Regd. Sld Creation

Hi all,
I am new to sld object creation.I need to create 3 software componets and i am utterly confused!!
1. for sap system,it would be one which will have IDOC's and all sap related objects only.I will be linking the sap business system to this.
2. Another two , third party and i dont have any business systems for them , i will be using business services if required.
My queries:
1.Do i need to create 1 product only or 3,if only one ,how to should i link it to 3 s\w componets.Is it a good practice or how should it ideally be.
2.Please let me know the steps to be followed like which one to create first , pls try to answer with my requirement in mind.
thanks....

Hi Abhi,
1.Do i need to create 1 product only or 3,if only one ,how to should i link it to
3 s\w componets.Is it a good practice or how should it ideally be.
2.Please let me know the steps to be followed like which one to create first ,
pls try to answer with my requirement in mind.
This is purely a work of technical consultant .The client team and PI  tech member has to sit and decide which approach to follow keeping business objectives in mind.
I guess there is no harm in creating seperate products. In your case , create one  ABAP  based product for SAP ( most of the cases it will be either sender or receiver in scenarios)
Create another for third party product : in fact you can go on creating products for every new vender (3rd party).
The steps would be like.. for SAP based system
  create Product->SWCV->tecnical system(link ur product created earlier)->create Business system(link technical system and SWCV).
for non sap Create Product and SWCV and import in IR .. Business services you can created at your will in ID.
Regards,
Srinivas

Similar Messages

  • Regd. Creation of Port and RFC dest in PI

    Hi Experts,
    I have two scenarios 1. file to IDOC and 2. IDOC to file.
    for first , i need to connect to ECC for posting IDOC. in sap side they have created port ,partner profile etc.
    in PI sides i created an RFC destination(sm59) ,given generic name, i have created port(idx1) and mentioned the partener num say(SAP123) ant type (LS). Loaded the meta data in idx2. i am able to post IDOC in sap.
    for the second case,i am supposed to receive idoc from sap.
    do i need to create another port and rfc destination ? or simply adding the metadata in the prev created port will help.
    Actually i tried creating another RFC dest and port and was trying to assign same partner num (SAP123) and type (LS)
    while loading the metadata i get an error saying 'basic type of the IDOC is unknown'.
    from SAP side the IDOC status is green , saying idoc is dispatched to the target port.But in Trn. SE58, there is error show.
    Is this something wrong in PI or SAP ?
    Please help me with the steps to be followed with suggested naming conventions if any.
    Best regards,
    Srinivas

    Hi,
          Port type shouldbe SAP SYSID ...it is important that you create the port with this naming convention as the name is very important to be followed...
    Try to create the port name with the above mentioned..and give a try...
    Also post the error generated in the SM58 ...
    HTH
    Rajesh

  • Activation of the activity fails u0096 no source files in the active workspace

    Dear All,
    I’m working on a NWDI installation since last month. The NWDI server (NW2004s) has been installed and configured with the following parameters:
    Some Details:
    -     Java Stack on SPS 12
    -     No complete Developer Workplace, we only use the Studio (SPS 12)
    -     OS: WIN 2003
    -     DB: Oracle 10g
    -     SDK: 2 SDK, Standard Edition x64 1.4.2_15
    Installation Usages Types: DI, AS Java, EP Core, EP (EP for the Visual Composer)
    Performed configuration steps:
    -     adaptation of VM parameter in the Visual Admin
    -     patched the NWDI Server and the Studio from SPS 9 to support package stack 12 + available single patches
    -     run the template installer => NWA with type “DI Allinone – run all post installation Steps for DI, CBS, CMS, DTR”
    -     Oracle Parameters changed, User and Authorizations created and assigned (UME, J2EE Security roles, DTR => ACL List), SLD (Creation of a new Landscape), Configuration of the CBS with the VA
    -     Configuration of the Studio (SAP J2EE Engine (fill in the NWDI engine), Proxy Settings, Development Configuration Pool)
    Development Steps for an example:
    -     Creation of a new software product (SLD)
    -     Namespace reservation on SLD => Application Context Root, Development Component Name
    -     Created a Domain and a Track on CMS
    -     Attached all Software components to the track (my own dc, SAP-JEE, SAP_Buildt, SAP_JTechs)
    -     Check-In the Software Components on Transport studio => CMS
    -     Moved the development configuration into Studio
    -     Created a ear- and a web-project => Display a JSP File (It’s the same example like in the SAP Course TADM10)
    -     Check-in the activity under “Open activities” => Activate
    My problem appears during the check-in phase in the studio. I was able to check-In the source files in to the inactive Workspace on the DTR, but the activation of the activity fails. (I thought that the build process runs automatically after the activation - also the movement from the source files from the inactive to the active workspace?).
    I received no error message, but I can’t find any source files in active workspace. The activity seems to be pending. I locate the request in the CBS, the request state is “failed” regarding the request type “activate”.
    At the moment there is no separate runtime system assigned to the NWDI System.
    Questions:
    1.     Have I forgotten an important configuration step?
    2.     Can I use the NWDI Server also as a runtime environment (DEV System)?
    Please let me know if somebody has an idea.
    Thanks.
    Christoph

