Same work center being used in different routings
Hi
I have requirement like this:
Workcenter WC1 works in two shifts Shist A & B.
It is being used in two routings for different products X & Y.
Product X will be prodiced in shift A.
Product Y will be produced in Shift B.
How to schedule it for different shifts for different products.
Thankls in advance.
Regards
YMREDDY
since workcentre is not working on the material based.
but the routing worked on the material based
give the shifting timing and the break timing in the work center alone
you have to select the matrl product x in the routing and the sequence of operation for the product is mentioned that the product that be there for the working in the
shift A .
product Y is to be sequenced to work at that w.c at shift B
Similar Messages
-
Parallel processing in the same work center
Dear Guys,
There is a routing sequence in which some 2-3 operations will occur parallely & those operations will belong to a same work center,How to map those operations in the routing,do i need to maintain parallel processing ,if so then how to go aboutParallel Sequence
Definition
A linear sequence of operations that is parallel to a sequence of operations in the standard sequence.
Use
A parallel sequence enables you to process several operations at the same time. A parallel sequence is carried out at the same time as the corresponding section in the standard sequence. It is a special form of overlapping operations.
Integration
You can create parallel sequences in routings and rate routings. You cannot create them in reference operation sets or reference rate routings. Creating a Parallel Sequence
Call up the sequence overview.
Choose Edit ® New entries.
The Choose Sequence Category dialog box appears.
Select Parallel sequence and press Continue.
The Sequence Details screen is displayed.
Enter the necessary data.
Select Operation overview to create operations for the parallel sequence.
so particularly in your case
WORK CENTRE OF 10, 20, 30 ,40, 50 ASSUME TO THERE
OPERATION OF THE SEQU : 1,2,3,4,5
SUPPOSE 3,4 ARE PARALLEL SEQUN AND THE WORK CENTRE 30,40 ARE SAME TYPRE TO OPR SAME
YOU MAY DESIGN AS
WC-30
(OPN3)
W.C 10 WC 20 WC50
(OPN1) (OPN2) (OPN5)
WC 40
(OPN4)
OR
WC-30
(OPN4)
W.C 10 WC 20 WC50
(OPN1) (OPN2) (OPN5)
WC 40
(OPN3) -
Same order start date for 4 FG in same work center
Hi All,
I have four different Finished goods all have same lead time and same requirement date in same work center, I didn't have capacity planning so all FG have same start date in same work center after MRP run, how it is practically possible on the shopfloor.
Is there any solution available.
SekharThe fact of running MRP (with or without Lead time scheduling) has nothing to do with the leveling of capacity. Lets consider both cases :
Indicator "1" :
- No capacity load is determined
- Basic Dates from material master calculated to cover the requirements.
Indicator "2" :
- Capacity Loads are calculated.
- Dates coming from recipes or routings calculated to fulfill the material requirements.
- Overload displayed in CM01
What you need is to run Capacity Leveling (CM25, CM29 ), dispatching the orders to the work center in a feasible date. But this step is never included in MRP run.
Regards -
Can we add additional fields in work center creation using any user exit ?
Hi,
is there any user exit using which we can have some tab and fields such that we can add/ update the equipment to wotk center in CR01 ?
regards,
madhu kiranhi,
requirement is can i get the additional fields like equipment and asset in the work center creation ?
i would like to maintain these against a work center
and using any user exit can i add additional fields ?
regards,
madhu kiran -
Could not found any usage key in the work center WC001(Use T-CODE CR02)?
my question:
(1) I have created one Work Center WC001 and one Plant HJW1.
(2) I have created one Routing with T-CODE CA01.
(3) Then I use T-CODE CA02 to change this Routing.
(4) When I enter the Head details screen,I click the Operations button to enter the Operations Overview screen.
(5) In the Operations Overview screen list,I input the Work Center WC001 and the Plant HJW1 at the first line and press enter.Then the sap raise error message like below.
(6) The question was: I could not found any usage key in the work center WC001(Use T-CODE CR02)! Could any one tell me the answer or give me some advice to resolve the problem?Thank you so much.
error message:
Work center WC001 plant HJW1 does not exist for task list type N
Message no. CR084
Diagnosis
You want to allocate the work center WC001 to a task list of the type N . However this work center is not intended to be used in a task list of the type N.
Procedure
The usage of a work center in task lists is restricted via the usage key. You define this key in work center customizing and allocate to it those task list types in which a work center with this usage key can be used.
Proceed as follows:
Check the usage key for the work center WC001 in work center maintenance.
If necessary change the usage key in the work center or change the allocation of task list types to the usage key in customizing or
allocate to the task list a work center which is valid for use in a task list of the type N.Hi
1) Check what task list usage key you entered for the work center in the basic data . If it is 009 then the work center can be used in all task list type.
