Resource management and information about material.

The system enables the management of resources and information about materials, vendors and stocks in the data base quickly. How is this made?
I.   Through individual researches of Purchase Orders.
II.  Through the display or issue of reports and/or analysis (monitoring the PO history and stocks balance).
III.  Through the invoice Verification process.

Hi,
Probably all of mentioned in some extent - depends, which data system needs.
regards,
wojciech

Similar Messages

  • Resource Management and Solaris Zones Developer Guide

    Solaris Information Products ("Pubs") is creating a
    developer guide for resource management and Solaris Zones.
    The department is seeking input on content from application
    developers and ISVs.
    We plan to discuss the different categories of applications
    that can take advantage of Solaris resource management
    features, and provide implementation examples that discuss
    the particular RM features that can be used.
    Although running in a zone poses no differences to most
    applications, we will describe any possible limitations and
    offer appropriate workarounds. We will also provide
    information needed by the ISV, such as determining
    the appropriate system calls to use in a non-global zone.
    We plan to use case studies to document the zones material.
    We would like to know the sorts of topics that you would
    like to see covered. We want to be sure that we address
    your specific development concerns with regard to these
    features.
    Thank you for your comments and suggestions.

    Hi there, i'm using solaris resource management in a
    server with more thant 2thousand acounts.
    Created profiles for users, defaul, staff, root and
    services.Seeing the contents of your /etc/project file could be helpful.
    But while using rctladm to enable syslog'ing, I set up
    global flags of "deny" and "no-local-action" in almos
    everything.The flags on the right hand side of the rctladm(1M) output are read-only:
    they are telling you the characteristics of the resource control in question (what
    operations the system will allow the resource control to take).
    Now, many aplications don't work because they are
    denied enough process.max-stack-size and
    process.max-file-descriptor for them to work.
    Applications such has prstat.If prstat(1) is failing due to the process.max-file-descriptor control value, that's
    probably a bug. prstat(1) is more likely bumping into the limit to assess how many file
    descriptors are available, and then carrying on--you're just seeing a log message since
    prstat(1) tested the file descriptor limit, and you've enabled syslog for that control. Please
    post the prstat(1) output, and we'll figure out if something's breaking.
    I don't find a way to disable the global flags. You can't. I would disable the syslog action on the process.max-stack-size control first;
    there is an outstanding bug on this control, in that it will report a false triggering event--
    no actual effect to the process. (If you send me some mail, I will add you as a call record
    on the bug.)
    Can anyone tell me:
    how to disable global flags?
    how to disable and enable solaris resource management
    all together?You could raise all of the control values, but the resource control facility (like the resource
    limit facility it superseded) is always active. Let's figure out if you're hitting the bug I mentioned,
    and then figure out how to proceed.
    - Stephen
    Stephen Hahn, PhD Solaris Kernel Development, Sun Microsystems
    [email protected]

  • CRM 7 Marketing Resource Management and BI

    Hello Gurus,
    we want to use the scenario for marketing resource management with integrated BI.
    Unfortunately in customizing and SAP Help only the connection to SAP BI BPS is described.
    As far as I know BPS is an old tool. What about the use of BI-IP or BPC?
    If you any information on that, I would be happy if you share it with me.
    Thanks a lot and kind regards
    Hannes

    Yes, Marketing resource management (MRM) is about managing all the resources required in marketing - money/budgets, time and resources (people, assets, etc.) and improving efficiency.
    Defined by analysts as "a set of processes and capabilities that aim to enhance a company's ability to coordinate and optimize the use of internal and external marketing resources. MRM applications facilitate planning and budgeting, they coordinate execution and measure the impact of marketing efforts."
    So, it goes beyond scenario planning and also includes budgeting, digital asset management, workflows, etc.
    Refer to this link for documentation:
    [http://help.sap.com/saphelp_crm70/helpdata/en/e0/4017b12a414e50bde6eb17b4b1233e/frameset.htm|http://help.sap.com/saphelp_crm70/helpdata/en/e0/4017b12a414e50bde6eb17b4b1233e/frameset.htm]
    Let me know if you need any additional information.
    Anik

  • HT202916 what is the type A adapter? can you help to send some picture and information about it

    hi,
    my name is Xue Wenzong, the EFB manager from Xiamen Airlines from China. we find that APPLE reliese released approval for their consumer product chargers to be plugged into a 115 VAC 400 hertz receptacle, you can see this link"https://support.apple.com/en-us/HT202916", my question is what is the type A adapter? can you help to send some picture and information about it?
    thanks!
    <Email Edited by Host>

