Possibility of Having GL Control while making Cost Centre PR

Hi Experts
I have one urgent requirement..i.e. at the time of Cost Centre PR creation user should be restricted to enter only selected 2-3 GL accounts. Please suggest how can i restrict GL account at the time of PR creation.
Regards
Ajay Goel

Hi,
   In standard, you can default the GL based on the account assignment category - using the account modifier maintained against the account assignment category in OME9 and the OBYC config for GBB - <account modifier>.
   If you want to restrict the allowed entries for the GL with few GL's then there is no option in standard in MM side as of my knowledge. You may check whether you can use different field status group for the allowed GLs' (FS02 and OBD4) and then maintain different field selection for the field status group same as the field selection for the account assignment category - I didnt test the option - you may check the same.
   Else, you may go for development. If you are going for development, you may create a custom table and maintain the account assignment category and the allowed GL's - you can write logic to check the account assignment category, entered GL and the ztable and issue message accordingly.
Regards,
AKPT

Similar Messages

  • Problem while creating cost centre

    hi all ,
    I am trying to create cost centre in t.code ks01 but the error message comes
    ''controlling area vi01 does not have a standard hierarchy(please assign one)'. but i
    i try to assign standard hirarchy in t.code okkp  again the error message comes like  'hierarchy name xxx_cost does not exist.' what is the exact problem
    pls clarify it
    chandra

    You please try by giving simple name like VI01 instead of what you have given, i think the field length should be restricting.
    Please try the above and see its working or not
    best regards
    Message was edited by:
            Emani

  • Error while uploading cost centre

    Hi Experts,
    I am trying to upload the cost centres against org unit in pre-production client in PP01
    After giving relationship A011 and selecting the cost centre if I am clicking on save it is throwing this error "Personnel number 123456 does not exist"
    Pls let me know your what would be the cause
    Thanks

    Hi,
    error "Indicators are not their for controlling area" but I hav given the controlling area as well
    please check you have now controlling area for fiscal year 2011, or desired year.
    i think you do not have for the fiscal year that you are trying the same.
    go to OKKP for your controlling area for fiscal year 2011 & select in as CoCd->CO Area ( controlling area same as company code) and active components/control indicators for { Cost Centers : Component Active ,Order Mgmt: Component Active } and then save.
    or it might be in T.Code: OKE5
    Check whether control indicators is checked in OKE5 or not.
    this is done by FI consultant. if you have authorization then do it, if not consult your FI consultant.
    regards,
    mohammed
    Edited by: 0mohammed1 on Nov 9, 2011 5:23 PM

  • How to Add the cost centre  in the KSBB report

    Hi Experts,
    How can we add cost centre in KSBB report. Is it possible to add? if yes could any one guide me how to add the cost centre in KSBB report?
    waiting for your replies,
    Regards

    Hi,
    I see only three possible explanations:
    a) no data on this cost centre
    b) authorizations
    c) 'hard-coded' filter in the relevant report (only if it's user-developed report)
    Regards,
    Eli

  • Cost Centre Reporting

    Hi,
    We are a large company with around 40000 staff and have the following business requirement.
    - Cost centre reporting is expected to be hierarchical in nature but current Cost Centre structure in Australia is flat in structure.
    - Natural hierarchies already exist by organisational structure: Total Company, Business, Zone, Region, Area and Branch.
    - As a high level requirement, cost centre data should only be available to the manager of the organisational unit that they are managing and any lower level organisational units. Managers should only be able to view their organisational unit costs or lower organisational unit costs. They should not be able to view cost centre data across structures (peer organisational units) or higher levels of responsibilities (parent organisational units).
    - The ability to access cost centre reporting data should take into account HR delegations and substitution processes. This also needs to take into account the granting of the correct authority to the delegated person to run reports.
    - One possible option is to utilise the A250 Cost Centre Manager relationship in SAP to facilitate the security for cost centre reports.
    I will be handling these requirements from a security perspective and would liike to achieve this without creating hundreds of roles and a maintenance nightmare.
    A finance version of structural authorisations would be good
    Any input would be greatly appreciated.
    Barb

    Hi Barbara
    I have been in this situation a couple of years ago. We ended with a solution where I made a report for generating the roles based on the responsibility area, and where the user assignment where done manually. Not a very elegant solution, but it worked.
    I can see that your requirement are a bit more sophisticated though. And if you do not want to generate a lot of roles I think you will need to develop your own concept for this.
    But again, as authorization check are implemented directly in the source code, this is not a small task ~ at least my guess is that you will have to limit the number of report etc used by managers to very few, perhaps Managers desktop or Manager Self Service could help here ? Otherwise I guess my suggestion would be to develop my own reporting application, or try to convince the customer to give up some of the requirements.
    The bottom line is, that SAP Finance really can't handle this in an elegant manor, So Yes  -  a finance version of structural authorizations would be a great Idea

  • Is it possible to reinitialise a control value to default each time the program redo his cycle in a while loop ?

