Process Integration Tools load from SAP

Hi,
I am trying to launch the PI Tools (java part) from the PI SAP machine in the abap part.
Does anyone know the name of the trasaction? I have searched on the internet but haven't found anything.
Thanks,
Edited by: Silvia Garcia Rua on Sep 26, 2011 1:17 PM

Thanks a lot!

Similar Messages

  • How to add License Key For Integration Tool kit For SAP in Linux Server

    Dear Experts,
    We are Using BO XI R3.1 SP3 Enterprise Version ,Integration Tool Kit For SAP,Live Office.
    The Server is Linux Server.
    But while generating reports in Infoview it is giving error like ""_check that you are licensed to access SAP Data Source_".
    So we came to know that license Key might Expire for Integraton Tool Kit For SAP in Bo Server.
    So can you tell me how to add the license key For BO XI R3.1 SP3 Integration Tool Kit For SAP in Linux Server.
    Thanks & Regards,
    Venkat

    On Unix / Linux you should be able to leverage the response from Raphael and change:
    Location=%BOBJDIR%/bobje/data/.bobj/registry/software/business objects/suite 11.5/sap/keycode/.registry
    For more information verify the below link
    [How do you update the SAP Integration Kit license?;
    Regrads
    Pardhu

  • Data load from SAP ECC to SAP BI

    Hello Gurus and Experts
                     I am new to BI and I m almost struggling to find a step by step process in loading data from SAP ECC to SAP BI through generic extractors from VBAK. The Problem is I can create an Infopackage for full update and loaded the records.(Lets say Upto this step 100 records are moved to PSA)
    Then I create a sale order in ECC which is a new record that has to be transfered as delta record.
    Now my questions are:
    Am I correct if I moved the initial records into PSA with Full Mode InfoPackage?
    Should I create another infopackage for delta records with Delta Mode or to change the update mode of the infopackage created earlier for Full Update mode?
    Should I create a new infopackage every time to load the delta records?
    Does separate DTP has to be created for Full and Delta updates?
    Please dont be frustrated if my questions are pointless or childish
    I would be glad if someone demonstrate the solutions in steps
    Thanks in Advance
    Karthik

    Hi Ram,
           I have followed all the steps mentioned by you, yet something is lagging in my end.
    Let me lists the steps done by me and please correct me if i am wrong anywhere.
    1. RSO2 in ECC..
    2. Created DS with short, med and long names in SD application component for VBAK with all the fields unchecked in hide selection except document number, time of document, document date, net
    value of the document and document currency.
    3. mentioned a numeric pointer as Document number for delta and used new status for changed records.
    3. saved the datasource. checked the newly created ds using the tcode RSA3.
    4. Replicated the datasource under SD Application Component in BI and Activated it
    6. Performed Transformations
    7.  created an Info Package with FULL UPDATE and executed. I got 6898 records in my PSA
    6. Created DTP with DELTA. Saved and Executed it. Got 6898 records in my DSO
    7. Created Info Package with INIT WITHOUT DATA TRANSFER and scheduled it.
    8. Switched over to ECC and added a sale order
    9. Created an InfoPackage with DELTA UPDATE and Scheduled it.
    -----I didnt receive any records in my PSA
    10. performed DTP.
    ---- I didnt received any new records in my DSO as my delta run is not working..
    PS: I am using WO DSO
    Please correct me if i am wrong anywhere
    Thanks in advance
    Karthik

  • What r the integration tools used in SAP

    Hi all,
    Please let me know What r the integration tools used in SAP

    BAPI - These are published programs which is used to upload data i
    nto SAP system.
    BADI - This is a program enhancement technique. SAP pr
    ovides BADI openings in the standard programs. You need to search for the s
    uitable BADI as ur requirement and then do the coding and plug in the progr
    am.
    IDoc (for intermediate document) is a standard data structure for electronic data interchange (EDI) between application programs written for the popular SAP business system or between an SAP application and an external program. IDocs serve as the vehicle for data transfer in SAP's Application Link Enabling (ALE) system. IDocs are used for asynchronous transactions: each IDoc generated exists as a self-contained text file that can then be transmitted to the requesting workstation without connecting to the central database. Another SAP mechanism, the Business Application Programming Interface (BAPI) is used for synchronous transactions.
    Afrasyab

  • How to avoid duplicate data loading from SAP-r/3 to BI

    Hi !
           I have created one process chain that will load data into some ODS from R/3,where(in R/3)the datasources/tables r updated daily.
           I want to scheduled the system such that ,if on any day the source data is not updated (if the tables r as it is) then that data shuold not be loaded into ODS.
           Can any one suggest me such mechanism,so that I can always have unique data in my data targets.
           Pls ! Reply soon.
          Thank You !
           Pankaj K.

