Route Stage data in Route determination

Hello Gurus,
We have scenario where in route defnition is not required. I am using the route just to have transportation implemented so I can use the shipment document.
I cannot maintain the route stage information Service Agent, shipping type, Distance, duration etc as all these are decided on the fly at the time of dispatch based on the weight volume of the material available for dispatch.
I get the message "Route 000001 has no valid legs" when I enter into the shipment, as I have not maintained the complete route information.
We have different phases in Shipment like Planning, Loading Start, Loading End.. could anyone plzzz explain me the use of these phases in shipment processing. Is it mandatory to maintain all these??
rgds,
Pavan P.

Hi Pavan,
          Go to Transportation in the IMG there you go to Detail screen of the shipment type, in the detail screen of the shipment type there are fields called Adopt Route and Determine legs based on these fileds the legs (stages) will be dtermined in the shipment document.
Go through this link it is having details about automatic leg determination and manual stages creation in the shipment document.
http://help.sap.com/saphelp_47x200/helpdata/en/d5/2285347860ea35e10000009b38f83b/frameset.htm
For One more doubt.
You fallow these steps
-->You create condition table with the fields Shipment type you can get the shipment cost based on the shipment type.
I-->n the condition type you select calculation.type as 'R' Distence dependent assign the access sequence.
-->You Maintain the condition record for that in TK11.
-->Maintain pricing procedure and determine the procedure in the IMG.
You can get the simulation of the shipping cost at order level with out hitting the G/L account.Based on this you can select cheaper one.
Shipment Cost Information in the Order
As the shipment costs can make up a large proportion of the total cost of a product it is important and therefore recommended that you have a rough idea of the shipment costs when the order is created. As in normal situations no deliveries, shipments or shipment cost documents exist at this point, simulated versions of these can be "created" in the background to enable you to calculate shipment costs on the basis of these documents.
This means that you can estimate shipment costs. When you make the appropriate setting it is also possible to implement several calculations at the same time, in order, for example, to determine whether transport by lorry or by train would be cheaper or how much more it would cost to send by express delivery rather than by standard transport.
Integration
Shipment cost information is called up in SD order processing but uses the transportation and shipment cost processing functions.
Prerequisites
Shipment cost information in the order can only be used if the control parameters and master data for transportation and shipment cost processing have been maintained.
Features
To calculate shipment costs in the order you can define profiles for shipment cost information. The profile for shipment cost information contains default values for shipment cost information in the order, for example, the transportation planning point, transportation type and the shipment pricing procedure. The profile for shipment cost information is assigned to a sales document type (when defining the sales document types in Customizing for Sales and Distribution). If you do not want to carry out comparisons between the calculation methods, but just want to receive an estimated value for the shipment costs, then use the details from the profile for shipment cost information (transportation planning point, transport type, pricing procedure) and the data from the order (forwarding agent, route) for calculating shipment costs and the related simulated creation of transports.
-->If you do not assign a profile to the sales document type, you can also enter the transportation planning point, shipment type and service agent in the order.
To carry out a comparison of different calculation methods, you can assign one or more shipment planning profiles to a profile for shipment cost information. This planning profile is used to create shipments in collective processing, in order to store specific selection variants and data, which should always be used, in the memory. A planning profile determines how deliveries should be put together with shipments and which data should be put in the shipment documents. You can assign various planning profiles to the profile for shipment cost information, in order, for example, to compare whether it is cheaper to transport by train or by lorry. It is also possible to assign a planning profile for creating transportation chains.
If you begin the calculation of shipment costs in the sales document, the data that is used to simulate the putting together of the two types of transportation, is the data which is saved in the order and in the shipment costs profile, which is assigned to the corresponding sales document type. If the planning profile is assigned to the shipment cost type, this data is also used for the parallel calculation of shipment costs, so that it is possible to compare different transportation options.
Calling up Shipment Cost Information in the Order
Procedure
Choose Logistics ® Sales and distribution ® Sales.
Choose Order ® Create.
Enter all the data from your order and save the document.
Call up the document again by choosing Order ® Change.
In the order, choose Details ® Shipment cost information.
You reach the screen where the planning profiles are listed. In the first line, you always have the planning profile . In this line you see the default values from the shipment cost profile that is assigned to the respective sales document type.
If you have not assigned a shipment cost profile to the sales document type, now enter the missing data for Transportation planning point, shipment type, and service provider.
If you have assigned a shipment cost profile to the sales document type, and there are shipment planning profiles assigned to this shipment cost profile, then the system will list all the shipment planning profiles that are assigned to the shipment cost profile.
Choose Execute.
Result
In the column Net value, you see the values calculated by the system. If several planning profiles are assigned, you can have the system make comparisons. In the log, you can display the details of the simulated shipments. If you have problems with the calculations, you can check the reasons listed on the log.
I hope it will help you
Regards,
Murali.

