Planning Application stuck in limbo

Essbase/Planning 9.3.1.
When administering the application view in EPMA, I have 1 application that validates properly, but the "Deploy" option stays grayed out. (Long story, must be a broken link somewhere from oracle data backups and restores). I don't have the option to "Delete" the application either.
I did a "Duplicate", and the copy of it will Validate, Deploy, Delete, etc.
How can I rename these applications so the one that will deploy is the name that I need it to be?
Is it as simple as renaming the C_APPLICATIONA_NAME element in the DS_APPLICATION table?
Any other ideas?
TIA,
Robert

Alp,
The epma table deletes worked as you stated. the hyp_plng deletes however are giving me foreign key violations. Are there other deletes that need to occur?
Here is the error I am receiving...
Error starting at line 1 in command:
delete from hspsys_application where app_id = 46
Error report:
SQL Error: ORA-02292: integrity constraint (HYP_PLNG.FK_HSP_APP_ID) violated - child record found
02292. 00000 - "integrity constraint (%s.%s) violated - child record found"
*Cause:    attempted to delete a parent key value that had a foreign
dependency.
*Action:   delete dependencies first then parent or disable constraint.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

Similar Messages

  • Can't restore 9.5, can't uninstall, stuck in limbo!

    I should have known better. I had acrobat 9.5.2 installed, and was perfectly happy with it. I could view PDF docs, and scan from my scanner directly to a PDF document. Then after weeks of the updater reminding me, I finally let X1 install. Much to my dissapointment I could no longer scan directly to PDF fioles from my scanner. So all I wanted to do was "go back", and this is where the trouble started. My machine is Win-XP pro SR3. I used a windows restrore point to go back to the day before my X1 upgrade. After doing that, acrobat 9.5x seemed to work again, and I could now scan to PDF again from my scanner. I thought I was done. But then, after viewing a document in acfrobat, I realized that a lot of features wouldn't work, and I'd keep getting complaints about plugins missing. So next, I downloaded the full install for Acrobat 9.5.2 from adobe and tried to install from scratch. It would get tp about 96% complete, and then fail with a box saying "the product is already installed". So next i went to the windows control panel and tried to remove acrobat, figuring it would install better if it was first completely removed. But the uninstall failed. Upon attempting to eremove acrobat (listed as adobe reader 9.5.2), an alert comes up saying "The patch package cannot be opened". So now I'm stuck in limbo, and I'll probably need some expert help to manually remove the product from my system, or find a way to fix it. Naturally when I got on the adobe chat line, I was basically told they wouldn't support anything but the latest product.

    Well thanks. Good to know its a registry cleaner, because cleaning up all remnants of an applications registry entries by hand is very tedious. But a registry cleaner is not a full uninstall, right? And for now, as i said, I did manage to fix my 9.5.2 installation.
    As far as the the versions and names, I've probably added to the confsion here, but in my defense let me explain that if you give me a product and call it "X", and after some upgrade it becomes known as "Y", you can see where a customer like me would be challenged to not think of them the same thing. And this time a programmer may have missed an instance of the name "acrobat" when the code base was borrowed. You see, it is indeed Adobe Reader 9.5.2 when you pull down the "help->about" menu. But, I also have an all-in-one Lexmark printer that has scanning capability, and when you use it, it downloads a list of available applications from the target computer that can accept the raw scan data. ACROBAT READER was one of them, and thats what "Adobe Reader" broadcasts to the scanners as an available scan application. This is what I've always used to scan documents and convery them to a PDF file.
    So... when I first upgraded to Adobe Reader X1, I lost my ability to scan to "Acrobat Reader" after it deleted files related to "Adobe Reader 9.5.2". And just FYI, it was NOT replaced by a new Adobe Reader scan application, so I lost my ability to "scan to PDF". When I subsequently backed out X1, and restored (and subsequently repaired) Adobe Reader 9.5.2, everything worked fine again, including the ACROBAT Reader option broadcast to my scanner (printer). So just to be clear, it is Abobe Reader 9.5, (and several versions prior incidentally ) that has carried over the word "acrobat", by sending this name as a potential scan application target to my scanner.
    I'll be happy to provide you any other particulars you might want, if it might help others in product support. But as for my current issue and situation, the problem was solved, even if by a round about way. Now I certainly would try completely uninstalling it and re-installing from scratch when I have time and have a clone ready to reverse whatever happens if it doesn't work out. But the fact is I still can't! The add/remove programs operation in my control panel still says that "patch package" is missing when I try to do an "uninstall" or "change", and you've just told me that the cleaner will only clean the registry. So it seems I have a situation where at this point, my adobe reader 9.5.2 works, and the only thing I can't do is uninstall it. Remember I mentioned that the X1 install attempt merilly deleted tons of files, and I geuss one of them was the uninstall script.

