Sales order with ref to make to order and with ref to make to production...

My requirement is as follows:
Material code : Plant specific and MRP activated
In one sales organization  the sales order should be created without limitation and with make to order type with ref to above material
Another sales organization the sale order should be created if stocks are available and with ref to make to production with above material.
The availability check rule  as no check for first scenario and  Individual requirement for second scenario.
can it possible ...........

Hi,
   functionality of availabity check is it checks the material as per order if it is avialable then it confirms quantity & if not then u have to procure or manufacture.
  Mts scenario works for sales from stock while mto to generate requirement via purchase requisition ir plan order.
  however you can configure availabity check for both the scenario by selecting suitable checking group, requirement class, requirement type & schedule lines.
Reward if it helps u
Regards
Dev kumar

Similar Messages

  • Had a windows partition but was too small; with bootcamp made 1 new part and then tryiing to make a new wind part wich is bigger, but that is not working

    Hello
    I have a nem apple macbook and made a 20 GB windows part on mac with bootcamp..after 1 week saw that 20 GB was too small so with bootcamp i removed the part, made 1 part of mac and then tried to make the new bigger oart of windows with bootcamp; this is not working; the mac will not recognize the windows installation cd

    hansthebeast wrote:
    Hello
    I have a nem apple macbook and made a 20 GB windows part on mac with bootcamp..after 1 week saw that 20 GB was too small so with bootcamp i removed the part, made 1 part of mac and then tried to make the new bigger oart of windows with bootcamp; this is not working; the mac will not recognize the windows installation cd
    Try asking your Boot Camp question in the Boot Camp forum rather than in the Windows Compatibility forum. The Boot Camp gurus hang out in the Boot Camp forum: https://discussions.apple.com/community/windows_software/boot_camp

  • Can I use iphone earbuds with a mac pro tower? And with an extension cord?

    I also need to use an extension cable because of my standing desk (tower is on the floor). I get confused with the 2-band jack, the 3-band jack, etc. I haven't been successful using a regular, radio shack type of headphone extension cord. Salesmen give me a blank stare when I try to explain that I have iphone earbuds with a 3-band jack and that it doesn't work with a regular extension cord. It's like I'm speaking Swahili.

    You can't using 4-band iPhone earphone with Mac Pro.
    You need to get 3-band earphone and extension cable.
    I've been using iPod shuffle's earphone with extension cable osn it works well.
    http://www.amazon.com/iMBAPrice-iMBA-PS-12MF-12-Feet-Plated-Extension/dp/B009UEB UZQ/ref=sr_1_5?s=electronics&ie=UTF8&qid=1382758521&sr=1-5

  • Loading and with error message :COLLECTION in SOURCE SYSTEM ENDED

    Hi,
    Facing problem with master data object while loading and with error message :COLLECTION in SOURCE SYSTEM ENDED
    This load is getting failed every day. It is a full load and records are getting transferered and added.
    when we check in details tab in RSMO all data packets in processing is green but in extraction some of the data selection scheduled are in yellow.We are changing QM status to green as records are added.
    Version i am using is BW 3.5
    Please let me know what will be the problem???
    Thanks,
    Edited by: lokesh thonsyd on Feb 18, 2009 8:55 AM

    First try to find out the reason for the load failure. Once you fix this, do a manual run of the infopackage and when successful you can continue with the rest of process chain.
    Sometimes, it doesn't help to just set a request to green status in order to run the process chain from that step on to the end.
    You need to set the failed request/step to green in the database as well as you need to raise the event that will force the process chain to run to the end from the next request/step on.
    Therefore you need to open the messages of a failed step by right clicking on it and selecting 'display messages'.
    In the opened popup click on the tab 'Chain'.
    In a parallel session goto transaction se16 for table rspcprocesslog and display the entries with the following selections:
    1. copy the variant from the popup to the variante of table rspcprocesslog
    2. copy the instance from the popup to the instance of table rspcprocesslog
    3. copy the start date from the popup to the batchdate of table rspcprocesslog
    Press F8 to display the entries of table rspcprocesslog.
    Now open another session and goto transaction se37. Enter RSPC_PROCESS_FINISH as the name of the function module and run the fm in test mode.
    Now copy the entries of table rspcprocesslog to the input parameters of the function module like described as follows:
    1. rspcprocesslog-log_id -> i_logid
    2. rspcprocesslog-type -> i_type
    3. rspcprocesslog-variante -> i_variant
    4. rspcprocesslog-instance -> i_instance
    5. enter 'G' for parameter i_state (sets the status to green).
    Now press F8 to run the fm.
    Now the actual process will be set to green and the following process in the chain will be started and the chain can run to the end.

