Quality inpsection on Work center (with/without Material Ref.)

Dear All,
I have scenario, where I have to do the in process inspection on machine (work center) to measure various process parameters that has a direct link with product quality. it is basicallly with out material reference.
I tried using in process inspection for production order but there are several constraints due to which It will not work for certain cases. if we record the readings on each interval against machine/workcenter then every thing will be fine.
how can we do it in SAP.
thanks
MD

Yes its a variant product (Like aluminium sheets rolls for different gauge and widths). which means alot of different product variants produce on same machine with same machine parameters.
so for inspection, product has secondary importance, we want to study the machine parameters to monitor which should remain same over the time and product.
Further at the end, the report we want to see is based on machine not product.
thx

Similar Messages

  • Userexit for populate profit center entry without material in T.code CORO.

    Hi guru's
    we are running T.code. CORO.. we want to populate profit center entry without material. can any one tell me the exact user-exit used for this and . can you tell me the procedure how to find the specific userexit trigger at that point while we are running any T.code.
    Thanks in Advance..
    GSANA
    user exist in PP for transaction code CORO-process order without matl code to populate profit center entry, can u plz find out that & send it to me..

    Thank you all for your valuable input.
    Srinivasa, your suggestion is very good, especially when calculation of variances/WIP is required. But again as there is no cost relevant material where the WIP/Variances will be settled during settlement process?
    1) PP need to create process order without material because changeover cost should not be charged to either material and capacity hours are consumed during changeover. 2) CO need to identify the cost of changeover which should be charged to cost center. So far we have achieved both of these two objectives by the following activities:
    Creation of Process Order without material using CORO T.Code     say 3 hours of changeover occurred we create order with quantity of 3 Hours. And confirmation of activities quantity 3 using COR6N so cost center is credited by 3 x rate per hour. As there is a separate Process Order type for Changeover we can identify changeover quantity and cost in a given period.
    After contributors feedback in this thread I have come to conclusion that I don't need to assign Settlement Profile and PA Structure to Changeover Process Order type. So no need to run Process Order settlement. As there is no specific required for Changeover WIP/Variances as well.

  • System Error Message CR082-Work center with ID 10000005 was not found

    Hi SAP Gurus,
    We are getting the error message 'Work center with ID 10000005 was not found' while our finance guys trying to do costing run for our two plants together. But when they run the costing for two plants seperately then it is working fine. Because of the business needs they have to do the costing run for both plants together.
    "The description of the error is as follows:
    System error: Work center with ID 10000005 was not found
    Message no. CR082
    Diagnosis
    Internal error.
    Procedure
    Repeat the transaction.
    If the error occurs and you have a CRM System connected to your ERP System, the document may have been archived in the CRM System.
    If the error occurs again, inform your system administrator. If the error cannot be corrected, call the SAP Hotline directly. Describe which steps preceeded the error"
    Any idea how to solve this issue.
    Thanks.
    Sachin

    Hi,
    Kindly check with following SAP note for Message No. CR082 :
    [Note 157682 - Message CR082: Work center not found|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=157682]
    Try with implementing this note which may resolve your problem.
    Hope this helps.
    Regards,
    Tejas

  • Work center with diff catogory -PS

    Dear All,
    Can we have a Work center with diff catogory..say 1) Labour 2)Electrician 3)Helper
    Supposing if 1 activity want to utilize the work center having Diff Catogories and each catogories will have diff work timings.How we can assign the same.
    Pls advise me .
    Regards
    Narayan Raju

    Hi,
    I have created 1 WC with 3 catogories and also i have 1 activity which is having 3 diff catogories of work tobe executed in the same WC. My question is how we can assign in PS.
    While seeing the load details, it is showing the avilable capacity depends on the work timing we have given for the Diff Catogories, But how we can assign it for the activity.
    Pls advsie.
    Regards
    Narayan Raju

  • Can you have multiple Rates within one Work Center with multiple operations

    We have a work center called Pipeshop.   Within the Pipeshop we have multiple operations such as Welding, Threading, Cutting, Grooving etc.  Each of these operations have a different cost assoicated with them.  How can you have different cost for these operations? 
    Thank you,
    Loretta

    Hi,
    For this case you need to do following activities.
    1 Create individual activity accoding to requirement, that will be used for costing.
    2  Activity planning w r t work center.  In this cost per unit is declaring.
    3. Create Routing and modify the default activity type, w r t required activity type, suitable to operations.
    Now  Order is referring the activity type, refered in Routing rather than, work center.
    Regards
    Gururaja Hebbar

  • Work center with two cost centers

    Hello,
    I have one work center. I can produce two different products on it. For one product the costs should go to cost center 1. For the othe product the costs should go to cost center 2.
    How can I realize this scenario?
    Kind regards.

