Schedule line disappears for Make to Order Item

Hello,
In make to Order process, there are 2 schedule lines created, while creating the order in VA01 transaction.
But when i save order and see it change mode (VA02), only one schedule line with 0 quantity confirmed for the requested delivery date is seen. the order schedule line with 120 confirmed quantity for the futhur delvery date disappears.
Can some body please comment why this is happening. I am not able to understand this.
Will this schedule line be created after MRP run. I have also executed MD02 for MRP run, as well as created the planned order to Production order. But still the second schedule line is not getting created which was seen at the time of creating the order. 
Regards
Prashant

ANy updates on this Thread............

Similar Messages

  • Item category determination for make to order item

    Hi experts,
    how can I determine item category(tak) for make-to-order. mean what should I put in ITEM CAT.GRP, USAGE AND HIGHER LEVEL ITEM CATEGORY GROUP. Please advice.
    Thanks in advance.

    Neel,
    Goto VOV4 and create new entry with
    your sales doc type + itm cat group + usage + higher leve item cat = TAK
    Just check your item cat group in material. If you have created TAK without copy then also check your SL assignment with VOV5.
    Suhas

  • Schedule Line for Make to Order Item.

    Hello
    In make to order scenario,  there are 2 schedule lines for the MTO item in create mode of Order. 0 confirm quantity on the req
    When I save the order, i can see only one schedule line with confirm quantity 0.

    Hi,
    Make-to-order production is controlled by the requirements type. The requirements type is
    determined on the basis of the MRP group and the strategy group in the material master record.
     Create material by specifying item category group as 0001 = Make u2013 to u2013 order (Normal item)
    In MM01 Basic data tab, General item category field [0001] = Make u2013 to u2013 order, 0002 for configurable
    material
    Make u2013 to u2013 order checking group for availability check should be [02] = Individual requirements in Sales:
    General/Plant tab.
     Go to VA01 and raise the sales order by specifying this material that we created in the previous step
    Item category is TAK
    Schedule line category = CP
    Requirement type = KE [Sales order Header  Procurement  Requirement field]
    KE = Individual customer order without consumption
    (For standard items item category group = NORM)
    System determines requirement type 041-order/delivery requirements. This requirement type points requirement
    class where we can control whether the system has to carryout TOR, Availability check, and Product allocation
    functions.
    Hope this helps.
    Regards,

  • Delivery schedule line number in make to order

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated and delivery date is not picking correctly in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    regards
    piyush

    Hi
    When you do the MRP Run at MD02, maintain the Delivery Schedules as 3 (schedule lines), so when ever you do the MRP Run, it will run along with the delievry date.
    reward if it helps
    Regards
    Prasanna R

  • Delivery Schedule line no in Make to Order

    Hi all,
            i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated and delivery date is not picking correctly in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    regards
    piyush

    hi
          thanks,
    i have checked MD04 peg requirement list with order route.
    every thing is ok.,schedule number is also coming but only for finished good . if three production order is there for semifinished then there is no any relation that how i can judge that this semifinished is for which FG material.means :
    FG 1             FG 2            FG 3
    SF 1              SF 2            SF 3
    SF 11            SF 22           SF 33
    How this SF 11 is linked with FG1.and schedule delivery number is there but only for FG material. planning segment is same for all the FG material.MRP element data having all the link but only for FG material.
    what is the link of SF 11 to schedule delivery line number with FG material.
    Regards

  • Sales order for a make to order item

    HI
    when i create a sales order in crm for a make to order item. its not creating any requirements.
    like for a make to order item  will have a BOM  and routing attached to it. it creates  a production order or a purchase requisition.  but  its not happening
    a sales order is getting created in ECC. but its not creating any requirements.
    so no planned order ( production order) or purchase requisition is getting created. even after running MRP.
    but when i create any thing in ECC everything is working fine.

    Hi,
    There is a difference in the ECC sale sorder and CRM sales order in ECC sales order when you sale a product then all the parts of the product and billed and for this they create a purchace order and maitain route of the material and transpotation point all the things but in CRM we dont maintain these thing so product does have parts in it self it is one type of dummy product in showroom thata have only price so when we create a sales order in CRM then we dont maintain the BOM of that product,.
    Regards,
    Sid

  • Schedule Lines and Confirmation on Sales orders.