  • I want to use system and job variables to make the information dynamic in the Email Subject Line

    Someone could mention the subject line character limitation needs to be expanded. 50 chars is not much to work with! 
    Is it possible to make SUBJECT Line to make , use system and job variables to make the information dynamic , Right now there is a limit for Characters in the Subject line ... is it possible to expand ???  

    I've encountered the same issue and worked around it by using generic variables that would always be the same for a certain email alert. eg =  "System XYZ -source file delay for :"
    So a sample subject would then be: 
    Where ENV = DEV/UAT etc.
    This functionality allows you to use generic alert templates for all filewait jobs, and just filling in the variables.
    A slight problem is that although this works very well, the use of group variables in email / alert actions is (/ wasn't) officially supported by Cisco when I last ran it past then. Cisco, any update in this?

  • Problem with "Epson Stylus SX110 (or SX115)" and the Airport Express

    Hello,
    I connect my printer on my airport express, via wifi connection. And the airport express doesn't recognize the printer (via the airport express utility)
    When I connect my previous printer (a canon), it works well.
    Thanks if you met this pb, to help me

    Hi All,
    I have intel based macbook pro running OSX 10.6.2, airport express with a connected EPSON Stylus SX115.
    I discovered two issues with using the printer via my Airport Express:
    1. I had to use the driver called 'Epson Stylus SX 100'. It ships with the op system. (note: NOT the 'Epson SX 100' !!! There is also one called like that, but it does not work for me...). When I tried to use the sx 110 driver, the printing stopped half way. Strange enough the sx 110 driver works ok when the printer is connected via a USB cable
    2. Now the more annoying problem.
    It takes ages before the airport express discovers the printer!!! After I scanned via an USB cable, I reconnected the printer to the Airport express. Printing was dead. Next I followed the Apple provided troubleshooting (restart sequence, etc). No success, the airport still couldn't find the connected printer, so I was getting really ******…..
    The solution I propose, as it worked for me already more than once on my macbook pro, is the following:
    1. Connect the printer to the Airport Express, switch the printer on and, and restart AE via the AE utility (Just to make your consciousness rest.):
    - Start Airport Utility: you can find the program by typing the name in spotlight
    - right click on the on the Icon of your Airport Express on the right of the window
    - Issue a restart (It takes some seconds to complete!)
    2. WAIT! As annoying it is, it takes about 15-30 min before Airport express discovers the printer.
    3. In System Preferences/Print&Fax add the printer: (NOTE: This is an optional step, in case the printer is set up the first time, otherwise skip to step 5. )
    - On the right, at the bottom of the Printers sub window, click on the + sign. This opens the Add Printer dialogue
    - In the Add Printer dialogue you should be able to see now your Epson printer discovered by Bonjour. Highlight it by clicking on it. (If you don't see your printer, you might have been impatient and waited to little after you connected the printer to the airport express, or you have some problem I did not have…)
    - At the bottom open the 'Print Using:' drop-down box, and choose the 'Select Printer' option. This opens a new dialogue. Scroll down to 'Epson Stylus SX 100 - Gutenprint v5.2.3'. Click on it, and press OK. This closes the 'Select Printer' dialogue
    - Back at the Add Printer dialogue, change the name of your printer to something more meaningful, to 'Epson SX 115 - Wireless' for example.
    - click ad
    4. Back at the Print & Fax dialogue, now you should see a new printer icon on the left with the name you just gave, and with an icon that does not look at all like your printer.
    5. Congratulations, you are done. You should be able to print now.
    I hope it helps

