Please help me in xi scenario

Hi Experts,
I am new to XI . my requirement is like this .please give me a brief  idea how to go forward and which are all the scenarios i can decide .client is asking and  iam in trouble.please tell me which scenarios are suitable .immedietly i will reward you points.
Project goals and objectives:
Brief Scope
1.Access Control Record System (ACRS) :
ACRS allows company users to view two different types of reports:
1.     Employees Access Reports
2.     Employees Working Hours Calendar View
3.     Contractor Man-hours Report
4.     Contractor Employee Man-hours Report
5.     Companies Overall Monthly Hours
These details are available in ISS Oracle 9i database server and the system should fetch the data through PI and place it over R3 ZTABELS.
Process Flow
Role based reports can be viewed based on the following input parameters:
1.     Department
2.     Employee Type
3.     Date From
4.     Date To
Access Control Reporting Master Table to have Access Control Reporting System Data from  ISS using XI.
2. Product Shipping & Management Application (PSMA) :
XI interface to accept input data from  R/3  and fetch the result from PSAM Oracle Database.
PSMA is mainly used to keep track of customer requested raised the vendor being company. It mainly tracks the status of customer requests from initiation to closure.
Part of the activities handles by PSMA is that it creates the shipping documentations in terms of submittals and cover letter including all details related to the shipment. Besides, it provides what is called a certificate of quality for the products being shipped.
What we are concerned with is basically the reporting mechanism built on top of PSMA Oracle Database as backend and ASP as front end. This is mainly a set of reports intended to provide business users with some sort of business intelligence on top of the PSMA system. These reports should be brought on portal using XI.
Process Flow
1.     User requests for a report from the available list of PSMA reports by providing required set of input parameters.
2.     Portal forwards the request with these input parameters to XI
3.     XI should communicate to Oracle Data base to fetch the required set of result and pass it on to portal.
4.     Report is viewed on portal screen
3. IOW (Integrity Operating Windows) :
XI interface to accept input data from portal and fetch the result from IOW (ODS) Oracle Database.
Brief Scope
This small application is built on top of ODS (Operational Data Server). This package is mainly used by operations and technologists. The main objective behind IOW is to report predefined set of tags in terms of being compliant/incompliant according to predefined constraints.
This Application takes the help of XI and reads data from the ODS Database (SQL Server Based)
The front end is a couple of Web Dynpro Pages that are used to query the ODS database using XI.
The first front end page provides user with the option to select under which area they need to view the report and what type of report they would like to see.
Process Flow
5.     User requests for a report from the available list of IOW reports by providing required set of input parameters.
6.     Portal forwards the request with these input parameters to XI
7.     XI should communicate to Oracle Data base to fetch the required set of result and pass it on to portal.
8.     Report is viewed on portal screen.
4. RELIEF VALVES TEST SHEET:
This form is used for Relief Valves Test Sheet request. Initiator (RV Technician) prepares the sheet by putting TAG No, Fetches other required data from PACER interfaced with XI.
Regards
Naresh