    Hello Michael,
    thanks a lot for your answer.
    I found the following error messages in the <b>request log</b>:
    <i>Calculate all combinations of components and variants to be built...
         "xxxtest.com/math/calc/webdc01" variant "default"
              "xxxtest.com/math/calc/webdc01" variant "default" cannot be built. Activation will fail.
              INVALID dependency is declared to public part: default.
              [DC 247 variant "default"][SC 65 "xxxtest.com_TASCHENRECHNER_1"] using [PP default of DC 6 at Build-Time Dependency]
         "xxxtest.com/math/calc/eardc03" variant "default"
              "xxxtest.com/math/calc/eardc03" variant "default" cannot be built. Activation will fail.
              The required Build Plugin "sap.com/tc/bi/bp/enterpriseApplication/enterpriseApplication" IS UNKNOWN. None of the compatments contains a suitable plugin for this component.
              [DC 248 variant "default"][SC 65 "sanofitest.com_TASCHENRECHNER_1"] using [BP sap.com/tc/bi/bp/enterpriseApplication/enterpriseApplication]
    Prepare build environment in the file system... started at 2007-09-04 06:13:54.316 GMT
    Prepare build environment in the file system... finished at 2007-09-04 06:13:54.316 GMT and took 0 ms
    ===== Pre-Processing =====  finished at 2007-09-04 06:13:54.332 GMT and took 406 ms
    Change request state from PROCESSING to FAILED
    ERROR! The following problem(s) occurred  during request processing:
    ERROR! The following error occurred during request processing:Activation failed due to component "xxxtest.com/math/calc/webdc01" variant "default". The component is BROKEN.
    ERROR! The following error occurred during request processing:Activation failed due to component "xxxtest.com/math/calc/eardc03" variant "default". The component is BROKEN.
    REQUEST PROCESSING finished at 2007-09-04 06:13:54.332 GMT and took 422 ms</i>
    The <b>Build Log</b> was empty.
    Thank you in advance.
    Best regards
    Christoph

  • Transport target for business system not found in System Landscape Director

    Folks,
    We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
    We are getting following error when we try to import an interfaces in to new PID system:
    Import failed because of business system transfer object
    Communication component XID_FileSystem: Obligatory
    transport target for business system XID_FileSystem not found in
    System Landscape Directory
    We are yet to install PIQ system.
    All the interfaces in the old XID system have transport target of XIQ system.  I removed the  transport taget for the interface, but transport target is still showing in the Business system under transport target head.
    How can we overcome this issue as we will not have PIQ system atleast for two weeks.
    Thanks in advance,
    Regards
    Chandu

    Hi,
    You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
    Illustrated with DEv & PRD here.
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the Following .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    Edit GroupsGroup1) Select the Business systems 
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • MDBT  with planning date in Past "01.01.2010".