    Hi all, here is a teaser for you to think about and comment.
    Ok we have a order line for a material that needs to be ordered into stock so we use the Item Cat TAB, this in turmn gives me a schedule line of CB.
    How ever as we do not use leadtime for materials the Qty is confirmed and a delivery can be created but until the item is GR'ed.
    What my questyion is is there any option to allow a REQ / PO to be created butr on the schedule line do not at the Qty confirm therefore not allowing a delivery to be created, but once the goods re GR's then allow the confirmation.
    Regards

    Hi,
    What my questyion is is there any option to allow a REQ / PO to be created butr on the schedule line do not at the Qty confirm therefore not allowing a delivery to be created, but once the goods re GR's then allow the confirmation.
    Yes there is an option for REQ/PO to get created and it can be done by following the below settings:
    Go to VOV6 tcode:
    Then, for your Schedule Line Category - CB make sure that in the Order Type field you have NB as option and also ensure that the P.req.del.sched. check box is tcked.
    For your second question, as may be the stock is not available, and once your GR is done -- you have your stock and hence the schedule line is getting CONFIRMED...
    Regards

  • Make to order item

    Hi Experts,
    I want to create Make-to-order.but when I entering material, it is showing an error message "item category can not determined...". I also created material with item category group(0001-make to order). should I enter item category manually in the sales order for the make-to-order item? I also created material (MM01) with Industry sector-mechanical engineering and material type- semi finished material. should I select finished product here? Please advice me.
    Thanks in advance.

    Hello,
    The item category determination in VOV4 needs to be done for the combination Sales order type /Item category group (here - 0001/- / - = TAK.
    Also check Setting of TAK (MTO item) in VOV7 and maintain VOV5 and determine Schedule line Category CP .
    Then Punch the Order VA01 with the MTO item category which you have maintained in MM01.
    Regards
    Deepak Dave

  • What are configuration steps in implementation for make to order?

    please give the steps for normal production also.

    Hi,
    Below is the requested info:
    Make-to-Order (MTO) Production
    Purpose
    The planning strategies explained in this section are designed for the production of a material for a specific individual sales order. In other words, you do not want to produce finished products until you receive a sales order. This means that make-to-order strategies always support a very close customer-vendor relationship, because your sales orders are closely linked to production.
    The same relationship exists between the sales order and production that exists in a make-to-order environment. Make-to-order is also used in the following environments.
    Production using variant configuration
    Assemble-to-order
    Prerequisites
    Choose a make-to-order strategy, if:
    The materials are segregated. In other words, they are uniquely assigned to specific sales orders.
    Costs must be tracked at sales order level and not on material level.
    Make-to-order strategies should always be combined with lot-size key EX (lot-for-lot. Rounding values should not be used. If you maintain rounding values, they have no effect due to the make-to-order properties of these strategies.
    Process Flow:
    There are extensive options that enable you to procure components especially for specific sales order items.
    You may, however, want to use a different planning strategy to procure components without sales orders. This allows you to keep your replenishment lead time to a minimum. You can do this by:
    Planning on the basis of the finished product (see Planning Without Final Assembly (50) or Planning with a Planning Material (60))
    Planning at component level (see Strategies for Planning Components)
    Using consumption-based or Kanban-controlled components
    Customer stock can exist on any BOM level. See Stockkeeping at Different BOM Levels for more information.
    Because production is closely linked to sales orders, this results in a customer section in the stock/requirements list.
    Unplanned goods receipts (such as returns) cannot, as a rule, be used for other sales orders, even if they are in working order, unless they are adapted to meet a customer's needs.
    In the basic make-to-order strategy, Make-to-Order Production (20), no specific product structures are required. This means that it does not matter if the material has a BOM or not. The material can be produced in-house, or it can be procured externally. No planning is involved in this strategy.
    Planning Without Final Assembly (50) and Planning with a Planning Material (60) do require a specific product structure (i.e. a BOM, which means materials are always produced in-house). These planning strategies assume that you want to plan procurement (production or purchasing) of your components by planning the finished products. This means that you need to have a fairly stable demand for your finished products. If, however, you can plan more easily at component level than at finished product level, see Strategies for Planning Components.
    Configuration Settings:
    Create material master by maintaining general item category group- 0001(make to order)
    Availability check - 02
    Transportation Group - 0001
    go to va01 and raise sales order
    item category:TAk
    Schedule line category : cp
    Requirement type KE
    Requirement class 040
    Check TOR and avalability check
    special stock : E
    VOV7
    of TAK
    billing relivence : A
    Pricing :X
    go to mb1c
    maintain stock with a special stock indicator E
    mavement type 61
    Special stock E
    specify sales order number line item number and saveit
    go to VL01N main data
    Go to VF01
    save it
    Thanks
    Ram

  • No schedule lines due for delivery up to the selected date

    Dear Experts,
    My order has no block. i tried with 3 months in selection date in VL01N.
    My schedule line in order has 0 confirmed quantity,
    Kindly confirm if error in VL01n No schedule lines due for delivery up to the selected date because of 0 confirmed qty
    Thanks
    Siva