Dear Naresh,
just follow any any BPM to collect the data.use File to file complex senarion..
here are the list of links for development of different senarios
If useful reward points****
/people/prateek.shah/blog/2005/06/08/introduction-to-idoc-xi-file-scenario-and-complete-walk-through-for-starters - IDoc to File
/people/ravikumar.allampallam/blog/2005/03/14/abap-proxies-in-xiclient-proxy - ABAP Proxy to File
/people/sap.user72/blog/2005/06/01/file-to-jdbc-adapter-using-sap-xi-30 - File to JDBC
/people/prateek.shah/blog/2005/06/14/file-to-r3-via-abap-proxy - File to ABAP Proxy
/people/venkat.donela/blog/2005/03/02/introduction-to-simplefile-xi-filescenario-and-complete-walk-through-for-starterspart1 - File to File Part 1
/people/venkat.donela/blog/2005/03/03/introduction-to-simple-file-xi-filescenario-and-complete-walk-through-for-starterspart2 - File to File Part 2
/people/ravikumar.allampallam/blog/2005/06/24/convert-any-flat-file-to-any-idoc-java-mapping - Any flat file to any Idoc
/people/arpit.seth/blog/2005/06/27/rfc-scenario-using-bpm--starter-kit - File to RFC
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1685 [original link is broken] [original link is broken] [original link is broken] - File to Mail
/people/jayakrishnan.nair/blog/2005/06/20/dynamic-file-name-using-xi-30-sp12-part--i - Dynamic File Name Part 1
/people/jayakrishnan.nair/blog/2005/06/28/dynamic-file-namexslt-mapping-with-java-enhancement-using-xi-30-sp12-part-ii - Dynamic File Name Part 2
/people/michal.krawczyk2/blog/2005/03/07/mail-adapter-xi--how-to-implement-dynamic-mail-address - Dynamic Mail Address
/people/siva.maranani/blog/2005/05/25/understanding-message-flow-in-xi - Message Flow in XI
/people/krishna.moorthyp/blog/2005/06/09/walkthrough-with-bpm - Walk through BPM
/people/siva.maranani/blog/2005/05/22/schedule-your-bpm - Schedule BPM
/people/sriram.vasudevan3/blog/2005/01/11/demonstrating-use-of-synchronous-asynchronous-bridge-to-integrate-synchronous-and-asynchronous-systems-using-ccbpm-in-sap-xi - Use of Synch - Asynch bridge in ccBPM
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
/people/michal.krawczyk2/blog/2005/08/22/xi-maintain-rfc-destinations-centrally - Maintain RFC destination centrally
/people/sameer.shadab/blog/2005/09/21/executing-unix-shell-script-using-operating-system-command-in-xi - Call UNIX Shell Script
/people/r.eijpe/blog/2005/11/04/using-abap-xslt-extensions-for-xi-mapping - Using ABAP XSLT Extensions for XI Mapping
/people/prasad.ulagappan2/blog/2005/06/07/mail-adapter-scenarios-150-sap-exchange-infrastructure - Mail Adaptor options
/people/pooja.pandey/blog/2005/07/27/idocs-multiple-types-collection-in-bpm - Collection of IDoc to Single File
/people/michal.krawczyk2/blog/2005/11/10/xi-the-same-filename-from-a-sender-to-a-receiver-file-adapter--sp14 - The same filename from a sender to a receiver file adapter - SP14
/people/michal.krawczyk2/blog/2005/11/23/xi-html-e-mails-from-the-receiver-mail-adapter - XI: HTML e-mails from the receiver mail adapter
/people/sap.user72/blog/2005/11/22/xi-faqs-provided-by-sap-updated - XI : FAQ's Provided by SAP
Thanks and Regards,
Sumit Gupta

Similar Messages

  • Please help me in this scenario .

    Hello Please help me in below scenario .
    We are loading the data from Source system to one cube  A  as delta load .
    then from cube to A to ODS   B as delta load once again , All key figures are set as addivitive .
    Then ODS B to cube C once again as delta .
    Some how we found that , there are double records  ( means double in net value ) in for week 01 to 07 .
    The root cause was , there was initial load from cube A to ODS B and from ODS B to cube C.  ( 2 weeks before )
    And after than there were delta request for week 8 , 9 10 .
    Now , we have done the selective deletion from Cube C for week 1 to week 7 .
    But how can we repair the whole scenario once again , because in the next load , i think once again data will be updated in cube C , which is not correct.
    All the request are in between , and delta has also done ..so how can i correct the things .
    Note that , Cube C  and ODS B are getting the data from many sources .
    Thanks in advance.
    Regards,
    Manoj

    Even if you did selective deletion from cube C and you still have the data additive in ODS, then the records to the cube is not going to be correct. Can you check if the ODS is also duplicated?, I am sure it is. I would recommend you do reinit  in cube C, after making sure the data in the ods is correct, if it is not, then you need to do the same thing in selective deletion on ODS as well and bring data from cube A to ODS and Cube C.
    thanks.
    Wond

  • Please help in this simple scenario

    Hi,
    There is standard query with BI Content for Incoming Orders Analysis, but i like to go for my own report with less number of fields.
    These are the SAP r/3 tables with fields which i like to make use of,
    1.<b>VBAK</b> (VKORG, VTWEG, SPART, VBELN, AUART, VBTYP, ERDAT, AUDAT, ERNM, KUNNR, VDATU)
    2.<b>VBAP</b> (VBELN, POSNR, NETWR)
    3.<b>VBEP</b> (VBELN, EDATU)
    4.<b>VBUK</b> (VBELN, GBSTK)
    5. <b>VBUP</b> (VBELN, POSNR, GBSTA)
    I found the corresponding InfoObjects for all, my questions:
    1. Do i have to create only one InfoStructure(LIS) for all?
    2. Any guideline which to decide as Characterstics and which as keyfigures?
    3.Do i have to perform any transfer rule for any of field if you have idea?
    Please help.........
    Thanks

    Hi,
       I would like to suggest you one thing. First of all, go through the standard datasources linked in your infosource. If you get all the objects in them, that's fine (hoping that you already have the infrastructure). Else you need to perform all common tasks. You will have the feilds required by you in 2LIS structures.
       Comming to the  point of query, do 'save as' the standard query and reduce the no. of fields.

