Report to see Maintenance Plans which are nearing due

Dear Gurus,
Is there a transaction or report which can see Maintenance Plans which are having Maintenance calls which are nearing due date?
Please help advise.  Thanks,

Hi,
You can use IP24 (scheduling Overview). Instead of entering no of days you can enter the the scheduling start date.
for example today is 21.02.2011.You want to see the schedules due till 28.02.2011
Enter the schedule start date From 21.02.2011 to 28.02.2011. If there are pending jobs which also should be included either leave the from date blank or give the date from which pending jobs also to be listed.
From the out put of IP24 you can see The plan , item , description ofitem/plan , Start date , End date ,completion date etc. also order number/notification number.
IP19 can be used for simulating and viewing  plan date beyond the scheduling period you have given for each plans.
Regards
Kannan G

Similar Messages

  • Deleting Multiple Maintence plan which are inactive

    Hi Guys
    Daily morning we are running IP30 for different sort field ie WS01,WS02,WS03 etc., we enter the following in the transaction
    1. Maintplant sort field      ws02 under interval for call objects 40 DAY tick Resheduling Incl box , log control -> application log ,
    BDC session -> call transaction and call mode = N .
    After running this transaction it will create maintenance plan for the following Sort field . The problem which i am facing is
    1. It is taking around 1hr 25 min to finished the Maintenance plan for some sort field ie ws02,ws04 .
    I think the system is checking the system status all the maintenance plan  which are DLFL, DLFL INAC, INSTEAD of CRTD status.
    So Is there anyway to tune IP30 so that when we run the transaction it should ignore inactive maint Plans.
    or is there any way to delete or archive maintenance plan which are Inactive .
    Please comment
    Regards
    Piroz

    CLOSE

  • Maintenance Plan which has two call dates for year

    Hi all,
    I need to create a Maintenance Plan which has two call dates for year. The dates have to be the last Sunday of March and the last Sunday of October for the same Maintenance Plan. Does anyone know the solution? Please do throw some light on it.
    Thanks
    S
    Edited by: Sara Silva on May 14, 2008 11:39 AM

    Sara,
    You could do this without user-exits...
    Create a factory calendar with two working days. Then create a maintenance plan with a package of 1 day.
    Once scheduled it should produce the required maintenance cycles.
    There are two things you need to be very careful about:
    1. Keep the factory calendars updated, say, 3 years into the future
    2. Ensure you comprehensively test the IP30 transaction
    PeteA
    [www,pjas.com]

  • How to reduce the open time of Ms proejct 2010 plans which are taking 6 minutes to open.

    In our company there is many plans which are uploaded in Project server 2010.
    all linking to each other and in master plan all also link with master project.
    when we open any project plan in Ms Project 2010 then it is taking 5 to 7 minutes time.
    I dont know why . it's too much time.

    Is this issue specific to one master project? Do you have MS recommended db maintenance plan in place. Try updating database statics  by executing  SP_updatestats on all 4 project databases
    Hrishi Deshpande Senior Consultant

  • MM-Report to see the materials which is not used from last 3 months

    Dear All,
    I want to find out the materials which are not used from last 3 months.Is there any report?
    Thanks
    Vishal

    Hi
    check MB5B
    give material and plant there
    select valuates stock radio button and NON-Hierarchical representation layout  on selection screen
    give last three month duration period on selection screen and execute report
    and see total  Goods receipt and total goods issue for material
    Regards
    kailas ugale

  • How to see the tables which are in the physical layer of SampleAppLite rpd

    Hi Everyone,
    I am new to OBIEE and I installed OBI Apps with Oracle 11g in my laptop. I tried to create reports using the OracleBIAnalyticsApps rpd. How can I know from which schema the tables are coming in the physical layer of the repository so that I can create a connection pool to the database. I got the default SampleAppLite rpd when I install the OBIEE but I am unable to see those tables in the database schema which are used in the SampleAppLite physical layer. Can anyone tell me how can I see the tables in the database which I see in the rpd. Actually my question may be wrong as I am new to this field, so please let me know if this is a wrong question. As I unable to express my question correctly. Thanks.

    For the OracleBIAnalyticsApps rpd - the tables are under "Catalog" then "dbo" in database "Oracle Data Warehouse" in the physical layer. The RPD comes out of the box with the required connection pools - you dont need to create any. The connection pools "Oracle Data Warehouse Repository Initblocks Connection Pool" and "Oracle Data Warehouse Connection Pool" in "Oracle Data Warehouse" read the data from the business analytics warehouse that you created in a schema name of your choosing with the DAC. All you need to do is edit the user name and password and the data source name with a connect string - which is the local net service name to your database for default call interface OCI 10g/11g assuming you used an Oracle database for your warehouse. One way to test the connection pool is to right click any table/alias then "Update Row Count".
    BTW Using the Admin Tool open the OracleBIAnalyticsApps rpd then do "Tools" then "Utilities" then "Repository Documentation" then "Execute". This will create a spreadsheet showing you all the mappings from the presentation to business to physical layers.

