Work center with diff catogory -PS

Dear All,
Can we have a Work center with diff catogory..say 1) Labour 2)Electrician 3)Helper
Supposing if 1 activity want to utilize the work center having Diff Catogories and each catogories will have diff work timings.How we can assign the same.
Pls advise me .
Regards
Narayan Raju

Hi,
I have created 1 WC with 3 catogories and also i have 1 activity which is having 3 diff catogories of work tobe executed in the same WC. My question is how we can assign in PS.
While seeing the load details, it is showing the avilable capacity depends on the work timing we have given for the Diff Catogories, But how we can assign it for the activity.
Pls advsie.
Regards
Narayan Raju

Similar Messages

  • System Error Message CR082-Work center with ID 10000005 was not found

    Hi SAP Gurus,
    We are getting the error message 'Work center with ID 10000005 was not found' while our finance guys trying to do costing run for our two plants together. But when they run the costing for two plants seperately then it is working fine. Because of the business needs they have to do the costing run for both plants together.
    "The description of the error is as follows:
    System error: Work center with ID 10000005 was not found
    Message no. CR082
    Diagnosis
    Internal error.
    Procedure
    Repeat the transaction.
    If the error occurs and you have a CRM System connected to your ERP System, the document may have been archived in the CRM System.
    If the error occurs again, inform your system administrator. If the error cannot be corrected, call the SAP Hotline directly. Describe which steps preceeded the error"
    Any idea how to solve this issue.
    Thanks.
    Sachin

    Hi,
    Kindly check with following SAP note for Message No. CR082 :
    [Note 157682 - Message CR082: Work center not found|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=157682]
    Try with implementing this note which may resolve your problem.
    Hope this helps.
    Regards,
    Tejas

  • Can you have multiple Rates within one Work Center with multiple operations

    We have a work center called Pipeshop.   Within the Pipeshop we have multiple operations such as Welding, Threading, Cutting, Grooving etc.  Each of these operations have a different cost assoicated with them.  How can you have different cost for these operations? 
    Thank you,
    Loretta

    Hi,
    For this case you need to do following activities.
    1 Create individual activity accoding to requirement, that will be used for costing.
    2  Activity planning w r t work center.  In this cost per unit is declaring.
    3. Create Routing and modify the default activity type, w r t required activity type, suitable to operations.
    Now  Order is referring the activity type, refered in Routing rather than, work center.
    Regards
    Gururaja Hebbar

  • Quality inpsection on Work center (with/without Material Ref.)

    Dear All,
    I have scenario, where I have to do the in process inspection on machine (work center) to measure various process parameters that has a direct link with product quality. it is basicallly with out material reference.
    I tried using in process inspection for production order but there are several constraints due to which It will not work for certain cases. if we record the readings on each interval against machine/workcenter then every thing will be fine.
    how can we do it in SAP.
    thanks
    MD

    Yes its a variant product (Like aluminium sheets rolls for different gauge and widths). which means alot of different product variants produce on same machine with same machine parameters.
    so for inspection, product has secondary importance, we want to study the machine parameters to monitor which should remain same over the time and product.
    Further at the end, the report we want to see is based on machine not product.
    thx

  • Work center with two cost centers

    Hello,
    I have one work center. I can produce two different products on it. For one product the costs should go to cost center 1. For the othe product the costs should go to cost center 2.
    How can I realize this scenario?
    Kind regards.

    Dear,
    IF you have to take care of capacity planning and scheduling, then you need to use  only one WC and having two WC will not serve the pirpose.
    Generaly you cannot assign WC to 2 different cost center unless the period is different.
    Then the only solution is let the cost get posted to 1 common cost centre. Then at the month end distribute the cost to 2 different cost centers depending on then qty produced.
    This is the one laternative we are following.

  • Table with all versions of capacities (work center)

    Hi,
    I've created a work center with capacity. This capacity has 2 versions (01 normal capacity" the activ version" and 02 minimum capacity).
    I'm surching a table where I can display the work center A with capacity A1 with the versions 01 and 02. (not only with the activ capacity 01 I need to display all the versions from this capacity)
    Thanks
    Dede

    Dede,
    You will have to use a combination of tables, perhaps a SQVI to join tables
    CRHD - Work Center Header (link work center to capacity ID)
    KAZY - Capacity version
    KAPA - shifts and intervals
    In KAPA the times are displayed in seconds
    Hope that helps,
    ~Sunil

  • Associate materials with work center

    Hello,
    For our chemicals production plant, vessels in which HALB products are produced are defined as work centers in SAP. Our business has a requirement that certain vessels can only be used to produce certain materials. Is there a way to capture this requirement in SAP, i.e. associate a work center with specified materials? Help is appreciated.
    Regards