    Hi,
    I think you should use the " Back order process". Using backorder processing, you can list sales documents relevant for requirements for particular materials and confirm them manually. You can assign available-to-promise (ATP) stock to
    Outstanding order quantities. In addition, you can withdraw already confirmed quantities and reassign them to different items. The stock may be reserved for other sales order. You can reassign the stocks to your sales order material.
    To do this, go to Co06 (Back order processing) , enter the Material number, Plant and the checking rule.
    Select any sales order and choose --> Edit --> Change confirmation. Make sure the confirmed quantity is "0".
    Then select the unconfirmed sales order, then choose --> Edit --> Change confirmation. Now you can enter the "Delivery quantity manually ".
    Now you can create the delivery document.
    Hope this can help you .
    Regards
    M. Lakshmi Narasimhan

  • Standard  report(for open PO order items) with estimated Delivery dates

    hi friends
    i would like to know if there is any standard  report(for open PO order items) with estimated Delivery dates on it.
    thanks
    alahari

    ME2M (by material)
    ME2L (by vendor)
    ME2N (by number)
    Use selection parameter WE101 for open GR
    and scope of list EINT (scheduling lines)

  • Schedule line blocked for delivery

    Hi Friends,
    Can you please tell what does Schedule line blocked for delivery ( LIFSP )  means?can you please explain the business process involved in this?
    Regards.
    Dinesh

    At schedule line level, the following are some important prerequisites must be fulfilled, else the same would be set as blocked:
    1. The schedule line must be due for shipping on the specified selection date.
    2. The schedule line is due for shipping as the material availability date or the transportation scheduling date is reached.
    3. The schedule line is not blocked for delivery.
    4. The delivery quantity must be greater than one.
    5. The items in the order must be fully processed.
    6. The product status of the material must permit delivery.
    7. No credit check are pending.
    Regards,
    Gauravjit
    Reward Points if solution is helpful.

  • Error "No schedule line due for delivery upto the selected date"

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).It allows to create a OBD either I change the delivery date in sales order to 04.09.2008 or create a delivery with delivery date 18.09.208.
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

  • Invoice Correction Requests for Make to Order

    Dear Gurus
    I am creating an Invoice Correction Request for an Invoice which was generated for Make to Order material. I am using Document type RK . I can save Invoice correction Request. But when I generate a Credit Memo it gives message that
    000010 "Create billing document" not allowed (Sys. status Cost, object VB0060000100000010)
    000020 "Create billing document" not allowed (Sys. status Cost, object VB0060000100000020)
    It should not ask for costing here in Credit memo Request.
    Even if I do costing for Line 20 it copies only Line 20 in Credit note  which gives wrong calculation. Because I  cannot change line 10 in Invoice Correction Request.
    Pl can you advise whether costing is required in Credit memo request. If not how can I handle this scenario.
    Regards,
    Neeraj Srivastava

    Hi,
    Just check if you attached status profile to either your sales order header or item.
    Just release that first and try again.
    Let me know if it helps.
    Regards
    Ravi

  • BAPI Error: No schedule lines due for delivery up to the selected date

    Hi,
    I have created a program to create delivery orders with reference to sales orders using BAPI - BAPI_OUTB_DELIVERY_CREATE_SLS.
    After execution I get the error: No schedule lines due for delivery up to the selected date
    Please help.
    Thanks in advance!!!
    Regards,
    Sriram

    hi,
    this is to inform you that,
    please check the schedule line date in the sales order because the date is not matching here for the BAPI to upload.
    here,  for example the schedule line is 4 days after and you are running BAPI today. that will mismatch no.
    the same thing is happening in uploading case also.
    so please check the date.
    because in teh sales order if teh schedule line date is today it will accept the uploading with out throwing any errors.
    regards,
    balajia

Maybe you are looking for

  • Re-Installing Snow leopard - help please

    I bought my MacBook Pro with leopard and later upgraded to SnowLeopard. So I have a Leopard disk and a Snow Leopard disk. I want to completely re-install the system to start fresh, with a time machine backup, so I figured the best way was to erase th

  • Adobe Application Manager Fails

    Hi there. Already six months ago, but now I have the same issues. Everything startet with a bug in Media Encoder and the support notice by adobe to uninstall all Quicktime components (see this thread:                                   Re: Adobe QT 32

  • Why do we need to point at main program when activating include?

    Hi There Abapers, Just a quick question, because I faced such issue when implementing OSS notes. When activating objects I am asked to point out the main program for one of includes changed. This inclde is used in ~30 programs. As far as OSS note doe

  • Where can I find the definition of ClassID and it corresponding ClassName

    I would like to modify property of differents objects on my panel by reference. So I would have a General Object reference as input in a subVI. But I need to know what is the type of object first. And then I could go into more specific class to treat

  • How to force Safari to remember THREE fields in auto fill

    this website [ https://www.renweb.com/logins/parentsweb-login.aspx ] requires THREE fields and autofill won't do it.  Can I force it?