Self Build - New Underground Line Ducting

Hi,
Last year we bought a site that had permission to demolish the existing house and rebuild a replacement dwelling.  The property was duly demolished by a reclamation company and now we are building the replacement dwelling.
There is a BT pole in the verge of our garden that the old house was connected to via an overhead wire.  We wish to reconnect to this pole but via an underground cable.
We are presently living in a house a mile from the site, in the same local dialing code and have a broadband/phone account with BT.  We wish to move this account, and phone number, to the new house once it is built.
My question is, what are the specifications of the ducting that we need to install?  There are plenty of online companies selling BT Spec Grey PVC Duct.  Presumably the 54mm is adequate?  What depth does it need to go etc?  Do I need to know anything else?
I believe that the duct cannot be within the slab, but can be brought up the outside of the house for drilling through the wall during connection?
Once the duct is installed, and we move into the house (moving our account) presumably BT Openreach just then come along and pull the wire through the duct to wire up/connect?
We wish to install the ducting now as we can only move into the house once it is complete - including the concrete disabled access ramps.  Obviously these would pose a significant problem to an underground cable if installed after we moved in!
Regards,
Oly

This link may help you http://www.openreach.co.uk/orpg/home/contactus/connectingyourdevelopment/developnetwork.do
If you want to say thanks for a helpful answer,please click on the Ratings star on the left-hand side If the reply answers your question then please mark as ’Mark as Accepted Solution’

Similar Messages

  • New Build / New Phone line Problems (Home Move)

    Hello Forum
    First post.
    Been trying to arrange a home move for 2/3 weeks now (New Build).  Was told to get the address registered with Royal Mail. Have done this. Address still not appearing with BT. Get told on the phone someone will ring me back from offline team within 24 / 48 hrs but they never do.
    Anybody have any experience than this? Any help to get this sorted much appreciated.
    regards
    Chris

    I have asked a moderator to provide assistance, they will post an invite on this thread.
    They are the only BT employees on this forum, and are a UK based team of people, who take personal ownership of your problem.
    Once you get a reply, make sure that you are logged into the forum, then click on their name, you will see a screen like this. Click on the link as shown below.
    Please do not send them a personal message, as they cannot deal with service issues that way.
    For your own security, do not post any personal details, on this forum. That includes any tracking number you are give.
    They will respond either by phone or e-mail, when its your turn in the queue.
    Please use the tracked e-mail, to reply, not via the forum. Thanks
    This is the form you should see when you click on the link. If you do not see this form, then you have selected the wrong link.
    When you submit the form, you will receive an enquiry number, so please keep a note of it
    There are some useful help pages here, for BT Broadband customers only, on my personal website.
    BT Broadband customers - help with broadband, WiFi, networking, e-mail and phones.

  • How long does a new phone line take to fit? Patien...

    I ordered a new phone line in April and was given a date of 1st May 2013 for the engineer to call.
    Having booked a day off work for the 1st May I got a text the evening before to advise that extra work was required on the lines outside my home and that they would be in touch soon. On 17th May I got another text to advise that my order for telephone and broadband had been CANCELLED. I phoned and a new order was placed (with a half-hearted apologies for the incorrect cancellation).
    Text: 20th May. Apologies for the delay in booking an appointment.
    Text 21st May: BT here. Your phone service is ready for you. You can find a phone's number by calling 17070 from it.
    I did not not have a phione line.
    Text: 30th May. To advise a new number.
    Text: 30th May: Apologies for the delay in booking an appointment. Due to necessary additional engineering work. Next update will be 6th June.
    Text: 5th June: BT here. Just to confirm you've set up online billing with BT, If you didn't please let us know at ... I didn't set anything up as far as I know.
    6th June:  Apologies for the delay in providing your service. No updates. Escalated the lack of infpormation and hope to have more news tomorrow.
    7th June:  Apologies for the delay on your order. I can confirm that we are awaiting the outcome of our escalation with our suppliers and are confident of haveing (sp) and (sp) update for you on 11/6.
    Now, I am quite a patient person but I need a landline. I live 60 metres or so from a Post Office and even less from a main road. I can see a telephone pole from my back garden just 50 metres away. My neighbours have landlines. Why can't I have one?
    S

    Hi
    I am sorry to see you are having problems
    I suggest you contact the forum mods they should be able to get this problem sorted for you this is a link to them http://bt.custhelp.com/app/contact_email/c/4951
    They normally reply by email or phone directly to you within 3 working days they will take personal ownership of your problem until resolved and will keep you informed of progress
    They are a UK based BT specialist team who have a good record at getting problems solved
    This is a customer to customer self help forum the only BT presence here are the forum moderators
    If you want to say thanks for a helpful answer,please click on the Ratings star on the left-hand side If the reply answers your question then please mark as ’Mark as Accepted Solution’

  • New infinity line and major speed issues with almo...