    See here: http://www.iec.ch/worldplugs/typeA.htm

  • Resource manager and images being rewritten in the project root

    Hi everybody,
    I began using the Resource Manager, and I created two folders, one with HTML files (topics), and another one with pictures present in those topics.
    As I transferred the topics to the HTML shared folder the pictures references remained the old ones, i.e. the ones inside the project folder, right?
    Therefore I began reassigning the pictures to the ones copied in the pictures shared folder, and here begins to be a little bit illogical and difficult.
    I deleted the pictures from the original project folder as I want to save the space and have, of course, the pictures only in the shared folder, however after I reassign the pictures to one of the topics, and I sync it, the pictures I deleted appear in the root folder of the project.
    I wanted to have the "common" pictures (they appear in 2 different projects) only in the shared folder (declared as pictures folder in Resource Manager) because if I do a modification of one picture, I would like to have this modification propagated in the second project, right?
    And also save some space, as it does not make any sense to me to have the same pictures in 2 places (double space consumed) when I can have them in only one folder.
    I would like to know how I can avoid this recopying of the picture files in my project folder, if possible.
    The procedure I used was:
    1. Found out which are the common topics for the 2 projects and copied them in the Resource Manager shared folder for HTML files.
    2. Found out which pictures were on those topics and copied them in the Resource Manger shared folder for pictures
    3. I included the shared topics into the project, and reassigned the pictures to the ones that are in the Resource Manager shared pictures folder
    4. I saved the topic, and did a sync in the Resource Manger
    Did I do something wrong here?
    Thank you.

    The repository has all the images you may want to use in any of your projects or elsewhere.
    Each time you link in a project, that image only is copied to the project, not the whole repository. If either copy changes, you are notified. You then have the choice of updating the out of date copy or breaking the link because for some reason you now want the difference.
    Your statement "I saw that if I use an external directory to the actual project where I have pictures, RoboHelp will copy those into the project's folder" is not correct. The Resource pod will show all the images available in the repository but only the ones in used in the project are copied locally.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • Resource Manager and Images

    Hi,
    I upgraded to RH9 (from RHX5) and very happily started to use both the Snippet and Resource Manager functionality.
    I seem to have hit a mental block despite reading the help and looking up this forum regarding updating images in the resource manager .....
    I have multiple projects and the same image is used throughout the projects - sometimes only once in a project and sometimes multiple times in the same project.
    Lets say this image is called Picture1.gif - due to program re-design I now need to update Picture1.gif.
    Picture1.gif is stored in Resource Manager and as it is linked then a copy is also stored in my project.
    I delete the old image, create a new image, rename it to the original name Picture1.gif and drag it to Shared Resources and then drag it back again so that it is linked.
    Despite the back and forth steps this does in fact work - the image is updated in other projects as expected.
    However, if an image appears in a project multiple times then I have to change it everywhere before I can rename it,  etc. etc.
    I feel quite sure that I am missing something here and that the whole process should be simpler!!
    I would have expected somehow to be able to update the image in the resource manger and then sync.
    TIA
    Morven

    Hi Morven
    In my own experience, it really shouldn't matter where you update the image, as the Resource Manager is a two way street. If you update in RoboHelp, it should be sensed and the updated image copied from your project to replace and update the centralized image. And likewise, if you update the centralized image, Resource Manager should update your project to match the updated centralized image.
    Again, I woudn't want to first delete the image followed by saving a new one using the same name. I would either open one of them (centralized or project) and edit as needed. Or edit a copy, make edits, then save using the same file name so the existing image is replaced.
    To the best of my knowledge, Resource Manager should sense the change as the date/time stamp should be different as well as possibly the size. Then the automation should kick in to update the image's counterpart and synchronize everything nicely. The only fly in this ointment would be if the new image were different in size from the pixel measurement standpoint. If the new image is wider or taller or narrower or shorter, you would need to ensure that you reset the sizes in your project so they match the new dimensions. Otherwise they will be a bit skewed and have the fun house effect. I believe RoboHelp supplies a script for this.
    Cheers... Rick
    Helpful and Handy Links
    RoboHelp Wish Form/Bug Reporting Form
    Begin learning RoboHelp HTML 7, 8 or 9 within the day!
    Adobe Certified RoboHelp HTML Training
    SorcerStone Blog
    RoboHelp eBooks

  • Oracle 10g database as Resource manager and heuristic transaction decision

    Hi,
    I have read in documents about distributed tarnsaction that resource manager like oracle databasecthat are involved in distributed transaction can take heuristic decision(unilateral decision) and can either rollback or commit the transaction associated with itself without having confirmation from the transaction manager.
    I want to know how a resource manager take this unilateral decision and can we set this as parameter either in resource manager or in application server.
    Thanks in advance

