Projects and OTA integration

Currently, I can tie an event in OTA to a project in PA in the Events form. However, this link is only that - there is no interface of information between the 2 modules. Does anyone know of any planned future releases to better integrate the 2? Alternatively, do you know where I can find Projects' future release notes?
Thanks!
Lauren Faulkner
[email protected]

Lot's of red underlines because JDev cannot find the source files. In 10, I could just list my root directory for the project and JDev could find the Java source files. In 11 I have to go into project properties and add the src and testsrc directories (under my product directory) explicitly. After that everything works (sort of). To see the problems create a directory, say myProduct. In that directory place a bunch of xml documents (like your build.xml). Under that directory create two directories: src and testsrc. Put some java files in both directories . Make sure the tests in testsrc reference the application code in src. Now create a project and point it to the myProduct directory. Now try to open a java source with <CTRL> -. The java source is listed, but when you select it JDev says it isn't there. Now open the java test class in the editor by navigating to it through the open dialog. References to the myProduct/src tree will be underlined in red.
Hope this was clear. If not, let me know and I'll set up an example, zip it up and send it to you.
Thanks Brian :-)

Similar Messages

  • OTL with Projects and Payroll Integration - Actual Costing

    How does the costing work when we have the OTL integrated with Projects and Payroll? (R12.2.4 functionality - Actual Costing)

    As explosion process is based on elements, it only applies to payroll. You can use this functionality with Projects and Payroll Timecard Layout, but project will get the non exploded hours.
    --Shiv                                                                                                                                                                                                                                                                                                                                                                                                               

  • SQL Server 2008 R2: which version of Visual Studio do I need to keep database projects and SSIS projects in the same solution

    I need to build a solution containing a database project and an integration services project for SQL Server 2008R2.  Apparently, the subset of Visual Studio tools that comes with SQL Server 2008R2 does not include database projects and does not have
    Team Foundation Server support.  Because of those limitations, I am trying to determine which version of Visual Studio will allow me to:
    1. Build a single solution that includes both a database project and an Integration Services project
    2. For the database project, be able to import a database schema from an existing SQL Server 2008 R2 database, do schema compares and update the project from the database and vice versa
    3. For the Integration Services project, be able to deploy the packages to SQL Server Integration Services on SQL Server 2008 R2 (that is, to the msdb database).
    4. Use Team Foundation Server for source control of the whole solution, including both project types.

    Hi G Britton,
    To build a solution containing a database project and an integration services project for SQL Server 2008 R2 and use Team Foundation Server for source control.
     You can choose to install Visual Studio 2008.
    And as you want to utilize Schema compare and/or Data compare functionalities in Visual Studio, you will need to install the
    Visual Studio Team System 2008 Database Edition or Visual Studio Team System 2008 Team Suite.
    In addition, for Visual Studio issues, I would like to recommend you post the question in the
    Visual
    Studio forums to get better support.
    Reference:
    Team Foundation Version Control
    Compare and Synchronize Database Schemas
    Interoperability and Coexistence (Integration Services)
    Thanks,
    Lydia Zhang
    Lydia Zhang
    TechNet Community Support

  • Test/Trial project on MDM and XI integration.

    Test/Trial project on MDM and XI integration.
    I want to try out a test case scenario where in i would be importing and exporting data to XI (Using XML files i guess)
    I am a newbie in MDM integration.
    Please help me out with my trial project.
    What i already have:
    I have MDM system and repository on which i have been learning basic MDM designing a (test)repository of my own.
    What information i need:
    -What all system requirements (XI system configuration and all) are needed to established. (What all should i be asking the XI and the system admin guys to be able to get the platform ready for me.*
    *-The further procedure for actual integration to be done for importing/exporting data as in a real time project scenario

