PLANT AS A COST CENTER

hi
we are using plant as a cost center and profit center, i want to know what are costs we will be able to collect on the cost centers and profit centers. will i be able to tract material costs , i.e materials costs for maintaienace order

Hi
Can you further elaborate on this point? The mapping of Plants to Cost Centers is 1:1. Again is the Cost Center hierarchy and Profit Center hierarchy are same?
Profit centers are basically statistical. Is the business requirement to collect at Cost center level?
Thanks
Murali

Similar Messages

  • Cost Center and Plant

    Hi Guys,
    Is there any R/3 table that gives relations between Cost Center and Plants?
    Thanks

    The plant is an <b>operating area or branch</b> within a company and  is assigned to a single company code. A company code can have several plants.
    The plant plays an important role in the following areas: <b>a) Material valuation
    b) Inventory management c) MRP d) Production  e) Costing (material prices valuation)</b>
    A <b>Cost center</b> is an organizational unit within a <b>Controlling area</b> that represents a defined location to identify where a cost is being incurred. or an area of Responsibility for costs
    If you happen to run transaction KSB1 for a cost center, where plant field is not blank, you may find some material transaction. These are trasnactions which could involve both plant and a cost center.

  • Mapping of Plant to Cost Center

    Is there any direct mapping of plant to the cost center?
    If so, pls. provide the transaction code through which we can check the same.
    Also provide the table, if any.

    Hi,
    If you are talking about getting the Default Account Assignment (Cost Center) for a Cost Element as per Plant (Valuation Area) then go to OKB9 and maintain the GL A/c with default Cost Center keeping value as "1" i.e. Valuation area is mandatory in the column of mandatory fields of Account Assignment.

  • Account/Cost Center Determination (OKB9) for same plant & 2 cost centers.

    Hi,
    I faced a weird situation My situation is i have the same plant but 2 different profit center's & 2 different cost center's . My OKB9 cost element is configured through "Plant/Valuation Area (1)".
    Previously when ever we used this "Plant/valuation Area" determination we used to give plant and corresponding cost center and left other fields like Business Area, Order and profit center blank. see below thing for clear idea
    Plant A - Cost Center A
    Plant B - Cost Center B
    Now with this weird situation, i am not sure whether we can configure OKB9  as below
    Plant A - Cost Center A - Profit Center A
    Plant A - Cost Center B - Profit Center B
    If we can do as above, will their be any implications.
    could anyone help me out of this situation.
    Thanks
    Shriya

    HI
    No complications for this u can assign the CCtrs to Profit Centres.
    Regards
    Shammi

  • KI222 - Inappropriate Cost Center Not Valid Error Message

    Iu2019m having a problem goods issuing material to a cost center (movement type 201) via a call of the BAPI_GOODSMVT_CREATE BAPI (ECC 6.0).  I can post a specific material / plant / storage location / cost center combination without issue via MB1A but when attempting to call the BAPI processing the exact same data, I get the error message KI222: Cost center aaaa/ccccc does not exist on 05/14/2009.  (where aaaa = the appropriate controlling area and ccccc = the cost center).  Iu2019ve checked the validity dates on the cost center via KS03 and all looks fine (the cost center is valid until 12/31/9999).  The cost center is valid on the posting and entry date I'm passing in the BAPI header. 
    Any ideas what I may be doing wrong or if thereu2019s some field Iu2019m not appropriately selecting / flagging in the BAPI.  Iu2019m using the BAPI successfully for several other movement types (701, 702, 551, 552).
    Thanks,
    Randy

    Hello,
    Go to OKKS and set your controlling are correct.
    Then go to KS03
    See the from validity. If there from date is in past then there should not be any issue.
    Make sure that your entry is using current date not old dates in the data using BAPI
    You can switch off the message for the time being.
    Go to OBA5 and application area KI and message number 222.
    Switch off the message for online and batch entries.
    This is only for temporary purpose till you pass on your BAPI. But this is not suggest to do it in production system, as this is deviating from standard functionality.
    If the message is not available in OBA5, first go to OBMSG transaction code add the message there to the application area (tick switch off message check box) and then come to OBA5 to switch off the message.
    Regards,
    Ravi

  • Error KI222 - Cost Center Not Valid for Date

    Iu2019m having a problem goods issuing material to a cost center (movement type 201) via a call of the BAPI_GOODSMVT_CREATE BAPI (ECC 6.0).  I can post a specific material / plant / storage location / cost center combination without issue via MB1A but when attempting to call the BAPI processing the exact same data, I get the error message KI222: Cost center aaaa/ccccc does not exist on 05/14/2009.  (where aaaa = the appropriate controlling area and ccccc = the cost center).  Iu2019ve checked the validity dates on the cost center via KS03 and all looks fine (the cost center is valid until 12/31/9999).  The cost center is valid on the posting and entry date I'm passing in the BAPI header. 
    Any ideas what I may be doing wrong or if thereu2019s some field Iu2019m not appropriately selecting / flagging in the BAPI.  Iu2019m using the BAPI successfully for several other movement types (701, 702, 551, 552).
    Thanks,
    Randy

    are you sure that the posting and document dates you submit with the BAPI are correct?

