I am unable to read master data and thus change the status of process order from REL to CRTD. (COR2)
The reason it says, error in BOM reading, Transport Requirement (TR) already generated.
Even after deleting the TR (LB02), the issue still exists.
Is there another way of changing the status or some more steps are needed for the TR deletion?
Thnx!
Abhi.

Order header Status-
REL  Released
MSPT Material shortage
PRT  Printed
PRC  Pre-costed
BASC Batch assignment complete
BCRQ Order to be handled in batches
SETC Settlement rule create.
In the error log it gives-
Diagnosis
Transfer requirements have already been generated, so therefore the bill of material cannot be read.
System Response
The system does not execute the action.
Then I deleted the TR (LB02), but still I cannot reread the master data.
The MSPT was for only 2 materials out of 6 and there is no GMPS status.
There is prod supply area and control cycle used.
and the TR generated at order release.

Similar Messages

  • Read Master Data on Process Order

    Hi there,
    We have a process order in status CRTD PRC  APNG APRS BCRQ MANC SETC.  But when user try to initiate a Read Master Data for Prod Version / Master Recipe / BOM, system is giving this error log:
    No approval: production version 0001 has not been approved
    Unreleased engineering change orders:
    Engineering change order 500000000001 has not been released
    I have checked on the Change Number for both the Master Recipe and Bill of Material and everything seems to be correct.  Why does SAP prompting "No approval: production version 0001 has not been approved" and why is SAP trying to read Engineering Change Order 500000000001?  This is an old one possibly the first Engineering Change Order generated...
    Cheers
    Edited by: patvin on Oct 18, 2010 11:44 AM

    Dear,
    As per GMP Steps are as,
    The procedure in the environment requiring an approval is the following:
    -> Create
    1. Create new production version, without specifying recipes and bill of material.
    2. Assign a change number which is valid for the recipe and the bill of material to be entered to the production version.
    3. Enter recipe and bill of material in the production version or if external number assignment of the recipe is required, make no entry in the recipe group.
    4. Navigate to the recipe, for example, by double-clicking on the Recipe field.
    5. Maintain the recipe and the material list (bill of material) within the recipe as usual.
    6. Save the recipe and, therefore, also the bill of material. (Return to the production version transaction. )
    7. Save the production version.
    -> Change
    1. Assign a change number which is valid for the recipe and the bill of material entered or to be entered to the existing production version.
    2. Navigate to the recipe and further processing as described under -> Create.
    After the release of the change request, all three objects production version, recipe and bill of material are approved providing a change rule which prescribes an approval procedure was defined in the recipe header.
    You need a suitable change request for defining the change rule. Providing you use the integrated maintenance via the production version as recommended, proceed as described above and assign the suitable change request to the production version.
    If you want to ensure furthermore that no recipes are created without change request, use a profile set correspondingly in Customizing for the creation of recipes.
    Hope clear to you. For details refer the Note  154360 - Maintain prod.vrsns+recpes i.env.requirng an apprvl
    Regards,
    R.Brahmankar

  • Function module for Process order status

    Hi techies,
    I want to know the function module for process order status , idoc type is liopro01 and message type is liopro, my requirement is that based on the different status received in IDoc SAP should update the process order status, separate user status will be defined as "MO START" and "MO end" using status profile.also it has change the process order status to "TECO" also it should check the user status for "MO Abort".
    Thanks in Advance

    Hi ross,
    Try this function module.
    STATUS_CHECK_MULTI
    May be helpful.
    Lincon

  • Scheduled finish date for process orders not updating in BW

    We are having problems with the scheduled finish date (GLTRS) for process orders. When the process order is already released, changes done in R/3 on the scheduled finish date will not result to a delta hence data in BW is not updated. Table AFKO, where data is coming from, is always updated with the changes though. 2LIS_04_P_MATNR is used in extracting the data.
    Has anyone experienced the same problem? We are looking for possible ways on how to have a delta whenever there are changes on the process order even after it is already released.
    Any help would be greatly appreciated...

    Hi Donna,
    If I've understood your problem correctly, you can increase the load frequency as Sriee has pointed out.
    If you want latest data frequently and if you are on BI 7.0 then you can look at Real Time Data Acquisition(RDA)
    Regards,
    Tom.

  • Batch processing function to read PP data for production orders

    Hi,
      As we know, If BOMs changed we can use T-code: CO02, then follow the menu "Function --> read PP master data" to get up-to-date BOM. But If there're many production orders need to be read PP master data again, I have to do it one by one.
       My question is, If I have a list of production orders, could I do it in batches? and What's the transaction for it?
    Please kindly Advise.
    Best Regards.

    Hi,
      As we know, If BOMs changed we can use T-code: CO02, then follow the menu "Function --> read PP master data" to get up-to-date BOM. But If there're many production orders need to be read PP master data again, I have to do it one by one.
       My question is, If I have a list of production orders, could I do it in batches? and What's the transaction for it?
    Please kindly Advise.
    Best Regards.

