RoboHelp5: Linking between project and subproject

I have a master project and four subprojects They all exist
in a flat directory; that is, the master project folder and all
subproject folders are on the same directory level. I can merge the
projects fine but when I try to add a hyperlink from a topic in the
master project to a topic in one of the subprojects, the link
disappears when I compile the master project.
I searched adobe for the answer and found a page that
describes "Linking Between Merged WebHelp Projects", however the
instructions suggest putting the subproject folders within the
master project directory. I keep a set of test projects available
just to practice things on without breaking my actual work and
tried this out. I couldn't create merged projects using this method
at all. The merged project link would appear in the TOC but when I
complied the master project and viewed the results. the merged
projects didn't appear.
Any ideas on how I can merge projects *and* create hyperlinks
between the master and subprojects? Thanks.

Just to clarify, I've got my test project organized as
follows (as per information from Peter Grainge's site):
Master: This is the top-level master project. The single
folder contains only one topic which is named "null" and I deleted
all text including the title from that topic. The TOC of this
project starts out as containing no information.
Child: This folder is at the same level of the directory as
the Master folder and contains the directories for each of the
subprojects.
Subproject1
Subproject2
Subproject3
All three of these subprojects are located inside the Child
folder so that all of my actual project content exist on the same
directory level.
From here, I go to the master project in the Null topic and
on Null's TOC, I create the Merged Project links to the three
subprojects. So far, everything works swimmingly. Then I try to
create a link between a topic in Subproject1 and Subproject3.
The link seems to be created correctly, but I do get a
warning message stating that it may not endure when the project
files are moved. When I look at the page with the link in preview
mode, the link exists and works.
I compile the three subprojects and recreate the merge links
to the subprojects in the master project, the recompile the master.
I click "view result" and navigate to the page that is supposed to
contain the link and (alas) the link is just plain text.
That's where I am so far. Still going to work through the
material on Peter's site to see if I missed something.
EDIT: I can see the subprojects in the master just fine,
Colum. But when I try to create a hyperlink on one topic in one
subproject to a topic in another subproject, when all the projects
are compiled, the hyperlink itself is broken. Does that
clarify?

Similar Messages

  • Link between Project and Sales Order

    Apart from sales order can we have a link between project and customer master ??
    I know that WBS element assignment can be made in sales order but i want to have link between
    customer master and project. I don't want any user field or text field in sales order.
    Any idea ?
    Regards
    Ashish

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • Link between Project and Inventory?

    Could you please guide me how can i get link from inventory to project?

    Hi,
    If you want to expense inventory to a project, you can create a transaction type with project enabled.
    If you want to capture inventory cost for a project with inventory tracked, then license Project manufacturing, setups the PJM parameteres. Activate the locator control. With all these done, you can transfer inventory to projects.
    Make sure you run the project cost collection report and do the import of transactions by running PRC: Transaction import from projects with source inventory.
    Regards
    Leo

  • Link between GTM and FSCM (sales or purchase order hedging)

    Hi all,
    I am trying for a few days to have SAP GTM working (I am in an IDES ECC6 system, and as far as I know in EhP4 version). The main goal in fact is to test the currency hedging, and therefore to the link GTM and FSCM, either single-sided purchase or sales order, or two-sided . The flow I want is the following :
    -     I buy or sell a product, in GTM, through a trading contract which generates a purchase or sales order.
    -     Automatically a currency hedge is generated to cover the risk, in FSCM, I guess in exposure management.
    -     And then the financial products (derivatives) are generated as well.
    No problem to create the trading contract, no problem to generate the sales or purchase order. But in spite of the (very little) customizing I found in u201CSAP GTM => currency hedgesu201D, and some in FSCM, in u201Ctreasury and risk managementu201D, no way to have this link between GTM and FSCM, no additional document is generated like a Forward Exchange Transaction (I guess I should have this, and then a risk exposure in FSCM).
    Would you have an idea ? Is this customizing, or an additional Business Functions or Extension Set not activated ? SAP says : u201Cit worksu201D, but canu2019t find the way.
    Thank you very much for your help, I am quite looking for this link for a few days now u2026
    Best regards
    Patrick

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • File not found in Link Between Projects Window - test no edit rights to other file