    Dear,
    IF you have to take care of capacity planning and scheduling, then you need to use  only one WC and having two WC will not serve the pirpose.
    Generaly you cannot assign WC to 2 different cost center unless the period is different.
    Then the only solution is let the cost get posted to 1 common cost centre. Then at the month end distribute the cost to 2 different cost centers depending on then qty produced.
    This is the one laternative we are following.

  • Work Center/Equipment wise Material issue report

    Hello Experts,
    Greetings.
    We are creating maintenance order.After completion of work we do issue the goods against cost center/order.
    We have almost 52 machines with Same type/Same Make.We have created one cost center only.We are able to get the report cost center wise issue from the system
    Now the issue is how to get report individual machine wise in terms of qty of spares/consumables used to repair that particular machine.
    Any help would be highly appreciated.
    Thanks & Best Rgds
    Nitin

    Sir,
    Thanks for reply.
    Now the issues is while using the report I m able to get the material where used list for only those order which are in Outstanding/Processing.
    But If I want to show the report for order which status has been set as a 'teco' and goods have already been issued against that report,it does not shows any data.
    I have tried using check box 'completed",to view the closed order data but it does not shows.It says No objects were selected.
    Please help me out what could be the problem?
    Thanks
    Nitin

  • Credit Memo without Material Ref.

    Hi ,
    1) Can we create Credit memo without entering material Reference (Only Value needs to be Credited)?
    2) Can we create Credit Memo for Freight & Insurance Value only (no other prices).
    Please explain how can we map the same in SD.
    Thanks in Regards,
    Vikas

    hello again.
    for freight and insurance, your approach will depend on how these are treated.  if freight and insurance are represented by material numbers, then these are entered in the credit and/or debit memo requests (also in sales orders).  this will then be a straight-forward process.  these items can have a set price, or the value can be manually entered.
    however, freight and insurance are sometimes represented as condition types,  these can then be entered manually in the order at header and/or item level again depending on your approach.
    regards.

  • Associate materials with work center

    Hello,
    For our chemicals production plant, vessels in which HALB products are produced are defined as work centers in SAP. Our business has a requirement that certain vessels can only be used to produce certain materials. Is there a way to capture this requirement in SAP, i.e. associate a work center with specified materials? Help is appreciated.
    Regards

    Dear Khan,
    work centers are not specific to any material production, u can restrict work center usage for the perticular task list by maintaing the field in work center basic data screen task list usauge.
    sree

  • Dyanmic work center selection in production order based on material

    Hi ALL,
    We’ve a business requirement to support the following functionality.
    There are four similar type of milling machines say MILL1 MILL2, MILL3, MILL4, we create a single work center called MILLMC by specifying total capacity of four milling machines in the capacity header screen of work center with 4 individual capacities. And we mention work center MILLMC in the operation of routings for respective materials.
    However, during production order creation, there needs to be provision for detailed planning of work centers as per the following requirements
    In production order, some operations can be performed on any one of the machines MILL1 MILL2, MILL3, MILL4, so provision needs to be there to enter exact machine on which it is performed in the production order operation after the details are copied from respective routing during production order creation.
    In production order, some operations can be performed on only MILL3, so system should select only MILL3 in the respective operation of the production order
    In production order, some operations can be performed on either MILL1 or MILL2 or MILL4 and not on MILL3, so system should not select MILL3 in the respective operation of the production order.
    Please provide your valuable feedback to support the above requirements.
    Regards,
    Satya.

    Hi Satyanarayan,
      Please do refer to the below document. I think the same concept can be used for work centers as it is used for resources in PI industry.
    Resource Classification in Master Recipe for Planning
    Regards
    Kalyan

  • Table with all versions of capacities (work center)

    Hi,
    I've created a work center with capacity. This capacity has 2 versions (01 normal capacity" the activ version" and 02 minimum capacity).
    I'm surching a table where I can display the work center A with capacity A1 with the versions 01 and 02. (not only with the activ capacity 01 I need to display all the versions from this capacity)
    Thanks
    Dede

    Dede,
    You will have to use a combination of tables, perhaps a SQVI to join tables
    CRHD - Work Center Header (link work center to capacity ID)
    KAZY - Capacity version
    KAPA - shifts and intervals
    In KAPA the times are displayed in seconds
    Hope that helps,
    ~Sunil

