Posting MBOM / EBOM..

Hi.
Actually we have used the BAPI : BAPI_UPLOAD_SAVE for uploading the BOM to R/3 which is coming from Windchill system..
Whether this BOM works for any such as EBOM or MBOM..
Initially we have checked it by pushing the MBOM but now the scope was change if i need to push the EBOM, do ineed to do any change in the interface..
regards
Krishna

hi,
>>>>Initially we have checked it by pushing the MBOM but now the scope was change if i need to push the EBOM
you can change ebom to mbom with Windchill MPMLink I guess and use the mbom only
Regards,
Michal Krawczyk

Similar Messages

  • How to Manage MBOM/EBOM

    Our company is currently beginning the implementation process for Oracle EBS 12R and is having difficulty between the consultants and employees finding a working module to manage our EBOM/MBOM without all the manual upkeep.
    Background info:
    - Our MBOM is currently managed in Flexnet MES manually
    - Agile contains our EBOM as well as all ECR/ECO's
    - Agile feeds PeopleSoft currently (which we are converting to Oracle)
    - Japan (our parent company) dictates our ECR/ECO's while we manage an in-house MBOM
    - The current MBOM is completely manually and not extractable from the MES system
    How do we find a logical way to maintain the EBOM in Agile, and the MBOM is Oracle and Flexnet MES without having to make so many manual changes every time an ECO is issued? Obviously we need to set the MBOM first but how do we logically compare the two for changes within the Oracle system and create automated updates? What is the best practice in the field? Thank you for your input.

    Can you please share the documents, if you have, how Agile is sending BOM to PeopleSoft? And can you also please share the docs for data flow in PeopleSoft?

  • Synchronization of EBOM with MBOM- ehp 5 question

    1. We are currently using custom programs to download multi-level Engineering BoMs to Plant BoMs.
    Will the  ehp 5.0 functionality do this function as a part of EBOM - MBOM synchronization?
    2. If MBOMs are modified specific to plants will these changes be highlighted back to EBOM ?
    3. Can this EBOM - MBOM synchronization happen across systems? Our Engineering BoMs are in a different server?
    Thanks
    Ramesh

    When it comes to FMS streams, there really is no way of
    accurately syncronizing streams. Since you can't keep data in
    buffer when pausing the stream, and you have to rebuffer any time
    you seek, it's impossible.
    The only way I've been able to sync flv's is using
    progressive download. With progressive, you can sync streams, but
    the accuracy is limited to the keyframe interval of the flv files.
    For example, if you have 2 keyframes per second, you can achieve
    sync with 1 second accuracy. with 4 keyframes per second, you can
    get the offset down to 500ms. If you make every frame a keyframe
    (makes for a huge file), you can get frame accurate sync.
    The theory is to build a class that monitors the time and
    buffer length properties of your two streams, pausing and/or
    seeking when needed to maintain sync.

  • MBOM and EBOM..

    Hi.
    Actually we have used the BAPI : BAPI_UPLOAD_SAVE for uploading the BOM to R/3 which is coming from Windchill system..
    Whether this BOM works for any such as EBOM or MBOM..
    Initially we have checked it by pushing the MBOM but now the scope was change if i need to push the EBOM, do ineed to do any change in the interface.. i am using the integrator tool as SAP XI..
    regards
    Krishna

    Hi
    I think no change is required, the only change is that sender system should pass STLAN = '2'.
    Basically you can execute the function module BAPI_UPLOAD_SAVE and with STLAN = '2' and see, whether it works.
    If yes than it will work from SAP XI also, assuming no specific hardcoding is done in SAP XI for MBOM
    Regards
    Madhan

  • EBOM vs Mbom

    Hi,
    Can anyone tell me something about Ebom vs Mbom.
    I want repliies with regard to manufacturing.
    Thanks & Rgds,
    - Pareena

    hi pareena,
    e bom means engineering BOM
    mbom is manufacturing BOM
    One of the functions of such software is the configuration of bills of materials or BOMs, taking the component parts list from engineering (eBOM) and manufacturing (mBOM) and updating it from “as delivered” through “as maintained” to “as used”.
    when the production planning department creates the Production Bill of
    Materials (PBOM) based on the Engineering Bill of Materials (EBOM). This
    initiates a planned order, which in turn creates a material need. The planned
    order is then transformed into a production order by the production controller
    in the workshop. This is done in SAP in transactions MD04 and CO41. The
    production order is then released with the transaction CO02. Here, the
    system automatically creates a picking list. Next the production order
    operation is confirmed by the production controller or supervisor in
    transactions CO11N and CO15.
    This is the critical point where it needs to be checked whether some materials
    went on the goods movements with errors list (COGI list). These could be
    materials that are consumed from stock or the end product itself. Mostly it
    concerns only the materials that are consumed from stock. Errors occurring
    in the consumed materials do not prevent the end product from being
    completed but it will have two unwanted consequences: the stock balances
    will become distorted and the costs will not be registered on the production
    order correctly.
    thanks
    karthik
    1) The recomended way of check-in file into SAP Content server is through CAD Desktop.
    Goto CAD Desktop and check in the file using Check in Original.
    If the Original file is not checked in SAP then the Problem is in File Check-in.
    2) Create EBOM and save in SAP. If you are getting any problem. Then the Problem is with BOM Creation