    Dear Khan,
    work centers are not specific to any material production, u can restrict work center usage for the perticular task list by maintaing the field in work center basic data screen task list usauge.
    sree

  • Work Center

    Hello Guru,
    I have some question about the work center when pick up by the creation of production order. When we create production order manually via CO01, SAP pick workcenter BSBA111 for this order. And when we convert a planned order to a production order SAP pick work center CAWORK01. same finished product is been consider with this material number 1111002 in plant 0012. why in different way of creating production order, but the system is been picking two different work center with different formula? please explain deeply for my concern.
    Thanks

    In this case what is happening is that while creating manual Production order you are manually selecting the production version . therefore the routing assigned to that particular production version gets copied & subsequently the work centre assigned to th routing gets copied along with that.
    Since you have used selection methood as 3 (selection only by production version) the system searches for the valid production version starting from the 1st production version in your list of production versions & stops as soon as it finds the valid one & selects it.(I.e. the 1st version which is valid for the date of exposion & within the lot size defined)
    Now in this case the one which you selected & the one which the system finds during MRP can differ.
    Thats why your work centres differ , because the production versions differ.
    Therefore If you want the selection to be same in Manual PO & PO by MRP , in OPL8, for your plant & order type , select indicator 0 for Production version i.e. automatic selection of production version.

  • Dyanmic work center selection in production order based on material

    Hi ALL,
    We’ve a business requirement to support the following functionality.
    There are four similar type of milling machines say MILL1 MILL2, MILL3, MILL4, we create a single work center called MILLMC by specifying total capacity of four milling machines in the capacity header screen of work center with 4 individual capacities. And we mention work center MILLMC in the operation of routings for respective materials.
    However, during production order creation, there needs to be provision for detailed planning of work centers as per the following requirements
    In production order, some operations can be performed on any one of the machines MILL1 MILL2, MILL3, MILL4, so provision needs to be there to enter exact machine on which it is performed in the production order operation after the details are copied from respective routing during production order creation.
    In production order, some operations can be performed on only MILL3, so system should select only MILL3 in the respective operation of the production order
    In production order, some operations can be performed on either MILL1 or MILL2 or MILL4 and not on MILL3, so system should not select MILL3 in the respective operation of the production order.
    Please provide your valuable feedback to support the above requirements.
    Regards,
    Satya.

    Hi Satyanarayan,
      Please do refer to the below document. I think the same concept can be used for work centers as it is used for resources in PI industry.
    Resource Classification in Master Recipe for Planning
    Regards
    Kalyan

  • IW41: automatic update of activity type when changing the work center?

    Hello colleagues,
    when doing a time confirmation with IW41, we have following problem:
    In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
    Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
    Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
    Thanks for your ideas!
    Regards,
    Patrick

    Hi Maheswaran,
    yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
    We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
    We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
    Thanks for your efforts so far!
    Patrick

  • Work center planned cost calculation- PM related

    i have created a work center with t-code ir01, used in Maintenance order under operations tab. In cost tab, it is not showing Planned costs of the pm order. Please advise what are check ups or config settings should be done? Thanks.

    hi
    first kindly check whtether you have defined value categories, grouped the calue value categories then specified the defualt values categories for order,
    then plan for activity type and cost center specified in workcenter in KP26,
    also check whether you have specified the formula in the work center costing tab page
    regards
    thyagarajan

  • How to link Cost center and Work center?

    Hi All,
    We have a list of Work centers and the corresponding Cost centers. We need to know which tables can be used to connect the Work center with its corresponding cost center?
    Thanks:
    Siddharth

    Hi Please use t-code OP42. Make sure all your configuration for work centre is there. You link cost centre in the costing tab of work centre basic data.
    Hope this helps.
    Thanks
    Sanjeev

  • Scheduling - Min. queue time & work center / reduction

    Hello,
    I have a small issue with scheduling of production order.
    I have maintained in a work center with Std. queue time = 15 days and Min. queue time = 7 days.
    Means less then 7 days it should be not reduced and by enough time it should be calculated with 15 days.
    I know the forward scheduling production takes 20 days ( 5 days for first operation plus 15 days Std. queue time for second operation)
    By backwards I schedule the finish date which is less then 20 days in the future.
    I would expect system would take 7 days (Min. queue time) instead of 15 days with using reduction strategy.
    But system throws the message "Start date is in the past: today scheduling" and increases the finish date, with queue time = 15 day, instead to take
    7 days!
    I dont see system takes Min. queue time in account. Please help to find the error. Thansk!