  • Usage of IO (read master data) in Process Chain

    Hi experts,
    I have a little bit complicated the task.
    i have some InfoObject ( as input) and i need to find out the list of Process Chains which read data from this IO, directly by using update rules/transformations or by using function modules.
    It means to check all steps in Process Chain and check all routines, selection conditions, update rules, transformations, functions ( function can call next function) , ... and find out if we read informations from IO (master data). I think it is complicated.
    Maybe next solution -  is existing any log of Process Chain which contains informations about "select" over IO (master data) ?
    Thanks in advance
    Martin

    There is something, what can make your work easier
    1. Go to table RSAABAP and put in field LINE value 'yourInfoobject'
    you will get list of all places, where this IO is read
    2. Go to table RSTRANSTEPROUT and paste all CODEID from previous table, and you will get list of all transformations.
    Having transformation you can find all DTPs and then process chains
    Regards,
    DL

  • Update batch for process order in change mode

    Hi All ,
    I need to update the batch number(which will be external batch number given by me ) in COR2 (process order change) transaction ,under the tab Goods receipt .
    Is there any bapi which achieves this ?? pls reply
    Thanks .

    try use BAPI_RESERVATION_CHANGE

  • Process Order status CRCR needs to  re read master data

    All,
    I have an issue with re-reading the master data in process order.
    I have an order which was  released and control recipe was also released since we use pi sheet to record shop floor data.
    After releasing the control recipe user  made changes into bom and he wanted to re-read master data , on the master data tab re-read master data button is not activated not  if i go menu path from the header process order-> functions-> re-read master data is active.
    Neither i am allowed to set the deletion flag for the order, i am getting error message process order status CRCR does not alow to set the delection flag.
    Any solution to this issue is appriciated
    Either i should be able to re-read the master data or set the deletion flag...

    In your case Control Recipe is already created, so you need to send a process message to set the status of the control recipe to finished. "CRFI". Follow the steps below,
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Then use Transaction CO54 to send the Message to the process order.
    You can complete the PI Sheet by clicking the "complete" button in the PI Sheet also.
    Now try to re read master data

  • Error while assigning infoobject to the read master data in rule type

    Hi sdns,
    I want to read the zwostd info object data from zemployee master infoobject attribute list. For that i have selected  rule details of zwostd infoobject in transformation of info cube, then i am tring to select the read master data rule type. It is taking more time and then it displayed error like permitted time was  exceeded. Could any one please give me  the solution for this problem.
    thanks
    karun

    Sometimes directly typing the infoobject name in the field helps - otherwise it tries to fetch all the infoobjects available which is possibly why the time out occurs..?
    Enter the Master Data infoobject directly and then you will get the fields assigned.
    However my experience with read master data has been that whenever you change the master data IOBJ by way of adding / removing Nav Attributes / attributes etc - all the transformations using the read master data for the IOBJ that is being changed will get deactivated and it is a pain reactivating and transporting them again - particularly so when you are developing something on them and the changes are stuck across multiple requests ...
    IMHO use a routine instead to do the same - it involves lesser maintenance. SAP is anyway going to run a similar SQL...

  • Error - InfoObject cannot be used to read master data

    Hi All,
    We am working on mapping objects in a transformation, on some of the transformation I am using the master data attribute to fill the infoobject.  In some cases the mapping happens without incident but in others we are getting the following error
    InfoObject  cannot be used to read master data
    Inside the long text of the message it says:
    InfoObject  does not have the correct attributes to be used to read master data for the target field
    The object is one of the master data attributes, so we are not sure why we are recieving this error?
    We have recieved it with 0COMP_CODE trying to load Fiscal Year Variant and with a non standard enhanced object ZMATERIAL which is a copy of 0MATERIAL with added attributes for Product Class, Product Group and Product Line wich come from the product hierarchy and are populated on the load of the material from product hierarchy.
    Has anyone else had an issue with this error and can you tell us how you fixed it???
    Thank you!
    Caroline

    You received this error for loading 0FISCVARNT (Fiscal Year Variant) because that InfoObject isn't an attribute of 0COMP_CODE (Company Code) and it cannot therefore determine what data to populate based on your input. Instead of using 0COMP_CODE, you may have to enter a constant value for the Fiscal Year Variant if you don't have it in your source InfoProvider.
    When you created ZMATERIAL, did you use 0MATERIAL as a reference so that it would inherit the attributes and texts? If so, Product Class, Product Group and Product Line would have to be attributes of 0MATERIAL. If you didn't reference 0MATERIAL and are loading attributes directly to the custom InfoObject attributes, then Product Class, Product Group and Product Line would have to be attributes in ZMATERIAL in order to use the Use Master Data function for transformations. You may have to derive the values for these different, such as add ABAP for lookup routines.

  • Order Status Change and E-mail Send

    Hello there,
    Is there some ready to use Scenario that checks for an order status change on repository and send an e-mail to the customer?
    Thanks.