  • Ebom's and Mbom's ???

    Hi,
    What are MBOM's and EBOM's with respect to 'Manufacturing Module'.
    Regards.

    Proplanneru2019s eBOM (product engineering bill of materials) defines and manages the components and structure of the product being manufactured. Users can attach documents to components (CAD Files, Cost Studies, etc), as well as database attributes that are reference by the other planning modules.
    Users can import bill of material directly into the eBOM, and then export the eBOM items into mBOM to populate the manufacturing bill of material for the first time. When the eBOM is reimported in the future, Proplanner will reconcile and report on differences between the new eBOM and prior mBOM.
    The eBOM and mBOM are presented as assembly trees that depict a hierarchical structure for the assemblies, subassemblies, and parts that make up the product, whether purchased or manufactured. Users can create and modify these trees as they would with files in Windows Explorer.
    Whether created or imported, components are stored in the customeru2019s library for easy reference by others in the organization.
    All end-items, assemblies, purchased components, manufactured components and raw materials are identified in the eBOM. Product features, can be accounted for in the mBOM. Users can associate drawing files, PDFs, digital photos and even video to every component in the tree for easy reference.
    The eBOM allows users to assign suppliers to Purchased parts, raw materials and manufactured components that can have external suppliers.
    Components in the eBOM can be assigned version numbers and are thus reconciled with the mBOM based upon their version.
    Proplanner allows users to assign Options to the eBOM components and Option Mixes to the eBOM end-items. Users can then generate a specific eBOM view for a particular model, or display the generic view which lists all components used in all models.
    Reward points if helpful.
    Regards.
    - Rishika bawa

  • EHP5 PLM 7.1 - Syncronization eBOM mBOM

    Hello,
    Does anybody know how Guided Syncronization Structure (GSS) will work in PLM 7.1?
    Is there any prerequisite in BOM management SAP process to enable this new feature?
    Thanks
    Riccardo

    Hi Satish,
    You may refer my wiki article on GSS [here|https://wiki.sdn.sap.com/wiki/display/PLM/GuidedStructureSynchronization+%28GSS%29].It clearly explains how you can use GSS to convert a product structure to eBOM and eBOM to pBOM.
    Regards,
    Pradeepkumar Haragoldavar

  • Change EBOM

    Hi all,
    I am trying to change an EBOM using CS_BC_BOM_CHANGE_BATCH_INPUT. Every single time I change happens, it sets VALID_TO date to current date. I am looking to append the components to the ones existing in the EBOM with a NEW CHANGE NUM.
    Is there any setting in the Func Module to acheive that or am I missing someting? Would reallly aprrecite your help
    Revist EBOM to update components
          CLEAR s_bomheader-aennr.
          perform create_eco_num using sy-datum changing p_aennr.
          s_bomheader-aennr = p_aennr.
    update the components...
          s_bomheader-tcode = 'IB02'.
          SORT t_stpub BY xline uposz.
          CALL FUNCTION 'CS_BC_BOM_CHANGE_BATCH_INPUT'
            EXPORTING
              bom_header   = s_bomheader
              close_group  = 'X'
              commit_work  = 'X'
              group_data   = s_groupdata
              new_group    = 'X'
              tcode_mode   = 'N'
              tcode_update = 'A'
            IMPORTING
              msgid        = l_msgid
              msgno        = l_msgno
              msgty        = sy-msgty
              msgv1        = sy-msgv1
              msgv2        = sy-msgv2
              msgv3        = sy-msgv3
              msgv4        = sy-msgv4
            TABLES
              bom_item     = t_stpob
              bom_sub_item = t_stpub.
          IF NOT l_msgid IS INITIAL.
           MESSAGE ID l_msgid TYPE sy-msgty NUMBER l_msgno
           WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
           EXIT.
          ENDIF.
    Thanks,
    Ravi

    hi,
    >>>>Initially we have checked it by pushing the MBOM but now the scope was change if i need to push the EBOM
    you can change ebom to mbom with Windchill MPMLink I guess and use the mbom only
    Regards,
    Michal Krawczyk

