Hi,
The output for MRP is in the form of Planned Orders/ Procurement proposals after netting all the available stocks, Pending PO's/PRQ's & Productio Orders.
But i want to know the requirements list with out considering the pending PO's/PRQ's/ Production Orders.
Is that possible to view?
Regards,
Sirisha
Dear
You need to deal with following table for your requirement to extract the list of MRP elements as they are NOT in a single table also
MDKP, "Header Data for MRP Document
MDTB, "MRP table
MDTC, "Aggregated MRP table items
T457T. "Description of MRP elements
For more details , i would rather suggest you to discuss with your ABAPer with following code as one of the referbce :
DATA: BEGIN OF MDTBX OCCURS 0.
INCLUDE STRUCTURE MDTB.
DATA: END OF MDTBX.
SELECT-OPTIONS: PLANT FOR MDKP-PLWRK OBLIGATORY,
MATNR FOR MDKP-MATNR OBLIGATORY.
CLEAR: MDKP, MDTB.
SELECT * FROM MDKP WHERE DTART EQ 'MD'
AND MATNR IN MATNR
AND PLWRK IN PLANT.
WRITE:/ MDKP-MATNR, MDKP-PLWRK.
IF MDKP-CFLAG EQ 'X'.
CLEAR MDTBX. REFRESH MDTBX.
IMPORT MDTBX FROM DATABASE MDTC(AR) ID MDKP-DTNUM.
LOOP AT MDTBX.
MOVE MDTBX TO MDTB.
SELECT SINGLE * FROM T457T WHERE SPRAS = 'E'
AND DELKZ = MDTB-DELKZ.
IF MDTB-PLUMI = '-'. MULTIPLY MDTB-MNG01 BY -1. ENDIF.
WRITE:/ MDTB-DAT00, T457T-DELB1, MDTB-VSTAT,
MDTB-MNG01, MDTB-LGORT.
ENDLOOP.
ELSE.
SELECT * FROM MDTB
WHERE DTNUM EQ MDKP-DTNUM
ORDER BY PRIMARY KEY.
SELECT SINGLE * FROM T457T WHERE SPRAS = 'E'
AND DELKZ = MDTB-DELKZ.
IF MDTB-PLUMI = '-'. MULTIPLY MDTB-MNG01 BY -1. ENDIF.
WRITE:/ MDTB-DAT00, T457T-DELB1, MDTB-VSTAT,
MDTB-MNG01, MDTB-LGORT.
ENDSELECT.
ENDIF.
ENDSELECT.
Regards
JH
Edited by: Jiaul Haque on Nov 22, 2010 4:25 PM
Similar Messages
-
Reg:MRP -Exclusion of open orders
Hi,
I want to run MRP without consideration of open orders(Production order).Is it possible.
I tried thru availability configuration.Its not working.
Regds
bhuvanDear ,
Just an work around : Did you check setting Technically complete status to Production Order .Goto -CO02-Function-Restrict Processing -Technically Complete and SAVE for those order which you do not want to consider in MRP .For mass teco use COHV.
Check with 2-3 sample orders in sand box and run MRP
Availabilty check is not fulfill the requirement bacause , it is not plant specifc and also for an particualr order type .
Try this and let us know the result .
Regards
JH -
Reg: MRP Run for all Materials
Hi Abapers,
I have an issue where in using MD01( Material Run), i need to raise one PR for all materials below the re-order stock. Currently system creates one PR for each material below the re-order stock.
Please throw any ideas regarding this.
Thank youHi ,
to procure assembly take 10 days.
And delivery date is after 2 days
After MRP run , system will take first backward schedulling from delivery date will take 2 days and going forward scheduling and take 8 days .
So that from current date system will take 10 days so assembly will procure easily .
Suppose today date 19/05/2011. And delivery date is after 2 days .( on date 21/05/2011 )
if MRP is run on 19/05/2011. System will create delivery date 29/05/2011.So assembly will be easily procure within span of 10 days from 19/05/2011 to 29/05/2011. Delivery of FG is easily available on 29/05/2011.
Regards
Vinod -
Hi all,
can any one know me the mrp elements in md04
As we call Value stock at vendor as Subcst
To.quality inspection as QM-Lot
In transfer ( storage location) as Sloc st
and i want to know for Returns,in transfer (plant), unrestrected consignment,
blocked consignment,Rest.Consignment,consignment in inspection.quality inspection stock at vendor.
Thanks,
Narsimha Reddyi need the mrp elements i.e.in md04 transaction we can see the stock. if we click on stock we will find all the stocks dispalyed so where can we see that all mrp list elements.
-
Reg.MRP Run without sale order
Dear Experts
We are in need of MRP run without sale order. I have created Finished product material (T-Shirt) and assigned components to that and then I ran MRP, If I do so, MRP is exploded but result is not satisfied some non components are displayed.
