Reg MRP

Hi,
The output for MRP is in the form of Planned Orders/ Procurement proposals after netting all the available stocks, Pending PO's/PRQ's & Productio Orders.
But i want to know the requirements list with out considering the pending PO's/PRQ's/ Production Orders.
Is that possible to view?
Regards,
Sirisha

Dear
You need to deal with following table for your requirement to extract the list of MRP elements as they are NOT in a single table also
        MDKP,  "Header Data for MRP Document
        MDTB,  "MRP table
        MDTC,  "Aggregated MRP table items
        T457T. "Description of MRP elements
For more details , i would rather suggest you to discuss with your ABAPer with following code as one of the referbce :
DATA: BEGIN OF MDTBX OCCURS 0.
        INCLUDE STRUCTURE MDTB.
DATA: END   OF MDTBX.
SELECT-OPTIONS: PLANT FOR MDKP-PLWRK OBLIGATORY,
                MATNR FOR MDKP-MATNR OBLIGATORY.
CLEAR: MDKP, MDTB.
SELECT * FROM MDKP WHERE DTART EQ 'MD'
                     AND MATNR IN MATNR
                     AND PLWRK IN PLANT.
    WRITE:/ MDKP-MATNR, MDKP-PLWRK.
    IF MDKP-CFLAG EQ 'X'.
       CLEAR MDTBX. REFRESH MDTBX.
       IMPORT MDTBX FROM DATABASE MDTC(AR) ID MDKP-DTNUM.
       LOOP AT MDTBX.
         MOVE MDTBX TO MDTB.
         SELECT SINGLE * FROM T457T WHERE SPRAS = 'E'
                                      AND DELKZ = MDTB-DELKZ.
         IF MDTB-PLUMI = '-'. MULTIPLY MDTB-MNG01 BY -1. ENDIF.
         WRITE:/ MDTB-DAT00, T457T-DELB1, MDTB-VSTAT,
                                          MDTB-MNG01, MDTB-LGORT.
       ENDLOOP.
    ELSE.
       SELECT * FROM MDTB
                     WHERE DTNUM EQ MDKP-DTNUM
                     ORDER BY PRIMARY KEY.
         SELECT SINGLE * FROM T457T WHERE SPRAS = 'E'
                                      AND DELKZ = MDTB-DELKZ.
         IF MDTB-PLUMI = '-'. MULTIPLY MDTB-MNG01 BY -1. ENDIF.
         WRITE:/ MDTB-DAT00, T457T-DELB1, MDTB-VSTAT,
                                          MDTB-MNG01, MDTB-LGORT.
       ENDSELECT.
    ENDIF.
ENDSELECT.
Regards
JH
Edited by: Jiaul Haque on Nov 22, 2010 4:25 PM

Similar Messages

  • Reg:MRP -Exclusion of open orders

    Hi,
    I want to run MRP without consideration of open orders(Production order).Is it possible.
    I tried thru availability configuration.Its not working.
    Regds
    bhuvan

    Dear ,
    Just an work around : Did you check setting Technically complete status  to Production Order .Goto -CO02-Function-Restrict Processing -Technically Complete  and SAVE for those order which you do not want to consider in MRP .For mass teco use COHV.
    Check with 2-3 sample orders in sand box and run MRP
    Availabilty check is not fulfill the requirement bacause , it is not plant specifc and also for an particualr order type .
    Try this and let us know the result .
    Regards
    JH

  • Reg: MRP Run for all Materials

    Hi Abapers,
    I have an issue where in using MD01( Material Run), i need to raise one PR for all materials below the re-order stock. Currently system creates one PR for each material below the re-order stock.
    Please throw any ideas regarding this.
    Thank you

    Hi ,
    to procure assembly take 10 days.
    And delivery date is after 2 days
    After MRP run , system will take first backward schedulling from delivery date will take 2 days and going forward scheduling and take 8 days .
    So that from current date system will take 10 days so assembly will procure easily .
    Suppose today date 19/05/2011. And delivery date is after 2 days .( on date 21/05/2011 )
    if MRP is run on 19/05/2011. System will create delivery date 29/05/2011.So assembly will be easily procure within span of 10 days from 19/05/2011 to 29/05/2011. Delivery of FG is easily available on 29/05/2011.
    Regards
    Vinod