    Hello Pankaj,
    By setting the unique records option, you pretty much are letting the system know to not check the uniqueness of the records using the change log and the ODS active table log.
    Also, in order to avoid the problem where you are having dual requests which are getting activated at the same time. Please make sure you select the options "Set Quality Status to 'OK' Automatically" and "Activate Data Automatically" that way you would be having an option to delete a request as required without having to delete the whole data.
    This is all to avoid the issue where even the new request has to be deleted to delete the duplicate data.
    Untill and unless the timestamp field is available in the table on top of which you have created the datasource it would be difficult to check the delta load.
    Check the table used to make sure there is no timestamp field or any other numeric counter field which can be used for creating a delta queue for the datasource you are dealing with.
    Let me know if the information is helpful or if you need additional information regarding the same.
    Thanks
    Dharma.

  • Error Converting Currency --  Load from SAP ECC / R/3  to BW / BI

    Hi,
    I have a custom extractor pulling data from ECC.
    However, I am getting the following error.
    'Error Converting Currency from USD4 to  on 8/27/2008'
    RSA3 works fine. PSA load fails and the above message can be seen in the application log in ECC.
    Any ideas?
    Points will be assigned.
    Thanks,
    Edited by: Rajen SAP BI on Aug 29, 2008 2:23 AM

    I believe in the transfer rule info object 0currency should be assigned with field from transfer structure which contains Currency . Once the assignment is done , delete data from info cube and reload the data and this time it should give
    corresponding currency along with Amount.
    Once you are able to see the currencies along with amount second step would be to create Currency translation ( RRC1 ) Put description ( Fixed Currency USD )
    Tab page exchange rate : Rate type M
    Source currency : From Data record
    Target currency : Fixed ( USD )
    Time ref. Fixed time ref. (Current datE) ( varies per scenario )
    Save it.
    Or
    Use this function module for converting currency from one format to another format...
    CONVERT_TO_FOREIGN_CURRENCY...

  • Getting Licece Key for BO XI 3.1 Integration tool kir for SAP Solutions

    Hi ,
    I want to Install 'BO XI 3.1 SP3 Integration Toolkit for SAP solutions'.I have market place login ID.
    1)Can you please tell the ways to get permanent licence key for above mentioned tool?
    Edited by: Venkat8130 on May 20, 2011 1:34 PM

    Check with your SAP/BO account manager to see if you are licenced for it.
    If you are, they will be able to supply it to you.

  • Delta Load from SAP R/3 to XI

    Hi Experts,
    Please let me know your how can I send the following data using IDoc from R/3 to XI :
    DELTA LOAD
    1.New or changed WBS Elements/Networks (T Code: CJ02, perhaps others)
    2.New or changed Orders (T Code: KO02 (internal), IW32 (PM))
    3.Transaction Data  for capital objects (Not thru XI)
    4.New or changed Cost Elements (T Code: KA02, perhaps others)
    5.New or changed Cost Centers (T Code: KS02, perhaps others)
    Thanks,
    Anirban.
    Moderator message: please do some research before asking.
    Edited by: Thomas Zloch on Mar 21, 2011 10:11 AM

    You must see this in WE05 or BD87. Just release the idoc and have a look at we05 or bd87 and limit down the time where to search. in sm58 you can only see the idoc ith the system can not log on to the remote system. Did you check sm58 in the target system? did you check bd87 in the target system?

  • Number of parallel process definition during data load from R/3 to BI

    Dear Friends,
    We are using Bi7.00. We have a requirement in which i should increase the number of parallel process during data load from R/3 to BI.  I want to modify this for a particular data source and check.Can experts provide helpful answers for the following question.
    1) When load is taking place or have taken place, where can we see how many parallel process that particular load has taken.
    2) Where should i change the setting for the number of parallel process for data load (from R/3 to BI) and not within BI.
    3) How system works and what will be net result of increasing or decreasing the number of parallel process.
    Expecting Experts help.
    Regards,
    M.M

    Dear Des Gallagher,
    Thank you very much for the useful information provided. The following was my observation.
    From the posts in this forum, i was given to understand that the setting for specific data source can be done in the infopackage and DTP level, i carried out the same and found that there is no change in the load, i.e., system by default takes only one parallel process even though i maintained 6.
    Can you kindly explain about the above mentioned point. i.e.,
    1) Even though the value is maintained in the infopackage level , will system consider it or not. -> if not then from which transaction system is able to derive the 1 parallel process.
    Actually we wanted to increase the package size but we failed because i could not understand what values have to be maintained  -> can you explain in detail
    Can you calrify my doubt and provide solution?
    Regards,
    M.M

  • Tools to Auto load bulk data from SAP BW into Essbase?