What is my requirement is ,when I run MRP if there is stock availble production order should be created otherwise Material requirement has to created.
Pls help what is the configuration for MRP run,
Thanks
Rajakumar.KHi Raja,
One of your requirements isn't available in R/3.
What is my requirement is ,when I run MRP if there is stock availble production order should be created otherwise Material requirement has to created.
Standard MRP will create Dependent requirements (demand elements). MRP will create order PROPOSALs (purchase reqs or planned orders)(supply elements). MRP can be immediately followed by an additional program that will convert planned orders to Production orders. All these things are possible.
However, MRP will not check for the availability of components, and then selectively create production orders. Availability check, which is not part of MRP, is usually performed at a later part of the production order cycle.
Regards,
DB49 -
Reg:MRP,SFC,SOP
1) suppose i have 4 seperate routings
how do i choose one among the four and link it to MRP
2) what is use of OrderType Dependant paramaters
3) i want Process FLow in SOP scenario
4)what is Planning Strategy =40Raj,
1.
With T-Code C223, you can create production versions for each routing. That will have different lot sizes and validity dates.
With respect to each production version routing will be selected.
2.
Order type Dependent parameters controls the following things.
a. Selection of PV: (0-Automatic, 1-Manual)
b. Routing (Selection ID, Routing Selection, TL Type)
c. BOM Application (PP01)
d. Inspection Type
e. Missing part List
f. Documentation Goods movements
g. Controlling data such as costing data and Result analysis Key.
3.
Process flow for SOP ( Consolidated from different blogs and libraries)
a. Maintain self defined information structure----MC21
Sales department in discussion with planning department prepares the sales plan for different product range or for
different product groups.
b. Create planning type----MC8A
Act as a template to maintain data for specific information structure. It is a customized view of planning table. You may have one view for sales planner and another view for production planner. There is no restriction on number of planning type per info structure.
c. Create planning hierarchy---MC61
It is a combination of characteristics value. It provides framework for planning in flexible planning.
d. Create product group---MC84
A product group combines other product groups and materials according to whatever criteria best meet the needs of enterprise. Product groups are classified according to whether they are multi-level or single-level. A product group is multi-level if it contains other product groups. However, the lowest level in a product group hierarchy always consists of materials.
e. Resources---CR01
Resource or work center is the standard essential master data in PP module.
f. Rough-cut planning profile---MC35
It is a kind of resource leveling tool. One can have a visibility of target in terms of resource required to meet them. This gives the input to fine tune the target and optimize the use of resource. Example: a product has to undergo processing in four machines. Machine three is a bottleneck operation. It is essential to check the capacity of this resource to the planned quantity. Then rough cut planning profile will be created to this resource and evaluated for capacity.
g. Create plan in inactive version---MC81
Sales department in discussion with planning department prepares the sales plan for different product range or for
different product groups.
h. Disaggregate product group plan and check capacity---MC76
Planning is done at the product group level at highest level. Now it is required to disaggregate the plan to plan the down level product group and finally the material.
i. Version management---MC78
"Presently the plan is available in inactive version. With this version, capacity situation is verified. If it is found
satisfactory, it may be transferred to A00 as a Active version.
j. Transfer product group to planning---MC75
Transferring disaggregate sales plan in to planned independent requirements i.e. planning table.
4.
Planning Strategy 40 (Planning with Final Assembly)
This is a Make to Stock strategy.
This strategy is preferable where quantities of the finished product can be predicted.
In this strategy, existing stock is considered and sales order will consume PIRs
Following fields need to be maintained in MRP 3 view along with use of 40 strategy .
a. Consumption Mode
b. Bwd Consumption Period
c. Fwd Consumption Period
Regards,
Samir Wadajkar
Edited by: wadajkar on Dec 14, 2010 8:54 AM
Edited by: wadajkar on Dec 14, 2010 8:54 AM -
Dear all,
Where can we create MRP elements for ex BH for process order, we can check in MD04 but i want to know where they are created
Regards
VenkatVenkat,
If you are talking about creating a new type of MRP element, this generally cannot be done. I believe the only way implement a new element would be to modify all existing programs that manage this field.
I have never heard of 'BH' for process order, the standard MRP element for Process order has already been assigned to 'BR'.
There is a configuration where you are permitted to assign different text elements (human-readable names) to existing MRP elements OMD5.
Best regards,
DB49 -
Hi Friends,
The quiery is like this
MD01 is scheduled as a background job using MDBT transaction . Here values are maintained for MRP control parameters which appear on MD01 initial screen like
Processing key
Create purchase req
Schedule lines
Create MRP list
Planning mode
Scheduling
Planning date .