  • LCM import of Planning Application Hangs with "In Progress Status"

    Hi,
    LCM import of Planning Application Hangs with "In Progress Status" . its already couple of hours. Earlier it was always within 10 mins.
    Any advise is appreciated.
    Regards,
    Vineet

    It is probably worth trying again, may be useful to first bounce the services.
    If it happens again after bouncing the services then investigate at what staging it is getting stuck at.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Weblogic Integration 9.2  task plan editor stuck up

    Hi,
    I am trying to create a taskplan file i.e .task file in weblogic workshop for bea weblogic platform 9.2.During the creation the task plan editor stuck up.
    The following is the message in problem window of weblogic workshop
    IWAE0033W The module WorkListWeb_WLI_ComponentBeans in enterprise application project WorkListEAR is not mapped to a workbench project.Use the application editor to correct
    Let me know if any one has faced this type of problem.
    Any type of help is appreacible.
    Thanks in Advance
    Regards
    Bishnu
    Edited by bishnu_kumar at 12/12/2006 4:53 AM
    Edited by bishnu_kumar at 12/12/2006 4:57 AM

    Hi Bishnu,
    I am too getting the same issue.Please let me know if you find the solution of it.

  • Can you copy Classic Planning Applications?

    Hi,
    Is it possible to take an existing Classic Planning application, and make a copy (or duplicate version) of it? For Essbase applications, this is a simple process in EAS, just right click the application and hit Copy. However, while this method will copy a Planning applicaiton's outline in EAS and nominally show a new application in Enterprise View, it does not actually create another application in the Planning workspace. This makes sense, because the process for creating Planning Applications is not done in EAS. There are two questions I have, and an answer to either would be appreciated. First, is it even possible to make a copy of a Classic Planning Application, in order to allow two different admins to work seperately in two independent applications that both begin with the same dimensions, outline hierarchy, data forms, task lists, user provisions, and initial data set? Second, if it is possible, what is the process, or could someone point me in the direction of where I may find this in guides? Thank you.
    Edited by: user3x3 on Apr 9, 2009 6:55 AM

    Thanks,
    I am a bit confused by what you mean when you say "replace SQL repository". I am not very experienced in this area, I am using SQL Developer to access the RDBMS. Could you explain what the steps are for this? I can find the tables that are created when a new Planning App is made, but I'm not sure what they mean, so the more specific you can be, the more helpful it would be.
    Also, when in Shared Services, I select the artifacts I want to migrate, and then click Define Migration, bringing up the Migration Wizard. However, after I select the source (which is the Old Planning App), I click next to select the target, and the screen goes blank white and seems to be stuck. I can exit out of the screen, but I have let it load for 20 minutes now several times, and it just stays on this blank white screen, like the Migration Wizard has frozen. Any ideas of what might be causing the Migration Wizard to go blank?
    *Additional note:  I am also no longer able to check the Artifacts box for Relational Data in Shared Services for any of my applications, and am not able to open up the Tree to expand it.  The artifacts for Plan Type, Configuration, Global Artifacts etc. can still be selected.
    Edited by: user3x3 on Apr 10, 2009 7:32 AM
    Edited by: user3x3 on Apr 10, 2009 7:33 AM

  • Planning Applications

    Following the developers' guide on 'Business Planning and Analytical Services' for 2004S we got stuck on assigning custom Commands for Planning Applications in WAD, which were created in the planning wizard.
    The option for 'Commands for Planning Applications' does NOT show up in the command wizard!
    is there a ABAP/Java stack pre-requisite for this or is there a new(?) authorisation object missing?
    Does it helps for others? On which Java Stack

    Check OSS note 948336.