  • Reg mrp elements

    Hi all,
    can any one know me the mrp elements in md04
    As we call Value stock at vendor as Subcst
                     To.quality inspection as QM-Lot
                      In transfer ( storage location) as Sloc st
    and i want to know for Returns,in transfer (plant), unrestrected consignment,
    blocked consignment,Rest.Consignment,consignment in inspection.quality inspection stock at vendor.
    Thanks,
    Narsimha Reddy

    i need the mrp elements i.e.in md04 transaction we can see the stock. if we click on stock we will find all the stocks dispalyed so where can we see that all mrp list elements.

  • Reg.MRP Run without sale order

    Dear Experts
    We are in need of MRP run without sale order. I have created Finished product material (T-Shirt) and assigned components to that and then I ran MRP, If I do so, MRP is exploded but result is not satisfied some non components are displayed.
    What is my requirement is ,when I run MRP if there is stock availble production order should be created otherwise Material requirement has to created.
    Pls help what is the configuration for MRP run,
    Thanks
    Rajakumar.K

    Hi Raja,
    One of your requirements isn't available in R/3.
    What is my requirement is ,when I run MRP if there is stock availble production order should be created otherwise Material requirement has to created.
    Standard MRP will create Dependent requirements (demand elements).  MRP will create order PROPOSALs (purchase reqs or planned orders)(supply elements).  MRP can be immediately followed by an additional program that will convert planned orders to Production orders.  All these things are possible.
    However, MRP will not check for the availability of components, and then selectively create production orders.  Availability check, which is not part of MRP, is usually performed at a later part of the production order cycle.
    Regards,
    DB49

  • Reg:MRP,SFC,SOP

    1) suppose i have 4 seperate routings
    how do i choose one among the four and link it to MRP
    2) what  is use of OrderType Dependant paramaters
    3) i want Process FLow in SOP scenario
    4)what is  Planning Strategy =40

    Raj,
    1.
    With T-Code C223, you can create production versions for each routing. That will have different lot sizes and validity dates.
    With respect to each production version routing will be selected.
    2.
    Order type Dependent parameters controls the following things.
                                         a. Selection of PV: (0-Automatic, 1-Manual)
                                         b. Routing (Selection ID, Routing Selection, TL Type)
                                         c. BOM Application (PP01)
                                         d. Inspection Type
                                         e. Missing part List
                                         f. Documentation Goods movements
                                         g. Controlling data such as costing data and Result analysis Key.
    3.
    Process flow for SOP ( Consolidated from different blogs and libraries)
       a. Maintain self defined information structure----MC21
                     Sales department in discussion with planning department prepares the sales plan for different product range or for
      different product groups.
       b. Create planning type----MC8A
                     Act as a template to maintain data for specific information structure. It is a customized view of planning table. You may  have one view for sales planner and another view for production planner. There is no restriction on number of planning type per info structure.
       c. Create planning hierarchy---MC61
                   It is a combination of characteristics value. It provides framework for planning in flexible planning.
       d. Create product group---MC84
                  A product group combines other product groups and materials according to whatever criteria best meet the needs of enterprise. Product groups are classified according to whether they are multi-level or single-level. A product group is multi-level if it contains other product groups. However, the lowest level in a product group hierarchy always consists of materials.
       e. Resources---CR01
                 Resource or work center is the standard essential master data in PP module.
       f. Rough-cut planning profile---MC35
                 It is a kind of resource leveling tool. One can have a visibility of target in terms of resource required to meet them. This gives the input to fine tune the target and optimize the use of resource.                                                                                Example: a product has to undergo processing in four machines. Machine three is a bottleneck operation. It is essential to check the capacity of this resource to the planned quantity. Then rough cut planning profile will be created to this resource and evaluated for capacity.
        g. Create plan in inactive version---MC81
                Sales department in discussion with planning department prepares the sales plan for different product range or for
    different product groups.
       h. Disaggregate product group plan and check capacity---MC76
                Planning is done at the product group level at highest level. Now it is required to disaggregate the plan to plan the down level product group and finally the material.
       i. Version management---MC78
               "Presently the plan is available in inactive version. With this version, capacity situation is verified. If it is found
    satisfactory, it may be transferred to A00 as a Active version.
        j. Transfer product group to planning---MC75
                 Transferring disaggregate sales plan in to planned independent requirements i.e. planning table.
    4.  
    Planning Strategy 40 (Planning with Final Assembly)
    This is a Make to Stock strategy.
    This strategy is preferable where quantities of the finished product can be predicted.
    In this strategy, existing stock is considered and sales order will consume PIRs
    Following fields need to be maintained in MRP 3 view along with use of 40 strategy .
    a. Consumption Mode
    b. Bwd Consumption Period
    c. Fwd Consumption Period
    Regards,
    Samir Wadajkar
    Edited by: wadajkar on Dec 14, 2010 8:54 AM
    Edited by: wadajkar on Dec 14, 2010 8:54 AM