Similar Messages

  • Please specify Transaction code to load SCM ROUTE MASTER DATA (EWM Routes)

    Please specify Transaction code to load SCM ROUTE MASTER DATA (EWM Routes data).
    Regards
    Dhirendra
    Moderator message - Moved to correct forum
    Edited by: Rob Burbank on Apr 21, 2009 8:58 AM

    Route definition is done at 0VTC. You have define the Route with its description, Transit time, factory calender, carrier info etc. It is stored in TVRO table
    Then yoiu will maintain the route determination in 0VRF.
    Route Determination:
    Dep zone of the shipping point + Destination zone (T-zone) of the ship-to + Transportation group + shipping conditions.
    Route determination details are stored in TROLZ table.

  • Routes and Route Stages

    Hi
    I have created a route in config. 
    However it does not allow me to enter any information in the route stages.  when I click on that the route stages screen comes but it is greyed out.
    Is there another way of maintaining the route stages?
    Thanks
    Vinesh

    ROUTE DETERMINATION
    Step: 6 - Define Transportation Zone
    Path: Sprou2014Logistics Executionu2014Transportationu2014Basic Transportation Function---Routesu2014Route Determinationu2014Define Transportation Zone.
    Step: 7 - Maintain County and Transportation Zone for Shipping Point.
    Path: Under the Same Menu path--- Maintain County and Transportation Zone for Shipping Point.
    Select the Shipping point and enter the Country and Transportation Zone
    Step: 8 - Define Transportation Groups.
    Path: Under the Same Menu path---Define Transportation Groups
    Step: 9 - Maintain Route Determination
    Path: Under the Same Menu path--Maintain Route Determination.
    Go to Customer master data.
    In Address of General data. Enter the Transportation Zone id. and save
    You will get the route.
    The system takes into account the following 4 conditions for determining the Route u2013
    a. The country and the Departure Zone of the shipping point +
    b. Shipping Conditions agreed in the sales document type or with the sold to party +
    c. Transportation Group assigned to the material +
    d. The country & Transportation Zone of the ship to party (in CMR)
    Route can be manually overwritten during a sales order processing. You can re-determine the route in the outbound delivery based on weight (weight group) provided it is allowed in the configuration of the delivery type.
    Scheduling takes into account the following times u2013 
    a. Transit Time + 
    b. Loading Time + 
    c. Pick/Pack Time + 
    d. Transportation Lead/Planning Time. 
    The loading time and pick/pack time come from the shipping point whereas the transit time and transportation lead time come from the route.
    The system performs backward scheduling first to confirm the required quantity checking the material availability on the material availability date. If the material availability date or the transportation planning date falls before the order date, the system automatically carries out forward scheduling and will propose a future date. A delivery type can be customized to carry out rescheduling if required during the delivery processing.
    Regards,
    Raj

  • Standard Idoc or BAPI to trasfer the routes and stages data

    Hi guys,
    We want to transfer the routes and stages data from one SAP system to other SAP system . can u suggest any standard idocs or BAPIs to do the job.
    thanks
    sankar
    Edited by: sudhakar murthy on Apr 1, 2009 10:18 AM

    hello guys
    any idea on this????
    thanks

  • Use the Transit Times of route stages ?