Though here it is given that no schedule lines , MRP output is giving schedules for BOM components
quiery is which control parameters are preferred while system is executing MRP ,
1.The Plant parameters which are maintained at plant level
thropugh OPPQ
2. The Plant parameters which are maintained at MRP Group
level thropugh OPPR
3. The MRP control parameters entered in MD01 initial screen
4. Master data maintained like planeed delivery time , etc... for
material in material master
another doubt is while running how the system considers the MRP control parameters pertaining to the BOM header parts and BOM components
regards,
Madhu KiranHi,
For MD01, system will check MRP group parameters for particular material. MRP group creation indicator overwrite the initial screen of MD01 creation indicator.
If MRP group not found system will use initial screen of creation indicator.
For MD02, system will overwrite MRP group creation indicator. MD02 initial screen indicator has priority over MRp group.
For your last question also system will work as above.
Check the following taken from SAP Help.
The creation indicator for purchase requisitions is only valid if the MRP group does not override it. The creation indicator for scheduling agreement schedule lines is only valid if the MRP group or the plant entry in Customizing does not override it (see Creation Indicators in the Initial Screen and the MRP Group ).
In single-item planning the creation indicators in the initial screen overwrite the creation indicators in the MRP group (see Creation Indicators in the Initial Screen and the MRP Group).
Regards,
Dharma -
Reg LPA Delivery schedules - MRP
Hi
Delivery schedules got created via MRP - LPA document type
We haven't released to vendor [JIT or Forecast]
When i manually change quantity in generated delivery schedule, Firmed indicator is ticked as expected
i am unable to uncheck this indicator when go there change mode it is grayed out
Please suggestSAP Help says 'You can only change it from the planning result. To do this, double-click on the schedule lines in the planning result.'
Planning result ??
How do i make changes to firm indicator, Please help -
Hi guru's can anybody tell can it be config., in such a way that the ext., req., can also be
taken into account while MRP run in consumpotion-based planning if VB is selected as MRP type.
thanx in adv.,
tulja singhHi,
In spro/ prodn/mrp/master data/check mrp type :
For mrp type VB you can include external requirements in total horizon or with in the replenishment lead time.
Select the external requirements to be considered by the system such as sub contract req, released purchase req, reservation etc.,
You can copy VB &make required changes & give a different name.
Hope this helps...
Regards,
Ramasamy -
Reg purchasing department processing time MRP
Is The purchasing department processing time defined for the plant is taken into consideration by MRP while calculating purchase requisition release date??? If not then what is the use of this ? [Where do we configure this in SPRO] ?
SAP help says ..
The planned delivery time from the purchasing info record and the GR processing time are only taken into account if the purchase requisition was generated via materials planning.This is what i understood please correct me if i am wrong
Requirement Date <GR Processing Time> Delivery Date <Plan Delivery Date>PODate <Plant purchase processing time> PR Release Date
Purchase process time will have effect on PR Release date not on Delivery date
Edited by: sasibhushan334 on Apr 28, 2010 2:08 AM -
hi,
system showing error message MRP parameters are not assigned to plant in tcode md04
pl suggestHi,
MRP must be active for each plant and the planning file must be set up.You can maintain the parameters for MRP in the material master, in the MRP group or you can maintain the plant parameters in Customizing.
Please check the mentioned settings for your plant.
Activate MRP and set up Planning file
Production> Material Requirements Planning>Planning File Entries-->Activate MRP and Set Up Planning File
Defining Plant Parameters for MRP
Production>Material Requirements Planning>Plant Parameters-->Carry Out Overall Maintenance of Plant Parameters
Go thru the following configuration guide for more information.
http://help.sap.com/bp_bblibrary/500/Documentation/P08_BB_ConfigGuide_EN_DE.doc
Regards
Venkat .V -
Reg. Access seq for MRP Price
Dear Friends
I have to create new pricing procedure for domestic sales, in this case, I need to create condition types for MRP Price,MRP Discount,BED,ECES,SHEC and VK11 also I maintained, but I faced access sequence problem,for MRP Price condition type I assigned the access seq. what is put in PR00 Condition type .if the enter the MRP Price which is treated as net price in header.so, which type of access sequence I have to use for the MRP the same should come in next to the PR00 condition type.
otherwise MRP should work as dummy should not involve anything. if remove the access seq in MRP Price,during billing release
I am facing TAXINJ problem. I want access seq also.
Pls help me.
Thanks in advance
Rajakumar.KDear Raja Kumar,
Kindly ask your client/business on what level they want to maintain the MRP...
Once a decision is made on this, please update in the thread.