  • Problem with Make to Order sales order

    Hi,
    We are facing a problem with sales order which has Make to order item catagory, Rescheduling is not happening for the sales order of this type. However, we have taken up this issue with SAP and SAP has replied that MTO sales order are Excluded from rescheduling program.  SAP has suggested us to use CO28 to reschedule the Production order so that the changes can effect the corrorsponding sales order.
    We have observed that when sales order is created with MTO item category, production order is automatically created but when we see the Requirement list in MD04 for the material there is an Exception message as '20' (Cancel process).  After the production order is confirmed and goods reciept has done the quantity confirmed against the sales order is becoming ZERO and hence we could not able to create delivery for the sales order.
    We kindly request you to help us in this regard. This is creating a big problem for our business.
    Thanks counting on your support.
    Warm Regards,
    Sridhar Burugula

    Dear ,
    Did you check any sales order reference in your production order assingment tab? Did you check the cost roll up in sales order level based on the BOM and Routung created for dt FG?
    I believe the link between Sales Order and Production order lies in requirement Type and Requirement Class  in define planning strategy .
    Check in you make to order planning stratgey -SPRO-Define Planning Strategy -Make To Order .Here you should keep the correct Requirement type for customer(OVZH)  and requirement class (OVZG).
    Check and revert
    Regards
    JH

  • How to deal with changing in Make-to-order style sales order?

    Hi, SAP experts,
    our situation and requirement:
    my client use make-to-order style to create sales order, normally one item in sales order.
    And this item stand for a dummy material, which include several components.
    Limited with material purchase delivery schedule, sales orders need to be made as planned sales
    orders to drive MRP to run out material requirement in ahead. Therefore, planned sales orders will
    often changed as final assigned customer request.
    1. Could be a possible to define components level to release sales order?
    2. If components in sales orders is replaced or added, even whole sales order released, production order initialized, how to deal with it?
    Scenario one: components in sales order added, modified in sales order, which will automatically create another production order for replacement action? if not, how to do?
    Scenario two: components in sales order replaced, how this sales order requirement transfer to production order?
    3. what about costing calculate for this changing?
    Thanks for your kindly help in advanced,
    Zhou Zhen

    Don't forget, this include both concrete inner classes as well as any anonymous inner classes you create, like
    myButton.addActionListener(new ActionListener()
      // Yada Yada Yada

  • Error Message V1810 - Make to Order No Change delivery plant in Sales Order

    Hello, for a client where I'm setting the flow intercompany , but i have  an error on the Sales Order when I must be change delivery plant.
    Scenario: Make to Order, Product configuration, Sales Order BOM created by  CS60
    Step:
    1 - I create sales order fo company X delivery plant 1000
    2 - Creates Order BOM on plant 2000 Company Y
    3 - creates MRP Planned Order
    4 - Convert Planned Order to Production Order
    For different issues can happen that you decide to ship the goods to a different plant than the X. Production Plant remains 2000.
    If I try to change the plant on the Order system stops me with the following error:
    Message V1810 - Plant can no longer be changed
    Diagnosis
    The plant can no longer be changed in the Following situations:
    The item has been assigned to a project.
    There is a production order for the order item but it is not a staticassembly order.
    Already have accrued costs.
    For the very complex structure of the product I can not delete the production order and sales order BOM.
    How do I handle these cases?
    Can anyone help me?
    Best regards
    Giuseppe

    Hi Guiseppe,
    can you please answer some questionsa to understand your requirement.
    if you want to transfer the goods from plant to plant you can do it through Stcok transfer MB1B t code.
    1.then why you want to change the plant? in which element you are trying to do in sales order or production order?
    2.you mention it as intercompany and MTO can you be clear for whoom you got the sales order(internal or External Customer?