    Hello. I would like to now if I somehow can use the transit time of the route stages instead of the header route transit time to reflect correct ATP. Current SAP is 4.7.
    Business Scenario behind my request is mainly for Ocean Liner Shipments:
    For Liner shipments most of the times there are fixed sailing Days ( i.e. every Friday ).
    Here I use a route with two stages:
    Shipping point to port of depature
    Port of depature to final destination port.
    As a possible solution I thought to use a Transportation connection point in between which should reflect the waiting time at the port having a factory calendar behind. But during first testing I recognized that any time specific date in the route stages are not take into calculation when creating a sales order ?
    Help please !
    Thanks
    Joerg

    I think the sales order picks up the time and dates from header of the route and applies stages and leg determination during shipment creation depending upon your shipment doc. type settings, hence, I think doesnt add stage values during order creation.
    If I understand the problem right, perhaps a user exit or something can help you get the days to next Friday to add to the transportation lead time and get to the right dates. Check if this idea can help.

  • Using Data-Dependent Routing in combination with Membership provider

    Hi there!
    Currently we have two Web applications running on azure using a single SQL database. We are experiencing problems with performance because we are using only one database. We are investigating some solutions like documentDB and elastic scale.
    DocumentDb seems like a really good option for us because it looks like it can be implemented easily and we know just what to do.
    With elastic scale on the other hand we have to figure out what our options are. We are using a membership provider for our users to login in one of the two applications. The other web applications does not use a membershipprovider, it does not use a login
    system at all.
    in the backend of our code we determine a subscription_id for both applications to retrieve tenant data.
    I think we have a few options here
    1. to keep using the membershipprovider we could create a database just for the login mechanism so we can determine the subscription_id, and with that subscription_id we can use Data-Dependent Routing to retrieve the correct data from the correct shard.
    2. We can add extra columns to the Shard Map Manager database (i think i've read that it's not supposed to be used for user data) like username and password so we can login through this database.
    Does anyone has better options than the options mentioned before and can anyone give me advise on how we should deal with these issues?
    Thanks!

    Elmar --
    The best approach would be to maintain the Membership DB in a separate Azure SQL database.  Then you could shard your transaction details across an Elastic Scale set of databases based on the subscription ID.   (The Shard Map Manager
    database is not designed to be extended with additional columns, and Elastic Scale works by caching that Shard Map data in the client application anyway, and those in-memory structures can't be changed).
    You would use an ordinary ADO.Net connection to query membership for a Subscription ID, and then get an appropriate shard-specific connection using the Elastic Scale GetOpenConnectionForKey method, passing the subscription ID retrieved from
    the membership query. 

  • Where config partner function in stage of a route?

    Hi all,
    Please help me find where config partner function in stage of a route. When I run tr. vt03n, go to Stages, press on Departure point,  go to "Details on Stage" and go to Partner. Here I see Partn.Funct. Where config in SPRO еhese partner function?
    Thanks.

    Hi
    Customize the partner profile in spro.
    S PRO > I MG_> LE -->Transportation --> Basic transportation functions > partner control>set up partner determination for shipments.
    Here in partner determination procedure assignment we need to assign the partner function to the shipment type.
    Hope this answers your query.

  • Unable to route the data from an AQ in AQ11g to an AQ in AQ10g via router

    Hi,
    I have configured a router to route the data from an AQ in AQ11g DB to an AQ in AQ10g DB with IP Message Type.
    Data of JMS OBJ Message type is getting routed between the queues of same DB.
    But its giving error while trying to route the IP Message type data or JMS OBJ Message type data from an AQ in AQ11g DB to an AQ in AQ10g.
    aqtrace logs have been configured and I could not see any exception logs in that.
    Please see the AQ log below:
    The router encountered errors in processing job: <router job name>: oracle.j2ee.jmsrouter.RouterException: The router encountered errors in processing job: <router job name>
    I have done the following:
    1) Created a new instance and have configured the router
    2) Deployed the Standalone Resource Adpater for 10g and 11g
    3) Source and Target connection factories configured in the router is the same
    Please let me know the following:
    1) Is it possible to route an IP Message Type data from AQ11g to AQ10g
    2) Is it possible to route an JMS OBJ Message Type data from AQ11g to AQ10g
    Thanks and Regards,
    Lydia

    HI All
    Thanks for the prompt response. I got solution for my question. Please check below thread. For quick reponse i posted my question in one more category. Thanks to all of you.
    How to read internal table w.r.t. fieldnames stored in other table