    Hi Guru,
    I need some help.
    Scenario: We made one variant in  MDBT  with planning date in Past "01.01.2010". But I could not Analise the effect of same.
    Can any one share what is the effect of planning date in Past.
    Thanx & Regd
    PNU

    Hi,
         creation of varient in the past date will not have any effect. All  that effects is scheduling the varient.
    Correct me if i ma wrong.
    Thanku
    krishna

  • NetWeaver XI components are not talking to each other

    I am an XI  consultant, i dont have proper Basis support at my client, since they are fond of only ABAP stack.
    They installed netweaver xi from the market place.
    I am unable to import any SWCV (even SAP BASIS) from SLD to IR and IR menu is blank.
    Unable to find list of adapters in Integration Directory.
    RWB -component monitoring is blank .
    SLD- creation of products,SWCV,Technical Sys,Buss Sys is possible.
    In conclusion i can say that they all are not co-operative and not talking to each other
    And also i want to know wheather xi 7.0 is compatable to databases Oracle 8.0.3 and Oracle 8.0.4

    Hi Venkata,
    Does the XI post Installation steps done by the team or not? It seems that there is some steps missing while doing the XI installation. Talk to to the BASIS team and tryu to find out the solution.
    >>> Unable to find list of adapters in Integration Directory.
    Check thisblog for it:
    /people/venugopalarao.immadisetty/blog/2007/03/15/adapter-engine-cannot-be-found-in-integration-directory
    >>> And also i want to know wheather xi 7.0 is compatable to databases Oracle 8.0.3 and Oracle 8.0.4
    In my view, yes. XI is compatible with all the versions of Oracle Database above version 8 but never tried it.
    Reward points if helpful. *
    Regards,
    Subhasha Ranjan

  • Time Dependent Hierarchy for Cost Center

    I have searched the entire SDN for this so any help would be really appreciated.
    I am a BI consultant and I am trying to look around for the exact steps on how to make a Cost Center Hierarchy "Time Dependent" in ECC system.
    I am aware of changes to do in BI system but there is no way that I can know what needs to be done in ECC side since we dont have any FI Consultant to help us. All the posts show that there is something to be done on ECC but it seems even no body is sure on what to do.  I think the hierarchy is created in KSH1.
    Please provide any documentation or exact steps on how to do it. I will assign full points to the correct and precise answer.
    Regds
    Girish

    Hi,
    Creation of cost centre:
    Path: Accounting  Controlling  Cost centre accounting  Master data  Cost centre  Individual processing  Create (T. Code KS01)
    Cost centre: Dept A
    Valid from: 01.04.2009 to 31.12.9999
    Enter
    Name: Dept A
    Depart Cost centre: Department A
    Person responsible: A
    Cost centre category: 1 (Production)
    Hierarchy area: XXXXXX
    Business area: XXXX
    Currency: INR
    Save (or) (Ctrl + s)
    Ignore the warning message, press enter
    Cost centre: Dept B
    Valid from: 01.04.2009 to 31.12.9999
    Reference cost centre: Dept A
    Controlling area: XXXX
    Enter
    Name: Department B
    Description: Cost centre department B
    Basic data
    Person responsible: B
    Save (or) (ctrl + s)
    Ignore the warning message, press enter
    Cost centre: Dept C
    Valid from: 01.04.2006 to 31.12.9999
    Reference cost centre: Dept A
    Controlling area: XXXX
    Enter
    Name: Department C
    Description: Cost centre department C
    Basic data
    Person responsible: C
    Save (or) (ctrl +s)
    Ignore the warning message, press enter
    Creation of Cost centre group:
    Path: Accounting  controlling  Cost centre Accounting  Master data  Cost centre group  Create (T. Code KSH1)
    Cost centre group: XXX Produ
    Enter
    XXX Produ u2013 Production department for Co. area XXXX
    Select insert cost centre button (Shift + F4)
    Give the cost centre: Dept A, Dept B
    Save
    Hope It will clear.
    Regards,
    Kishore K
    Edited by: kishore babu on Nov 12, 2009 1:14 PM