    Does any one know what is the most efficient way to retrieve a large amount of data from SAP BW into Essbase on a regular basis? We currenly export data from BW into several Excel files, which has the limitation of 64k row in a batch, we then load the excel files into essbase usng rules files. And it's a manual process. Do you know if there is a better tool/approach that we can use to do the data retrieve and load into essbase in one batch without need of human interference? Thanks for your good ideas!

    you can use HAL to do the extraction and loading data from SAP. did you try this?

  • SAP BPC 7.5: Master Data and Hierachiy Load from InfoObject

    Hallo Forum Participants,
    I am going to load Master Data from a "Clarity" Reporting Tool in BW to SAP BPC 7.5 via Process Chains (/CPMB/IMPORT_IOBJ_MASTER, /CPMB/IMPORT_IOBJ_HIER) delivered from SAP.
    These Process Chains load the Master Data and Hierarchies from an InfoObject. To find out more about Ticking of BPC I have performed a following test. So, on BPC Admin Interface I have duplicated the Dimension u201CAu201D and called it as Dimension u201CBu201D (in BW site InfoObject u201CAu201D and u201CBu201D). In the Member Sheet of Dimension u201CBu201D I have implemented the several changes und tried to load Master Data from BW namely from infoObject u201CBu201D into BPC Dimension u201CAu201D. Therefor I created a transformation file and mapped one for one IDu2019s. The data Manager started these chains, but resulted nothing (Status: red X).
    What are the features of BPC InfoObjects in Comparision with regular InfoObject?
    How can I load Hierarchies into InfoObject?
    What else I must take into account?
    Why does not work this simple test?
    Regards.
    Alisher
    Edited by: Alisher Babaev on Jan 6, 2012 1:59 PM

    Hallo pkrishna,
    so it is successed with master data load, but without hierachiies.
    My Master Data Properties on Dimension Sheet are:
    -ID
    -EVDESCRIPTION
    -PARENTH1
    -CURRENCY
    I have mapped as below:
    ID=ID
    CURRENCY=/CPMB/CURR
    /CPMB/CURR- my technical id in BW.
    In the Note you advised transformation file has been mapped like below:
    -NODENAME=NODENAME
    -HIER_NAME=HIER_NAME
    -PARENT=PARENT
    -ORDER=ORDER
    After executing of package i get whether rejected list or log file. No data can be retirieved from InfoObject.
    Have you any Idea?
    regards

  • Loading of transaction data from SAP ECC system failed

    Hi!
    I successfully connected SAP ECC system to SAP BI system.
    The following steps have been executed:
    - user ALEREMOTE with max. authorization
    - RFC destination
    - Distributing Data model
    - Generated Partner profile
    - Maintaining message types in WE20
    Now when I try to load any data from SAP ECC system the loading process in hanging in status "yellow" and never comletes.
    [0FI_AR_4|http://www.file-upload.net/view-1447743/0FI_AR_4.jpg.html]
    The following steps within Load process are yellow:
    Extraction (messages): Missing messages
      Missing message: Request received
      Missing message: Number of sent records
      Missing message: Selection completed
    Transfer (IDocs and TRFC): Missing messages or warnings
      Request IDoc : Application document posted (is green)
      Data Package 1 : arrived in BW ; Processing : 2nd processing step not yet finished
      Info IDoc 1 : sent, not arrived ; Data passed to port OK
      Info IDoc 2 : sent, not arrived ; Data passed to port OK
      Info IDoc 3 : sent, not arrived ; Data passed to port OK
      Info IDoc 4 : sent, not arrived ; Data passed to port OK
    Subseq. processing (messages) : Missing messages
        Missing message: Subseq. processing completed
        DataStore Activation (Change Log) : not yet activated
    Question:
    Can some one give me some technical steps (tcode, report) to solve this problem?
    Thank you very much!
    Holger

    Hi!
    Many thanks for your answer.
    Via BD87 on BW system I detect that all the IDOC's (type: RSRQST) will be received from SAP ECC system.
    Via tcode SM58 I could not detect any entries.
    However the loading status from yesterday is set to "red".
    The errors are:
    Extraction (messages): Missing messages
    Data Package 1 : arrived in BW ; Processing : 2nd processing step not yet finished
    Info IDoc 1 : sent, not arrived ; Data passed to port OK
    Info IDoc 2 : sent, not arrived ; Data passed to port OK
    Can you investigate my issue again?
    Thank you very much!