  • Problem with Updating of Routing Master data

    Hi,
        My requirement is I have to download Routing Master data into excel sheet. Once downloading is over, user can change some fields data in excel sheet. Again u’ll upload the changed excel sheet data to SAP. Finally these changes will effect to  the Routing Master data.
    I am  downloaded routing master data using FM ‘CARO_ROUTING_READ’.
    I changed some fields in excel sheet. I tried so many FM’s for updating the routing master data, but system not allow to me to change the Master data.
    I tried with ‘CP_BD_DIRECT_INPUT_PLAN’,
                 ‘CP_BD_DIRECT_INPUT_PLAN_EXT’,
                 ‘CP_BT_PLPO_UPDATE’, for updating Routing Master.
    And  Standard program RCPTRA02 also.
    Please send me one function module which can update the Routing Master data. But that FM have the same structure of CARO_ROUTING_READ. Otherwise type conflicts will come.
    System throws error ‘YOU CANNOT  EDIT TASK LIST OBJECTS WITH ACTIVITY TYPE&’.
    Regards
    Shaik

    Hi,
    I have found in OSS the following programs to download and upload routings:
    - Note 107242: You can create the sequential input file with report RCPDIRO1
    - Note 106965: Direct input routings: reading datasets
    Maybe this can help you to upload your routings in another way. Unfortunately I haven't figured out yet how the program exactly works. So if somebody can give me some info about that one, it would be great.
    Thanks,
    Steve

  • Different calendars for route stages? Is it possible?

    HI,
    Is it possible to set up 2 different calendars for this same route?
    I made a route with 2 different route stages. Each of stages have different calendars. Unfortunatelly system is not checking those calendars..... System always take route calendar...
    My client is shipping materials from the shipping point to the end customer each Monday and Thursday. Materials are shipped first to the main office and after that are shipped to the end customer (each Tuesday and Friday form the main office).
    I made a route which has 2 different route stages: Stage 1 u2013 To Office, and stage 2 u2013 to the end customer. Each of stages have different calendar.On the sales order document system is checking only one calendar (route calendar). My client would like to see when the material will be received by the end customer, examle: You make sales order on Sunday, so it means that materials will be shipped from the shipping point on mondey, and will be received by the end customer on Tuesday.
    Does anyone know the answer?
    Best regards,
    /Maciej K.

    Hi,
    Why do you need to keep calendar assigned at route level here? Did you try removing calendar from the route and leaving it only at stage level?
    Regards,
    Dominik Modrzejewski

  • BUFTYPECONV vs Data Dependent Routing

    Hello everyone,
    when using BUFTYPECONV for a service in conjunction with data dependent routing, which buffer type is used for the DDR? The original buffertype or the converted?
    If I re-phrase the question: Which operation is performed first - buffer conversion or data dependent routing?
    Any input on this welcome,
    /Per
    Per Lindstrom R2Meton AB, SWEDEN

    Per,
    The datatype conversion occurs after routing in the server that has been
    chosen to process the service.
    When the server receives the message and sees that it has receved an XML
    buffer for a service with BUFTYPECONV specified, the postrecv function for
    the XML buffer type converts the buffer to FML or FML32. When the service
    calls tpreturn(), if the buffer passed to tpreturn() is an FML or FML32
    buffer, it is converted back to XML before the reply message is sent back to
    the caller.
    <plindstrom> wrote in message news:[email protected]..
    Hello everyone,
    when using BUFTYPECONV for a service in conjunction with data dependentrouting, which buffer type is used for the DDR? The original buffertype or
    the converted?
    >
    If I re-phrase the question: Which operation is performed first - bufferconversion or data dependent routing?
    >
    Any input on this welcome,
    /Per
    Per Lindstrom R2Meton AB, SWEDEN

  • Data dependent routing with WebLogic

    How do you do data dependent routing with WebLogic Platform? Does it require additional
    products or can it be done just using WebLogic Platform components?
    Thanks

    WLI, or "WebLogic Integrator" may be what you are looking for, this is a
              full fledged message-flow/routing product built on top of JMS.
              If your needs are simple, you can roll-your-own data dependent routing
              using the WebLogic server built-ins of JMS, which provides reliable
              messaging, in combination with MDBs and/or Messaging Bridges - both of
              which allow the specification JMS selectors (filters). Furthermore,
              your MDB application can enqueue to a specific local destination (or a
              remote one, which is harder) based on the contents of the message it
              receives. Voila.
              For example, WorkQ (local or remote) --> MDB --> JobQ1 or JobQ2 or
              JobQ3. To simplify the MDB logic, JobQs could be on the same server,
              and therefore always available. (This is one of the advantages of
              having a JMS that can run in the same JVM as the app server, the other
              is very fast performance.)
              Tom
              David B wrote:
              > How do you do data dependent routing with WebLogic Platform? Does it require additional
              > products or can it be done just using WebLogic Platform components?
              >
              > Thanks
              

  • Is Their Any Support For Data Aware Routing Through The Coherence DataGrid?