  • Error while posting a write up for asset belonging to affiliated company

    Hi,
    I am facing an error while posting a write up for an asset which belong to an affiliated company. Error is
    Transaction type 790 not possible (posting to affiliated company)
    Message no. AA390
    I am using Transaction type 711 which is linked to 790 in custo. Kinldy let me know how to resolve this issue.
    Thanks
    Pragya

    Hi
    According to this note for document type used, we should not select the 'inter company posting' or 'enter trading partner indicator'
    but as i m doing writeup for asset belonging to affiliated company, so i need to set this indicator. the document type used is standard AA
    Is there any other way, to resolve the issue
    Thanks
    Pragya

  • Error while running a query-Input for variable 'Posting Period is invalid

    Hi All,
    NOTE: This error is only cropping up when I input 12 in the posting period variable selection. If I put in any other value from 1-11 I am not getting any errors. Any ideas why this might be happening?
    I am getting the following error when I try and run a query - "Input for variable 'Posting Period (Single entry, mandatory)' is invalid" - On further clicking on this error the message displayed is as follows -
    Diagnosis
    Variable Posting Period (Single Value Entry, Mandatory) is used as a lower limit (X) and an upper limit () in an interval selection. This limit has the value #.
    System Response
    Procedure
    Enter a different value for variable Posting Period (Single Value Entry, Mandatory). If the value of the other limit is determined by another variable, you can change its value also.
    Procedure for System Administration

    OK.
    Well, if the variable is not used in any interval selection, then I would say "something happened to it".
    I would make a copy of the query and run it to check if I get the same problem with period 12.
       -> If not, something is wrong in the original query (you can proceed as below, if changes to original are permitted).
    If so, then try removing the variable completely from the query and hardcode restriction to 12.
       -> If problem still persists, I would have to do some thinking.
    If problem is gone, then add the variable again. Check.
       -> If problem is back, then the variable "is sick". Only quick thing to do, is to build an identical variable and use that one.
    If problem also happens with the new variable, then it's time to share this experience with someone else and consider raising an OSS.
    Good luck!
    Jacob
    P.S: what fisc year variant are you using?
    Edited by: Jacob Jansen on Jan 25, 2010 8:36 PM

  • Posting the Expenses of Free Goods

    All SD Gurus
    I have some doubt in SD-Module.
    We have Trading Business, in that the Trade offers ie 100+10 Like that.... is presently posting in VPRS - Cogs (During PGI) only. But finance wants to post the values of trade offers (10 pcs) to Marketting expenses (During Bill Release to Finance), Presently during Bill release these trade offers are not considered for pricing.
    According to my Current setting Free Goods Item Category is marked as Statistically. So it not posting my PR00 Conditions in Accounts.
    Any help on this subject will be highly appriciated.
    Thanks in Advance
    Regards
    Vishal

    Thanks, I have maintained all setting for Free goods. System is not posting any values @ time of Invoice in accounts as my free goods Item category is statistical. If I remove this setting then I have to maintain the PR00 - Base Condition (Mandaotry) which will post amount in Sales Domestic G/L Account.
    Any alternative solution?
    Regards
    Vishal

  • Item cost not found for one or more items - Inventory Posting

    Good Day Mentors,
    My user has encountered an error during Inventory Posting and its "Item cost not found for one or more items".
    The specific Message ID from SAP's System Message Log is 10001287.
    I found a similar post which addresses this error here.
    But unfortunately it did not help me solve my user's problem.
    I already checked if the items had a defined "Item Cost" in the Item Master Data Inventory Tab, and they all have "Item Cost" defined.
    I'm not sure if this will help, but below is the Inventory Audit Report of one of the items that is throwing the "Item cost not found" error.
    I am not a business consultant neither am I literate in accounting, so thanks for the patience.
    SAP Version: 9.0 PL5
    Valuation Method: Moving Average
    Thanks in advance!
    Sean

    Hi Augusto and Raviraj,
    I've already verified in our production database the points you made:
    - Is the "Manage Item cost per warehouse" selected in the Basic Initialization Screen?
    YES
    - Is the "Manage Inventory by Warehouse" ticked/checked in the "Inventory Data" tab of the "Item Master Data" screen?
    YES
    * I apologize for not have been able to give this information upfront.
    Anyway, the database only has one warehouse at the moment.
    I've checked the items, like the item in the screen shot above, and it does have an item cost.
    Below is the screenshot of the sample item from my original post,
    Thanks in advance!
    Sean

  • Possible to clear vendor open item against already posted payment document?