  • Error when trying to lainch the visual administrator

    Hello,
    I have installed the Solution manager 7.1 on Linux 5.4 / Oracle 11.2.0.2 while i am trying to open the visual administrator to configure the SLD (Creation of the onnection LCRSAPRFC_<SID>), i am getting the following error:
    +SD1ODYLSV1:sd1adm 17> pwd
    /usr/sap/SD1/DVEBMGS00/j2ee/admin
    SD1ODYLSV1:sd1adm 18> ./go
    java version "1.4.2"
    Java(TM) 2 Runtime Environment, Standard Edition (build 2.3)
    IBM J9 VM (build 2.3, J2RE 1.4.2 IBM J9 2.3 Linux amd64-64 j9vmxa64142ifx-20110628 (JIT enabled)
    J9VM - 20110627_85693_LHdSMr
    JIT  - 20090210_1447ifx5_r8
    GC   - 200902_24)
    Exception in thread "main" java.lang.UnsatisfiedLinkError: awt (libXp.so.6: cannot open shared object file: No such file or directory)
            at java.lang.ClassLoader.loadLibraryWithPath(ClassLoader.java:990)
            at java.lang.ClassLoader.loadLibraryWithClassLoader(ClassLoader.java:954)
            at java.lang.System.loadLibrary(System.java:409)
            at sun.security.action.LoadLibraryAction.run(LoadLibraryAction.java:76)
            at java.security.AccessController.doPrivileged(AccessController.java:197)
            at sun.awt.NativeLibLoader.loadLibraries(NativeLibLoader.java:81)
            at sun.awt.DebugHelper.<clinit>(DebugHelper.java:56)
            at java.lang.J9VMInternals.initializeImpl(Native Method)
            at java.lang.J9VMInternals.initialize(J9VMInternals.java:196)
            at java.awt.Component.<clinit>(Component.java:571)
            at java.lang.J9VMInternals.initializeImpl(Native Method)
            at java.lang.J9VMInternals.initialize(J9VMInternals.java:196)
            at java.lang.J9VMInternals.initialize(J9VMInternals.java:161)
            at java.lang.J9VMInternals.initialize(J9VMInternals.java:161)
            at java.lang.J9VMInternals.initialize(J9VMInternals.java:161)
            at java.lang.J9VMInternals.initialize(J9VMInternals.java:161)
            at java.lang.J9VMInternals.initialize(J9VMInternals.java:161)
            at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)
            at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:88)
            at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:61)
            at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:60)
            at java.lang.reflect.Method.invoke(Method.java:391)
            at com.sap.engine.tools.launcher.Launcher.launch(Launcher.java:336)
            at com.sap.engine.tools.launcher.Launcher.main(Launcher.java:114)
    +
    The package libXp.so.6 is already installed and the x server used (Exceed )in my case works fine.

    Hi Hassan,
    Visual Administrator is no more as of NetWeaver 7.10 release. Please start using NetWeaver Administrator (NWA) to configure SLD.
    Please have a look at the below link to configure NWA to work with SLD.
    http://help.sap.com/saphelp_nw70/helpdata/en/23/b557422d095542e10000000a1550b0/content.htm
    Please let me know if you need any further help.
    Thanks,
    Siva Kumar

  • How to Configuring Groups and Transport Targets ?

    Hi Experts,
             In my scenario i am having two XI Servers XI1(DEV) and XI2(QUA) each system is connected to different r/3 system.
         If i transport object from XI1(DEV) to XI2(QUA) after defining Transport Target in XI1(DEV) as r/3 system connected to XI2(QUA) using file system would be fine (or) should i go for CTS?
    Regards,
    RajeshKumar.D

    Hi,
    You have to use Transpoprt method
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    1) Select the Business systems GroupEdit Groups
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Problem with SLD and Creation of JCo

