Remote replication - scheduled or continuous? Project-level or share-level?

Hi, I had a lot of problems with RR with the older 2009 firmware, but there's supposedly some improvements to in Q1 2010.
Previously, I've been doing scheduled and share-level rep, because any time the connection between the devices was broken, the replication failed and could not be restarted, resulting in me having to destroy the target rep and starting over. I have to move a couple terabytes over a 20mbit line between the devices, so it took a couple of months because of multiple restarts before all the data had copied over.
I have two questions regarding best practice:
1. Should I be using scheduled or continuous replication?
If the connection is lost during a continuous rep, will I need destroy the target, and re-create it from scratch?
2. Is it better to replicate at project-level, or set up individual replication for each share and LUN?
I need to be able to mount a single share if necessary, but managing share-level replication is very time consuming, because I have to set up a schedule that allows each share to fully replicate before it starts the next share. But if a whole project fails, I have to restart terabytes of data.
Thank you,
Max

Hello,
In a continuous replication, one the initial copy is sent, any interruption in communication would require the last update package to be sent again, not the entire data.
Regarding, which is "better" is your preference. Each has its own best use and one is not inherently better than the other method.
-Jay

Similar Messages

  • S_ALR_87013532 report -plan cost not rolling upto the WBS/Project level

    Dear All,
    Plan cost from production orders is not rolling up to the WBS/Project level in S_ALR_87013532 ( Plan/Actual Variance report).
    Where as plan cost from network is properly rolling up to the WBS/Project level in the above report. 
    Please suggest what could be the reason for this issue. Is any configuration needs to be done for this.
    Thanks & Regards,
    Vishal

    Dear sir,
    Thanks for the reply & sorry for late response from my side.
    OPSV settings are already maintained in our system.
    Some how i realized  later that cost are actaully getting rolled to the WBS level, but we have observed one more discrepancy.
    Example -
    Production order "X" value - 100 (  as seen through co03)
    Production order "X"value- 40 ( as seen through report s_alr_87013532).
    We found that  in report  s_alr_87013532 , although my total  producton order value of 100 is represented at the WBS /Project level, but at the production order level , it is showing value of 40. 
    On further analysis we found that for production order X
    Materail cost- 60
    Labour cost-40
    The material cost of 60  is not getting fetched against production order "X" in report " S_ALR_87013532".
    There are very few cases , where such discrepancy is seen.
    Kindly suggest.
    Regards,
    Vishal

  • I cannot enter new Schedule lines in item level

    hi.,
    while creating sales order, i want to  split the Schedule lines in item level for running MRP. i cannot enter new Schedule lines in item level. at present the system is not allowing in sales order
    Regards.,
    Lakshmanan.S

    Hi,
    Will you let us know what is the error message system is giving ?
    Regards,
    Amrish Purohit

  • Difference between sales order schedule line and item level data

    Hi All,
    Could you please let me know what is the difference between sales order schedule line and item level data?
    Thanks,
    Ramya

    Hi Ramya,
    Sales order schedule line contains del date, order qty, rounded qty, confirmed qty, delivery qty, schedule line category, purchase requisition etc.,  ie It contains the full details of sales order data with respect to the scheduled line of delivery.  The total quantity of a sales order item can be subdivided into schedule lines that contain the various subsets with the corresponding delivering dates.
    Sales order Item level data contains details of the item in the sales order like material code, net price, net value, UoM, PO details, reason for rejection if any, material group,billing date, plant etc., ie this
    contains the full details of item irrespective of scheduled line.
    Regards,
    R. Senthil Mareeswaran.