    Is it possible to reinitialise a control value to default each time the program redo his cycle in a while loop ?
    My problem is that I have a numeric control (0 or 1) and I want taht wahn the numeric is 1 labview makes the writing process of my data but after that the control must return to 0 to write only one time.
    Is it possible ? I've tried some trials but none of them succeded

    well i'm student and i have to write a program for school i don't know labview very well.
    i post here the part of the program i have to do so you can see what i must do .
    The button pass with datasocket so i can't use boolean and the problem is that the value must be set to 1 only for one cycle (one writing of the values). so when th people set it to 1 in internet explorer for exemple the value must be considered as a impulsion and as it is it always do a lot of cycle until the man set it manualy to 0 what i don't want.
    Attachments:
    exemple.vi ‏9 KB

  • Automatic batch creation while making the UD

    Hi Gurus,
    Due to a customer need, I want to create the batch number for a good's receipt while making the UD, is that possible in a way other than using transaction MSC1N?

    Hello Max,
    What I have understood is you need not to create batch number while posting the MIGO document and need to fire the batch number at the time of performing UD? If it is so then here is the solution:-
    You can meet the requirement via so many ways but according to me the easiest way is, follow these steps.
    Step:01 Copy the movement type 101 (use Trx OMJJ) create Z01. Where you need to select the option "No Creation" in the field "Create New Batch" in the entry level control.
    Step:02 Use this movement type while creating GR, (change the std setting for GR against PO for trx MIGO)
    Step:03 For movement type 321 - TF quality to unrest change the settings for the "Create New Batch" field from "No creation" to "Automatic / manual without check"
    I think these will be enough for your requirement.
    If there is any query pls revert.
    Regards,
    Shyamal

  • Validation for bank while making payment to Vendors

    Hi All,
    We want the system to validate the bank balance while making payment to Vedors via f-53,f-58,f110 or any other payment transaction,
    Eg;
    Available Balance in Bank ; 25,000/-
    Payment to vendor must be restricted to max of 25000/-  or less than 25000/-
    The system must allow us to make payment more that the available bank balance(less the minimum balance that has to been maintained at bank).
    Where & How can i capture this requirement in the system.
    Appreciate your responce in time  and your patience too
    Regards

    Dear Raghu,
    Thanks for your reply.
    Our requirement is not the minimun bank balance.
    Our requirement is that the system must not allow us to run any payment beyond the available amount in the bank account.
    for eg : if we have 10 lacs as on day in our bank account,we must be in the position to make payment to vendor to max extend of 10 lacs only not more than that.
    At present the system not having any control in this.....
    How can i do it in OB28...bcoz we have 5 account.1.Main Bank,2.Chq Incoming,3.Chq Outgoing,4.Cash With drawal & 5.Cash Deposit.
    Can you let me know how can we bring this in the system to validate the out going payment.
    Regards

  • Pricing error while making Credit Memo

    Dear Gurus,
    While making credit memo with reference to credit Memo request i am getting pricing error on the basic price.
    Please note i am getting this error only while making credit memo under this conditions
    1. while using Invoice as reference while making credit memo request and than making credit memo with reference to credit memo request.
    Please note i am not getting this error while the credit memo request is not refrenced to Invoice.
    I am using the same document types for both the scenarios. I have checked copy control and the Pricing type maintained is "D".
    Please let me know what could be the possible error.
    Thanks for your help in advance.
    Regards
    Shrads

    Hi,
       Please check your credit memo document type for document pricing procedure in VOV8.

  • Programatically bring the cursor to a numerical control while VI running

    Does anyone know how to programatically move the cursor to a particular numerical control while a VI is running?
    I have a VI that polls the user for information, and at one point, the user has to repeatedly type numbers into the same numerical control and press enter. For a number of reasons, it is awkward to be messing with the mouse during this particular test. Each time the user presses a paricular button to send data a to file (which I have linked to the Return key on the keyboard by means of 'key navigation'), I would like the cursor to jump to the relevant numerical control ready for the next number to be entered on the keyboard. Does anyone have any ideas how to do this?
    I have set up a separate key navigation for thenumerical control in question, so if the user presses the Esc key, this control becomes active and the cursor is in place, but I would like to move the cursor there without this extra user button press if at all possible. 
    Regards,
    Will

    Will
     I'm not sure if this is what you are looking for but it might do what you need.
    On the block diagram right click the control in question >>create>>property node>>key focus. Now right click the property node and select Change to write. Wire a boolean true constant to it and place this snippit in the appropriate place(s) in your code depending upon your architecture.
    Hope this helps.
    Using LabVIEW 2010SP1 and TestStand 4.5

  • ORA-00607: Internal error occurred while making a change to a data block

    hi
    i hv use testing purpose oracle 10 Xe in unix
    but when today i hv connect database following error occured
    SQL> startup
    ORACLE instance started.
    Total System Global Area 83886080 bytes
    Fixed Size 1257284 bytes
    Variable Size 75497660 bytes
    Database Buffers 4194304 bytes
    Redo Buffers 2936832 bytes
    Database mounted.
    ORA-00607: Internal error occurred while making a change to a data block
    ORA-00600: internal error code, arguments: [4193], [625], [640], [], [], [],
    I hv check alert log , but no proper solution is given , how can start database