    Hi Gaurav,
    SInce you want to try a test scenario including MDM and XI, I would suggest you to try
    ECC -> XI->MDM scenario
    Wherein you can take the data from ECC in the form of IDOCs and convert them into XML.
    You can then import the XML into an MDM repository. MDM repository can be a Customer, Material, Vendor etc repository. Hence extract the similar data from ECC.
    Kindly follow the steps below:
    1) Firstly you will have to extrcat the look-up table data from R3 using MDMGX transaction-
    Please follow this link to know about the same:
    How to Configure Master Data Management Reference Data Extraction -
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/f0740b31-a934-2b10-2e95-af2252991baa
    https://websmp203.sap-ag.de/~sapidb/012006153200000394732006E/MDM554_GenericExtactor.pdf
    2) For loading the main Table Data into MDM, kindly follow the link below, which will guide you to the config/prcoess that will be required for the data to be uploaded from R3 into MDM.
    2.1) R/3-XI-MDM (Outbound Scenario)
    You will have to extract the data from R3 in the form of IDOCS and then using XI, you will have to convert them into XML format as MDM understands that.
    2.2) For the process of Data from MDM back to R3, kindly refer this link below:
    MDM-XI-R/3  Integration
    2.3) For general info about this scenario, kindly refer this link below:
    MDM Mass data Integration with R/3 made easy
    Please follow these links for additional info-
    1) SAP Network Blog: XI Configuration for MDM Integration - Sample Scenario-
    XI Configuration for MDM Integration - Sample Scenario
    2) The below given blog can be used to understand the XI config done when data is sent back from MDM via XI to R3.
    MDM->XI->R3
    MDM-XI-R/3  Integration
    3) MDM 5.5 data distribution using SAP XI -
    MDM 5.5 data distribution using SAP XI
    Hope this information helps.
    Thanks and Regards
    Nitin jain

  • Data Integration Middleware and Data integration Architect Java Projects

    Hi all,
    What is meant by the terminologies
    Data Integration Middleware and Data integration Architect Java ProjectsAre both of them the same?
    Rony

    Moved to a different forum.

  • SQL Server and TFS integration: can't see TFS SQL Server project

    Hi:
    From SQL Server Management Studio 2012 FILE-> OPEN FROM SOURCE CONTROL -> SQL Server doesn't recognize the SQL Server Project in TFS I specify; I have carefully checked that the project files are in the path specified. I have placed the solution/project
    additionally into the VS Studio 2012 path -> whatever path I point to, SQL Server is unable to open the project and I cannot get to the checked in SQL source. Thank you for your help :)

    The problem is that SSMS doesn't see existing SQL server projects that are checked into TFS by others; I cannot get my SSMS instance to connect to TFS and see the existing projects and check them out. The tutorial is no help.
    Hi,
    According to your description, you could not add the project or solution to source control in SQL Server Management Studio 2012. I recommend you if you install and configure the Team Foundation Server MSSCCI Provider successfully. And check if you can launch
    the client (File >> Source Control >> Launch Team Foundation server MSSCCI Provider). If yes, I recommend you install
     the latest Cumulative Update of SQL Server 2012 , which can be downloaded from Microsoft website.
    In addition, if the error still exists, I recommend you post more details about error log for analysis. When you connect to TFS server, we need to verify if you supply the right information and sign-in credentials for your Team Foundation Server .
    Regards,
    Sofiya Li
    Sofiya Li
    TechNet Community Support

  • PS and PP integration

    Dear Experts,
    Good Morning....
    Please suggest me PS and PP integration customization steps.
    Regards
    Lallan