  • Multi Currency planning Application(Xchange rate not pushed to Essbase)

    In planning Application "ABC"
    If i change the values manually in "EXCHANGE RATE TABLE"
    after i refresh the data into the Essbase
    and run "HSPCRTB"
    the value changes in the Spreadsheet... (i.e Exchange rates are visible)
    But when i follow the same process for the n Planning Application "XYZ"
    The Spreadsheet is not showing the Xchange rate values..
    "XYZ" this application is built 2 years ago but.. this is the first time i am using for currency.
    i.e Exchange rates.. values to input
    Is there anything i need to do for the first time when i input the FX rates and push into the essbase?
    Can you please suggest me for further process of
    "Xchange rates to be visible in Essbase" ?
    Edited by: 838300 on Oct 18, 2011 11:24 AM

    Hi Jay,
    Thanks for the Reply,
    Both of them are Multi currency Applications, i used Exchange rate table in both the applications
    and also the rates are assigned to scenarios and after the refreshing the Database,
    there is only one default currency script generated in EAS console for each DB, i.e "HspCRtB"
    I run that script after i refreshed
    But the rates are not populated into the essabse cube.
    I am stuck over there... please do give me suggestion if u find anything else left out, that i missed.
    thanks for reply once again.

  • Planning application deployment error (unable to create schema)

    Hi,
    I was trying to deploy a planning application and got stuck at the deployment step (the validation wen't through fine). During deployment the job aborts giving the following error : Unable to create Scehma for application. Exiting Application Creation.
    Can anyone suggest what could be the issue here. Appreciate the help.
    [Sep 8, 2010 2:06:07 PM]: Parsing Application Properties...
    [Sep 8, 2010 2:06:08 PM]: Application Configuration Properties...
    [Sep 8, 2010 2:06:08 PM]: Parsing Dimensions info...
    [Sep 8, 2010 2:06:08 PM]: Creating Application bkpln4...
    [Sep 8, 2010 2:06:10 PM]: Error Unable to create Scehma for application. Exiting Application Creation.
    StackTrace:
    java.lang.IllegalStateException: Unable to create Scehma for application. Exiting Application Creation.
         at com.hyperion.planning.HspManageApplication.createApp(Unknown Source)
         at com.hyperion.planning.appdeploy.HspSaxParsedAppDefinition.deployAppFromXML(Unknown Source)
         at com.hyperion.planning.appdeploy.HspAppDefinition$1.run(Unknown Source)
    [Sep 8, 2010 2:06:10 PM]: Error An error occurred while creating the application. Please check log for details. Unable to create Scehma for application. Exiting Application Creation.
    java.lang.IllegalStateException: Unable to create Scehma for application. Exiting Application Creation.
         at com.hyperion.planning.HspManageApplication.createApp(Unknown Source)
         at com.hyperion.planning.appdeploy.HspSaxParsedAppDefinition.deployAppFromXML(Unknown Source)
         at com.hyperion.planning.appdeploy.HspAppDefinition$1.run(Unknown Source)

    Check if the oracle user schema has sufficient privileges to create the tables it needed, etc. Usually if the Oracle DBA grants Connect and resource it is sufficient or more specifically, they need to ensure the following privileges have been granted on a tablespace to the user/schema that is connecting: create table, create any index, create sequence, create procedure, create session, alter session.
    Cheers,
    Jasmine.