  • Reg creation of MRP element

    Dear all,
    Where can we create MRP elements for ex BH for process order, we can check in MD04 but i want to know where they are created
    Regards
    Venkat

    Venkat,
    If you are talking about creating a new type of MRP element, this generally cannot be done.  I believe the only way implement a new element would be to modify all existing programs that manage this field.
    I have never heard of 'BH' for process order, the standard MRP element for Process order has already been assigned to 'BR'.
    There is a configuration where you are permitted to assign different text elements (human-readable names) to existing MRP elements OMD5.
    Best regards,
    DB49

  • MRP issue -reg

    Hi Friends,
    The quiery is like this
    MD01 is scheduled as a background job using MDBT transaction . Here  values are maintained for MRP control parameters which appear on MD01 initial screen like
    Processing key  
    Create purchase req
    Schedule lines  
    Create MRP list 
    Planning mode   
    Scheduling      
    Planning date   .
    Though here it is given that no schedule lines , MRP output is giving schedules for BOM components
    quiery is which control parameters are preferred while system is executing  MRP   ,
    1.The Plant parameters which are maintained  at plant level  
       thropugh OPPQ
    2. The Plant parameters which are maintained  at MRP Group
         level thropugh OPPR
    3. The MRP control parameters entered in  MD01 initial screen
    4. Master data maintained like planeed delivery time , etc... for
        material in material master
    another doubt is while running how the system considers the MRP control parameters pertaining to the BOM header parts and BOM components
    regards,
    Madhu Kiran

    Hi,
    For MD01, system will check MRP group parameters for particular material. MRP group creation indicator overwrite the initial screen of MD01 creation indicator.
    If MRP group not found system will use initial screen of creation indicator.
    For MD02, system will overwrite MRP group creation indicator. MD02 initial screen indicator has priority over MRp group.
    For your last question also system will work as above.
    Check the following taken from SAP Help.
    The creation indicator for purchase requisitions is only valid if the MRP group does not override it. The creation indicator for scheduling agreement schedule lines is only valid if the MRP group or the plant entry in Customizing does not override it (see Creation Indicators in the Initial Screen and the MRP Group ).
    In single-item planning the creation indicators in the initial screen overwrite the creation indicators in the MRP group (see Creation Indicators in the Initial Screen and the MRP Group).
    Regards,
    Dharma

  • Reg LPA Delivery schedules - MRP

    Hi
    Delivery schedules got created via MRP - LPA document type
    We haven't released to vendor [JIT or Forecast]
    When i manually change quantity in generated delivery schedule, Firmed indicator is ticked as expected
    i am unable to uncheck this indicator when go there change mode it is grayed out
    Please suggest

    SAP Help says 'You can only change it from the planning result. To do this, double-click on the schedule lines in the planning result.'
    Planning result ??
    How do i make changes to firm indicator, Please help

