = p_pl_id)
    Catch with this is, We have 62 business groups off which only 50 might run the plan next year and ohters might not. in that case it will also return data for all the BG's including the 12 BG's where plan has not been run for that year.
    Any suggestions or help will greatly be appreciated.
    Thanks
    Hari

    Hi Ankush,
    I am also of the same opinion. Start and end dates can probably be enforced by a policy condition in AM but would lead to proliferation of policies as we would end up creating policies per role entitlement duration for a user.
    Any thoughts on whether the sunrise/sunset concept of Identity Manager can be used for this requirement.
    Thanks,
    Srinivas

  • Prorating Wage Type in IT0014 based on start and end dates

    Hi experts
    I have a scenario wherein I want to prorate a Wage type according to the start and end dates in Infotype 0014. I have tried setting the Processing Class 10 to 1. When I do this, the system prorates according to the start date. Example:
    If the start and the end dates for wagetype 4000 are: 24.05.2014 to 31.12.9999, amount is 1000 and the payroll period is May'2014, then amount calculated is 258.06, which is correct.
    If however, the start and the end dates for wagetype 4000 are: 01.05.2014 to 24.05.2014, amount is 1000 and the payroll period is May'2014, the system generates the amount 1000, which is incorrect.
    How can we handle this? Please help.
    Regards
    Divya Tiwari

    Hi Divya,
    Please check the below mentioned pcr's in your system.
    UW14 and X011
    Check above mentioned pcrs in subschemas INBD,ZNAP and share me the existing pcr's screenshot in your system.
    Regards,
    Haranath

  • How to input my own Validity Start and End Dates in ME21N

    Hi All,
    I have to change the Validity Start and Validity End date in Addiitional Data Tab of ME21 transaction( PO Create ) using default Customer Values.How Can i accomplish it?
    I have used the BAdI ME_PROCESS_PO_CUST and implemented it, I have coded in the method PROCESS_HEADER.First I retrieved the data using get_data( ) method, changed the values with Customer Values and called the method set_data( ).
    However my validity start and End Dates and not changing.
    Even in ME21N if I create the PO with my own Validity Start and End dates, and go to ME23N to display the created PO, still in the additional data tab, the start and End dates are current date and Next date respectively.why its happening?
    Thanks in advance

    Hi,
    Can you please let us know in which business scenario this is required.
    SAP has provided separate functionality of Outline Agreement for considering validity period.
    If you let us know the business scenarion some solution/workaround can be suggested.
    Regards

  • SNP Planned order start and end dates are not calculated correctly

    Hello SNP Guru's
    The SNP planned orders generated after the Heuristics run, have a start and end date based on the Activity Duration (Fixed), while the resource consumption is based on the Bucket Consumption (Variable), which is correct.
    The Activity Duration (Fixed) is based on the BOM Base Quantity. So if the Activity Duration = 1 day, and if the order quantity is more than a day, the start and end dates, still shows as 1 day. So no matter what is the order quantity, the start and end dates is always = 1 day.
    Does anyone have any experience in implementing any code to change the start and end dates on SNP Planned Order?
    Seems like it should work as standard.
    Am i missing something?
    Thanks,
    Mangesh

    Dear Mangesh,
    SNP is a infinite planning tool. If you have defined fixed duration to be 1 DAY in the activity, no matter how many quantity you input for your planned order, the order will last for one day. If the resourced is overloaded, you then run capacity levelling to
    banlance the capacity. What your expected beahavior happens in PPDS planning.
    Claire

  • URGENT REPORT START AND END DATE

    GUYZ help me how to generate a report with start date and end date, two text item or calendar rpresent start and end date, it will generate only the start to end date... plzz put the code guyss..
    this is my code when i call my report in runtime only in client server .. i want to generate it wit start and end date but dunno newbie ..
    Declare
    v_Rep varchar2 (30);
    repid report_Object;
    begin
    repid:=find_report_object('dept');
    v_rep:=run_report_object(repid);
    end;

    Check this sample Code..
    DECLARE
    pl_id ParamList;
    pl_name VARCHAR2(10) := 'repdata';
    BEGIN
    pl_id := Get_Parameter_List(pl_name);
    IF Id_Null(pl_id) THEN
    pl_id := Create_Parameter_List(pl_name);
    Add_Parameter(pl_id, 'P_STARTDATE', TEXT_PARAMETER,:BLK_CTRL.P_TODATE);
    Add_Parameter(pl_id, 'P_ENDDATE', TEXT_PARAMETER, :BLK_CTRL.P_CURRENCY);
    Add_Parameter(pl_id, 'PARAMFORM', TEXT_PARAMETER, 'NO');
    ELSE
    Destroy_Parameter_List( pl_id );
    END IF
    RUN_PRODUCT(REPORTS, 'D:\MMRROLDL.RDF' ,SYNCHRONOUS, RUNTIME, FILESYSTEM, pl_id ,NULL);
    END;

Maybe you are looking for