  • URGENT : Unable to re deploy Planning application in 11.1.1.3

    Hi All,
    We are working on Oracle Fusion 11.1.1.3 version and have created a planning application using the EPM way.
    Since yesterday we are facing a peculiar problem which we have not encountered till date.
    When we try to deploy the application in Application Library, the deploy option appears to be greyed out.
    Can anyone help us in resolving this issue? Its critical for us.
    Thanks.
    Madhavi

    If you have a look at the AwbConfig.properties file which for tomcat is located at \Hyperion\deployments\Tomcat5\EPMAWebServer\webapps\awb\WEB-INF\conf
    If it has not been updated there will be a line
    DEPLOY_PENDING_TIMEOUT_MINUTES=480
    This means it will not timeout until after 8 hours, if you change the timeout to a lower value like 15 and restart the EPMA services hopefully it will notice that the timeout has passed and reset the properties of the app.
    Have a look at: Re: EPMA Planning App - Deploy is "Stuck"
    HTH-
    Jasmine.

  • Commands for Planning Applications in WAD?

    Hi all,
    Following the developers' guide on 'Business Planning and Analytical Services'  for 2004S we got stuck on assigning custom Commands for Planning Applications in WAD, which were created in the planning wizard.
    The option for 'Commands for Planning Applications' does NOT show up in the command wizard!
    is there a ABAP/Java stack pre-requisite for this or is there a new(?) authorisation object missing?
    Does it helps for others? On which Java Stack?
    Thx,
    Markus

    Check OSS note 948336.

  • Urgent help needed in creation of planning application

    Hi,
    Iam new to planning. I installed planning and configured(Created planning instance, Datasource). When i login into workspace and want to create new planning application. The wizard opens correctly. After giving application name, calender,currency type, Plan type, etc... when i click finish to create a new planning application, it says *"An error occured while processing this page. Check the log for detail".* But i observed one thing the application was created in Essbase without Databases and outline. So can anyone explain me wats the exact prob. where I can see the Log details. Help me.
    Thanks in advance.

    Hi,
    Databases will not be created until you created until you refresh to essbase from within planning, you are not up to that stage yet. Only an essbase application will be created.
    What I suggest you do, is delete the essbase application. Then run planning from the start menu and not as a service, this will mean you will get any error messages displayed in the window.
    Then try and perform the application creation again and see what errors are produced.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Problem with Hierarchies in BPS- Web-Based Planning Applications

    Im trying to use a Web-Based Planning Application in BPS. The Datacolumns consist of a charecterisitc with a hierarchy. this hierarchy is time dependend. The timeframe is set correctly but i still receive an the following error message in my web browser:
    "Hierarchy 'Hierarchy_name' is not valid for date 26.06.2004"
    Does this error message look familiar to anybody? In the moment I have no clue what went wrong

    Hello Tobias,
    I assume you are talking about error message UPC 413 (it always helps to mention the message class and number). Please check table RSHIEDIR. The hierarchy you are using is not valid for the key date you specified (RSHIEDIR-DATEFROM > KEYDATE or RSHIEDIR-DATETO < KEYDATE). If you do not enter a key date in the planning area, the system will always use the system date. So either use a different hierarchy or maintain it differently to be valid on keydate (26.6.2004).
    Regards,
    Marc
    SAP NetWeaver RIG, US BI

  • Problem in Logging in to planning application in planning desktop

    Dear Gurus,
    Today morning I have added the new MSAD, which was previously configured with another IP. I am able to see all the users in the domain. I have given provision to one admin user, opened the Planning desktop and changed the DCOM settings as needed, but the system is not opening the planning application.
    I need to open the application so as to refresh the security filters, which I am not being able to do.
    I am not able to login to Planning Web with the same user.
    I am using 9.2 planning and 9.0 shared services. please suggest accordingly.
    Thanks in advance,
    Giri Prasad
    Edited by: Giriprasad on May 13, 2010 5:01 AM

    Dear John thank you very much for response.
    Domain server have been moved to another location, so IP has changed, I have updated the new IP in the shared services for the same.
    Application owner is in the same domain users list. I just updated the DCOM settings.
    Thanks
    Giri Prasad

  • Issue with LCM while migrating planning application in the cluster Env.