    Hello everyone!
    I have a problem with the SLD and the Creation of JCo on the Portal, in trying to create the JCo always tells me that the name used there in the SLD, being that the facility is new.
    Who performs the installation, set in the SLD the ECC 6 PRD, delete it to see if I could create a JCo but still the error again when creating the ECC 6 PRD in the SLD I said that already exists and can not create it.
    I found a forum which recommended re-import the cimsap .... .... zip and zip CR_Content which would clean everything, I managed to import the zip cimsap ... but in trying to raise CR_Content gives me the following message "All incremental updates of the selected aggregate import for export SAP_CR line have already been loaded before. You require a newer import to update your current content SAP_CR version 4.11." .
    I recommend, do the installation again, reload the cimsap.zip and CR_Content.zip a copy homogeneous.
    from already thank you very much
    Text of error to create JCo destination
    Failed to process request. Please contact your system administrator.
    [Hide]
    Error Summary
    While processing the current request, an exception occured which could not be handled by the application or the framework.
    If the information contained on this page doesn't help you to find and correct the cause of the problem, please contact your system administrator. To facilitate analysis of the problem, keep a copy of this error page. Hint: Most browsers allow to select all content, copy it and then paste it into an empty document (e.g. email or simple text file).
    Root Cause
    The initial exception that caused the request to fail, was:
       java.lang.NullPointerException
        at at com.sap.tc.webdynpro.serverimpl.wdc.sl.SystemLandscapeFactory.checkStatus(SystemLandscapeFactory.java:991)
        at at com.sap.tc.webdynpro.services.sal.sl.api.WDSystemLandscape.checkStatus(WDSystemLandscape.java:469)
        at at com.sap.tc.webdynpro.tools.sld.ButtonBar.onActionGoForward(ButtonBar.java:505)
        at at com.sap.tc.webdynpro.tools.sld.wdp.InternalButtonBar.wdInvokeEventHandler(InternalButtonBar.java:280)
        at at com.sap.tc.webdynpro.progmodel.generation.DelegatingView.invokeEventHandler(DelegatingView.java:87)
        ... 28 more
    See full exception chain for details.
    System Environment
    Client
    Web Dynpro Client Type HTML Client
    User agent Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; Trident/4.0; .NET CLR 1.1.4322; InfoPath.1)
    Version null
    DOM version null
    Client Type msie7
    Client Type Profile ie6
    ActiveX enabled
    Cookies enabled
    Frames enabled
    Java Applets enabled
    JavaScript enabled
    Tables enabled
    VB Script enabled
    Server
    Web Dynpro Runtime Vendor: SAP, build ID: 7.0017.20081210091801.0000 (release=NW04S_17_REL, buildtime=2009-01-12:09:43:27[UTC], changelist=52884, host=pwdfm114), build date: Tue Apr 28 19:28:39 CLT 2009
    J2EE Engine 7.00 patchlevel 48199.450
    Java VM IBM J9SE VM, version:2.2, vendor: IBM Corporation
    Operating system Linux, version: 2.6.18-92.el5, architecture: amd64
    Session & Other
    Session Locale en
    Time of Failure Fri Aug 28 11:43:53 CLT 2009 (Java Time: 1251474233677)
    Web Dynpro Code Generation Infos
    sap.com/tcwdtools
    No information available null
    sap.com/tcwddispwda
    No information available null
    sap.com/tcwdcorecomp
    No information available null
    Detailed Error Information
    Detailed Exception Chain
    java.lang.NullPointerException
         at com.sap.tc.webdynpro.serverimpl.wdc.sl.SystemLandscapeFactory.checkStatus(SystemLandscapeFactory.java:991)
         at com.sap.tc.webdynpro.services.sal.sl.api.WDSystemLandscape.checkStatus(WDSystemLandscape.java:469)
         at com.sap.tc.webdynpro.tools.sld.ButtonBar.onActionGoForward(ButtonBar.java:505)
         at com.sap.tc.webdynpro.tools.sld.wdp.InternalButtonBar.wdInvokeEventHandler(InternalButtonBar.java:280)
         at com.sap.tc.webdynpro.progmodel.generation.DelegatingView.invokeEventHandler(DelegatingView.java:87)
         at com.sap.tc.webdynpro.progmodel.controller.Action.fire(Action.java:67)
         at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.doHandleActionEvent(WindowPhaseModel.java:420)
         at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.processRequest(WindowPhaseModel.java:132)
         at com.sap.tc.webdynpro.clientserver.window.WebDynproWindow.processRequest(WebDynproWindow.java:335)
         at com.sap.tc.webdynpro.clientserver.cal.AbstractClient.executeTasks(AbstractClient.java:143)
         at com.sap.tc.webdynpro.clientserver.session.ApplicationSession.doProcessing(ApplicationSession.java:321)
         at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessingStandalone(ClientSession.java:713)
         at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessing(ClientSession.java:666)
         at com.sap.tc.webdynpro.clientserver.session.ClientSession.doProcessing(ClientSession.java:250)
         at com.sap.tc.webdynpro.clientserver.session.RequestManager.doProcessing(RequestManager.java:149)
         at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doContent(DispatcherServlet.java:62)
         at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doPost(DispatcherServlet.java:53)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:760)
         at javax.servlet.http.HttpServlet.service(HttpServlet.java:853)
         at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.runServlet(HttpHandlerImpl.java:401)
         at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.handleRequest(HttpHandlerImpl.java:266)
         at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:386)
         at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:364)
         at com.sap.engine.services.httpserver.server.RequestAnalizer.invokeWebContainer(RequestAnalizer.java:1039)
         at com.sap.engine.services.httpserver.server.RequestAnalizer.handle(RequestAnalizer.java:265)
         at com.sap.engine.services.httpserver.server.Client.handle(Client.java:95)
         at com.sap.engine.services.httpserver.server.Processor.request(Processor.java:175)
         at com.sap.engine.core.service630.context.cluster.session.ApplicationSessionMessageListener.process(ApplicationSessionMessageListener.java:33)
         at com.sap.engine.core.cluster.impl6.session.MessageRunner.run(MessageRunner.java:41)
         at com.sap.engine.core.thread.impl3.ActionObject.run(ActionObject.java:37)
         at java.security.AccessController.doPrivileged(AccessController.java:207)
         at com.sap.engine.core.thread.impl3.SingleThread.execute(SingleThread.java:102)
         at com.sap.engine.core.thread.impl3.SingleThread.run(SingleThread.java:172)