    PP is not a major player in PS as far as integration is concerned. It is through Material Management that Production Planning is informed of Production Orders using special settings in the Material Master.
    One another area, the PP and PM modules share Work Centers with Project System.
    The Work Center is needed for Capacity Planning and Planning costs. If we integrate this Work Center with HR module, we will be able to select only the people who have been assigned to the Work Center. We can specify the amount of work the individual will contribute. This forms the basis for capacity planning.
    Hope u must have understand.
    PS - Process
    After creating the project next step is u want to do cost, Revenue & Budget Planning for the project
    in the t-codes CJ42, CJ30 & CJ40 respectively. Next step is creating the Sale order in va01 T-code.
    But I have internal project scenario, example: Overhauling of DG set. Assigned work enter & Workforce & also material to network. So shall I do costing? As explained! Is it necessary to create of Sales Order?
    CMP2 - Assign workforce to activities
    CAT2 - Transfer actual time to CATS. In CAT2 we have record the actual timing correct for an activity, on day basis & with personal number.
    MD51 - Run Project MRP to create Planned orders.
    MD04, ME21N, MIGO - Convert planned orders to purchase requisitions and P.O, and goods receipt.
    MB1A - once the goods are brought is project stock; the same needs to be consumed by mb1a -281 Q on the project.
    CJ20n - Attach milestones as per the payment terms.
    VA02 - Copy billing plan to sales order.
    VF01 - Billing
    CJ20n - Project tech complete and closure.
    Hope this will help you,
    Regards,
    ANSAR

  • Upgrading a project from Weblogic Integration 8.1.3 to Weblogic Integration

    Can anyone offer any advice to assist me in upgrading a project from Weblogic Integration 8.1.3 to Weblogic Integration 9.2.1?
    Here are some nuances of the project:
    * The JNDI, JDBC, & JMS server resources are secured; access is controlled by Deployment Descriptor run-as/security-role/... tags and custom CSPs
    * The application is currently build for deployment using wlwBuild ant task (class in workshop.core.WlwBuildTask which is located in the 8.1.3 {weblogic.home}/workshop/wlw-ide.jar - so far I can't find this class/task in my 9.2.1 install)
    * The following are the application characteristics (and utilized WLI features): multiple web apps, EJBs, JMS, Page flow/netUI, web services, WLI controls (process, java, transformation), XMLBeans
    * One of the project goals is to not make any functional changes and modify as little code as necessary (the only expected justification for a modification is a) fallout out from the JVM 1.5 upgrade or b) something is no longer available in WLI 9.2)
    I know there is a edocs page with a tutorial for upgrading from 8.1.4 or 8.1.5 to 9.2, but I am interested in knowing if anyone has insight on upgrading directly from 8.1.3?
    Thanks in advance for any and all assistance.
    Regards,
    Andy Frank

    just as a followup to my original message.. regarding the 8.1.4 install log that had all the warnings with the msi it expected and the different one it found... at the bottom of the log..this is what I got;
    Property(S): SourcedirProduct = {AC76BA86-7AD7-1033-7B44-A81300000003}
    MSI (s) (6C:30) [11:11:23:828]: Product: Adobe Reader 8.1.4 - Update 'KB408682' installed successfully.
    MSI (s) (6C:30) [11:11:23:828]: Product: Adobe Reader 8.1.4 -- Installation operation completed successfully.
    when i go into adobe reader -> help -> about i stillget 8.1.3

  • AP and PA integration

    Dear Dina,
    Is this meaningful??? do AP module talk to projects module?? which way?? wat kind of interaction? any standard reports to track procurement to pay cycle(in the
    dimension of projects)??
    Plz help me to understand...
    thanks a lot n advance