  • Please help me on this scenario...

    Hello Experts,
    When the current user runs my report, I need to validate on which divisions he/she has access to. So
    if for example I run the said report in the INITIALIZATION phase I need to check what divisions(SPART)
    the current user is allowed to process. Then in the selection-screen when he/she presses F4 help on
    the division parameter it will only display the divisions that is authorized for him. Currently, I tried
    using the object V_VBAK_VKO but when we transported it to QAS it does not work.
    So is there a table that will link what division/s a user has access to? below is the step by step flow on what I
    want to do.Thank you guys and take care!
    1. When a user runs the report, in the INITIALIZATION phase I need to check on what divisions the current user is
    affiliated to.
    2. Then those divisions that he/she is affiliated, I will store it in an internal table to be called
    when the suer presses F4 on the division parameter in the selection-screen which I have done.

    user profiles will have one desire Role , first u have to get the role by the help of Basis , or check user Own Data from Menu item --->systems.
    or
    PFCG
    give role name ---> and search for this Object.
    2.U can adjust user roles with PROD by using Adjustment Functions avail. in this Tcode , by using this u can get settings of PROD into DEV server.
    i am not pure Basis , so i may missed some points.
    Regards
    Prabhu

  • Please help with this simple scenario

    I have two tables in two different instances, these two are linked by database link.
    table A, base table
    table B, read_only view connected through link.
    I need them to be semi parallel in this way:
    user queries emp_id to query tableA, if emp_id is available in table A, then just display id and emp_name, if nothing found, check if available in table B, if so then insert it on table A. If not available in table B, then display message.
    I have tried, cursors, selects into, etc etc and no luck!, please if you time allows, write a sample code if possible.
    thanks a bunch!!
    joey

    Hi,
    fallow this,
    1) Create segment (WE31) Of course it will have naming convention for different company. Here are some tips: If you copy from existing or std segment eg: Z1E1EDP01_01. If not you can just put Z1u2026.but this is only the example.
    2) Create IDOC Types (WE30)
    3) Create message type (WE81)
    4) Link message type with basic type (WE82)
    5) Create FM In the FM all the attributes should be the same for Inbound or Outbound. Basically you can get an example from the std FM eg: Inbound - IDOC_INPUT_DELVRY Outbound - IDOC_OUTPUT_SHPMNT.
    6) Create Process Code (Inbound - WE41/ Outbound - WE42) IMPORTANT: Before you key in the FM, you are required to add the FM in this table V_TBD51.
    7) Link FM with Basic Type For testing go to WE19.
    Regard's
    Shaik.

  • Please help me in removing Scroll Bars

    Hi
    Please help me in following Scenario
    I am Implementing Light Portal. I have a Page link in detailed Navigation with 2 column Layout.
    I am getting an Inner Scroll as the Content in the First cell exceeds.
    please help me in removing the Inner Scroll.
    I tried blog 5192. But I could not find any Change. please let me know If I need to do anything more
    Thank you
    Regards
    Krishna Kanth

    Hi,
    Is it a custom developed iView from PAR or standard iView? if it is custom developed iView, you write some java script fuctions using EPCF to autosize the iview. I had done this some time back and I don't have the code right now.
    If you can give more details, I'll check wheather I will be able to help you.
    Satish

  • I have a scenario. Import IDOC into PI and PI transform IDOC to Excel. Using mail adapter attach that Excel using pi and send to customer. Can you please help me on the same?

    HI Experts,
    I have a scenario. Import IDOC into PI and PI transform IDOC to Excel. Using mail adapter attach that Excel using pi and send to vendor. Can you please help me on the same?
    Thanks
    SaiSreevastav

    Hi Sai,
    you can use XSLT or java mapping or adapter module to convert IDOC xml to XLS. Please refer the below blog
    Convert incoming XML to Excel or Excel XML – Part 1 - XSLT Way
    Convert incoming XML to Excel Sheet Part 2 – Adapter Module way
    Convert incoming XML to Excel Sheet
    then after converting to Excel, you can use the payloadswap bean in mail adapter
    XI: Sender mail adapter - PayloadSwapBean - Step by step
    regards,
    Harish

  • Unable to do IDoc to File Scenario ; Please help me....

    Hi Experts!!!,
                     I am trying to convert an IDoc to an .Txt or .Xml file, But I am un able to do it. Whenever I m trying to configure the Idoc adapter , it's not allowing me to select as "sender" (default it will be on the recvr side). Please help me in this regard. 
    Do I need to use RFC adapet, or BAPI instead of IDoc or any other way..to complete IDoc to File scenario...
    THANKS IN ADVANCE!!!
    Sunil K Shetty.