    Hello!!
    The "SLD" with which I am working up to Portal, the "ECC" installs itself as "ABAP.
    Who did the installation and initial configuration, do not leave any documentation about it.
    Now I need to create the systems and "JCo" necessary to enable them to implement the "ESS", but errors are presented above.
    Some days ago I managed to update the CR_Content, which allowed me to create the "JCo" but at the time of the test, says' com.sap.mw.jco.JCO $ Exception: (103) RFC_ERROR_LOGON_FAILURE "name or password incorrect .
    I managed to also create the portal systems, "System Administration -> System Configuration -> Content Portal" and to test it fails on "Test Connection with Connector", which as noted is associated with the connectors "JCo".
    For the creation of the system, I think I should create something in the Visual Administrator ", but within the documentation that I do not see anything about it.
    thanks for your help!

  • Creation of business and technical systems for sld

    hi
    can any one help me out, to creation of technical and business system for system landscape directory ....give me detailed instructions.
    this is urgent requirement
    regds
    venky

    Hi pervalli,
    plz look to
    http://help.sap.com/saphelp_nw04/helpdata/de/31/f0ff69551e4f259fdad799a229363e/frameset.htm
    Regards,
    Udo

  • Regd. Detailed steps for creating BS,TechSys, SWC etc in SLD

    Hi Experts !
    Can some one share a good detailed document on  the steps performed in SLD  like creation of product, software componet and how to create and link the Technical system and business systems. What are the various dependencies to be maintained and what autorisations to be given to the users to access business system created in SLD.
    Regards,
    Srinivas

    Hi Srinivas,
    You can follow below links.
    You can search on SDN can get more information if needed.
    http://help.sap.com/saphelp_nw04s/helpdata/EN/31/f0ff69551e4f259fdad799a229363e/frameset.htm
    http://www.sapag.co.in/HOWTOLOGINTOXI.html

  • A Doubt in Creation of Tech. System for a BW Server in SLD

    Hi Experts,
    I want to access BI Queries in a BW System in VC 7.1.
    When I am trying to create a New Technical System in SLD of CE 7.1 Server, it is giving me the options, to Select the System Types as
    1. AS ABAP
    2. AS Java
    3. Standalone
    4. Third Party
    So, Whether we need to Select the System AS ABAP or we need to Install anyother thing to get a Systems Option as ABAP.
    Also, I read in a SAP Note, That we have to define the System as AS SAP_BW.
    Note: BI Kit is installed in my CE 7.1 Server
    Please help me to solve this issue.
    Thanks in Advance.
    Regards,
    Palani

    Hi Palani,
    you don't need an SLD for configuring Bi connections. Please have a look at
    http://help.sap.com/saphelp_nwce10/helpdata/en/7e/6dbcea3700452195e3bddaa47c5906/frameset.htm
    how to define a BI connection for Visual Composer 7.1
    Best regards
    Hartmut