  • Cost Center in work center

    *Hello*
    *I dont want to put the cost center in work center as we are not capturing the labour cost. so creating only dumy work center for each plant but the cost center is mandatory in work center*
    *I also try to make it non-mandatory through field selection path as shown below but i am not able to that*
    *work center -- general data --- define field selection*
    Thanks
    kapil

    Hello Thaila shree
    Thnx for givin your valuable time ,,  solution is ok but now every time at i m getting a pop-up(cost center is not assign to the work center ) at the time of creation of notification, equipment, order.
    Is there is any alternate to solution or pl suggest how could remove that pop-up
    Thank
    Kapil

  • How to write a validaton rule for Cost Center and plant in PO

    Hi,
    I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    Thanks
    Sunil

    >
    Sunil Pal Raj wrote:
    > Hi,
    >
    > I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    >
    > But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    >
    > Thanks
    > Sunil
    Check OKC7
    Regards,
    Indranil

  • ME_PROCESS_PO_CUST Plant and Cost Center Validation Isuue

    Hi Friends,
                      I have a requirement to validate ME21N PO creation with Account assignment 'K'. In our Business Process, we have 2 plants lets say 3000 and 5000. Plant 3000 is linked to Business Area say 4000 and Plant 5000 is linked to Business Area 9000. Now we have unique cost center assignment in both Business areas.
    My requirement is when i enter wrong cost center then system has to validate it with plant and has to pop up error message in PO creation. With BADI ME_PROCESS_PO_CUST, i am able to populate the error message when i enter wrong cost center but i can save the PO which is wrong.
    Please help me on this issue.
    I have written in my logic in BADI ME_PROCESS_PO_CUST -> PROCESS_ACCOUNT.
    Thanks,
    -Ziad

    hello ziad
    Some sample code, same code is there in POST also. just refer it, not as per your requirement.
    CHECK
    METHOD if_ex_me_process_po_cust~check.
    Konstanten
      CONSTANTS: lc_e(1)  TYPE c VALUE 'E',
                 lc_x(1)  TYPE c VALUE 'X',
                 bsart    TYPE bsart VALUE 'FO',
                 ekorg    TYPE ekorg VALUE 'REPL'.
      DATA: ls_mepoheader TYPE mepoheader.
      INCLUDE mm_messages_mac.
    Rechungspläne müssen mit der Belegart FO und in der
    EKORG = REPL angelegt sein
    Get header data
      ls_mepoheader = im_header->get_data( ).
      IF ls_mepoheader-bsart EQ bsart AND ls_mepoheader-ekorg NE ekorg.
    Create Message
        mmpur_message_forced
                lc_e
                'ZI_MM'
                '007'
                ls_mepoheader-bsart
                ls_mepoheader-ekorg
        CALL METHOD im_header->invalidate( ).
      ELSEIF ls_mepoheader-bsart NE bsart AND ls_mepoheader-ekorg EQ ekorg.
    Create Message
        mmpur_message_forced
                lc_e
                'ZI_MM'
                '008'
                ls_mepoheader-bsart
                ls_mepoheader-ekorg
        CALL METHOD im_header->invalidate( ).
      ENDIF.

  • Cost center and plant in asset master creation compulsory entry config

    where we configure that cost center and plant entry is complusory while creation of asset master.
    is it   asset accounting
                   master data
                           Define screen layout for asset master
                                     Define Screen Layout for Asset Master Data
    as in our system in config    cost center and plant is optional        but while creation of asset master it becomes compulsory field

    Hi,
    Yes, it's defined in the layouts for assets master data.
    Regards,
    Eli

  • QM PLant settings - Cost center

    HI QM Gurus,
    In the inspection lot completion tab for QM Plant settings in customization
    we have two feilds
    Cost Center - Scrap and Destruction
    What is the significance of Cost center feilds in QM Plant settings?
    What will happen if I do not use any of these feilds?
    Are they only for reporting purpose?
    I believe for each movement type we define one cost center.
    What is the need to define a different cost center for QM.
    Kindly give ur comments
    Regards
    JEEVAN

    Hi Jeevan,
    You can post quantities of material from an inspection lot to the following destinations:
    1. To unrestricted-use stock
    2. To scrap
    3. To sample usage
    4. To blocked stock
    5. To new material
    6. To sample reserves
    7. Return delivery
    In system, Each and every movement will be monitored.
    If you are collecting costs on manufacturing orders, you can post the scrap costs to a cost center. You cannot settle scrap costs to a cost center if you are using a product cost collector.
    **Process Flow**
    The planned quantity of the order is 10 units. The yield is 8 pieces and the scrap quantity is 2 pieces.
    You change the settlement rule so that 80% of the costs can be settled to the material stock account for that material. You then create a new distribution rule in which the remaining 20% of the costs is settled to a cost center.
    The actual costs for the order are USD 2,800. When 8 pieces are delivered to stock, the system charges USD 2,000 to the order.
    80% of the total cost is USD 2,240.
    20% of the total cost is USD 560.
    The order was already credited by USD 2,000 upon delivery. During settlement, the system then settled USD 240 to the material stock account of the material and USD 560 to the cost center.
    Thanks,
    Rgds...