  • Maintenance Plan - Tasks are not executing in the order they were created

    I've created a new maintenance plan to perform differential backups but the tasks I created don't necessarily seem to execute in order all the time.  These are the tasks and order assigned when I created the plan using the Maintenance Plan Wizard:
    Back Up Database (Differential)
    Clean Up History
    Maintenance Clean Up Task
    Here's the deal...When it executes in the order they were created (above), all my old backups are deleted successfully.  However, there have been instances where, for example, the Maintenance Clean Up task executes before the
    Clean up History task.  When this happens, only one of my backup files is deleted successfully but not the second (I have two .bak files needing to be removed).  Furthermore, I noticed that the backup that wasn't deleted when it should
    have gets deleted at the next increment when new backups are created.
    Again, this does not happen when the tasks run in the sequence shown above.  Only one old backup gets deleted (instead of two) when one of the above item is out of sequence.  Strange behavior to say the least.
    Any feedback on this will be appreciated!

    If you do not set up precedence constraints it runs all tasks at the same time.
    Please see "8. To define a workflow between tasks:"
    http://msdn.microsoft.com/en-us/library/hh710041.aspx

  • Not to display the document which are not due at the time of making the pay

    Hi,
    My user dont want to display the document which are not in due at the time of making the payment through F-53.
    For example:
    Vendor Code: 1001 has the open item as below:
    Due Date - 29.09.2009 Amount 50000
    Due Date - 30.09.2009 Amount 10000
    Due Date - 15.10.2009 Amount 40000 (due date is in future)
    Now my user want to make the payment for the above vendor through T-Code: F-53 / F-58, while clicking the process Open item the syste, shows all the document (which inclues the future due date document).
    My user dont want to display the document which is in future due date because by wrongly he should not make the payment for the future due dated document.
    Kindly provide me the solution how to disable the document which are not in due.
    Regards
    JS

    Hi,
    You can try the following -
    Execute transaction code O7F4, and maintain the field FAEDT. Then execute F-53 and check if the option to enter net due date appears in the additional selection or not.
    Please revert.
    Thanks and Regards,
    Anit

  • Report to find user ids which are expiring ...

    Hi all,
    We need to have a report which will give a list of people whose SAP ID passwords are expiring so that they can change their passwords.
    Is there any standard report to get this list ?
    If we need to have a custom report where can we get the data from ?
    Regards,
    Vivek K

    Hi,
    Use program RSUSR200. Select only 'Users with inactive passwords' checkbox.
    Just check [this also....|http://help.sap.com/saphelp_nw04/helpdata/en/1e/478f40f3b19920e10000000a1550b0/frameset.htm]
    Thanks

  • Report CN52N to display Network which are Closed

    Hi,
    Our Client User has came across an issue which is causing lack of accurate reporting from SAP.
    User runs the CN52N for Network Order status and schedule updates on a daily basis.
    It seems that when a Network is Closed or Technically Completed,  the Network drops out of the report.   
    Could please throw pointers on how to obtain the detail for network orders that are closed or technically completed.
    Regards
    Tushar

    Dear Michael,
    Please follow steps mentioned below.
    1. Execute CN52N report for Networks in question.
    2. Once you execute, click on option Edit -> Deleted Objects-> Display
    3. View Deleted Objects
    We have guided in similar fashion to our Client which in turn helped Client and hence issue was resolved.
    Regards
    Tushar

  • Create a public access site to see the documents which are created by administrator

    Hi ,
    I am new to the sharepoint. I would like to create a public facing sharepoint 2013 site .
    Main requirement is Administrator must login to site and create a documents in library.  Those documents must visible to everyone. So that site must be public facing. 
    Please let me know step by step how to resolve it as I am new to this.
    Regards,
    Raj

    Hi,
    From your description, my understanding is that you want to let all users have permission to access a document.
    The first method you could create a public facing site with method below:
    1.      
    You should change settings in CA and your site. You could refer to this article:
    http://blog.cloudshare.com/2012/10/15/how-to-enable-anonymous-access-to-a-sharepoint-2013-site/.This is a video for you:
    How to make your SharePoint 2013 site a public facing website?
    https://www.youtube.com/watch?v=SnOmtE1x8JM
    2.      
    Add your document into the home page: Click gear icon -> edit page -> INSERT tab in the Ribbon -> Web Part -> select your document -> Save.
    The second method you could accomplish your requirement via manage your document permission:
    1.      
    Enter your document library.
    2.      
    Click Library Setting in the Ribbon.
    3.      
    Click
    Permissions for this document library under Permissions And Management section.
    4.      
    Click Stop Inheriting Permissions in the Ribbon.
    5.      
    Click Grant Permissions in the Ribbon.
    6.      
    Enter everyone and choose view only as the screenshot below.
    7.      
    Then users can access this document library via its URL(in my case it is:
    http://sp/sites/sharepoint2013/Shared%20Documents/Forms/AllItems.aspx).
    Best Regards
    Vincent Han
    TechNet Community Support

  • I bought an airport extreme (5th gen) and have set it up today. However I am having troubles getting it to co-excist with my already set up ethernet connections which are necessary due to the size of the house.