    HI,
    No need to use Sender Idoc adapter , default , IDoc adapter resides on Integration Engine. No sender communication channel and sender agreement also
    see the below links
    /people/prateek.shah/blog/2005/06/08/introduction-to-idoc-xi-file-scenario-and-complete-walk-through-for-starters - IDoc to File
    IDOc testing - /people/suraj.sr/blog/2005/12/29/generate-test-case-for-an-idoc-scenario
    Idoc settings https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/73527b2c-0501-0010-5398-c4ac372c9692
    Regards
    Chilla

  • Please help in configuring IDoc to JDBC scenario

    Hi all,
    i am very much new to SAP XI 3.0. We are trying to execute an IDoc-XI-JDBC scenario. The data in the segments of the IDoc should be populated into a table of the database.I am unable to do it as I am totally new to XI.Can any one please help me on the steps invovled in configuring the above scenario or please provide any document describing a similar configuration.
    Thanks in advance
    Pavan

    Hi Pavan,
    check these links (some on Idocs & some on JDBC)
    /people/sap.user72/blog/2005/06/01/file-to-jdbc-adapter-using-sap-xi-30
    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] [original link is broken] [original link is broken] [original link is broken] [original link is broken] [original link is broken] [original link is broken]
    /people/prateek.shah/blog/2005/06/08/introduction-to-idoc-xi-file-scenario-and-complete-walk-through-for-starters
    Regards
    Vishnu

  • Please help with subcontracting scenario............

    Hi All,
    Can anyone please help me in dealing with subcontracting scenario with scrap taken into account. Please provide the screen shots from BOm creatio to challan closing. the requirement is urgent. please help me. all replies will be suitablly rewarded.
    regards,
    vvr sharma

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity. 
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor. 
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor.  As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" 
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated: 
    DR FG Stock/ SC By-Product Stock 
    CR Change in Stock (FG/ SC By-Product ) 
    (for finished goods received) 
    DR Subcontracting Charges 
    CR GR/IR Clg 
    (for moneys payable to Subcontractor) 
    DR Consumption (Components) 
    CR Change in Stock (FG/ SC By-Product ) 
    (material provided to Vendor is now charged to expense) 
    (5) You do the IV for SC Invoice, and the process is complete. 
    Process of Subcontract in MM
    Sub-contract business process: 
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor . 
    Vendor shall process the item / use the item provided & supply the final item. 
    SAP process: 
    1.Create the finished goods material code. 
    2.Maintain the BOM for the material. 
    3.Create PO with item category as "L" . 
    4.Issue material to vendor with movement type 541 
    5.Receive the material against the PO with movement type 101. 
    6.MIRO to account for vendor's invoice for the service charge& material used by him. 
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations  1)weaving 2)dyeing 3)cutting & packing 
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting. 
    1. Item code(material master) to be created at the stage of before dyeing. 
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30) 
    3. Bill of material to becreated for the material(2) calling for material(1) 
    4. Inforecord and source list to be created for material(2) with the corresponding vendor 
    5. PO to be released for material (2) 
    6.Along with PO the material(1) to be issued to vendor 
    7.On receipt of material when GR is made the stock with vendor will get updated. 
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows: 
    Enter the material you want to order and the item category for subcontracting (L) in the order item. 
    Press ENTER to display the screen for component processing. 
    Enter the components that the vendor requires to manufacture the product. 
    Please note: 
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER. 
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F). 
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check. 
    If you entered a bill of material as the material in the subcontract order, the components are created automatically. 
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material. 
    Save the purchase order. 
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product.   In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Hope this is helpful.
    Regards
    Ravi

  • Excise (sales return) scenario PLEASE HELP

    Hi All
    We have a scenario, form our factory (exciseable) plant we have transfered the goods to our shop ( non Excise). And sold the material at VAT.
    Under sales replacement Policy we have taken the sales return at shop.
    Now we have to transfer the material to factory and take the CENVAT credit.
    How can we do the excise entry at the time of goods recipt the factory
    PLEASE HELP
    With Reagrds
    Niti Narayan

    Use J1IEX transaction and use the EWPO transaction type to capture the transaction. Also please remember that EWPO accepts only Goods receipt via MM process and not SD process in the Standard scenario so please ensure that it is allowed for other types as well. Any ABApper should be able to help you on this. There is a SAP note on this so please check it out as well.
    regards
    Jude