2) If you have defined and used any other usage key , ensure that for this key , the routing type N is allowed in OP45.
Regards,
Ramasamy -
Hello! How I can be on the same page with the same table insert and update operations using 2 different forms (single form and tabular form)
I have little knowledge of Apex, but I know PLSQL
Thanks
Ginger
EcuadorThank you Gramps. It took some time, but I've got it working now. I had to re-do all the user authentication actions from scratch for one of the databases, but it's finally behaving itself now. I appreciate you pointing me in the right direction.
-
Can work center formula use function floor()?
I create a formula in a work center.
I must use function floor() in formula.
But it appear error.
Can it use in formula?Hi Philip,
We cannot use Mathematical Functions in formulas.
Check url
http://help.sap.com/saphelp_47x200/helpdata/en/b1/c0392e439a11d189410000e829fbbd/frameset.htm
Check for Formuls->Rules for Maintaining Formulas
Hope this helps.
Thanks
Lakshman -
Cookie being used in different applications which are on different database
Hi,
I have two htmldb applications. One app (App1) is on database DB1, and the second one (App2) is on database DB2. App1 will create a cookie, and App1 will use URL to redirect to App2. App2 will use the cookie which App1 created.
The problem is in App2, I used owa_cookie to get the cookie but, it is not there.
I know different htmldb applications in the same workspace (in the same database) can share the cookie. Can the htmldb applications in the different databases share the same cookie?
Thanks.
JuneScott,
Thank you for your reply.
In App1, I have set a cookie as following:
begin
owa_util.mime_header('text/html', FALSE);
owa_cookie.send(
name=>'LOGIN_USERNAME_COOKIE',
value=> 'abcd');
owa_util.http_header_close;
exception when others then null;
end;
App1 in DB1 accesses source(URL) App2 (eg: http://mymachin.domain.com:7778/dbname/f?p=100:101).
App2 in DB2 has a process (On Load -Before Header) in login page to get the cookie:
declare
v varchar2(255) := null;
c owa_cookie.cookie;
begin
c := owa_cookie.get('LOGIN_USERNAME_COOKIE');
:P101_USERNAME := c.vals(1);
exception when others then null;
end;
I just want to pass the username from App1 to App2.
Is there any way the cookie can be shared in my case?
Thanks.
June -
Same JSF page being shown for different command links
Hi
I have two command links and as per navigation-rules, both of them go to the same page "Common.jsp" which has a <jsp:include> to include another file which is gets from session.
Each command link specifies its own JSP page to be included (in common.jsp) and adds them to the sesion.
After selecting one command link the desired page is showing up fine...
However if I come back and select the second command_link, it shows the same page again.
It does not even go to the action_listener of the second command_link.
Is there any way to force it go to the actionlistener of the command_link where I can specify a different page in the session... ?
ThanksHi
I have two command links and as per navigation-rules,
both of them go to the same page "Common.jsp" which
has a <jsp:include> to include another file which is
gets from session.
Each command link specifies its own JSP page to be
included (in common.jsp) and adds them to the sesion.
After selecting one command link the desired page is
showing up fine...
However if I come back and select the second
command_link, it shows the same page again.
It does not even go to the action_listener of the
second command_link.
Is there any way to force it go to the actionlistener
of the command_link where I can specify a different
page in the session... ?
What do you mean by "specify a different page in the session"? An <h:command_link> always goes back to the page it was originally rendered from, and expects the action invoked by the command to determine where to go next. If you really want to go to different pages, you should either make the action method return different results (i.e. trigger different navigation rules) or consider using <h:output_link> instead, where you can define the destination URL yourself.
Craig McClanahan
Thanks -
Help appreciated.... Bascially 2 of the devices (an IPad and the iPhone 3) are used by me and the others by my wife, son and daughter. They all sync to the same iTunes library so I am thinking that if the other 3 get their own apple IDs, they will not be able to access the existing library.
Please note that though a fan of apple stuff, I am utterely useless at using them so I am sorry if my question is naieve or ill informed!
Thanks in advance for help.
StephenYou can all have independent AppleIDs for iCloud or iMessage etc, but share the same one for iTunes Store / AppStore purchases.
-
Profit center hierarchy used in different reports
Dear All,
We had a requirement of knowing the profit center hierarchy is been used in how many reports,is there any way to get these details.
Thanks,1. In RSZRANGE table, enter info-object name on which hier is build and node (Hier Name) in LOW fields.