    What version are you on of EBS? My comments will apply to EBS 11i, though probably pretty much the same for EBS.
    Oracle Purchasing and Oracle Payables Integration--Requisitions, Purchase Orders, and Supplier
    Invoices
    Oracle Projects fully integrates with Oracle Purchasing and Oracle Payables, and allows
    you to enter project-related requisitions, purchase orders, and supplier invoices using
    those products.
    When you enter information in Oracle Purchasing and Oracle Payables that affects
    Oracle Projects, you enter project information on your source document. Oracle
    Purchasing, Oracle Payables, and Oracle Projects carry the project information from the
    requisition to the purchase order in Oracle Purchasing, to the supplier invoice in Oracle
    Payables, and to the project expenditure in Oracle Projects. You can report committed
    costs of requisitions and purchase orders that are outstanding against your projects
    in Oracle Projects.
    Oracle Purchasing integration includes:
    • entry of project information on requisition distribution lines
    • entry of project information on PO distribution lines
    • entry of project information on PO release distribution lines
    • entry of project information on preferences
    • copy project information from requisition to PO in AutoCreate
    • support load of project information on requisitions in Requisition Import
    • support building of GL account with Workflow based on project information
    Oracle Payables integration includes:
    • entry and inquiry of project information on invoice distributions
    • entry and inquiry of project information on invoice header (for default entry)
    • entry and inquiry of project information on distribution set lines
    • copy project information from PO to invoice when they match
    • support building of GL account with Workflow based on project information
    • support load of project information in Invoice Import from project expense reports
    Oracle Payables Integration--Expense Reports
    Oracle Projects fully integrates with Oracle Payables so that you can easily create and
    pay invoices for your project expense reports in Oracle Payables. You can enter expense
    reports in Oracle Projects and use Oracle Payables to create invoices from the expense
    reports, maintain and track payments of them, and transfer the accounting transactions
    to Oracle General Ledger.
    The above was copied in from the Oracle Project Fundamentals Guide. The Oracle Project Costing User Guide and Oracle Payables User Guide also cover the integration between AP and PA. As a general rule, the flow is from Payables into Project Costing, though if you get into expense reports there can be some flow going from Projects to Payables.
    Not sure what you are looking for in regards to Procure to Pay cycle. You may have to be more specific in exactly what you are looking for here. Most of the procure to pay reporting is going to be done out of purchasing and payables, in my mind. Project Accounting really does not do any kind of payables reporting - just project costing and project billing reporting. Now project costs would include invoice costs, among the various costing sources, but the amount of detail in the project cost distribution detail history for payables information is minimal, in my opinion. Others may disagree with that statement.
    Hope this helps a bit.
    John Dickey

  • CFolders and DMS Integration

    Hi,
    At present we have DMS. We are going in for cFolders now.
    How do we integrate cFolders and DMS? What are the pre-requisites / configurations needed?
    Where can I find the related documents?
    Regards,
    Rajesh

    Hi,
    please check the cFolders configuration guide (for release 4.0, the guide is also attached in note 973764), chapter u2018cFolders Back-End Integrationu2019 or the Online Help in the SAP Help Portal under http://help.sap.com/ > SAP ERP > SAP cProject Suite > Project and Portfolio Management XX > Design Collaboration with cFolders > cFolders Functions > cFolders Back-End Integration.
    For example, you can use the back-end integration for cFolders to exchange DMS documents. In the DMS system (or so-called back-end system), use transaction CFE02 to export DMS documents to cFolders and CFI01 to import documents from cFolders into DMS.
    Please read the above documentations to see the system and installation requirements.
    Besides creating a RFC destination in transaction sm59, you need to maintain the backend system using transaction CFC01 in the DMS system. At least one cFolders system must be defined in the customizing before backend integration can be used.
    In order to allow the user to create new documents in cFolders, he/she needs write and create authorization in the relevant folder.
    Regards,
    Silvia

  • LDAP and SAP integration

    Hi,
    As a part of a project requirement, we are trying to integrate Solution manager with LDAP (Lightweight Directory Access Protocol).
    Using the directory service, we are trying to synchronize the CUA (Central user administration within Solution manager) with Active directory of LDAP so that we can maintain the User data centrally from a single point in LDAP.
    Problem description:
    Currently, Client has implemented the LDAP and CUA integration and when a new user is added in LDAP, it is automatically getting copied in all SAP systems and at real time, when the useru2019s u201CLASTNAMEu201D field is updated in LDAP, it is automatically getting synchronized in all SAP systems.
    But, If any attribute other than u201CLASTNAMEu201D is changed (i.e. The expiry /validity date of the User in LDAP, GLTGB in SAP), then the field value is not getting synchronized in the SAP Central User Adm.
    Our Findings:
    We have checked the configurations and imported mappings in SAP Solution Manager and everything looks fine. We have debugged the standard program RSLDAPSYNC_USER extensively and found out that an RFC call to function module LDAPRFC_SEARCH is not returning the expected values.
    Thanks
    Deb

    Hi Deb,
    It would be really nice if you can elaborate on the configurations that need to be done as part of this integration. I hope, you have been successfull by now.
    Actually, I too need to perform the same as part of a project.
    Thanks in advance.