  • Please help me with this automotive storage scenario

    HI,
    Please help me with the way of implementing this scenario business scenario,
    The scenario is a car agency which works on importing cars from EUROPE[ITALY, FRANCE, GERMANY] and its main location in EGYPT and have three branches[CAIRO, ALEX and ASWAN].
    THE imported cars are first shipped to alex through ships from EUROPE then usually stored in the company stores in ALEX from 5 to 30 days until they are moved to either CAIRO or ASWAN to be sold there.
    I want to implement the shipping of all the cars coming from EUROPE to be stored in PLANT ALEX  for 5 to 30 days, as i have three types of Purchase Orders 1- Foreign PO (for buying from europe), 2- Local PO (for buying locally from egypt), 3- Service PO (for asking for any service).
    Hint: I tried to make a default and displayed plant Alex in the PO but it is not the solution i have a local PO which have a default material group BMW.
    Please help...

    HI nour el din
    There will be 2 possible scenarios,
    1. If you consider Alex as plant,
    Against the "Foreign PO" receive the material at the Plant Alex ,Keep the stock as many days required there,Then subsequently Create the STO to move the stock to other plants for the storage .
    2.If you consider Alex as storage.
    Receive the material at Alex storage location & Later do Sloc to Sloc ttransfer posting.
    Regards
    Mascot.

  • I want bapi real time scenario ? please help to me

    hai friends,
       I want bapi real time scenario.please help in bapi.
       my id :[email protected]
    regards,
    siva

    hi siva,
    for full information on BAPI's, check these links.....
    http://help.sap.com/saphelp_47x200/helpdata/en/7e/5e12224a1611d1894c0000e829fbbd/frameset.htm
    this link as everything like how to use bapi, code examples etc..
    reward me if useful......
    Harimanjesh AN

  • Help me please with File-to-RFC scenario

    Hi, I'm a beginner with XI and I have as problem with an interface.
    This interface is a file-to-RFC scenario an it was working correctly a few days ago. Suddenly, the interface doesn´t work and we haven´t error message in sxi_monitor transaction. The queues are fine and we haven´t any sign that why the interface doesn´t work.
    If someone´s had a similar problem and know how to solve it or someone can teld me a clue, please, help me!!
    Thank you

    HI,
    You can monitor the Communication Channel in RWB.
    Go Component Monitoring in Runtimework Bench and click on Adapter Engine and select the Communicaiton Channel and select your channel name.
    You can find any whether it is in active or not?
    Also check the Message monitoring in RWB.
    Regards
    Sridhar Goli

  • Strange Urgent scenario please help!

    Hello Friends,
    I am having one strange problem in InfoCube loading.
    I am loading from 0FI_GL_4 extractor to BW InfoCube with full load.
    I have start routine  logic in my update rules.I debugged routine several times simulated update from PSA plenty of times.
    In debugging and simulation it gives expected results, but when I actually load data to InfoCube it misses some data.
    Some data are not showing up in InfoCube.
    Please help with your suggestions.
    Thanks,
    John.

    Ajax,
    What do you mean by key of the IS.There is no end routine as this is 3.x
    Jr Roberto,
    The records are cuting down in the start routine, I can see it clearly into the monitor.
    But the strange thing to notice is when I debugg code for error records it gives right result and when I load actually it cuts some records.
    Thanks for looking into it.

Maybe you are looking for

  • Audio Issues in Final Cut Pro 6

    Recently working on a project, re-opened it the other day, to have the audio playing at a slowed rate if at all. Speed still says 100% and the problem occurs regardless the song or project I use. Any Ideas?

  • When is table analyzed after mapping

    The OWB 10.1 User Guide says this about the mapping configuration parameter Analyze Table Statements: "If you set this parameter to true, Warehouse Builder generates code for analyzing the target table after the target is loaded if the resulting targ

  • [Please answer] Is it possible to replace the graphics card in a laptop?

    http://forum.fdzone.org/j.php?u=http%3A%2F%2Fwww.amazon.com%2FHP-Pavilion-G70-250US-17-0-Inch-Laptop... this is my laptop.... Please help ;-(

  • An OpenGL error occured while attempting to load the frame (fragment shader at -1:)

    I get this error when I try to load Magic Bullet Looks 1.4.1 from within AE CS5. I'm running Windows 7 x64 with an Nvidia QuadroFX 5800. - Driver version 197.03. Anyone know what causes this? Thanks

  • Could not find main class!

    I tried some code I got from a book I recently bought it compiled ok but when I tried to run it in JPadPro I got the Java Virtual Machine Launcher warning saying 'Could not find the main class. Program will exit!' As far as I can see there is a main