    Hi,
    Following are some links to documents.
    Handling Heuristic Completions
    http://edocs.bea.com/wls/docs81/ConsoleHelp/jta.html
    A heuristic completion (or heuristic decision) occurs when a resource makes a unilateral decision during the completion stage of a distributed transaction to commit or rollback updates. This can leave distributed data in an indeterminate state. Network failures or resource timeouts are possible causes for heuristic completion. In the event of an heuristic completion, one of the following heuristic outcome exceptions may be thrown:
    HeuristicRollback—one resource participating in a transaction decided to autonomously rollback its work, even though it agreed to prepare itself and wait for a commit decision. If the Transaction Manager decided to commit the transaction, the resource's heuristic rollback decision was incorrect, and might lead to an inconsistent outcome since other branches of the transaction were committed.
    HeuristicCommit—one resource participating in a transaction decided to autonomously commit its work, even though it agreed to prepare itself and wait for a commit decision. If the Transaction Manager decided to rollback the transaction, the resource's heuristic commit decision was incorrect, and might lead to an inconsistent outcome since other branches of the transaction were rolled back.
    HeuristicMixed—the Transaction Manager is aware that a transaction resulted in a mixed outcome, where some participating resources committed and some rolled back. The underlying cause was most likely heuristic rollback or heuristic commit decisions made by one or more of the participating resources.
    2. Understanding EJB Transaction
    http://www2.sys-con.com/itsg/virtualcd/Java/archives/0504/tyagi/index.html
    Unilateral Decisions
    The transaction manager allows certain heuristic or speculative decisions to be made based on the state of all participating resources in a transaction and the underlying two-phase commit protocol. A heuristic decision occurs when one of the resources in the transaction unilaterally decides to commit or roll back the transaction without permission from the transaction manager
    3. Oracle® Containers for J2EE
    http://download.oracle.com/docs/cd/B31017_01/web.1013/b28958.pdf
    Heuristics
    To achieve consensus, two-phase commit is a blocking protocol. This means that, if a coordinator fails before delivering the final phase messages, the participants must remain blocked, holding onto resources. Modern transaction systems add heuristics to two-phase commit, which allows such participants to make unilateral decisions about whether they will commit or rollback. If a participant makes a choice that turns out to be different from the one taken by other participants, then non-atomic behavior occurs.
    I got this problem while trying to do a distributed J2EE tarnsaction with two XA (one MQ and other Oracle 10g database XA) and one non-xa (oracle 10g database). According to above docs a resource manager can decide tarnsaction final state unilaterally and that can result in unatomic transaction.
    Do oracle also make such decision and if yes then on what ground it takes decision? Can we change this according to our requirement either always rollback/commit anywhere as parameter setting?
    Thanks

  • Database resource manager and RAC

    Hello,
    This is probably is very simple question, but...
    I have a system with mixed workloads (OLTP and BATCH). As many before, I want to prevent BATCH processes from impacting OLTP. I read about RAC and DRM, and how each could be used to assign resources to services.
    Do I need RAC to be able to use DRM? Or can I do DRM without RAC? Are they the same thing?
    Thanks in advance for your help.

    DRM provides control over resource management decisions on both oracle standard and clustered databases.
    pecifically, using the Database Resource Manager, you can:
    * Guarantee certain users a minimum amount of processing resources regardless of the load on the system and the number of users
    * Distribute available processing resources by allocating percentages of CPU time to different users and applications. In a data warehouse, a higher percentage may be given to ROLAP (relational on-line analytical processing) applications than to batch jobs.
    * Limit the degree of parallelism of any operation performed by members of a group of users
    * Create an active session pool. This pool consists of a specified maximum number of user sessions allowed to be concurrently active within a group of users. Additional sessions beyond the maximum are queued for execution, but you can specify a timeout period, after which queued jobs will terminate.
    * Allow automatic switching of users from one group to another group based on administrator defined criteria. If a member of a particular group of users creates a session that executes for longer than a specified amount of time, that session can be automatically switched to another group of users with different resource requirements.
    * Prevent the execution of operations that the optimizer estimates will run for a longer time than a specified limit
    * Create an undo pool. This pool consists of the amount of undo space that can be consumed in by a group of users.
    * Limit the amount of time that a session can be idle. This can be further defined to mean only sessions that are blocking other sessions.
    * Configure an instance to use a particular method of allocating resources. You can dynamically change the method, for example, from a daytime setup to a nighttime setup, without having to shut down and restart the instance.
    * Allow the cancellation of long-running SQL statements and the termination of long-running sessions.
    http://download-west.oracle.com/docs/cd/B14117_01/server.101/b10739/dbrm.htm#i1007556

  • OracleIAS and Information about Process and Threads

    Hi all,
    I need to know information about the running process and threads inside a Conteiner or an Enterprise Application, is it possible?
    Thanks in advance.