  • OES and WebCenter Integration And PEP API Issues

    Hi All,
    Currently we want to develop a WebCenter app which will check Authentication Policy in Oracle Entitlement Server using PEP API.
    We encountered some issues, and have following questions:
    1. According to PEP sample API, seems the PEP client application could only connect to the OES which is deployed on the same container context (same WLS domain).
    Is that possible for our PEP client application to connect to OES which is deployed on a different WLS domain or even remote WLS?
    2. Currently we deployed our WebCenter Spaces and OES on different WLS domains, is this a common pattern for WebCenter and OES integration?
    We got following error while starting up OES, after we try deploying OES 11.1.1.5.0 and WebCenter Portal 11.1.1.6.0 together on a WLS (10.3.5) domain.
    Any ideas? Thanks in advance.
    Thanks,
    Nicholas
    Caused By: oracle.mds.config.MDSConfigurationException: MDS-00035: cannot load the class: oracle.security.apm.rgx.mds.cust.SiteCC.
         at oracle.mds.config.CustConfig.getCustClassList(CustConfig.java:365)
         at oracle.mds.config.CustConfig.loadFromBean(CustConfig.java:277)
         at oracle.mds.config.CustConfig.<init>(CustConfig.java:242)
         at oracle.mds.config.MDSConfig.loadFromBean(MDSConfig.java:781)
         at oracle.mds.config.MDSConfig.loadFromElement(MDSConfig.java:848)
         at oracle.mds.config.MDSConfig.<init>(MDSConfig.java:491)
         at oracle.mds.config.MDSConfig.<init>(MDSConfig.java:438)
         at oracle.mds.internal.lcm.deploy.DeployManager.deploy(DeployManager.java:516)
         at oracle.mds.internal.lcm.deploy.DeployManager.startDeployment(DeployManager.java:204)
         at oracle.mds.internal.lcm.MDSLifecycleListenerImpl.start(MDSLifecycleListenerImpl.java:215)
         at oracle.mds.lcm.weblogic.WLLifecycleListener.preStart(WLLifecycleListener.java:77)
         at weblogic.application.internal.flow.BaseLifecycleFlow$PreStartAction.run(BaseLifecycleFlow.java:282)
         at weblogic.security.acl.internal.AuthenticatedSubject.doAs(AuthenticatedSubject.java:321)
         at weblogic.security.service.SecurityManager.runAs(SecurityManager.java:120)
         at weblogic.application.internal.flow.BaseLifecycleFlow$LifecycleListenerAction.invoke(BaseLifecycleFlow.java:199)
         at weblogic.application.internal.flow.BaseLifecycleFlow.preStart(BaseLifecycleFlow.java:62)
         at weblogic.application.internal.flow.HeadLifecycleFlow.prepare(HeadLifecycleFlow.java:283)
         at weblogic.application.internal.BaseDeployment$1.next(BaseDeployment.java:613)
         at weblogic.application.utils.StateMachineDriver.nextState(StateMachineDriver.java:52)
         at weblogic.application.internal.BaseDeployment.prepare(BaseDeployment.java:184)
         at weblogic.application.internal.EarDeployment.prepare(EarDeployment.java:58)
         at weblogic.application.internal.DeploymentStateChecker.prepare(DeploymentStateChecker.java:154)
         at weblogic.deploy.internal.targetserver.AppContainerInvoker.prepare(AppContainerInvoker.java:60)
         at weblogic.deploy.internal.targetserver.AppDeployment.prepare(AppDeployment.java:141)
         at weblogic.management.deploy.internal.DeploymentAdapter$1.doPrepare(DeploymentAdapter.java:39)
         at weblogic.management.deploy.internal.DeploymentAdapter.prepare(DeploymentAdapter.java:191)
         at weblogic.management.deploy.internal.AppTransition$1.transitionApp(AppTransition.java:21)
         at weblogic.management.deploy.internal.ConfiguredDeployments.transitionApps(ConfiguredDeployments.java:240)
         at weblogic.management.deploy.internal.ConfiguredDeployments.prepare(ConfiguredDeployments.java:165)
         at weblogic.management.deploy.internal.ConfiguredDeployments.deploy(ConfiguredDeployments.java:122)
         at weblogic.management.deploy.internal.DeploymentServerService.resume(DeploymentServerService.java:180)
         at weblogic.management.deploy.internal.DeploymentServerService.start(DeploymentServerService.java:96)
         at weblogic.t3.srvr.SubsystemRequest.run(SubsystemRequest.java:64)
         at weblogic.work.ExecuteThread.execute(ExecuteThread.java:209)
         at weblogic.work.ExecuteThread.run(ExecuteThread.java:178)