  • Problem in creating sales order in Make TO Order

    Hi all,
    We are trying to test the strategy 50 (Make to Order strategy) . To begin with we are trying to create the Sales order. However , we are getting the message "NO availibity check can be carried out for Material " we have assigned the checking group and checking rule .
    What can be the possible causes for this problem . Please help me . I will be very grateful . Thanking you.
    Kind Regards
    Ayaz

    Dear ,
    Planning startegy 50 , Requirement Type of Customer KEV , in -OVZG -can you please chek the following : Select the Requirement Class for Planning Startgey 50 based on the Requirement Type : KEV
    1.Did you mark the Indicator Requirement Transfer in Requiremet Tab
    2.Did you mark the Availablity Check marked ?
    Goto SPRO-Define Planning Statgey and Comapre the same because it will be copied from OVZG
    Hope it is clear
    Regards
    JH

  • Sales order does not allow make-to-order production

    Dear Friends,
    I am trying to do do planned order for sales order in MD50 it was showing the error message as
    "Sales order does not allow make-to-order production"
    Can any one solve this
    Shakthi

    Hi Shakthi,
    It is also possible to set the priority for Requirement Type determination like
    0 Material master strategy, then item category and MRP type
    1 Item Category and MRP Type
    2 as 1, with check for allowed requirement type.
    The transaction for this is same as "Requirement Type Determination :
    Sales and Distribution --> Basic Functions --> Availability Check and Transfer of Requirements --> Transfer of Requirements --> Determination Of Requirement Types Using Transaction
    Look for "Source".
    In this transaction, Please, check "Requirements".
    Please, make sure of the following 2 things :
    1. If you do not set an indicator for maintaining the requirements class: Transfer of requirements is not carried out, irrespective of the specification you make at schedule line level for the transaction.
    So it is necessary to mantain the setting first at the Requirements Class. As mentioned in my earlier posts, the requirement class for the material can be found out from Planning Strategy / MRP3 view --> Main strategy (defined in the strategy group) --> Requirement Class for Customer Requirements.
    The IMG path for "Define Strategy" is Production --> Production Planning --> Demand Management --> Planned Independent Requirements --> Planning Strategy --> Define Strategy.
    2. Once the "Requirements" indicator is set in Requirement Class, the requirements indicator at the Schedule Line decides whether or not you require transfer of requirments for the relevant transaction.
    I hope this should solve your problem.
    Regards,
    Sandeep

  • Make-to-order. Requirement linked to Quotation and not to Sales Order

    After we have changed our Make-To-Order Materials from unvaluated sales order stock to valuated Sales Order Stock we do face a problem with the Requirement for those Sales Orders lines which are started with a Quotation. After running MRP a planned Order is created (ok) but the Planned Order is linked to the Quotation line and not to the Sales order line. When converting the Planned order to a Production order the AFPOD-KDAUF field is the number of the Quotation and unfortunately not the Sales Order number.
    The Quotation looks ok. Item category is AGN and Schedule line category is BN (no MRP). When converting the Quotation into a Sales Order the Item category change to TAN and schedule lin category is now CP.
    The copy rules QT -> OR (VTAA) shows copying requirement = 501 Schedule qty >0 and DataT = 201 General Schedule line Data
    Anyone got a clue about where to look? ¨
    Thanks in advance
    Ken

    Hi Guys
    Thanks for your proposals.
    The Materials involved are standard items (FINI -> NORM) and our Set-up with item category TAN works perfectly when we create a Sales Order without a Quotation first. And the way we solve the problem manually right now is to convert the Quotation and delete in line item and recreate them manually. 
    I found that if i delete the requirement type in the Quotation and then convert the Quotation into a Sales Order then the Planned with be linked to the Sales Order = perfect.
    Any other ideas
    Best
    Ken

  • Make-to-order: COPS for  KMAT materials (Non-valuated sales stock)