    Hi,
    Just has infinity installed after moving from my previous FTTC provider.  With the previous provider i was getting 16 down / 1-2 up and it worked great.
    Had my my new inifnity line put in on thrsday and i am getting 17 down / 0.5 up!! 
    I work from home and connect to the office via vpn and remote desktop and its almost unusable.  Laggy, slow, unrepsonsive and is constantly dropping the connection with a failed to read from socket error and is making it very difficult to work form home effectively.
    I have a 4g EE modem also and if i switch to this it is like lightening compared.
    I also had absolutely no connection issues with my previous provider and as i posted above had a mich better uplink speed - which is where i think im getting most of my issues.
    When i signed up to BT this is what i was sent via email:
    We estimate your download speed will be 19.1Mb.
    We estimate your upload speed will be 3.9Mb.
    Im fine with the download but the uplink is shocking compared to the estimate - and as i had much better before i think something is amiss.
    Also when i signed up i was told that if i had any connection issues with the new line i had to notify BT within 7 days and it woudl eb investingated but it seems there are so many roadblocks to creating support tickets etc.. Its like it s been hard to report a fault on purpose.
    Where can i create a support ticket or similar to get this looked at?
    Thanks
    Damian

    dgreenuk wrote:
    Hi,
    I work from home and connect to the office via vpn and remote desktop and its almost unusable.  Laggy, slow, unrepsonsive and is constantly dropping the connection with a failed to read from socket error and is making it very difficult to work form home effectively.
    Thanks
    Damian
    As you use the internet for work purposes did you have business broadband with your previous provider ?
    This is the Residential forum. You may be better posting on the BT Business forum.
    Best regards,
    dfenceman

  • I cannot enter new Schedule lines in item level

    hi.,
    while creating sales order, i want to  split the Schedule lines in item level for running MRP. i cannot enter new Schedule lines in item level. at present the system is not allowing in sales order
    Regards.,
    Lakshmanan.S

    Hi,
    Will you let us know what is the error message system is giving ?
    Regards,
    Amrish Purohit

  • How to add a New schedule line and update the order quantity?

    Hi all,
       I have to add a new schedule line in VA01/VA02 so that when ther is partial confirmed quantity against a schedule line, we have to create a new schdule line based on the existing so that it will contain confirmed in one and unconfirmed in the other.
    The schedule line will split once the user go to Header data screen in VA01/VA02. So I used USEREXIT_MOVE_FIELD_TO_VBAK  user exits in MV45AFZZ include program.
        I splited the order quantity against the confirmed quantity and added it as new schedule line in the XVBEP internal table and update UPDKZ flags for XVBEP & YVBEP.
      Could anyone tell me is there any other way to do this without updating XVBEP? Because it is affecting some other place because of index table is not updating. How to you think use if update xvbap-etenr_high and update index table IVBEP1 for new line insert into XVBEP instead directly inseritng it into?
    My code as follows:
    xvbep-WMENG = t_temp-WMENG .
    modify xvbep TRANSPORTING WMENG.
    t_temp1- ETENR = '0002'.
    if SY-SUBRC <> 0.
      t_temp1-UPDKZ = UPDKZ_NEW.
      modify xvbep TRANSPORTING WMENG UPDKZ.
    endif.
    With Regards
      Raj

    Have you got thru this one if so please provide me with the solution as i got the same req' ..

  • Badi ISU_PRODUCT_CHANGE and creation of a new contract line item

    Hello Gurus;
    I have this requirement: Once a contract gets close the ending date (30 days before) i need to automatically renew the contract. In order to do that i thought that an action in the Contract Item might get the job done and browsing i found that badi ISU_PRODUCT_CHANGE does almost what i need even if it creates a new contract line item with a new product and this is not good for me... Does anybody know if there is a better Badi matching with my requirements or i have to "modify" the ISU_PRODUCT_CHANGE? I hope my question was clear if you need more specifics please ask me...
    Thank you very much.
    Fabio

    You can create a new costing variant with  a valuation variant that points to inforecords for material prices. Go to OKKN t-code and create the required configuration and start using the new costing variant to measure the current cost of making vehicles.

  • Creation of new freight line in PO

    Hi Everyone,
    Could you please guide me about the following query:
    In a PO, suppose we have done GR once and then cancelled the GR, in that case can we add a new freight line (previously there was no freight component added with the item) in the PO for the particular item for which we have done GR?
    Please guide.
    Thanks and Regards

    Normally system will allow you to add new delivery cost in PO condition,but you can set error message also.
    Refer below sap note for the same
    Hi,
    Please check SAP Note 549408 - Conditions modifiable after invoice receipt for the same.
    THis will resolve your issue.
    Symptom
    You already posted an invoice receipt for a purchase order with delivery costs, but no goods receipt yet. After that you can still change conditions of type 'B' (Delivery costs) via Transaction ME22 or ME22N in the purchase order.
    Solution
    Refer to the attached advance corrections.
    In addition you must adjust message V1631 as follows:
    Change the short text of the message via Transaction SE91 as follows: <Z1> No new delivery costs must be entered after occurred GR/IR.
    Extend the long text by the following passage in section 'Diagnosis': <Z1> After an occurred invoice receipt the change of delivery costs is not allowed in the purchase, either, as information for the correct process are no longer available and the postings can no longer or not without errors be carried out, particularly after the deletion of posted delivery costs for subsequent cancellations or invoices.
    Regards,
    Sandesh Sawant

  • How to add a new schedule line?