    Finally I found the error I got was because of the wrong version of JDeveloper and WebCenter extension.
    Portal apps which created by JDev 11.1.1.6.0 are not able to run on WebCenter 11.1.1.1.5, while the ones created by JDev 11.1.1.1.5 with WC extension 11.1.1.4.0.120306 work.
    Looks like it's not a good idea to mix FMW products of different version in a single project.

  • [svn:fx-trunk] 13699: -update textLayout, osmf, and flash-integration

    Revision: 13699
    Revision: 13699
    Author:   [email protected]
    Date:     2010-01-21 15:28:17 -0800 (Thu, 21 Jan 2010)
    Log Message:
    -update textLayout, osmf, and flash-integration
    -to build proper _rb swcs with the recent localized properties that have been checked in for each project
    -to build proper fat-swcs with the recent localized xml that have been checked in for each project
    updated the spark/build.xml to pint the properties files under textLayout and osmf
    removed files from package that were not required: build.xml, build.properties, sparkskins/assets folder. 
    QE notes:
    Doc notes:
    Bugs: sdk-25171
    Reviewer:
    Tests run:
    Is noteworthy for integration:
    Ticket Links:
        http://bugs.adobe.com/jira/browse/sdk-25171
    Modified Paths:
        flex/sdk/trunk/build.xml
        flex/sdk/trunk/frameworks/build.xml
        flex/sdk/trunk/frameworks/projects/datavisualization/build.xml
        flex/sdk/trunk/frameworks/projects/flash-integration/build.xml
        flex/sdk/trunk/frameworks/projects/osmf/build.xml
        flex/sdk/trunk/frameworks/projects/rpc/build.xml
        flex/sdk/trunk/frameworks/projects/spark/build.xml
        flex/sdk/trunk/frameworks/projects/textLayout/build.xml
    Added Paths:
        flex/sdk/trunk/frameworks/projects/osmf/bundles/da_DK/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/da_DK/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/de_DE/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/es_ES/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/es_ES/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/fi_FI/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/fi_FI/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/fr_FR/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/it_IT/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/it_IT/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/ja_JP/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/ko_KR/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/ko_KR/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/nb_NO/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/nb_NO/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/nl_NL/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/nl_NL/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/pt_BR/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/pt_BR/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/ru_RU/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/sv_SE/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/sv_SE/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/zh_CN/osmf.properties
        flex/sdk/trunk/frameworks/projects/osmf/bundles/zh_TW/
        flex/sdk/trunk/frameworks/projects/osmf/bundles/zh_TW/osmf.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/da_DK/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/da_DK/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/de_DE/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/es_ES/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/es_ES/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/fi_FI/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/fi_FI/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/fr_FR/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/it_IT/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/it_IT/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/ja_JP/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/ko_KR/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/ko_KR/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/nb_NO/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/nb_NO/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/nl_NL/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/nl_NL/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/pt_BR/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/pt_BR/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/ru_RU/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/sv_SE/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/sv_SE/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/zh_CN/textLayout.properties
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/zh_TW/
        flex/sdk/trunk/frameworks/projects/textLayout/bundles/zh_TW/textLayout.properties
    Removed Paths:
        flex/sdk/trunk/frameworks/projects/datavisualization/manifest.xml
        flex/sdk/trunk/frameworks/projects/spark/bundles/da_DK/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/da_DK/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/de_DE/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/de_DE/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/es_ES/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/es_ES/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/fi_FI/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/fi_FI/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/fr_FR/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/fr_FR/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/it_IT/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/it_IT/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/ja_JP/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/ja_JP/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/ko_KR/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/ko_KR/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/nb_NO/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/nb_NO/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/nl_NL/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/nl_NL/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/pt_BR/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/pt_BR/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/ru_RU/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/ru_RU/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/sv_SE/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/sv_SE/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/zh_CN/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/zh_CN/textLayout.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/zh_TW/osmf.properties
        flex/sdk/trunk/frameworks/projects/spark/bundles/zh_TW/textLayout.properties

