Report cost

Hi,
Is it possible to cumulate the cost of a report?
Or how can I retrive the select statement from a report?
I converted a report to .rex and I can see the select statements but I'd like to see the full select of a difficult report.
Thanks.
Atesy

Hi,
No! I would like to use the select in the sql tuning advisor which can get the explain plan and the cost of it.
Nowadays I convert the rdf to rex and I try to retrive the text of the select but it is not easy by difficult reports.
It is not a good way to open the rdf in report builder because I want to automate this process.
1. convert rdf to rex
2. retrive select
3. run sql tuning advisor
4. use the result
I hope somebody know an easier way to retrive the full select and I can use it by the SQL tuning advisor.
Atesy

Similar Messages

  • How to find reporting cost center for a emplyee

    Hi Experts,
    I have to display a report in SAP EP Manager Self Service. The Manager will click on the report and he will be shown all the Cost Centers reporting to him
    Do we have a standard RFC which will have input parameter as pernr and output parameter should be Reporting Cost Center. For example if the VP will login he will be shown, list of reporting cost centers to him. It may be the cost center of Marketing Deptt, Sales Deptt, HR Deptt etc.
    I tried BAPI_COSTCENTER_GETLIST. However this is not helping.
    There is one standard transaction code ppom_old. Using this transaction code, I can see the Cost Center hierarchy (similar to Org Structure). I need same data but using some RFC
    Regards,
    Gary

    Hi Gary,
    I have the same requirement to find out the reporting cost center. Could you please share your solution?
    Thanks
    Jay

  • Report Cost of Operation Activity and Component

    Hi Gurus,
    Is there report to list cost of Operation Activity and Component in the same report (not in separate) ?
    In our environment "operation activity" show Labor Cost and "Component" show material cost. If one by one of document we can see it in each document. The requirement is to see in a list of documents that contain labor dan material cost in the same report.
    When use IW49N, only show cost of "operation activity" not include cost of material used.
    Regards,
    Tri W

    duplicate.closed.

  • Internal Order Report - Cost Elements by Order

    Dear All,
    When I run the report S_ALR_87012997 - List: Cost Elements by Order, the system shows the report like
    Cost Element: 500000 -  Actual: 8900    Plan : 833.33 Abs. Var: 8066.67  Var (%): 968
    Order: 100219 (stat. order): Actual: 8900  Plan: 833.33  Abs. Var: 8066.67   Var(%): 968
    how should I understand the report?
    Please guide me - urgent.
    High points will be awarded...!
    Regards,
    Ranesh.

    When I run the report S_ALR_87012997 - List: Cost Elements by Order, the system shows the report like
    Cost Element: 500000 - Actual: 8900 Plan : 833.33 Abs. Var: 8066.67 Var (%): 968
    Order: 100219 (stat. order): Actual: 8900 Plan: 833.33 Abs. Var: 8066.67 Var(%): 968
    how should I understand the report?
    Please guide me - urgent.
    Internal Order 100219 is statistical order. Under cost element 500000, actual expenses posted are 8900 against planned values of 833.33. The absolute variance is (8900-833.33) is 8066.67

  • Primary Cost Element Report - Cost Center wise Totals

    Dear Seniors,
    Requirement is to have a report which gives Cost Center wise Totals (Net posted amount) for Primary cost elements with the following fields --
    Company Code
    G/L account
    Business Area
    Cost Center
    Accounting Period
    Fiscal Year
    Net Posted Amount
    Debit / Credit Indicator
    Currecny
    Which Table gives me this information ?
    Thanks and Regards
    KVKR

    Hi
    If you are on New GL - Then FAGLFLEXT (Totals table)
    If not - Then GLT0 or tables startng with GLT*
    You can also use reports FBL3N and subtotal on Cost Element/Cost Center
    br, Ajay M

  • Asset Report - Cost Centerwise

    Hi friends,
    I have posted many more asset in various cost centers.
    We can see the asset report in AR01.
    Like this Can I see the Asset List in Cost Centerwise with Accu.Dep.?
    With Advance Thanks!
    Muthuraj.G

    Hi,
    another option is to use the multiple functionalities of the SAP List Viewer. include the fields as explained in note 335065, and then use sort-, summarize-, subtotal-, filter- functionality from the list viewer.
    Regards,
    Markus

  • Overview report cost estimate (fix and variable)

    Hello
    anybody knows a overview report  where i can see for the current valid cost estimates
    per material
    costs splitt between fix and variable costs
    Alternatively it would be sufficient if this is just shown for a costing run
    In CK40N and all other reports i know i have the complete costs but to see details an extra click to the between fix and variable costs is needed and i can not extract to excel.
    Or is the only option an query on KEKO,KEPH, CKIS?
    Cheers
    Tim

    Hello
    @Sachin: Thanks for the report but the output is not that good - but helpful
    @Eric: Thanks this report solved my problem )
    Cheers
    Tim

  • Retreiving F.01 Report Cost Center wise

    While executing F.01 report GL Code and cost center wise it does match with the FBL3N report by puttiing the same parameters i.e GL Code and the Cost Center.
    Please advice....