    Hi
    Yes .Reduction strategy is only for floats to carry out detail scheduling
    Reduction in the float before and after production in the order, expressed as a
    percentage of the original float.
    For example  :
    The original float before and after production was 10days in both cases. You
    have entered level 2 as the maximum reduction level. The reduction of the float
    is in the first level 40 and in the second level 60.
    This means that in the first level the float is reduced by 40% of the
    original value, that is 6 days. In the second level the float is reduced by 60% of
    the original value, that is to 4 days
    Regards
    JH

  • Work-center timings not reflecting in maintenance order.

    Hi,
    My requirement is, I want the work-center timings to reflect in my call object (Maintenance Order) generated through a maintenance plan.
    My scenario is: I've made a work-center with the following data,
    wrkcntr category as 0005; usage 004; control key PM06 with scheduling indicator checked;
    in capacities start-finish timings as, 06:00-14:00; operating time of 8hrs, and factory calendar is chosen for maint. people.
    The order type say pm08 is selected.
    now in the maint. plan we choose this work center in the planning data field.
    Task-list is also attached and the data are OK.
    in maint. plan scheduling parameter shift factor etc NOT given.
    Now when after schedulling I got one order with the
    SchedStart: DD.MM.YYYY 06:00
    Sched.Fin.: NEXT DATE 06:00
    but I need the date to be 06:00 to 14:00 as in the respective work-center.
    For for fastly solving the problem my analysis:
    I checked the order,goto operation tab,goto dates tab and found that basic finish time of activity is 24:00:00
    If this is the reason than how to make it 08:00:00 default for this order type.
    Thanks in advance,

    Hi Tyag,
    the details are cmins as below
    Erl. start: 19.09.2008 06:00:00      Earl. fin. 20.09.2008 06:00:01
    LatestStart: 19.09.2008 06:00:00  LatestFin. 20.09.2008 06:00:01
    Act. start:                    00:00:00  Act. finish                  00:00:00
                                                     FcstFinish                  00:00:00
    Restriction
    StartPoint
    End                                                         24:00:00   
    I am new to this and need your help.
    The req is how to reflect wrk center timing in the wrk order generated through a maintenance plan.
    Regards,
    sanjay
    Edited by: ganesh sarasvati on Sep 23, 2008 11:47 AM

  • Combine Work Center Link Groups in one Work Center

    Hello Experts,
    our requirement is to combine the Work Center Link Groups of several Work Centers into one Custom Work Center.
    For example, the work centers Knowledge Management and Managing Operations. (IC-MGRKM, IC-MGRMA)
    They have Work Center Link Groups like IC-MGMA-CR or IC-MGKM-CR. Now we defined an own work center Y-IC-MGRMA and assigned these links groups (and others) to the Work Center.
    However, when we open the Work Center we only ever see links of one work center type (for example only the links of Knowledge Management).
    Is it even possible to combine the different work centers into one big work center with many links? What would we have to do to achieve this?
    Help would be appreciated!

    If I am not wrong you are assigning standard work Center Link Groups like IC-MGMA-CR & IC-MGKM-CR to newly created Work center Y-IC-MGRMA .If I try the same, all related links can be made visible. The process you are following is correct.
         You may have confused with the nomenclature of your work center ID - Y-IC-MGRM. Please look into the "Group ID" column, if you are assigning standard group links as mentioned above you will find three logical link ID for Knowledge management & two for MGMA too. In short if five logical links are available in second level navigation then things are correct at you end. I tried it and its working fine.
    Pease check.
    Thanks & regards,
    Amit

Maybe you are looking for

  • How do I remove a credit card from my account settings if I don't have an ITunes ?

    How do I remove the credit card if I don't have an iTunes card or an iTunes account? I don't have another credit card and it has no other categories that says none. I can't download no apps (free apps ).

  • Creating movement in space

    Hi there, Im working on some [stereo, not surround] cinematic projects at the moment, and I want to create a sense of movement through the audio field. Obviously, I'll be using pan for left-right movements, but I wondered if any of you had any tips f

  • Blackberry Q10 - Bluetooth Audio gone / Contacts not shown in HUB

    Dear Blacberry Community, I have some questions regarding my Blackberry Q10, that I use since not even a year. 1. If I buy a mobile phone from a company that wants to be the star in the business world, why do I have to solve any issues with the help

  • Error Code:  18452 - Invalid logon parameters

    We are trying to schedule several crystal reports to run automatically on our server and continue to get the following errors. Invalid log on parameters Database Vendor Code:  18452 When we review the log in Crystal Report Viewer we are receiving the

  • HELP!!! Can't use sql:update in Netbeans Visual Web JSP

    I use Netbeans Visual Web in my project. I use Java DB database and Sun Java System Application Server 9. When i run my project, there is an error "The server encountered an internal error () that prevented it from fulfilling this request." Here is t