  • Loading Chart of Accounts from SAP into Account dim in BPC automatically

    Hi,
    for my client I would like to take a predefined flat file from SAP containing chart of account details (account id, description and parent) and load and  process them automatically using dtsx packages in BPC 7.0 MS.
    Also, I want the package to able to be able to change details when it finds an already existing account id (e.g. if the description changes) and only for the properties contained in the flat file (i.e. keep the property values the same in BPC for those properties which are not in the extract for existing account records), or to add new accounts for those that don't exist.  I don't want the existing dimension completely replaced, as the SAP file won't contain info for fields like ACCTYPE, or TYPEELIM for example.
    I find the help in Data Manager extremely confusing and am not sure which bits are current or have been superceeded.
    I am an application consultant with limited knowledge of DTS/ SSIS and I wonder if someone can give me a step by step detail of  what I must do to achieve this. I am sure that many people would like to do something similar.
    regards
    Scott.

    Here is what you need to do in the SSIS package.
    1. You need to create exactly same structure as MBRAccount Table. Let's say tmpMBRAccount
    2. Export Account data from SAP as FlatFile
    3. You need a Script to fill in ACCTYPE or other properties that doesn't exist in SAP but mandatory for BPC account dimension. This script will change exported Flatfile.
    4. Import step3 flatfile into tmpMBRAccount table.
        Some users import data into MBRtable directly but it is not good because if error happens,
        there is no way to roll back until restore table from backup database.
        If users use temporary table as we do, Admin task will backup and roll back if error happens.
    5. Run Admintask and point tmpMBRAccount table as source table.
    6. You need another script to update Excel member sheet from updated mbr table.
        If you don't have this script, data member will be inconsistent between excel member sheet and MBR table.
    Some customer add more steps to validate members or error handling.
    If you are not an expert of SSIS, I think you need a technical consultant for doing this.
    There are an example package in BPC sample package folder but it is very basic one.
    Thank you.
    James Lim

  • Adobe Bridge CC 'Tools Load Files Into Photoshop Layers' missing from menu.

    Hi,
    After updated to bridge CC the 'Tools > Load Files Into Photoshop Layers' has simply disappeared from the menu! Is there a plug in that I'm missing or is this something similar to how the Output module works, where you have to install the files manually?
    Thank You

    I uninstalled all Adobe products -> reboot -> reinstall; which didn't work.
    So I had to uninstall all Adobe products again, then use the Adobe Creative Cloud Cleaner, reboot & reinstall everything again; then it finally worked.
    This seems to be a regular thing since the introduction of Adobe CC, almost every new update or new versions breaks functionality & requires a complete uninstall -> reinstall process.

  • Webinar:SAP NetWeaver Process Integration u2013 Advanced Adapter Engine in PI 7

    +Please Note: This webinar is aimed at consultants, Patners and Customers in APJ Region and is scheduled at  2.00 - 3.00 p.m. Singapore Time (UTC +8)+
    Dear valued SAP Experts,
    Next SAP Intelligence Platform & NetWeaver RIG Expert Call Session will take place on Tuesday, September 1. The SAP Intelligence Platform & NetWeaver RIG Expert Call Sessions are designed to support consultants, partners and customers during their implementation projects. The sessions cover all different aspects of SAP NetWeaver and are aimed at experts, thus provide knowledge which is not available via standard training courses. The session duration is typically 60min and includes questions and answers.
    Tuesday, September 1, 2009:
    SAP NetWeaver Process Integration u2013 Advanced Adapter Engine in PI 7.1 EHP1
    Time: 2.00 - 3.00 p.m. Singapore Time (UTC +8)
    This event will feature Charu Goel with the SAP Intelligence Platform & NetWeaver Regional Implementation Group. Charu provides the following abstract:
    With PI 7.1 Enhancement pack 1, we continuously thrive to bring in advancements in AAE. In this APJ expert call, we talk about the much awaited capability of IDOC packaging along with the enhancements in JMS. You will learn about the interaction between the AAE and ABAP stack, new enhancements on the JDBC adapter and overall improvements in the technical adapters available with PI 7.1 EHP1.
    For meeting and Dial-in detail please register [here|http://www.surveymonkey.com/s.aspx?sm=qkBfQCM5FM_2f_2b4O0ihVpFRw_3d_3d]
    Thanks & Best Regards,
    Sarma Sishta

    Hi,
    This was one of the good session...
    Especially the features such as;
    -- TCP/IP connection control with JMS adapters
    -- Empty file Handling
    -- Set the various Attributes for Mail attachments via dynamic configuration (intially only subject line was possible)
    -- Message Prioritization
    -- single IDOC Ack for IDOC Packaging
    -- IDOC packaging
    -- and many more........................
    Even the future indicatioon of IDOC J2EE based adapter will provide new direction to the existion IDOC related scenarios..
    One thing that was changed in IDOC packaging is to control it via Sender Communication channel...intially we were doing it either via ECC system or with t-code "idxpw"
    Its almost in same way...but from J2EE based adapter perceptive IDOC packaging will be available with Java stack...and will no need to depend only ABAp stack for this feature.
    Thanks
    Swarup

Maybe you are looking for