    Duh, and of course I missed the significance of
    oracle 10 Xe in unix
    XE is only supported for Linux - according to the downloads page that means "Debian, Mandriva, Novell, Red Hat and Ubuntu".
    Oracle have not publically stated the reasons why XE is only available on Linux and Windows, but my guess is that it is something to do the Intel chip architecture. If this is so it would be possible for Oracle to port XE to run on Solaris for x86. But they have not done so yet.
    Which means, alas, that you are unlikely to get any help for this one, because XE is not supported on any unix platform.
    Good luck, APC

  • Error while making joins between ODS in a Infoset

    I am getting these 2 errors while making a join between ODS In InfoSet
    1).Incomplete ON conditions in an outer join
    2).Invalid ON condition for left outer join (ZSDO015)
    Please help what to do?

    Hi,
    Check both ODS's are having a common Infoobjects are not i.e. same name and datatype and length.
    http://help.sap.com/saphelp_nw04/helpdata/en/44/b21f98be886a45a4bb7e123e86e4c2/frameset.htm
    Thanks
    Reddy

  • Customer as Vendor --while making payment f110 how to deduct line item wise

    Dear all ,
    My Requirement like this please help me come out this issue.
    we have 5 company code , we have created customer as a vendor.In one company code ,for eg(10000 is a customer and mean time same as Customer as  Vendor(10000) in another company code.
    Now we have raised customer invoice ,
    For eg   10000 for fertilizer.
                  10000 for Drip irrigation
                  20000  some loan.
    These transaction incurred in one company code.
    In other company code these customer as a vendor ,
    Here we have enter Vendor invoice,
    For ex Invoice amount is 70000.
    while making payment i want to deduct this amount from customer invoice amount.
    like in 10000 for Fertilizer in that ,I want to deduct partial  amount in line item level  for different purpose.
    How to deduct this amount .and how to map this scenario in the system.
    Please guide me come out of this issue.
    Thanks in advance
    Regards
    Girish.

    Hi
    vendor and same as a customer functionally is possible with in one company code.  in that case you will be able to clear the customer open items when you are doing the vendor payment.  
    but in my knowledge this functionally is not possible with other company codes. as per your query you are maintained the vendor in one company code and customer in another company code.  you want to clear the line items with one transaction in F110.
    i think its not possible.  becuase payments and receivables are with in company code.  
    Regards
    Ram

  • While making changes in alternate Unit of measure CAR it makes changes

    While making changes in alternate Unit of measure CAR it makes changes in other alternate Unit of measure KAR.
    Both are having same ISO unit CT.Please suggest why it is happening.

    your units have probably a conversion rate to the SI unit in its definition.
    you can see this in CUNI, open your unit in detail and look at the lower left  part

  • How to handle the table control While working with LSMW?

    How to handle the table control While working with LSMW?

    its possible in lsmw,
    Hi,
    LSMW will have a Indicator for headr and itam, i do not remember the correct field, but it will have an indicator, check the fields, there will be a single charecter lenght field, that should be the indicator, and using that we can write the logic.
    check that single charecter field, it that is X that means the header record is processed, and do the items.
    and, this is another way, try this out also
    YOu can do this in "Define Source Structures" step,
    the HEADER is defined first,
    then the DETAIL below the HEADER.
    add the fields to the structures.
    Both should have some common key field
    Please take care that the name of the common field is the same.
    Once you do this it is linked. The you have a header and item corresponding to that header. then run the LSMW as you would.
    Thanks

Maybe you are looking for

  • Build-in SMS function for iphone3GS

    I have just started to use my iphone recently. I am a heavy sms user and I find that the current SMS/ Message function in my iphone 3GS is very unfriendly and make me feel very frustrating..the following issues I have encountered and hope some good e

  • Trying to output from s-video to composite (for television) radeon 4770

    I put together a little htpc using a bunch of spare parts I had lying around...I'm trying to get the s-video to output to component in (RCA type connectors) I have the s-video to component adapter, but I have no idea what the color coding means, as w

  • Office 2013 Service Pack 1 installation causes shim error in Windows 8.1 Enterprise

    On a clean install of Windows 8.1 Enterprise and Office 2013 I installed RSAT and everything works fine initially.  When I install the Office 2013 Server Pack 1 update (categorized as an "Important" update) I then get the following errors when attemp

  • Saving processed files in original raw (or DNG?) format

    Hello. I'm new to Lightroom, so although I've spent a day or so ploughing through the tutorials, please accept my apologies if my question seems dumb. However I can't see an answer to my problem so far. It is this: after importing my raw files (CR2)

  • Exported file plays poorly on Windows device

    I created a video on FCPX 10.1.3 with a Mac 10.9.4 and exported it as a .mov file. The file was 4g. When I played it on my Mac it worked perfectly. When I played it on a ThinkPad laptop the audio was majorly delayed with the video. I tried re-exporti