  • Buttons not enabling for JCO Creation in SLD

    Hi Experts,
    When i logged in into my Webdynpro Content Administrator with administrative rights, all the button like Create JCo Destination, Maintain JCo Destination and Start assigned SLD are getting disabled expect Check SLD Connection Button.
    Moreover, displaying a message : "Connection to System Landscape Directory (SLD) could not be opended successfully." at the bottom of the screen.
    When i click on the Check SLD Connection Button and then Test Connection, it gives again the same message i.e "Connection to System Landscape Directory (SLD) could not be opended successfully."
    Now, When i click on the Check SLD Connection Button and then Start SLD, SLD server is staring and running.
    Another thing is, When i am starting my sld server from logging in into http://<hostname>:<port>/sld, SERVER status is running. I stopped it and again started, then it is starting, but giving an error message as:
    "Failed to send start signal for complete cluster, SLD may still be stopped on other cluster nodes."
    When saving any parameters like profile information, it is not saving and saying error as:"
    Cannot save profile settings CIM_ERR_FAILED: Failed to initialize cluster notification sender."
    My setting are correct in SLD Data Supplier in Visual Administrator. I had filled the host/port/user/password information for both "HTTP Settings" and "CIM Client Generation Settings".
    It went worked well earlier, i come across this problem recently with my sld.
    Another thing that i noticed is when i click on the "CIMClient Test" button, its getting an error message saying "Failed to Generate and Test CIMOMClient Object". But, ealier it came as successfull.
    I have full authorization to use admin tools.
    What might be the problem.
    any help must be appreciated.
    regards
    sunil kumar

    Hi Sunil,
    We just had this issue couple of days before, this has to do with the JMS Provider Authorization. We did the following steps to solve our issue:
    I. Default security configuration of JMS resources is in place (this is by far the most common scenario) and named anonymous users have been created.
    Change the mapping of the "clients" jms role as follows:
    1. Start the Visual Admin
    2. Browse the tree in the left pane
    <SID> -> Server 0 -> Services -> Security Provider
    3. The "Policy Configurations" tab should be selected by default on the right hand side
    4. Select the "service.jms.default.authorization" node from the "Components" list (should be the nineth entry from the top down)
    5. Select the "Security Roles" tab
    6. Select the "clients" node from the security roles list
    7. You should see on the right hand side "Security Roles" list in which the "guests" node is marked
    8. Switch to edit mode by pressing the change button on top (pencil icon). The "Modify" button should now become active
    9. Press the "Modify" button
    10.Select the "all" entry from the "Security Roles" list. The "Groups" pane should show one entry named "Everyone"
    11. Press the "Save" button
    12. Restart the cluster so that JMS and applications using it can reliably reinitialize.
    Check
    Note 971249 - JMSServerSecurityException thrown accessing JMS resources
    for more details.
    Hope this helps!
    Regards,
    Preetha Rethinam

  • SLD - Error in creation of technical system

    hi experts,
    when we go to create a new technical system type WEB AS ABAP, the system said 'system already exists'
    it exist other technical system for this system of type third party,
    don't is it possible have together?
    very thanks,

    Hi,
    The problem is due to whatever technical system your are trying to create those details are  already contain another technical system name in SLD.  We can't create more then one technical system with same parameters.  Better to use existing technical system or delete existing one create new one.

Maybe you are looking for

  • Db2 license expiring in SAP Dev system

    hello All, Im new to DB6 database and we are experiencing db2 license expiring. What logs should I first investigate and and what SAP tcode can help me with this aside from SM21. Thanks and hoping for your kind feedback. kharlos

  • Changed Apple Store I.D. but not on iPhone

    I recently changed the email addy associated with my Apple Store account. Today when I went to update my iPhone apps it still brought up the old email addy when having me log into the iTunes store. Nothing I do changes it. I even synced the phone wit

  • URLEncoder.encode() for double-byte characters

    I use URLEncoder.encode(String s) and I know that this api is deprecated. Instead I use URLEncoder.encode(String s, String enc) api and I pass-in a URL as the value for 1st parameter which is "http://regexp.tistory.com/entry/깨진-한글-URL-변환" and for the

  • Adobe reader update 9.3.4

    Hello, I have tried to update adobe reader to the 9.3.4 version. It seems to be accomplised. The reader says it is the correct version. When I go to secunia.com, it says still have the 9.3.xxx  before .4 If I mouse over the exe file in explorer, it s

  • Space Designer preset select crash

    I'm running Logic Studio (upgraded from L7) on a core duo iMac, osx 1.4.10 Selecting a preset in Space Designer crashes Logic. Any preset does this and it does it every time. Anyone else experiencing this?