  • Resource Management of Shared Resource Pool at the Project Level

    I am having difficulty figuring out how to implement our resource management process. Currently we have one "Resource Pool" project that has all the shared resources. It is connected to both a "master portfolio" plan that has some task
    detail in it and other individual project plans that have their own WBS (for larger projects).
    The difficulty arises because we want to do resource allocation at a project level, but the resource usage view shows the WBS/task level detail.  I've tried grouping the resources assignments by resource and then project, but since everything is
    in the "Resource Pool" project, they all group under that project.  I've tried adding the "Project" field and it does show as the source project, but it doesn't group on that field, but rather the "Resource Pool" project
    only.
    How can I see resource allocation/usage at just the project level so our managers can do planning, negotiation, and re-allocation on a periodic basis with one simple view?
    My best current idea is to disconnect all the sub-tasks from the sharer, eliminate the WBS below the project level in the master plan and attach resources at that single line project in that master plan.  Then, we would have to manually alter the "Max"
    available time in the individual sub-plans as we altered allocations.  That essentially disconnects individual plans from both the master plan and the shared resource pool.
    Is there a better way?

    Mark,
    Yeah, I think there is a better way. Having a linked structure the contains both a pool file and a dynamic master is tenuous enough (i.e. prone to corruption), but if you start disconnecting from the pool and and messing with the master, you will most certainly
    invite trouble.
    But here is an approach that might work. I tested it on a sample pool file with two sharer files and I think it might give you what you want.
    1. First, either manually copy or use VBA to copy the contents of the Project field to a custom text field in each sharer file
    2. In the pool file display the Resource Usage view
    3. Create a group that first groups on the Resource Name and then on the Text1 field, and select "group assignments, not resource"
    4. Change the Text1 group field to be "assignment"
    Does that give you what you want?
    To help visualize, here is a screenshot of my test file. After grouping I applied a filter to Text1 with the option to also show summary tasks:
    John

  • How to make a mass change for incoterms of a scheduling agreement at item level.

    Hi SAP Guru,
    There are many wrongly assigned incoterms in the scheduling agreement at item level by a user exit which was implemented recently in production. May i know if there is any way that we can revert those changes back to the original incoterms via mass change? I've tried to search over the internet and it seems like there is no posting about this issue before. Please help urgently. Thanks in advance.
    Regards,
    Shawn

    You can use the following sample to develop your usecase.
    Here, we would show menu items only for the nodes at level 3.
    You can also download the entire sample based on POJO at
    http://adfsampleapplications.googlecode.com/svn/trunk/TreeSampleApplication.zip
    The code is self explanatory.
    Let know, if you have any specific questions.
    <af:form id="f1">
    <af:treeTable value="#{bindings.continents.treeModel}" var="node"
    selectionListener="#{bindings.continents.treeModel.makeCurrent}"
    rowSelection="single" id="tt1" columnStretching="last">
    <f:facet name="nodeStamp">
    <af:column id="c1">
    <af:outputText value="#{node}" id="ot2"/>
    </af:column>
    </f:facet>
    <f:facet name="pathStamp">
    <af:outputText value="#{node}" id="ot1"/>
    </f:facet>
    *<f:facet name="contextMenu">*
    *<af:popup id="p1" contentDelivery="lazyUncached">*
    *<af:setPropertyListener from="#{bindings.continents.treeModel.depth}"*
    *to="#{pageFlowScope.CurrentDepth}"*
    *type="popupFetch"/>*
    *<af:menu text="menu 1" id="m2">*
    *<af:commandMenuItem text="View Districts" id="cmi1"*
    *visible="#{pageFlowScope.CurrentDepth == 2 ? true : false}"/>*
    *<af:commandMenuItem text="View Attractions" id="cmi2"*
    *visible="#{pageFlowScope.CurrentDepth == 2 ? true : false}"/>*
    *</af:menu>*
    *</af:popup>*
    *</f:facet>*
    </af:treeTable>
    </af:form>
    Thanks,
    Navaneeth

  • How to define a unique project level custom field in project server 2010?