  • Plant and Cost Center are not displaying in FI doc. for asset scrap ABAVN.

    Hi All,
    When we do asset retirement by Scraping using Transaction Code ABAVN, Plant and Cost center are not appearing in the FI document. But, in the master data the Plant and Cost center are assigned for the particular Asset. 
    When I see the FI document display, the fields Cost Center and Plant are blank.  Business Area and Profit Center fields are getting updated.
    Can any one help me how to get this Plant and Cost Center in the posted document.  Is there any OSS notes for this.  I am using ECC 6.0 version.
    Thanks in advance for your help.
    Regards,
    Rajesh

    Rajesh
    Aditional on me answer.
    The systemtakes not the cost center from the asset you have to assign it in OKB9 or to fill in during this posting:
    Steps
    Click on Simulate, than you see the posting screen:
    Click on the line (pk 40)
    Click on Goto and Additional account assignment and fill in the cost center whatu2019s in the master record of the asset and post
    An other option is to make a substitution to get this information

  • How do i fetch workcenter ,cost center and cost elem using plant ,material

    Hi.
    i have plant and material in my sleection screen..
    how do i get corresponding workcenter,cost center and coste elements..
    i need to find total quanity(total hours per cost center) in terms of huors corresponding to each costcenter

    Start with VAPMA and then go to VBAP. You can use the information here to go to BSEG if necessary.
    Rob

  • BADI for IW31 which has values of Plant,Fundcenter,cost center

    Hi,
    My requirement is that While running IW31,if the first four characters of Settlement Rule(Cost Center) and FundsCenter is not equal to Planning Plant then an error message should be raised . Can you suggest any appropriate BADI or User Exit for this?
    Path for Funds Center-->Go to>Assignment--->Funds Management
    Thanks
    K Srinivas

    Hi Srinivas,
       In order to find Badi or User Exit, you can put a STOP point at class CL_EXITHANDLER and in method GET_INSTANCE, CALL METHOD cl_exithandler=>get_class_name_by_interface and then you can execute the Tcode and then at every click it will stop in debugging & give the name of the Exit or Badi.
    Hope it Helps...
    Regards,
    Shailesh Jadhav

  • Plant wise Cost center list

    Hi,
    How can we know the Cost Center list with Plant wise..
    Reason is that we just completed rollout project and create a new plant. for example, now our plant is AAAA & new one is BBBB. and we create the cost centers for that plant also i.e. BBBB.
    So, i want to see newly created cost centres list for plant BBBB...
    plz. help...

    Dear ABAP,
    Goto KS03,press F4 and serach using the option Cost center,enter the controlling area,company code and remove the
    maximum no of entries and press enter.
    You will be able to get the list of cost centers.
    Or else check the table CSKS,you will get the data related to cost center.
    Regards
    Mangalraj.S
    Edited by: Mangalraj.S on Oct 8, 2009 2:15 PM

Maybe you are looking for

  • Use of custom structure defined in the program in Function Module

    Hi, We have defined a structure in a program. We want to define a Tables parameter in a Function module having the same structure as in the program. Is there a way to do this without defining a standard structure? Thanks, Arun

  • Encrypting non-English characters

    Hi, I have this application which has to do the following Scenario (i) - Read ENCODED string SE from Network Source NS1 (Native,Non-JAVA) - Decode SE to SD using the same charset as NS1 - Apply some transformation to SD to get SD2 - Encode SD2 to get

  • Right-Indenting the last paragraph line in a Table Of Contents entry

    Hi, I'm using CS4 In Design. I'm trying to format the paragraph styles for my Table of Contents. I have the tab leaders working, everything looks good except that I have entries that have multiple lines, and I can't find a way to format the TOC parag

  • Ar01 not consistent

    Hi all, i have some problem with report ar01. Suppossed i have asset A. This asset has been depreciated in period 9 and 10. When i check the accumulated depreciation in fbl3n and in ar01, the amount is same. Then in period 10 i change the asset life

  • Cloning DB to single instance ASM issue 11.2.0.3

    Hi All, Having trouble cloning a DB via OEM to a new server I just built up which utilizes a single instance ASM. Creating a new DB via dbca onto ASM works no problems. When doing the clone it fails on the source server during the duplicate database