    I would contact iTunes:
    Apple - Support - iTunes

  • Set Deletion Flag for Process Order is not possible due to status ORRQ

    Hi Guys,
    I need to mark some process orders for deletion, but the status ORRQ (order record required) is blocking me. I've read some SAP Documentations and SAP Notes and it's recommending run tcode COPA to store the order records. A
    Although the Process Order is appearing there to be stored, we I execute store process it gives me a message that "Zero Orders were stored".
    So, can you help me on this?
    Thanks.
    Pérsio Kojima

    Hi Pérsio,
    Check In Customizing whether the order type has been set up for storing in T code COR4 (order type-dependent parameters, Master data tab page, Order record required indicator).
    IF the option is selected, the system will not delete the record directly. The order record must be archieved and then deleted.
    based on this either you can de activate the option or archive before deletion.
    Hope this answers your question.
    regards,
    Pradeep.

  • Bapi for update Master Data in Production order

    Dear All ,
        I am working in a car manufacturing company here production order is made month wise planning qty , but every day its Bom is get changed by Autocad/PLM interface and all changes are being recorded through ECN .
       I have to  generate daily reservation for assemblies for a perticular finish vehical ,so I need to update the Masterdata in production order no through the PLM( VB platform) interface .
      So please suggest me any BAPI so that I can update the master data regular basis in monthly production order  or if you have any better way to map this process into SAP please suggest .
    Thanks in advance .
    regards ,
    Pralay ..

    Not sure what master data in production order you want to change. Anyway if it is at header level, then evaluate BAPI - BAPI_PRODORD_CHANGE.
    Alternatively evaluate the usage of Order Change Management if it is feasible in your solution. Do a search in this forum you will find many threads on it, also read SAP help & do a test a test in your sandbox. If you face a specific issue then do revert

  • BAPI_PROCORD_CHANGE for process order operation level change

    Hi,
    Can any buddy tell me how to change operation dates in process order with following requirement:
    Process order scheduling type is 'Forward',
    1st step, read operation start dates 'Earliest Dates' and 'Latest Dates',
    2nd step, change operation 'Earliest Dates' and 'Latest Dates' directly, this step can't be done in foreground,
    Can use BAPI_PROCORD_CHANGE to update operation dates directly?
    Best Regards
    Amy

    Hi Amy
    BAPI_PROCORD_CHANGE cannot be used to change operations.
    According to note 1694267 you can use the remote-enabled function module CO_SE_PRODORD_CHANGE that is released by the customer to change the order header, sequences, operations and production resource/tool. See the detailed documentation for the function module.
    BR
    Caetano

  • BAPI for Process order change

    Hi,
    Can any buddy tell me the Bapi used for Process order change
    with following scenarios:
    Quantity change
    Resource change
    Rescheduling
    Control key change
    RM Change
    Recipe change
    TECO
    REVOKE
    Material shortage check
    Best Regards,
    Sheetal.

    Hi,
    BAPI_PROCORD_CREATE for process order create
    BAPI_PROCORD_CHANGE - Change Process Order
    BAPI_PROCORD_CLOSE - Close Process Order
    BAPI_PROCORDCONF_CANCEL for Cancel Process Order
    Confirmation.
    BAPI_PROCORD_COMPLETE_TECH - Complete Technically
    BAPI_PROCORD_RELEASE - Release Process order
    BAPI_PROCORD_SET_DELETION_FLAG - Deletion Flag
    BAPI_PROCORD_REVOKEUSERSTATUS - Cancel User Status
    BAPI_PROCORD_SCHEDULE - Carry Out Scheduling
    pls refer below link
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/200dd1cc-589e-2910-98a9-bb2c48b78dfa
    http://help.sap.com/saphelp_nw04/helpdata/en/e0/9eb2370f9cbe68e10000009b38f8cf/frameset.htm
    Regards,
    Sankaran

Maybe you are looking for

  • How to scan photos

    I have a new iMac I use with an HP 6180 Photosmart All-in-One. I've downloaded the driver update and can scan to the Mac however I am looking for a way to have the scanned images go directly to a folder rather than first to an app such as Preview or

  • Accessing SDM, Deploy Tool from Browser

    Hello Experts, Can we access SDM or Deploy tool using Internet Explorer?? Just like a SAP MMC?? Thanks, Prashant

  • Re-addressing of WAE's management port

    Hi, I would like to re-address management port of WAE. What is the correct method for doing it? Because the WAE is registered in the central manager WAE. When I re-address management port of WAE, the central manager has problem with the new address.

  • ORA-04031 Error

    Hi All! Can someone help me find the cause for the following error which occurs at random when I access Oracle through the servlet? java.sql.SQLException: ORA-04031: unable to allocate 744 bytes of shared memory ("unknown object","sga heap","library

  • How can I turn off that stupid feature that shows previous spellings?