    Hi every one;
    is it possible to define a unique project level custom field?
    our client wants to have a unique custom field( project code) which doesn't allow users to save and publish projects with the same value.
    for example if user A define a project and set "project code = 1" if user B define another project and wants to save "project code =1" for it, the server doesn't allow him to save this value and he has to change value for example to 2
    thanks for any help

    First of all you need to have Project server development environment also for coding visual studio hands on is required.
    To start with PSI (Project Server interface)you need to have Development Environment of Project Server 2010.
    you can get the overview from http://msdn.microsoft.com/en-us/library/office/ms457477(v=office.14).asp
    You
    can get the information about SDK: Download SDK.
    http://msdn.microsoft.com/en-us/library/office/ms512767(v=office.14).aspx
    Below mentioned link is having code and reuqired information about :
    Generate Unique ID for Project using a webpart
     http://epmxperts.wordpress.com/2012/05/21/generate-unique-id-for-project-using-a-webpart/

  • How to find Project Level Text Custom Fields in Project Server 2010 databases?

    Hello,
    We are using Project Server 2010 SP2 in SEM Mode. We are planning to use Project Level Local Custom fields and we want to pull them in reports using SSRS, so I am wondering which table these "Local" (non enterprise) custom fields are stored in
    database.
    Any suggestions?
    Regards,
    Kishore Dodda
    Kishore Dodda

    Hi,
    Please see this
    similar thread about reading local custom fields though the PSI.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Task level data at the Project level?

    Hi all,
        I have a custom date field in Project 2010 that if certain text is displayed in the task name, this field is populated by the task finish date.
    Essentially this task is connected within Project Server to an external 'deliverable'.
    I need to grab this date and have it at the Project  Information level - is this possible?
    Even using Enterprise flags, I still could not obtain the task date at a Project level.
    Any thoughts much appreciated.
    -CL

    Rob,
    Maybe my latest post on this need may be of interest. How to show Implementation Milestone Dates in Project Center. #msproject
    http://aboutmsproject.com/how-to-show-implementation-milestone-dates-in-project-center/  I'm able to use formulas to bring task data up to the Project level.
    Treb Gatte, Project MVP |
    http://AboutMSProject.com |
    @tumbleroad

  • URGENT: Project level authorization

    Dear All,
    In Solman, Can we assign our users at project level only, so that they can see and change only the project assigned to them. They should not be allowed to view and see any other project.
    If yes then how?
    and is there any way to implement further filters like uses according to project phase or at task level?
    Looking forward for a quick repsponse. of anyone of you has relavent document then please mail it to me [email protected]
    Thanks in advance
    Hemant K

    Hi Hemant,
       Yah..U can do.
    In T.code PFCG, under authorization object S_PROJECT, assign your project in "Project name" field.
    Then go to t.code SU01, enter the user ID to whom u want to restrict the project. Then select "Personalisation" tab, in this u can find entry "SOLAR_SETTINGS" under personalisation object key, doule click there...new window appears, in this window , in the field.."Initial project" assign your project.
    This may help u.
    Regadrs
    Senthil

  • Problem with "View project-level information" permission when accessing build definition in Visual Studio Online

    Hi, 
    from some time all our team members are experiancing problems when acsessing list of builds on Visual Studio Online or when trying to edit build definition in Visual Studio. Error message suggests problem with missing View project-level information permission:
    "TF50309: The following account does not have sufficient permissions to complete the operation: XXXXXXXX. The following permissions are needed to perform this operation: View project-level information."
    I've checked permissions of my User account and Group. "View project-level information" is set to Allow on both levels. We didn't make any changes in security configuration recently. Does anyone faced similar problem?
    Short term solution was to add all users, to Project Collection Administrators Group, but it is not what we would like to live with.

    It seems that the problem was fixed and Project Collection Administrators permissions are no longer required. Great :-)

  • How we can skip project level schema validation in BPEL

    How we can skip project level schema validation in BPEL................... Because i have a requirement to send email with attachment. to send attachment i have to skip schema validation from EM console. so it will skip schema validation for all deployed application.it creates problem for other project so i want to do that thing at project level ....

    Hi
    It can be done by going opening the composite.xml in jdeveloper and than opening the properties window of the composite.There you will see a property Validate schema.Set that to no to overwrite the property set at the sever level.
    The following property gets added in the composite.xml
    <property name="validateSchema" type="xs:boolean" many="false">false</property>
    Redeploy the composite and check.
    Hope this helps!!!