    Hi
    Can you advise if it is possible to clear an open item against already posted payment/clearing doc? Here is the background to the scenario:
    An invoice was posted with transaction FB60. This was subsequently picked up in the payment run F110 and cleared by payment document number 200005678. The item went to the bank on the paymnet file and was paid out to the vendor. The transaction reference, which appeared on the incoming bank statemnet was the payment document number 200005678.
    Subsequently it was discovered that the original invoice should have been posted with reference to a PO using MIRO. The requirement now is to reverse the paymnet documnet 200005678 in SAP, then reverse the document that was posted using FB60. After this the invoice will be posted using MIRO. This will create an open item on the vendor account.
    This item will not be piad out again. Therefore the requirement is to try clear that open item against the previously posted payment document 200005678.
    Is there any way to clear this vendor open item against the originally posted payment document 200005678?? Or any other advice on how this scenario can be handled in SAP?
    Thank for your help.
    Mike

    Hi,
    I tried that option in our test system. I ran FBRA and entered Paymnet Documnet Number (+Clearing Doc Number), Company Code, Fiscal Year.
    Then chose menu option Clearing -> Reset Cleared Items.
    The system pops up a window asking for a reversal reason and reversal date.  I use 01 and posting date of today.
    The system now posts another cleared document. That document places the invoice as an open item on the vendor account. It does not place the Payment Document as an open item on the account.
    When I go to F-44 only the open vendor invoice is showing there. There is no open paymnet document.
    Is there perhaps some configuration setting that stops the placement of the paymnet document as an open item when reset?
    Thanks for your help again.

  • Where we have to open and close posting periods in asset accounting

    hi sap gurus
      can anybody give where we have to open and close posting periods in asset accounting
    thank you
    venkatareddy

    Hi Venkatareddy,
    You make specifications for fiscal years and posting periods in the SAP R/3 System in Customizing for Financial Accounting. This is done in the fiscal year variant in the global parameters of the company code. These settings are, in general, also binding for Asset Accounting. The depreciation periods in Asset Accounting then correspond to the posting periods in Financial Accounting.<b> It is usually not necessary to create a separate fiscal year variant for Asset Accounting.</b>
    The period control in the depreciation key determines the start and end of depreciation when asset transactions are posted . The period control determines the relationship between the calendar period in which the asset transaction is posted and the depreciation period.
    These calendar periods are independent of the posting periods in Financial Accounting. The only restriction is that the beginning of the first calendar period and the end of the last calendar period defined in a period control have to match the start date and final date of the fiscal year in Financial Accounting.
    Kindly let me know if this useful for you

  • How to Open and Close Posting Periods in MM

    Hi,
    I have opened posting periods for 10/2008 first and by mistake even 11/2008 and 12/2008 using MMPV.
    Now when I am trying to do PGI from VL02N, the system says postings are only possible for 11/2008 and 12/2008.
    How to close these two periods and default to 10/2008.
    Please kindly help me to solve this issue.
    Regards,
    Gopi Krishna
    SAP QA Lead

    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.
    If there has already been postings after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/03/2008 for Mar. 2008 month to be opened as of now
    That means, user can post for the month of Feb 2008 as well as Mar. 2008
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    XXXXXXXXXXXXXXXXXX
    Other way of doing it is follow these steps( But try this method in Sand box Only):
    1. Go to OX18, and delete the plants assigned to your CO.Cd and save.
    2. Go to OMSY and change the posting period to the one u want and save.
    3.Go to OX18 and assign the plants you have deleted in step 1.and save.
    regards,
    indranil

Maybe you are looking for

  • HT1338 xcode shuts down when trying to distribute to itunes store?

    So I am trying to distribute an app to Itunes.  I get this shut down error now when I try to distribute my app to Itunes. This just started happening.  It didn't happen yesterday or any other day leading up to today. I haven't done anything different

  • [JS] [CS3] Text Path to Layer?

    A Hierarchy question. How can I navigate from a Text Path object to find its Layer? (ie the Layer it resides on) Thanks, PJB

  • Examples of continuous pulse train generation on a 6602 using C#

    Hi All I have an application in which I am hoping to use a 6602 counter timer to generate a square wave whose frequency can be varied, on the fly, between 10 Hertz and 250 KHertz.  Now I have been able to create a task using MAX to output the wavefor

  • Help with Camera (Built-In)

    Hellow everyone, I have a Imac and the camera light is green but noting is showing up on my screen on a webcam site, does anyone know how to fix this?

  • COST CENTER VALIDATION

    Hi All, I got the situation where i need to use a cost center in another company code for this i have to write validation for the same. Please suggest me the formula for writing validation that when there is COST CENTER 1 it will not check for COMPAN