    Hi,
    Probably all of mentioned in some extent - depends, which data system needs.
    regards,
    wojciech

  • Open Item Management and Taxation Configuration Material Needed

    For an interview, needed is some help;
    - Open Item Management - Definition and how it is managed.
    - Taxation Configuration - Configuration Documentation
    - FI - HR integration - Documentation.
    Any help would be of great help.
    Points awardable.

    Hi,
    When a GL is created it can be a normal GL account or an open item managed GL Account. In case of an open item managed GL Account the debites and credits are knocked off and the net balance in the account indicates the amount amout due or amount receivable etc.
    Some of the examples of GL Accounts are GR/IR clearing account, Bank clearing account, accrual accounts, Prepaid AAccounts, Loan account etc.
    By default Customer and Vendor Accounts are open item managed accounts.
    In SDN you can search for the documentation of Tax configuration. There are several threads on this topic.
    Thanks
    Murali.

  • Need information about creadit card process in ESS and transaction PR05

    Hello,
    Can anybody explain me the credit card clearing in ESS and information about transaction PR05...Its very urgent...No doubt...Good help will be appreciated and honoured...
    Thanks,
    Tushar

    Dear Sarthak M,
               Assume you have gone through the transaction BAPI,
    where you can find all relevant BAPI's .
    select the relevant text such as "sales orders" - from the right side of the screen - check "Tools" tab,where you will find "Create BAPI list", click to search for the Function moduels.

  • Provide information about handling units

    Plz provide information about handling units. Explain all the paths and information about HU.

    Hi,
    Purpose
    You can use Handling Unit Management (HUM) to reflect packing-based logistics structures in the SAP System. Using this method, you track the movements of entire handling units and the materials they contain rather than tracking each material individually.
    When you base logistics processes on handling units, goods movements processing is made easier, which in turn optimizes all logistics operations. This simplified processing includes the existing packing function in shipping and warehouse processing in the Warehouse Management system, which is expanded here.
    Features
    In the system, the handling unit (HU) expands on the shipping unit. Handling units can be nested, which means that you can create new handling units from several handling units as often as you like. At the material item level, HUs contain the complete material identification, the quantity, and, in the case of serial numbers, the respective object list. Handling units have unique, scannable identification numbers that can be developed according to standards such as EAN 128 or SSCC.
    Handling units contain all inventory management information of the materials they contain that are maintained in Inventory Management. There are also status messages that you can call up at any time that indicate whether a handling unit is only planned or if the ship-to party has been notified of the arrival of this handling unit, or whether it is in the warehouse or has already been posted to goods issue. The integrated history function also records each business process in the life cycle of each handling unit, meaning that you can track the handling unit’s path and development at any time.
    In HU-managed storage locations, all goods movements are executed through the specification of the respective HUs, and Inventory Management is performed through the handling units. If you are not working with HU-managed storage locations, you can use handling units (without stock information) as before in the delivery and in the shipment.
    In HU-managed storage locations, materials can be managed in HUs only. Mixed stock (stock made up of packed and non-packed materials within the same storage location) is not supported. HUs can also be managed in interim storage types. Unpacking a material from an HU means that the stock of the material is posted to a storage location that is not HU-managed.
    If you call up normal material movements in connection with an HU-managed storage location, a delivery is created, rather than a direct material posting, which has been the procedure up to this point.
    Handling units are unique at client level in at least one system. Using an indicator at client level (see Unique Identification of Handling Units), you can control whether you are going to work with the HU functions. Since the handling unit is a physical unit, the central logistics processes are controlled through the input of the handling unit identification. These processes include putaway, picking, and stock transfers, as well as goods receipts and goods issues.
    A handling unit’s mobility can be limited if quality checks are active. Changes in the stock category caused by a quality inspection are made using a posting change in the handling unit.
    There is also a report available that you can use to find and display handling units using different selection criteria such as material, packing instruction, or storage location.
    Although the handling unit is basically a unit that remains constant in the system, you can change it by repacking the materials it contains. All the packing functions, such as packing, repacking, and unpacking, are completely supported by the handling unit function. In this way, handling units can be created in production, during goods receipt, or in the packing areas of the warehouse. If you have automatic packing, the handling unit is created from the packing proposals defined in the system (from the packing instructions, for example).
    Regards
    Adarsh Mathur

  • Fund Determination - Marketing Resource Management - SAP Library

    To add a comment, please log in or register on the top of this page and choose Reply. Please write your comment in English.
    You can also go back to the SAP help page.