  • MRP run reg.,

    Hi guru's can anybody tell can it be config., in such a way that the ext., req., can also be
    taken into account while MRP run in consumpotion-based planning if VB is selected as MRP type.
    thanx in adv.,
    tulja singh

    Hi,
    In spro/ prodn/mrp/master data/check mrp type :
    For mrp type VB you can include external requirements in total horizon or with in the replenishment lead time.
    Select the external requirements to be considered by the system such as sub contract req, released purchase req, reservation etc.,
    You can copy VB &make required changes & give a different name.
    Hope this helps...
    Regards,
    Ramasamy

  • Reg purchasing department processing time MRP

    Is The purchasing department processing time defined for the plant is taken into consideration by MRP while calculating purchase requisition release date??? If not then what is the use of this ? [Where do we configure this in SPRO] ?
    SAP help says ..
    The planned delivery time from the purchasing info record and the GR processing time are only taken into account if the purchase requisition was generated via materials planning.

    This is what i understood please correct me if i am wrong
    Requirement Date <GR Processing Time> Delivery Date <Plan Delivery Date>PODate <Plant purchase processing time> PR Release Date
    Purchase process time will have effect on PR Release date not on Delivery date
    Edited by: sasibhushan334 on Apr 28, 2010 2:08 AM

  • Md04 stock reg list -mrp

    hi,
    system showing error message MRP parameters are not assigned to plant in tcode md04
    pl suggest

    Hi,
    MRP must be active for each plant and the planning file must be set up.You can maintain the parameters for MRP in the material master, in the MRP group or you can maintain the plant parameters in Customizing.
    Please check the mentioned settings for your plant.
    Activate MRP and set up Planning file
    Production> Material Requirements Planning>Planning File Entries-->Activate MRP and Set Up Planning File
    Defining Plant Parameters for MRP
    Production>Material Requirements Planning>Plant Parameters-->Carry Out Overall Maintenance of Plant Parameters
    Go thru the following configuration guide for more information.
    http://help.sap.com/bp_bblibrary/500/Documentation/P08_BB_ConfigGuide_EN_DE.doc
    Regards
    Venkat .V

  • Reg. Access seq for MRP Price

    Dear Friends
    I have to create new pricing procedure for domestic sales, in this case, I need to create condition types for MRP Price,MRP Discount,BED,ECES,SHEC and VK11 also I maintained, but I faced access sequence problem,for MRP Price condition type  I assigned the access seq. what is put in  PR00 Condition type .if the enter the MRP Price which is treated as net price in header.so, which type of access sequence I have to use for the MRP the same  should come in next to the PR00 condition type.
    otherwise MRP should work as dummy should not involve anything. if remove the access seq in MRP Price,during billing release
    I am facing TAXINJ problem. I want access seq also.
    Pls help me.
    Thanks in advance
    Rajakumar.K

    Dear Raja Kumar,
    Kindly ask your client/business on what level they want to maintain the MRP...
    Once a decision is made on this, please update in the thread.
    Thanks & Regards,
    Hegal K Charles

  • Steps in Fore Cast Based MRP-reg

    Hi,
    we would like to implement forecast based MRP for spare parts which we supply against sales order from dealers
    request you to provide us step by step working with forecast based MRP
    1. what are the inputs for forecast based MRP
    2. Process of forecast based MRP
    3.Out put of forecast based MRP
    4. reduction of requirements
    etc...
    madhu kiran.