Thanks & Regards,
Hegal K Charles -
Steps in Fore Cast Based MRP-reg
Hi,
we would like to implement forecast based MRP for spare parts which we supply against sales order from dealers
request you to provide us step by step working with forecast based MRP
1. what are the inputs for forecast based MRP
2. Process of forecast based MRP
3.Out put of forecast based MRP
4. reduction of requirements
etc...
madhu kiran.Hi Madhu,
Use
Forecast-based planning is also based on material consumption. Like reorder point planning, forecast-based planning operates using historical values and forecast values and future requirements are determined via the integrated forecasting program. However, in contrast to reorder point planning, these values then form the basis of the planning run. The forecast values therefore have a direct effect in MRP as forecast requirements.
Features
The forecast, which calculates future requirements using historical data, is carried out at regular intervals. This offers the advantage that requirements, which are automatically determined, are continually adapted to suit current consumption needs. The forecast requirement is reduced by the material withdrawal so that the forecast requirement quantity that has already been produced is not included in the planning run again.
Reducing Forecast Requirements
*Reducing forecast requirements by consumption
If consumption is higher than the forecast requirements in the current month, then the system also reduces future forecast requirements.
*Reducing current forecast requirements by consumption
If consumption is higher than the forecast requirements in the current month, then the system does not reduce future forecast requirements.
*Average reduction of the forecast requirements
The reduction of the forecast requirements is based on average daily consumption. Actual consumption data is not relevant.
The system calculates the average daily requirement first using the formula forecast requirement/number of workdays in the forecast period.
The forecast requirements are then reduced by the quantity resulting from the following formula: number of workdays worked x average daily requirements.
Period Pattern and Forecast Periods
You can specify the period pattern for the forecast (daily, weekly, monthly or per accounting period) and the number of periods to be included in the forecast individually for each material. It is possible, however, that the forecast period pattern is not specific enough for planning purposes. In this case, you can define per material that the forecast requirements should be divided according to a finer period pattern for planning. You can also define how many forecast periods are to be taken into account during requirements planning. The splitting indicator is defined in Customizing for MRP per plant and per period unit and is assigned to the material in the material master.
For a monthly forecast, the requirements date would be set on the first workday of the month because, for planning, it is assumed that the total requirement must be available at the beginning of the period. You can then divide this monthly requirement into either daily or weekly requirements.
Prerequisites
You have set an MRP type for forecast-based planning in the material master (MRP 1 view).
You define MRP types in Customizing for MRP in the IMG activity Check MRP types.
Process Flow
1.The system copies the requirements quantities that it has forecast in the requirements planning run and calculates net requirements. During this calculation, every period is checked to make sure that the forecast requirements are covered either by available stock, by planned receipts from purchasing or by production. If a material shortage occurs, the system generates a procurement proposal.
2.The system calculates the quantity recorded in the procurement proposal according to the lot-sizing procedure that you specified in the material master. Depending on the lot-sizing procedure, several forecast requirements are grouped together into one lot.
3.For every procurement proposal, the system calculates the date on which it must be converted into a purchase order or a production order.
Hope this helps you.
Regards,
Vinodh -
MRP list out put tables for header and item -reg
Hi ,
What is the table to be used for MRP out put
header is MDKP
for item what is the table ?
regards,
madhu kiranDear,
Tthe MRP item data is stored in a data cluster. The database
table is MDTC, and the data cluster area is ar. Use the following command to
import the data from the data cluster:
Import <structure> from database mdtc(ar) ID <key>.
The ID key value comes from the field dtnum (Number of the material
requirements planning table) in table MDKP
MDKP MDTB MDKP
Please refer this also,
[Table for MRP item|table for MRP item]
Regards,
R.Brahmankar
Maybe you are looking for
-
10.4 install fails on stock PowerMac G4 450 Sawtooth running OS 9.2.2
I did my search before posting this question so helpful answers would be appreciated. I aquired a PowerMac G4 450 AGP system which originally had OS 9.0.2, 20Gb HD, 256Mb ram, DVD-Rom and standard AGP video card. I have since pumped the ram up to 384
-
Decode in the select Statement
Hi All, I am using the decode function in the select statement....but as i am using the group by in the select statement....i am not able to run the same query How to tackle this problem of handling the decode ....while we have group by also. This is
-
Hi all, when I try to send a mail with an accented letter in subject (or in body) outlook does not display it properly I've tried to encode subject with MimeUtility but the only way I found is to encode it in UTF-8 (I want iso-8859-1 !!!) so outlook
-
Emailing Photos from iPhoto 09 causes date/time information to be lost
My entire family just updated from iLife 06 to iLife 09. We are all running OS 10.5.7 and have installed all of the auto updates for iLife. Since the upgrade, we've noticed that if we email eachother pictures (using Apple's Mail program), the date an
-
Drop down screen not showing weather
How do I get the weather and travel times to show on the drop down on the 5S ??