    Yes, Marketing resource management (MRM) is about managing all the resources required in marketing - money/budgets, time and resources (people, assets, etc.) and improving efficiency.
    Defined by analysts as "a set of processes and capabilities that aim to enhance a company's ability to coordinate and optimize the use of internal and external marketing resources. MRM applications facilitate planning and budgeting, they coordinate execution and measure the impact of marketing efforts."
    So, it goes beyond scenario planning and also includes budgeting, digital asset management, workflows, etc.
    Refer to this link for documentation:
    [http://help.sap.com/saphelp_crm70/helpdata/en/e0/4017b12a414e50bde6eb17b4b1233e/frameset.htm|http://help.sap.com/saphelp_crm70/helpdata/en/e0/4017b12a414e50bde6eb17b4b1233e/frameset.htm]
    Let me know if you need any additional information.
    Anik

  • What the best Task manager and why?

    Hi
    I dont know if this is the right place to post this but i post anyway.
    Im looking for the best task manager por my systems and my mates.
    So, what the best task manager have for my system and why?
    I saw somethings app's but or is very expensive or inst very good.

    I'm recently freelancer, and i like to insert in one place all my works and information about my costumers and task's i have to do.
    And if more late have a team and like to connect the tasks with the team.
    Sorry about my english

  • Error Implementing Oracle Projects Resource Management

    I'm implementing Oracle Resource Management and I've followed all the requirement/steps in the Implementation Guide. I realized that after I changed the flag "Include in Utilization" to Yes in the Job Definition, the request showed me the following error in log:
    Current NLS_LANG and NLS_NUMERIC_CHARACTERS Environment Variables are :
    American_America.WE8ISO8859P1
    Enter Password:
    REP-1401: 'beforereport': Fatal PL/SQL error occurred.
    ORA-06503: PL/SQL: Function returned without value
    REP-0069: Internal error
    REP-57054: In-process job terminated:Terminated with error:
    REP-1401: 'beforereport': Fatal PL/SQL error occurred.
    ORA-06503: PL/SQL: Function returned without value
    Thanks in Advance.

    Hi Dean and Dina,
    Thanks for your answers. Following is the missing info:
    - Yes, we are using the AIA PIP
    - We are using 'Workplan enabled' projects for integration with a 'Partially Shared Structure'
    - In integration options, we are only integrating 'Workplan' with a 'Working Version'
    - We are trying to send only progress information from P6 to Oracle Projects, not the time card info
    Iniitially, when trying to send progress from P6 to Oracle Projects, we were getting the error - 'You cannot update a published version of the workplan'
    However, after checking the following flags, we stopped getting any errors in AIA/middleware and still not getting any data into Oracle Projects:
    Projects --> Setup --> Integration settings:
    Integrate - Workplan - Send Task - Current Working Version
    Integrate - Workplan - Receive Task
    Workplan --> setup:
    Allow Physical Percent Complete Collection
    Allow Physical Percent Complete Overrides
    Thanks for your help.

Maybe you are looking for

  • Is there a way to make the Tween class move XY?

    I want to move an object across the screen. For the first 10 x pixels I want it to also move 10 y pixels. So if I was manually coding it I would do for (i = 0; i < 10; i++) {      x + i;      y +i Once it gets to the max x position I want it to rever

  • Access forbidden when Apache is trying to use NSS volume

    I'm helping a customer migrate from an OES2 SBE server to an OES2 Linux server running under VMware. The new server is up and seems to be running fine and I've migrated all of the data over, but not using the Migration Tools as I could not get them t

  • Exporting Canon XHA1 from final cut pro?

    I have a problem with my export. my footage plays fine in my browser when playing on final cut pro (before export). i have been exporting for YOU TUBE as a quick time conversion (mp2 & mp4) but when i play it back the footage cant keep up with the so

  • FlashBuilder 4.7 shows wrong errors at start

    Once in a while when I start FB 4.7 it shows me a bunch of wrong errors during which I cannot compile anything but after a few minutes especially after opening the files the errors point to, all the errors (correctly) disappear and I can work normall

  • How do I download Elements 11 to a new laptop?

    I have Elements 11 on my desktop and an old laptop.  I know I have to deactivate the laptop before downloading to my new laptop, but how do I download Elements 11?  I have the activation code from my previous purchase.