    Hi all,
    Following paragraph describes the feature i m looking for(*Data Aware Nodes*)......
    The Function Service can transparently route behavior to one or more nodes in the cluster. In the case of Data Aware Functions, the behavior can be directly routed to the node(s) that hosts the data needed to execute the function in parallel, stream and aggregate the results substantially reducing the time taken to execute complex data intensive tasks.
    So please tell me is their any support for above said question. If this feature is their in coherence please help me with it's configuration and implementation as well.
    Thanx

    Hi JK thank you for your reply
    I want to achieve Data Aware Routing in Parallel Execution (Parallel Function Execution).
    Consider a case where i have three nodes (say Node A,B C) in coherence cluster with partitioned scheme. Now suppose we have Employee related objects stored in cache of Node A and Node C only, but not on Node B. Then i want to perform some operation on Employee objects only in parallel fashion.
    In coherence i ll achieve this using map.invokeAll(collectionKeys, agent);_ from client program.
    Now my question to you is, as my operations are based on Employee objects only which are stored on Node A & c. Then When i request parallel Execution from client program which will connect to Node A from our cluster, will it go to Node B where their is no Employee objects ??????
    Edited by: 981644 on Mar 6, 2013 7:52 PM

  • Route scheduling "calendars for route stages not checked"

    Hello
    My client is shipping materials from the shipping point to the end customer each Monday and Thursday. Materials are shipped first to the main office and after that are shipped to the end customer (each Tuesday and Friday form the main office).
    I made a route which has 2 different route stages: Stage 1 u2013 To Office, and stage 2 u2013 to the end customer. Each of stages have different calendars.On the sales order document system is checking only one calendar. My client would like to see when the material will be received by the end customer, examle: You make sales order on Sunday, so it means that materials will be shipped from the shipping point on mondey, and will be received by the end customer on Tuesday.
    Any ideas whatu2019s wrong? Can anyone give me some advice?
    /MK
    Edited by: Maciej Kromolicki on Oct 1, 2008 8:58 PM
    Edited by: Maciej Kromolicki on Oct 2, 2008 9:03 AM

    Can someone give me some advice??
    Edited by: Maciej Kromolicki on Oct 7, 2008 9:36 AM

  • Transfer Master Data Rate Routing

    Hello Gurus,
    We need to transfer Master Data (Rate Routing) with ALE. We already configure the ALE connection. We need to know which is the Process Code in the Inbound Table.
    Anyone can help us, please.
    Thanks in advance.
    Best Regards.

    Check this link
    http://help.sap.com/saphelp_47x200/helpdata/en/92/58d455417011d189ec0000e81ddfac/frameset.htm
    For BOM and materials there are transaction codes...but i could not get for WC and Routing...

Maybe you are looking for

  • Invalid extract structure template && of DataSource &&

    Hi, While creating a z datasource i have received the above error. Fom the previous threads here (and from notes 202162 & 335342) I can understand that when there are Currency or Quantity fields included in the datasource, their key fields (CUKY for

  • Unicode support in my terminals is not working anymore

    After turning on my computer today, the unicode characters for my terminals are not working. Other applications like gvim and awesome, firefox, etc. still display the unicode chars correctly. Awesome tag names (unicode working): uxterm (unicode worki

  • The MP Role, how many do you need?

    On a previous post I was told that the MP role is random and your CM2012 clients can use any MP they find at random.    If that is the case is the following scenarios fine to use? We have 1 CM2012 server that is a MP (plus many other roles) We have 6

  • How can I have complex arrangement of filters?

    I would like to separate my incoming mail first those messages where [from] is in any of my address lists. I would then want to apply a set of filters sorting them into folders with the residual going into a separate folder. Then I would like to have

  • Down payment document

    hi,    can u please tel me how to see the down payment document?