    Hello,
    We are working with KMAT configurable material (i.e. non valuated sales order stock).
    The client is requiring that inventory of these KMAT material should be shown in the financial accounting;however as we work with KMAT, this seems not possible.
    The whole process is:
    - taking of the sales order with the configuration
    - MRP and Production order Execution
    - Settlement of the PO to the sales order
    - Settlement of the Sales orden to a given account in FI (just like "stock for customer order") - inventory.
    The problem we are facing now is how to make the compensation of this account once the product is delivered.
    It seems the sales order's default settlement receiver is only the PSG. can we have to use the result analysis key to calculate the cost of sales, and which valuation method can we use if I only want to settle the actual cost that settled from the production order.
    By the way, I have search for the notes:Note 26459  it seems we have to run the sales cost estimate first for the KMAT.
    Summary
    Symptom
    It is not possible to perform results analysis on sales order items with materials of material type KMAT.
    Additional key words
    Transactions KKA3, KKAK
    Cause and prerequisites
    In make-to-order production, the inventory and the cost of sales are not posted through goods movements because the materials are managed in a non-valuated sales order stock. The only way to create postings in FI is to use results analysis (see Note 26456). If the sales order item consists of a material of material type KMAT, results analysis is not possible because no cost estimate exists for this material.
    Solution
    Results analysis must be performed with a valuation method that uses profit basis C. With this profit basis, the system uses the planned costs of the production orders for the sales order instead of a cost estimate for the KMAT material.
    In Release 2.2 a modification is needed for this which is described in Note 25772. In Release 3.0 this function is provided as standard.
    From 3.0C onwards the planned costs of the sales order can also be calculated in a product cost estimate for the sales order. You should use profit basis E in this case.
    However, if you are using assembly processing with production orders, you can only use profit basis C.
    Hope the scenario is clear. Perhaps you have a different approach to work with KMAT materials.
    Regards

    Hi Friends,
    Can you please provide the solution for my problem and its slight urgent.
    Regards
    Goutham

  • Make to order and stock both in one material with consignment

    Hi Seniors
    FERT Material = XYZ which is being used for Make to Order and Make to stock both.
    In case of make to stock  scenario from GR u2013 101 and PGI made @ std price. At the time of Consignment 631 mvt. No accounting document is generated. As per my knowledge its fine. No issue.
    In case of Make to order scenario for above material.
    Q.1   At the time of goods receipt (101 Mvt) from production order,  accounting document is generated at the rate of Per unit target cost of production order and no variance shown on production order. Why not accounting document is created at Std price of Material?
    Q.2 At the the time of consignment an accounting document generated with following entry.
        Finished Goods Inventory      Dr
        Price difference                   Dr             
                        Finish Goods Inventory Cr
    Why accounting document is generated at the time of consignment in case of make to order scenario?  Pls confirm is this a sap standard behavour or anything wrong with me. As I told earlier that in case of make to stock when we make 631 mvt there is no accounting document generated.
    Note: My standard price is on the base of mix costing using two production versions.  Every time we create production order in each version.
    Regards
    Imdad

    Hi Imdad
    Q1: Why not accounting document is created at Std price of Material?
    Check your req class... There is a Field called "Valuation"... your valuation depends on whether you select M or A there... You can decide to valuate based on CK11N std cost estimate or based on Sales order cost estimate / Prod order cost estimate
    So, in a nut shell, you can configure the system to generate acc doc at CK11N Std cost also
    Q2. Why accounting document is generated at the time of consignment in case of make to order scenario?
    In my opinion, your MTO stock is maintained in Table EBEW.. Pls check that... WHen you do GR from Prod order, it resides in EBEW table..
    However, when you send it as a cons stock, the link to sales order is lost and your stock is no longer a MTO stock.. Hence, it is valuated at CK11N Std Cost.... If there is a diff between CK11N cost and GR Price, then PRD is generated... Thats why you are seeing PRD in your case
    BR, Ajay M

  • Make-to order with production in alternative plant

    Hi,
    We are thinking about implementing a scenario with Make-to Order production for our products, but with production in alternative plant (special procurement type 80).
    For example, sales orders will be directed to plant A, but production should take place in plant B - and using a make-to order strategy (in our case planning strategy 50 - planning without final assembly).
    Is there any problems with our approach, making it not feasible to implement? Is it even possible in SAP to combine MTO with special procurement key 80 (production in alternative plant)?
    Is there any other issues that can be foreseen with using this type of production strategy?
    Thanks in advance,
    Lars

    Hi,
    The production strategy which you are going to use is very fine.
    As per me there is one concern. Example you have created a sales order in Plnat A, in plant A that FG is handling through Special procurement 80, then in the MRP run system will be creating a planned order in Plant B without running MRP in plant B. In MD04 screen you can see planning plant as Plant A. In plant B, u r converting this planned order in to Production order and executing the production. While doing the GR against the production order, the goods receipt will happen directly in Plant A.
    This is the one problem (Accountability)  you can face.
    Regards,
    V. Suresh