    Hi,
    F.01 is for displaying the balance sheet and P&L statement for a company code.
    Cost Centers is a cost object where costs will be stored for analysis purpose. If you want to match the Expenses gl balances with F.01 balances, go to FBL3N and take all the Expences GL accounts and execute.
    The important one is in all GL accounts should be selected for line item display.
    After executing the report change the layout, select the cost center and display subtotals gl wise.
    Thanks & Regards,
    shashi kanth.

  • COPA Report- Cost Elements

    Hi All,
    We have done the required configuration for COPA. We have created a COPA (Costing Based) report as well. The client wants this COPA report to be run for the first quarter of 2008 i.e. April 2008 to June 2008.
    However, discount values for the said period are not flowing to this report.
    Verification reveals that, no cost element is created for "Discount Given" GL Account. Hence, only revenues, from billing document, are being posted to CO area. The same values are updated in COPA also.
    As per my knowledge, unless Cost Elements are created values won't flow to CO and COPA.
    Can anybody help me to overcome the problem. . . ?? i.e. How to get the values in COPA report for the said period . . .
    Thanks in advance . . .
    Regards,
    Ravi Kumar

    Hi
    Your understanding is perfect we need a cost element for transfering the data to CO and COPA.For flow of values to COPA from SD we need to make the following config.
    Create the GL account with cost element category 11 or12
    Map the discount condition type to COPA value field.
    Also it is very diffucult to identify the discount region wise customer wise etc.Since it is posted to one GL account.
    To overcome come this issue I guess the only option is to cancel the billing documents,maintain the config and the again create the billing documents.As you said the volume of transactions are high you can consider using LSMW for cancelling and recreating the billing documents.
    Regards
    Sandy.

  • Reporting - Costs from the same GL account required in different categories

    We have a business requirement to report in the following way for management account reporting:
    Sales
    Gross Profit
    Freight
    DC Rent & Other Operating Costs
    DC Wages
    Intercoy Logistics Charge
       Total Distribution
    Store Operating Expenses
    Wages
    Rent
    Other Expenses
       Total Store
    Head Office Operating Expenses
    Advertising
    Wages
    Other Expenses
       Total Head Office
    The issue is that Wages appears 3 times in the hierarchy, for different groups of cost centres but using the same GL Accounts.
    We currently export a hierarchy from ECC6 as a Cost Element Group but it is not possible to include a cost element multiple times in a hierarchy.
    We do not wish to create different GL Accounts for DC, Store and Head Office wages.
    Does anyone have any suggestions as to how we can report in the above format?. Can the hierarchy be built directly in BW?
    Thanks,
    Susan

    Adrian - the problem is that you have two organisational enties that you are trying to merge and provide an intersection of data
    The easiest and from a scalability viewpoint - the worst is to have two key figure structures
    ie in your columns you have a normal This month, YTD etc - which is based on key figure plus a time srestiction (and maybe a version for actual or plan etc,)
    then in your rows you have multiple hard coded lines - ie create a second key figure structure and have hard coded RKFs ie Sales is all profit centres, head office opetaring expenses is profit centre of head office and cost element group of expenses etd
    To get the text only lines you create a CKF and hard code it to a constant of 0 (I know it's pants but unless you do it in Crystal that is the only way) and give it a text of Head Office
    There are other ways of doing it which are more scalable but if yo uare new to BW this is the easiest way
    Naturally if you have a huge row count then you will be in trouble trying to maintain it as in effect you are hard coding each line

  • Report cost center/cost element in Business Warehouse

    I have report in SAP CO including: rows - cost centers / cost elements; columns - periods /months/, created using trans GRR1;
    I need the report including: rows - cost centers / cost elements; columns - divisions /that are defined in cost centers - 2010400000 - 04 is the division/;
    I'll do it in BW but I have to write every row separately /the report consist over 500 rows/
    Are there any way to do this easier?
    Pls advise
    Katya

    Hi,
    How do you solve the problem?