    Please let me know how I can set it up so it works along with my ethernet cables and downstairs network. I have several ethernet connections that I need to use as they are out of range of the network.

    When trying to connect my AppleTV 3rd gen to another ethernet port of airport extreme with another faster (85mbps) Trendnet ethernet adapter via a different electrical outlet, my extreme goes from green light to flashing amber light and my wifi stops working.
    If the Apple TV was originally setup for WiFi, I suggest that you reset the device back to default settings and then configure it again with Ethernet plugged in. Settings > General > Reset > Reset Settings
    As a test,  connect a spare Ethernet cable of any length (that you know is working) from the LAN <-> port on the AirPort Extreme to the Apple TV for the setup.
    Setup the ATV again and double check to make sure that it is operating correctly
    Change the location of the ATV back to the desired location on the network behind the powerline adapters
    If you have a problem now, the first thing to check is the powerline adapter and or wiring

  • Certain Maintenance Plan not getting scheduled in the background job

    Hi Gurus,
    I am facing an issue here.
    A weekly background job (RISTRA20) runs every weekend and schedules the maintenance plans.
    But we have noticed that some maintenance plans are not getting scheduled. i.e no orders or schedule is getting generated.
    When I run IP30 manually for these plans then the schedule gets generated and orders get called.
    I have checked up the background job and it is running fine.
    Also, i have noticed a similarity in all these plans which are not getting scheduled. There schedule has been restarted (through IP10) at somepoint or the other.
    But i don't see any direct impact of this?
    Can any of you provide some help on this?? Points will be rewarded.
    Thanks and regards,
    Nitin Saini

    Hi Narender,
    Thanks for replying.
    The message number for 'Groups don't match' is ME303.
    I think this does not have anything to do with the restart as i have done further investigation.
    Whenever I run IP30 with sortfield input as AS02*, i get the error as mentioned above for a certain number of maintenance plans while the remaining plans get scheduled.
    If i run IP30 for any other sort fields, it runs fine and i don't encounter the error
    mentioned above.
    If you send me ur email address, i could forward you screen-shots of the issue.

  • How can we know a particular maintenance plan is stopped

    Hi All,
    Suppose a particular maintenace plan BP-P-0108 which is monthly recurring plan is created in 01/01/2008 and scheduled from 01/01/2008. Subsequesnly, the maintenace plan was stopped in 01/01/2011.How can I know this maintenance plan is stoppped from scheduling?
    Thanks
    ebenalfa

    HI Pete,
    Thanks for your response.
    I am in the process of migrating maintenance plans which has been created already in the past 10 to 12 years. During this period, many maintenance plans were cretaed and scheduled. Some of the maintenance plans might have become obsolete and need not be migrated.  The maintenance plans may not have scheduled in the near past. How can I know that these are not scheduled in the near past?
    If the user sets deletion flag or deactivate it. i may not have the scheduling happen.
    Apart from these two statuses of maintenance plan, is there any way I can identify a stopped maintenance paln schedlue ?
    If so, Which SAP table will give me the required information
    Thanks, ebenalfa

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

Maybe you are looking for

  • How to create a login session in flex?

    Hi there, I have a flex application with two states. One is a "login" state which is a screen with username and password. The other state is "loggedIn" state which is a screen with a small application. As soon as the user credentials are checked from

  • SAP ECC S&OP Macro for this requirement

    Hi there, I am doing flexible planning in S&OP and as a result maintained a row to calculate the actual inventory cost. The S&OP is done at Product Group level with many FERT in it per group. So when I do my S&OP plan I want to be able to calculate t

  • IPod when sync'ed stops all my songs I downloaded from playing.

    I put a play list on my iPod and it would only play my songs that I got off my CDs but everything I paid online for now do not play even in MusicMatch Jukebox. I can see them but they will not play on anything. What gives? I paid a lot of money to he

  • Can't mount hard drive icons on desktop

    Hello, Just partitioned a friend's new iMac running Snow leopard. Noticed before starting that the 1Tb drive wasn't showing on the desktop, but nor are the two new partitions, even though Disk Utility seems to be showing them as mounted. I've never s

  • Cannot save any file opened in Photoshop CS5

    Hi all, looking for some help... I've got a 27-inch Imac running: Mac OS X Lion 10.7.1 Processor: 2.8 GHz Intel Core i5 Memory: 4 GB 1333 MHz DDR3 Graphics: ATI Radeon HD 5750 1024 MB Storage: 1TB HD with 920 BG free The problem is (thus far) exclusi