  • How to find work center in REM from the material Documnet number

    Hi ,
    We want to develop a Z report for the repetitive manufacturing cycle. Please let me know the logic how to get the work center from the material document that is posted after backflushing MFBF tranaction.
    I will elaborate it little further. From the material document number that is genearted out of confirmation from that document no how can I find the work center so that we can so show the throughput of each work center.
    Please avoid standard transaction of MCRP etc.
    Thanks & regards

    Dear Kumar,
    I'm not sure whether you can get the work center details,but you can get the production version number from you can get the
    rate routing details.
    Give a try by passing the document no to table BLPP and get the document log number and pass on the document log number to
    table BLPK,by which you can identify the production version.
    Also give a try using this FM,RM_DISPLAY_AFRU_REM,I guess you can get the exact work center details from here.
    check and revert back.
    Regards
    Mangalraj.S

  • Select the work center in sales order

    Hello gurus,
    When I create a saler order, the system create automatically a service order with the corresponding data which are reported in transaction OISD for the service material. The key of this table only permits a work center for one material service and plant. And it is impossible to add more work centers for the same service material and plant.
    So I need to be able to choose the work center when I generate the sales order. How can I get it?
    Thanks in advance

    Dear Venkat,
    Try These tabels:
    MARC Plant Data for Material
    /BEV1/RBVBAP                     Sales Document: Item Data        
    COER                             Sales Order Value Revenue        
    VBAP                             Sales Document: Item Data        
    VSVBAP_CN                        Version: Sales document: Item data
    VVBAP                            Sales Document: Item Data        
    GLPPC                            Profit Center Accounting: Plan line items
    GLSPC                            Profit Center Accounting: Line Items    
    Regards,
    Naveen.

  • Work Center

    Hello Guru,
    I have some question about the work center when pick up by the creation of production order. When we create production order manually via CO01, SAP pick workcenter BSBA111 for this order. And when we convert a planned order to a production order SAP pick work center CAWORK01. same finished product is been consider with this material number 1111002 in plant 0012. why in different way of creating production order, but the system is been picking two different work center with different formula? please explain deeply for my concern.
    Thanks

    In this case what is happening is that while creating manual Production order you are manually selecting the production version . therefore the routing assigned to that particular production version gets copied & subsequently the work centre assigned to th routing gets copied along with that.
    Since you have used selection methood as 3 (selection only by production version) the system searches for the valid production version starting from the 1st production version in your list of production versions & stops as soon as it finds the valid one & selects it.(I.e. the 1st version which is valid for the date of exposion & within the lot size defined)
    Now in this case the one which you selected & the one which the system finds during MRP can differ.
    Thats why your work centres differ , because the production versions differ.
    Therefore If you want the selection to be same in Manual PO & PO by MRP , in OPL8, for your plant & order type , select indicator 0 for Production version i.e. automatic selection of production version.

  • Difference of work center Vs Cost center

    Hi,
    Let me know what is the difference between cost center vs work center with definition?
    Thanks and regards
    Ramesh

    Cost Center  One of the three types of cost objects currently used in the SAP system. Cost centers are centrally allocated funds, budgeted on the fiscal year.
    Cost centers are used to track where cost occur in the organization.
    As costs are incurred, they are assigned or posted to the appropriate cost center.
    The posting and assignment of costs to cost centers is a critical step in using the CO module.
    Cost centers are organized in a Standard Hierarchy.
    The Cost Center Standard Hierarchy is used to structure the cost centers in an organization.
    All cost centers must be entered in the Standard Hierarchy.
    To display the standard hierarchy follow the menu path:
    Accounting ->Controlling ->Cost Center Accounting ->Master data ->Standard Hierarchy ->Display
    Work center its specific to which application you are using.
    Logistics - General (LO)
    An organizational unit that defines where and when an operation must be performed.
    The work center has an available capacity. The activities performed at or by the work center are valuated by charge rates, which are determined by cost centers and activity types. Work centers can be:
    Machines
    People
    Production lines
    Groups of craftsmen
    Quality Management (QM)
    A place at which inspections are conducted.
    In the SAP System, work centers are entered in the inspection operations. Several inspection characteristics can be inspected for each work center or inspection operation.
    Warehouse Management
    A physical unit in the warehouse, in which warehouse activities such as packing, distribution, and weighing, can be performed.
    Example
    Packing station
    *Look into the following link for SAP Glossary *
    http://www.sapfans.com/sapfans/sapfaq/sapgloss.htm#sectW
    Hope this helps
    Vinodh Balakrishnan