  • COPA Gross Margin report Cost component roll up

    Hi,
    I have a question about COPA valuation using standard cost estimate and roll up of cost components in Gross Margin report.
    I would like to build a simple Gross Margin Report in KE30 showing Billed quantity, Revenues and COGS split to Material, Labour and Overhead Components, but with cost components roll-up from SGH to FG.
    In order to have the split of COGS I believe I need to maintain Valuation using Standard cost estimate in COPA. However, from my experience, I think that in Gross Margin reports I saw in COPA in the past - there was no cost component rollup from Semi finished to Finished products.
    I mean if we sold 1 piece of FG at a price of 20 EUR and cost components for it would split into:10 - Materials, 2 - Labor,3 - Overhead (Total COGS of 15 EUR)
    If  this is 2-level production and this FG has SFG in its cost estimate, the SFG cost split into: 3 - Materials, 1 -Labor and 2 - Overhead
    From my experience all costs of SFG used to produce that FG would go under Materials Component in Gross Margin report (312=5 from SFG would go to Material component of Sold Finished Product). Is it possible to have in Gross Margin report situation where Material Component from SFG would be rolled up to Material component in Sold Finished Product, Labor component from SFG rolled up to Labour component in FG... etc?
    Regards,
    Karol

    Hi Karol
    I dont think that SAP functions this way... In your eg, the Cost of SFG (321) does not roll upto to the Material cost of FG
    Moreover, it is not controlled in COPA, but in Product Costing
    When you define your Cost Comp Str in OKTZ, you can tick the check box "Roll up Cost Component" in each of the cost components.... Once you do this, the Overhead cost in SFG will be rolled up to the Overhead cost of FG (And Not to Material Cost of FG)...
    Costing keys would simply fetch the cost estimates and transfer it to COPA.... So, set it up right at the source in OKTZ and it should be done
    br, Ajay M

  • Standard consumption report & cost sheet

    Dear Gurus,
    I want to know what is the actual consumption v/s the standard consumption of materials and their respective values for all the orders processed on a given date. Is there a standard report for the same.
    I also need to know how do I extract cost sheet on a periodic basis. All configuration has been made for the same. I just need to get the output now.

    Hi Priya
    I am not very sure whether you can use cost sheet without configuring the Product cost planning. But if you want to apportion overheads through cost sheet in the process orders.
    You have to assign the cost sheet in the Costing variant / Valuation variant under "overheads".
    When you run the overheads calculation it debits the process orders and credit the cost center.
    As far as i know there are no reports to get the cost sheet. You have to write a ABAP code or use report writer.
    Regads,
    suraj

  • Application to report cost of INCOMING calls

    Hello everybody,
    My requirement for a project is:
    *"After user hangs up on a completed call, this app will put up a popup, saying your call to phone number nnnn lasted ssss seconds, and cost cccc cents.*
    *Cost will be computed by multiplying call during in seconds rounded up to minutes, at 5c a minute."*
    Can you please tell me what are the process/steps I need to follow in order to complete the project successfully and what are the jar files and other stuffs I need to download.
    I hope I am with the right forum, and is eagerly waiting for your prestigious suggestions.
    Regards,

    I was told in April 2012 you can add a call barring to landline for £3.15 a month, no outgoing calls allowed but allows emergency calls. 
    Hope this helps

  • Currency in 'Cost Centers: Actual/Plan/Variance' report for specific user

    Hi there CO people, I'd like to ask about currency settings in CO S_ALR_87013611 report (Cost Centers: Actual/Plan/Variance)
    The question is ... where can I define the currency in which report output should be displayed?
    I've got such situation, that amounts for USER_X are displayed in CURR_X currency, whilst for USER_Y amounts in report are displayed in CURR_Y currency.
    Could You tell me some tip? Or give some literature-track to follw? I'd be thankful for help. Greetings. P.

    USER_X -> TCode: RPC0 -> Tab: Report currency -> Tick 'Objeck currency' (Before was: 'Controlling area currency')
    now USER_X has got the same currency as USER_Y
    That solved my problem
    Greetings

Maybe you are looking for

  • Long running process chains - No Dump / error message.

    Hello, We have defined some steps in process chain that contains default macros. We mainly included that to ensure calculations happens even when users dont open or access the DP Planning book. Issue is, these steps are running endless. normally it t

  • Login issue in studio

    I'm unable to log into studio with '[email protected]' Emaill address and I tried to login by creating a new userid but in that login inside control panel its just showing 'MyAccount' and its not showing other options. How can I login with the admin

  • New files not appearing in Yosemite

    Did a clean install of Yosemite to a new drive on a Mid 2010 Mac Pro (2.8 GHz Quad-Core/16GB RAM) and I have an issue where the OS is occasionally not showing a new file when I save one. The issue is random and intermittent, I cannot reproduce it on

  • Flexible real estate: contract between 2 companies

    Hi, We have not yet flexible real estate and we are studying this module for deciding to use it or not. We have a lot of contracts where the landlord is one company of our group and the tenant is another company of our group. Both companies are in th

  • Startup disk issues with a new SSD

    Ok so last week I had what I thought was a hard drive failure. In disk utility I could not see the drive and thought it must be corrupt. It's been on my mind to buy an SSD anyway and so bit the bullet and bought a Samsung EVO 840 500GB. After install