2. Copy field ELTUID in TELTUID field of table RSZELTXREF.
3. Copy SELTUID from table RSZELTXREF to ELTUID column of table RSZELTPRIO.
4. Add COMPUID from that table to RSRREPDIR.
In this table entries, you will be able to find all the queries which have used hier on that info-object. -
How does time machine work when being used with a mac pro?
How does time machine work when backing up a mac pro?
Considering the fact that the mac pro can hold 8TB and a external (non NAS) hard drive can hold only 2TB does time machine only backup the OS disk.macnewcomer22 wrote:
Considering the fact that the mac pro can hold 8TB and a external (non NAS) hard drive can hold only 2TB does time machine only backup the OS disk.
Time Machine will backup everything by default, on every disk in your Mac.
Choose System Preferences > Options to exclude items. You could exclude everything except your OS...but I'd think it is your data that's more important to you, if you have to make choices.
See...
http://discussions.apple.com/thread.jspa?threadID=1964018
While it's true you can store almost 8TB, how much do you think you'll actually store? If you have 1TB of data you want to store then a 2TB drive can do it. Also when your TM drive begins to get full it will begin deleting the oldest backups to make room.
You could also get a Drobo with 8 bays...
http://www.drobo.com/products/index.php
-mj -
Hi,
Can you put deletion flag for a work center ?
or is the only option is go to CR02 and delete ?
Once we delete then latter any thing to revert of trace means what to do ?
is it possible to put deletion flag for a work center and revoke when required again ?
please help
regards,
madhu kiranHi,
The question is while deleting the work center , system will not allow to delete unless its taken out from all the routings where ever it is assigned .
But when i put deletion flag its not stopping instead its proceeding further and just setting the deletion flag for the work center
issue is when the work center is in use in routings system should not allow to put deletion flag
once i put deletion flag system should not allow to use the same work center in any of teh routings
but system is allowing both
only at the time of standard cost run we can get an error saying that working center is set deletion flag
instead when i try to set the deletion flag itself ca system prompt and stop me doing that and when i set it should stop me using the work center set for deletion in any routings further
what should be done ?
regards,
madhu kiran -
PP work center capacity and link in Equipment master
Dear All
My client has five equipments which he is clubing them into one work center with five capacities. In equipment master i have given for respective equipments i have given PP work center locations but when i create a maint order for one equip then in planning the capacity avalability is affecting the entire work center for ex if the total work on one equip is 12 hrs then only 8 hrs of capcity should be deducted for to day and 4 hrs for tommorow but in plannig all 12 hrs are getting deducted in todays capacity itself.
Pls give some inputs from your experiances
Thanks and Regards
PankajHi,
Even if we have more than One Equipments in the same work center, PP-PM integration will work.
This is the standard scenario in any Process Industry or in case of an Assembly line of a Automobile manufacturing industry.
So it should work. Please check the following points again,
1. Assignment of Work Center to Equipment Master
2. System Condition - '0' Not in Operation in Both header as well as against Individual Operations (in Work Order for that Equipment)
3. Work Order has been released.
4. Same Work Center is used in Routing and the same is Planned for a period.
If we have all the above points right, then while dispatching the Production Order system should show the Period of block and should shift/plan the PO accordingly.
Regards
Sam -
For multilingual same API's will be used or different while adding node
Hi
Right now we have developed application using weblogic portal bea 10.2.
now we want to insert metadata in bea repository.
Is there any change that needs to be done at Repository level.
same APIs will be used or different one.
Regards
ParamdeepSame API's but your underlying database should be able to support multibyte etc..
Maybe you are looking for
-
SOLUTION MANAGER 4.0 SR2 - SP12 deployment issue
Dear all, in our Solution Manager system we're moving our SP stack level from 10 to 12. We could successfully deploy via JSPM all the needed components except sap.com/CAF 12, here's the relevant part of the JSPM log: Jul 23, 2007 8:57:44 AM Info: **
-
''''''After I downloaded the Imesh program I noticed each time I go into firefox it appears as my search engine and I want firefox as my search engine I keep changing it it firefox grabbing the icon and placing it into the house and saving it. When I
-
Hello. I've had this issue for a long time and just never did anything about it. Hopefully there's an easy answer... If I look on my LAN to see other computers and none are there, then I go turn on a WinXP machine and it connects fine to the network,
-
Output Condition Records based on Document Value
I have a need to send/not send different pieces of output based off of Quote value. Example: if a quotation is over $100 send a copy of the quotation to the field sales rep automatically. And simultaneously if the quotation is under $4000 automatic
-
SAP QM - Message QE405 is not appearing in QE51N
Hi guys, Im working in hte area QM in SAP (ECC 6.0) and I need to know where one can configure the following funcionality: In trx QE51N one is entering results for an inspection lot. If the caracteristic shows values lets say between 2 - 10 and one