  • Project level variables in OSB

    Is there any way we can declare project level variables or global variables that are visible to all the projects in OSB?? If yes,the how can they b used??

    OSB is stateless and can not remember variables outside a running process instance.
    However you can have a solution similar to global/project level variables if they are static.
    What you can do is create an XSL or XQuery with your variables defined as elements in the XML and inside Proxy service if you need to refer to these variables just call that XQuery/XSLT for that element.
    A use case where this scenario can be used is for defining log levels. You can have a config XQ for each project and define the value of log level element for each project in that XQuery. Inside a Proxy service just call this XQ and fetch the LogLevel and log accordingly. This is also useful in migrating between dev/test/production environments. You can have different values of LogLevel in the XQ in different environments so that you dont need to change the code in proxy service when you move from one environment to other and also you dont need to change in each and every proxy if you need to change the level of logging.

  • Funding from Task Level to project level

    Hi,
    Can someone let me know how do we change the Task level funding to project level funding for a project in the following scenario:
    1. I have a line in Contract Funding already interfaced to projects but not baselined.
    is it OK if I update ENABLE_TOP_TASK_CUSTOMER_FLAG in PA_PROJECTS to 'N' and remove the task in PA_PROJECT_FUNDINGS and PA_SUMMARY_PROJECT_FUNDINGS and reverse the Funding and then create a new funding/agreement at the Project level.
    Thanks & Regards,
    Kiran

    Hi Sunny,
    Thanks for the reply. Here just sharing my views.
    It MUST depends on network speed. We need to consider this.
    And the factores u mentioned are comes under how to speed up the process. Any way we can do all, considering all yr system hardware, here ie 4gb only, But my question is very clear.
    Based on basic setup like 4gb ram with normal upgrade, if experienced, we can say appromiximate time lines.
    <removed_by_moderator>
    Read the "Rules of Engagement"
    Regards,
    Rao.
    Edited by: Juan Reyes on Mar 9, 2011 9:53 AM

  • Multiple Project Scheduling for the project at a same time

    Hi Experts,
    Is it possible to schedule multiple projects together at a same time. As my client is having more than 5 customer project running all together and he wants to schedule all the projects together so that there is no dates overlapping for similar activities for multiple project. As the activities are dependent on labour and machine and at one particular time the resource could be devoted either on one activity of the project.
    I look forward for your revert
    Thanks and Regards
    Simon

    Hi
    One more thing, when i am changing the dates of the activity due to delay from customer end, then where can i see the comparison of old dates and new dates.. though i can see the report in CJ29 but when i change the date in the activity then in the report it shows new date in the new and old date column and does not display the old date in report in the old date column..
    Please let me know if i need to do any configuration for that
    Regards
    Simon

Maybe you are looking for

  • Booting to clone on an external drive?

    Hi everyone, Well, after a couple of scary incidents and some lost data, I finally went out and bought myself a LaCie 250 GB external drive (firewire 400, 800, USB), and am ready to back up everything. My question: If I make a bootable clone of my en

  • My java is extremely slow in yosemite

    my java is extremely slow in Yosemite. i found existing comments on uninstall java and reinstall. I did reinstalled java couple of times, but not helping. when i simply enter java, java -version, javac in the terminal, its taking **** lot of time to

  • Am i laying out my film right by imprtng small sequences in 1 big sequence

    I am working on small portions of my film in there own individual sequence, then I import those small sequences into one final sequence. Is this the right way to lay out the film. When I render a small sequence, then go into the final sequence, it wa

  • Update Project Server using PSI

    I need to update a project server 2007 file (tasks and custom fields) using PSI on a weekly basis. How do I update a required custom field in the project using C# and PSI web services? I get the following error when I save the changes: false); projec

  • Why not a flex-width forum?

    I see it is easily possible--just look at Jive's forum! Some major issue I see with the 700px or so size you're currently using. * Code blocks are practically useless for indented code. * Put it into threaded mode and have a good laugh at the 250px w