    Hi,
    I am doing a test to see if i can create a link by typing the link path (f.i. <>\plan2\1) in the predecessor column without having edit rights to the other plan.
    I expect this to be possible as the edit in the other plan (creation of link) is only done after the change is accepted through the LBP (link between projects) window. Besides, when i do it to both my own plans, in this LBP window i get 'create external
    link' as difference to accept.
    When I do it on Project Server 2010 to a plan I do not own or having edit rights on, I got the message 'file not found'.
    Is this message related to what I am trying or does it have another cause?
    Does someone know if what I want can be done?
    Rgds
    Sander

    Hi Sander,
    I confirm that for creating a link between projects, you need to have access in read-write to both files.
    Indeed creating such a link will write in both files information about successors (in the source file) and predecessors (in the destination file).
    Note that if you only need to update the successor, you don't need anymore to open in read-write mode the source file, since you won't write any more information in it.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Link  between LANDSCAPE AND R/3

    hi gurus i have doubt. that what is the difference between DEV,QUALITY AND PRODUCTION SERVERS AND DATABASE, APPLIACATION, PRESENTATION.
    initailly while we are in implementation we use DEV,QUALITY AND PRODUTION.
    after impllementation DATABASE, APPLICATION AND PRESENTATION comes into picture. so in landscape good configuration sits in production server. so for end user point of u PRODUCTION SERVER WILL BECOME DATABASE SERVER OR NOT. pls tell me the link between landscape and R/3.
    will reward

    Hi Krishna,
    I think you are trying to mix 2 questions.
    Well you can frame the questions like this:
    1) Difference between Development, Quality and Production Servers
    2) Database, application and presentation layer.
    Well the point1) refers to Landscape. What happens is when are working for any end to end implemetation or support project we need certain instances so we can have instances like Development, Quality and Production. we have got different instances because we need to test whether the changes made are working as per the requirements.
    Point 2)  refers to R/3 technology.
    SAP R/3 is based on a three tier client/server technology. Typically, it is made up of three functionally distinct layers namely: the user interface, business logic and database.
    The user interface, which is otherwise known as the presentation server displays the interface for users' communication with the SAP system. It is often referred to as the SAP GUI. As a matter of fact, it is a program called sapgui.exe. The application server is where the business logic and data manipulation takes place. Data processing, SAP administration tasks and client request/feedback management are handled within the business layer. The database layer is synonymous to the database server and it typically acts as a data repository for tables and other database objects and structures.
    Ideally, an R/3 system is composed of one database server, one or more application servers and one or more presentation servers.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • How to break the link between photoshop and lightroom when saving a photo?

    I've had an ongoing issue with saving copies of photos I import from LR to PS and back into LR. Any multiple copies I make get erased when they move back to LR. My solution has been to save a copy in an extra folder apart from Lightroom and import them in later. It's rough, but it works. But now I have a new demon.
    I tweaked a photo in LR, made a copy to keep it safe, then sent the copy over to PH where I did some magic. I Saved As in that special other folder, closed the tab, got the usual box asking if I wanted to save the changes (of course I did), I went back to LR to see both the original and copy changed over to the PS version. I went back to PS, opened the .psd, unclicked the mask, clicked the checkbox, when back to LR and both the original and copy in LR had the mask removed.
    I'm missing something here.
    There m u s t be a way to break the link between PS and LR so that when I save a copy of a photo I made in LR the original and copy remain two separate photos. Does anyone know how?
    Thanks,

    I think I am a little confused. What you are describing seems more like a Project Server "Profile" issue, than a SharePoint to MS Project Sync.
    If my guess is correct, then you just need to set the default profile to be something other than your computer.
    If I am wrong, a screenshot of the error would be really helpful.
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:
      

  • Link between Progress and Consumption

    Dear Sir,
      I want to link between project progress and consumption.
    Means we get work for testing of no. of joints say 1000. Now I want to make some restriction say for  testing of 10 joints , only 100 qty of this material shud consumed. System should triger some message that I am exceeding my allocated amount.
    Please help the needful
    Regards
    Umesh

    Dear Umesh,
    Please refer SAP Help where this method is explained in detail.
    SAP Help > Logistics > Project System > project progress > progress analysis process > progress calculation > measurement methods > quantity proportionality.
    Tnx.
    Abdul.