  • Project Sales Order Integration

    Hi,
    I have a question on Oracle Project and Sales Order integration.
    In the sales order form, there is a place to enter project and task information. What is the significance and how can we bring this information into Project itself?

    Hi
    1) Shipping functionality is supported for Sale Order, for Project Contracts and for Project Management (Deliverables). If you need to track shipping for a project, you will need to enable Project Manufacturing, no mater which of above three modules is implemented.
    By the way, shipping integration for all those modules support the outbound deliverables, meanning items you need to ship from your own inventory facility to a customer or other third party. You mentioned a case for tracking items shipped from a third party vendor. You may need to look at the purchasing side and not the sale order for that.
    2) If you implement Project Manufacturing, there is a process caleed Cost Collector, which interface the inventory and WIP transactions into PA Interface Table. From there you have to run the PRC: Transaction Import process to bring into Oracle Projects the expenditure Items.
    3) I can explain the accounting, but I'm not sure which scenarios you will be implementing, and which module are you going to define the accounting. Please be more specific, and detail the release number your are implementing.
    Dina

  • Task dependencies and scheduling in Oracle projects and project management

    Am I correct in the belief that Oracle projects/project management does not have the ability to create, manage and track dependencies between tasks in a project ? And to achieve that micro level of planning I need to use something like Microsoft Project Integration ?

    Gordon,
    Project integration is the link between Oracle Projects and MS Projects.
    If you want to define dependencies between tasks, MS Project is best bet
    for you.
    Cheers,
    Gopal
    [email protected]
    www.sagss.com

Maybe you are looking for

  • Loading slide show takes too long - want play to start earlier

    I made a long slideshow with perhaps 80 smallish (700x500) images. It is just a simple timeline with fade ins with varying durations for displaying the images. Most images are shown for a second or more. It takes quite a while to load sometimes. One

  • How to read and update the value of property file

    Hi, I am not able read the values from property file. Please tell me how to read and update the values from property file using Properties class This is my property file : - Config.properties its located in D:\newfolder Values SMTP = localhost Now i

  • Power mac 7300 connection to monitor

    The connection to the monitor is made through an adaptator with 10 buttons. During a transport of the mac and the monitor, some buttons have been put "off". Can you tell me what buttons should be "on"?

  • Wireless tv to imac, wireless tv to imac

    Is it possible to send wireless tv signals to an imac?

  • Called-Station-ID attribute and Cisco WLC code 7.4

    Hello I have 2 WLCs configured with 2 SSIDs (one is [WPA2][Auth(802.1X)] and the other is Web-Auth). One of the WLCs is remote and its WLANs are configured with mobility anchors pointing to the other WLC. Both WLCs are configured with Called-Station-