    Hi Madhu,
    Use
    Forecast-based planning is also based on material consumption. Like reorder point planning, forecast-based planning operates using historical values and forecast values and future requirements are determined via the integrated forecasting program. However, in contrast to reorder point planning, these values then form the basis of the planning run. The forecast values therefore have a direct effect in MRP as forecast requirements.
    Features
    The forecast, which calculates future requirements using historical data, is carried out at regular intervals. This offers the advantage that requirements, which are automatically determined, are continually adapted to suit current consumption needs. The forecast requirement is reduced by the material withdrawal so that the forecast requirement quantity that has already been produced is not included in the planning run again.
    Reducing Forecast Requirements
    *Reducing forecast requirements by consumption
    If consumption is higher than the forecast requirements in the current month, then the system also reduces future forecast requirements.
    *Reducing current forecast requirements by consumption
    If consumption is higher than the forecast requirements in the current month, then the system does not reduce future forecast requirements.
    *Average reduction of the forecast requirements
    The reduction of the forecast requirements is based on average daily consumption. Actual consumption data is not relevant.
    The system calculates the average daily requirement first using the formula forecast requirement/number of workdays in the forecast period.
    The forecast requirements are then reduced by the quantity resulting from the following formula: number of workdays worked x average daily requirements.
    Period Pattern and Forecast Periods
    You can specify the period pattern for the forecast (daily, weekly, monthly or per accounting period) and the number of periods to be included in the forecast individually for each material. It is possible, however, that the forecast period pattern is not specific enough for planning purposes. In this case, you can define per material that the forecast requirements should be divided according to a finer period pattern for planning. You can also define how many forecast periods are to be taken into account during requirements planning. The splitting indicator is defined in Customizing for MRP per plant and per period unit and is assigned to the material in the material master.
    For a monthly forecast, the requirements date would be set on the first workday of the month because, for planning, it is assumed that the total requirement must be available at the beginning of the period. You can then divide this monthly requirement into either daily or weekly requirements.
    Prerequisites
    You have set an MRP type for forecast-based planning in the material master (MRP 1 view).
    You define MRP types in Customizing for MRP in the IMG activity Check MRP types.
    Process Flow
    1.The system copies the requirements quantities that it has forecast in the requirements planning run and calculates net requirements. During this calculation, every period is checked to make sure that the forecast requirements are covered either by available stock, by planned receipts from purchasing or by production. If a material shortage occurs, the system generates a procurement proposal.
    2.The system calculates the quantity recorded in the procurement proposal according to the lot-sizing procedure that you specified in the material master. Depending on the lot-sizing procedure, several forecast requirements are grouped together into one lot.
    3.For every procurement proposal, the system calculates the date on which it must be converted into a purchase order or a production order.
    Hope this helps you.
    Regards,
    Vinodh

  • MRP list out put tables for header and item -reg

    Hi ,
    What is the table to be used for MRP out put
    header is MDKP
    for item what is the table ?
    regards,
    madhu kiran

    Dear,
    Tthe MRP item data is stored in a data cluster. The database
    table is MDTC, and the data cluster area is ar. Use the following command to
    import the data from the data cluster:
    Import <structure> from database mdtc(ar) ID <key>.
    The ID key value comes from the field dtnum (Number of the material
    requirements planning table) in table MDKP
    MDKP MDTB MDKP
    Please refer this also,
    [Table for MRP item|table for MRP item]
    Regards,
    R.Brahmankar

Maybe you are looking for

  • 10.4 install fails on stock PowerMac G4 450 Sawtooth running OS 9.2.2

    I did my search before posting this question so helpful answers would be appreciated. I aquired a PowerMac G4 450 AGP system which originally had OS 9.0.2, 20Gb HD, 256Mb ram, DVD-Rom and standard AGP video card. I have since pumped the ram up to 384

  • Decode in the select Statement

    Hi All, I am using the decode function in the select statement....but as i am using the group by in the select statement....i am not able to run the same query How to tackle this problem of handling the decode ....while we have group by also. This is

  • European accent

    Hi all, when I try to send a mail with an accented letter in subject (or in body) outlook does not display it properly I've tried to encode subject with MimeUtility but the only way I found is to encode it in UTF-8 (I want iso-8859-1 !!!) so outlook

  • Emailing Photos from iPhoto 09 causes date/time information to be lost

    My entire family just updated from iLife 06 to iLife 09. We are all running OS 10.5.7 and have installed all of the auto updates for iLife. Since the upgrade, we've noticed that if we email eachother pictures (using Apple's Mail program), the date an

  • Drop down screen not showing weather

    How do I get the weather and travel times to show on the drop down on the 5S ??