    Hi,
    Having issues with LCM while migrating the planning application in the cluster Env. In LCM we get below error and the application is up and running. Please let me know if anyone else has faced the same issue before in cluster environment. We have done migration using LCM on the single server and it works fine. It just that the cluster environment is an issue.
    Error on Shared Service screen:
    Post execution failed for - WebPlugin.importArtifacts.doImport. Unable to connect to "ApplicationName", ensure that the application is up and running.
    Error on network:
    “java.net.SocketTimeoutException: Read timed out”
    ERROR - Zip error. The exception is -
    java.net.SocketException: Connection reset by peer: socket write error
    at java.net.SocketOutputStream.socketWrite0(Native Method)
    at java.net.SocketOutputStream.socketWrite(SocketOutputStream.java:92)
    at java.net.SocketOutputStream.write(SocketOutputStream.java:136)
    at java.io.BufferedOutputStream.flushBuffer(BufferedOutputStream.java:65)

    Hi,
    First of all, if your environment for source and target are same then you will have all the users and groups in shared services, in that case you just have to provision the users for this new application so that your security will get migrated when you migrate the from the source application. If the environs are different, then you have to migrate the users and groups first and provision them before importing the security using LCM.
    Coming back to the process of importing the artifacts in the target application using LCM, you have to place the migrated file in the @admin native directory in Oracle/Middleware/epmsystem1.
    Open shared services console->File system and you will see the your file name under that.
    Select the file and you will see all your exported artifacts. Select all if you want to do complete migration to target.
    Follow the steps, select the target application to which you want to migrate and execute migration.
    Open the application and you will see all your artifacts migrated to the target.
    If you face any error during migration it will be seen in the migration report..
    Thanks,
    Sourabh

  • Financial report for essbase and planning application

    Hi,
    Can any one please explain me what is the difference between creating financial report for essbase application and planning application.
    Considering we will have Essbase cube for the planning application
    Thanks in advance

    Correct, the data that is stored in Essbase will be the same regardless of which connection type you use.
    Data that is only stored in Planning can only be retrieved using a Planning connection. This includes Supporting Detail and SmartLists as these are stored in the Planning relational database.
    As a general rule I always use an Essbase connection unless i specifically want to get supporting detail or smartlists but that is just me.
    Hope this helps
    Stuart

Maybe you are looking for

  • IPod playlists delete?!

    So, I have an iPod touch, and I had like 15 playlists.  But, after a while they start to delete without me doing anything (that I know of).  I add more, or remake the ones I lost, but if I don't listen to them for a while, they dissapear.  It kind of

  • Match no longer shows whether a track is matched or uploaded?

    The previous iTunes version showed whether a track was uploaded or matched and I can't seem to see whether this is still available? Just using cloud to view my music as the copies are on an external hard drive. Can anyone advise? Many thanks.

  • Samples to read option in DAQ

    Hello,           I am new to signal processing and confused about the DAQ Assistance option "samples to read". What I understand is about  Sampling rate indicates the samples read per second, I run my vi for a second and I got 10K samples when my sam

  • Air mobile encryptedlocalstore not working at android

    hi, i have a problem in my mobile application i use encryptedlocalstore to store user id and password and packaged apk with captive-runtime but some device without adobe air, store and get data with encrypedlocalstore not working when i install adobe

  • Why are my photos jarbled/color-distorted when I pull them into Photoshop?

    DETAILS: I'm using Photoshop CC 2014. Photos were captured on my iPhone 5 and captured through Image Capture. PROBLEM: I dragged two photos into a Photoshop file.  The first one imported fine.  The second one came in distorted (see below).  It seems