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • 'Is there a link between OLM and iProcurement'

    I have been asked 'Is there a link between OLM and iProcurement'? The person posing the question is wanting to create trainers as suppliers and I know that the supplier information is shared between OLM and the A/P, A/R and G/L modules and I presume that the link to iProcurement will be via one of these modules however is there a more direct vanilla link between OLM and iprocurement?
    Any help would be great
    Thanks
    DM

    I am afraid there is no link between the iProc and OLM.
    The closest that apps can offer you is that your learner/delegates can be of type external i.e. being an Organization or a Customer. Hence there exists a link for your delegate to be a customer(hz_parties).
    However this might be a future integration i.e. Trainers being suppliers. I am saying so because in 11.5.10 there is a table named OTA_VENDOR_SUPPLIES that has reference to vendor_id. Currently this table is not being used by OLM.
    You may look into the code of packages OTA_VSP_API, OTA_TEA_BUS & OTA_PLE_BUS and see if Oracle's future functionality will converge towards your business requirement.
    Thanks,
    Anil Passi
    http://oracle.anilpassi.com

  • Link between Item and delivery

    Hi ,
    I want to know the link between item and deliveyr. Like for example, an sales order item ( no. 10) containing 10 quantities can be delviered 5 times( each containing 2 quantities) and line item ( no. 20) can contain one single delivery. I am working on a report where i have to link all the line item to its delivery number. I am trying to achieve this through GENIl but i am not able to indetify as to how to differentiate the different deliveyr numbers. In other words, can some one help me as to how to link the delivery number to its corresponding items?

    Document flow is stored in the table VBFA in ECC.
    VBELV fied is the sales order number and in POSNV specify the line item number and speicfy VBTYP_N = J (Delivery).
    Regards,
    Bhanu

  • What is the link between PO and Requisition in database side

    hello friends,
    please can any one tell me that what is the link between PO and Requisition in database side. means after creating the requisition we will go for create the PO based on that requisition.
    want to know that what is the link between both in database side.
    Thanks in advance
    krish.

    Hi,
    The link is at distribution level, between:
    PO_DISTRIBUTIONS_ALL.REQ_DISTRIBUTION_ID
    and
    PO_REQ_DISTRIBUTIONS_ALL.DISTRIBUTION_ID
    Hope it helps.

  • Link Between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL

    Guys,
    I am new to Oracle Financials, can you please let me know if my understanding of link between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL is correct or not?
    SELECT ai.invoice_id
    , ai.invoice_num
    , aps.due_date
    , aip.accounting_date
    , aip.amount, aip.payment_num
    FROM ap_invoices_all ai
    , ap_invoice_payments_all aip
    , ap_payment_schedules_all aps
    WHERE aps.invoice_id = ai.invoice_id
    AND aip.invoice_id = aps.invoice_id
    AND aip.payment_num = aps.payment_num

    plz look at seeded view AP_DOCUMENTS_PAYABLE
    FROM
    ap_invoices_all ai,
            ap_invoice_payments_all aip,
            ap_payment_schedules_all aps,
    WHERE
    AND aip.invoice_id = ai.invoice_id
    AND ai.invoice_id = aps.invoice_id
          AND aps.payment_num = aip.payment_num
    ...your code a bit different by
    AND aip.invoice_id = aps.invoice_idbut it's ok
    >
    AND aip.payment_num = aps.payment_num
    Is this correct?
    >
    yes

  • Link between PR and RFQ

    Hi all,
    I looking for a table where I got a link between e PR and the RFQ which refeer to that PR. We can see in ME53N in the Status tab the RFQ number. I want to fine a table where is that link between PR and RFQ.
    We can see the link in EKPO with the PO number  only if a PO is done from the RFQ (field BANFN).
    If I look in EKPO with the RFQ number, the field BANFN (PR number) is empty.
    I don't find a table with a link between the PR and the RFQ if the PO is not done (nothing interesting in EBAN)
    May someone help me ?
    Thanks all
    Regards
    Mathieu PAINEAU

    Hi all,
    I found by myself ! This link is done in the Table EKET.
    Regards
    Mathieu PAINEAU