    Hi folks,
    Please help to tell me is there any user exit can be used for adding a new schedule line? I want to keep the old first date data, add new shedule line with new updated schedule line date. Pls. help to advise how to do it in VA01/VA02 ?
    If i simply use the following update statement in MV45AFZZ, then the first date will be updated by the new Schedule line date, which is not what i want. (Since new order always the First line "0001" will get updated)
    xvbep-edatu = t_temp-edatu .
           modify xvbep TRANSPORTING edatu "UPDKZ
                         where posnr = t_temp-posnr
                           and ETENR = '0002'.
            if SY-SUBRC <> 0.
               modify xvbep TRANSPORTING edatu "UPDKZ
                            where posnr = t_temp-posnr.
            endif.
    Tks,
    Jenny
    Message was edited by:
            Jenny Zhuang

    Hi Ferry,
    Many thanks for the reply. But i still have the question, seems the user exit 'USEREXIT_CHECK_VBEP' in 'MV45AFZB' is used for addtional checks on the schedule line, my questions is how to add a new schedule line? It maybe very difficult. so is it possible to change the configurable Sales order's Finish Date for it's production order, and force it to generate a new schedule line?
    Tks,
    Jenny

  • Adding a new schedule line for a line item using bapi_po_change

    hi experts,
    can i know how to add a new schedule line for a line item using<u> bapi_po_change</u>. what are the parameters that need to be filed. i filled poitem with total quantities and poschedule table with 2 different schedule lines and passing as the parameter.but then i get the error saying item 0000 doesnt exist

    Hi,
    Please check if you have properly populated the following fields in POSCHEDULE:
    PO_ITEM
    SCHED_LINE
    and the other fields required for your schedule line such as delivery date and quantity, etc.
    After that, make sure to properly populate fields in POSCHEDULEX:
    PO_ITEM -> same value as found in POSCHEDULE
    SCHED_LINE -> same value as found in POSCHEDULE
    All other values populated in POSCHEDULE should be ticked as 'X' in POSCHEDULEX.
    Kind Regards,
    Darwin
    Kind Regards,
    Darwin

  • Set funcitonal area in new PO line item

    We are trying to re-trigger the derivation of the functional area when a new PO line item is created using the <Copy PO line item> function.  Using standard SAP functionality and changing the delivery date, the functional area associated with the new delivery date is not derived.  I have tried using BADi ME_PROCESS_PO_CUST~PROCESS_ITEM interface and try to rederive the functional area.  This works but when I try to set it using method SET_DATA for the account assignment, the field status does not allow me to do it.  Also, I have tried using the FIELDSELECTION_ITEM interface to set the field status of the functional area.  However, SAP has informed me that this will only work for customer-defined fields and not standard SAP fields, even though the documentation said it would.  Has anybody tried to figure this out or has run into a similar problem?  If so, how did you fix it?

    Thanks for your answer. Yes i am aware of that, basically the settings is what the price indicated in the info record and as long it is included in the validty periiod then when you create the PO, that price will be detected by the system. i am clear for that, my issue is why there are some materials that i can change the price in the PO directly while the others are the pricing tab is disabled(cannot change the price)
    Settings in the SPRO-MM - PURHASING- CONDITIONS-DEFINE PRICE DETERMINATION PROCESS- DEFINE CONDITION TYPES PB00 is D(NOT POSSIBLE TO PROCESS MANUALLY) but stilll the system is showing some PO's that can be changed the price

  • NEW SINGLE LINE PLAN ??? WHERE IS IT????

    I see there is another question out on this...but what's the story? How does one get this plan from an existing 1 line phone I have had with my 4s for 3 years..
    I want reliable LTE service with 2 gigs of data, unlimited talk and text...  HOW DO I DO THAT ONLINE???????
    Thanks

    I tried to switch my plan to the NEW SINGLE LINE PLAN w/ 2GB for $60. The customer support agent couldn't find it. I was on phone for a long time..........on hold and then "I found it" and then "don't know what happened" and on hold and finally "found it". I thought I switched to the NEW SINGLE LINE PLAN, but saw a different "Loyalty" plan for 1 year contract. I got the 2GB though. I posted a question on the forum.

  • How to display values and new char line (blank line)

    Hi,
    In database, one field contains values followed by new character lines (blank lines) after blank lines there is no values. Finally, I would say the field contains values and blank lines. Every thing is fine in database.
    In Crystal Reports the field is displaying only values. Need to display values and blank line.
    User is asking after values new character lines (blank line) to be shown. They enter like that in an application. The user doubt is why report is not showing what they enter in the application.
    In detail explanation, front end tool is ASP.NET and backend is SQL Server.
    User enter some values in note field, after that they hit enter button in the same field, cursor will go next line...user may hit u2018enter buttonu2019 more than 5 times. So note field contain values and some blank lines which are created by after hitting enter button.
    If user opens the application, they could see values plus blank lines in the note field.
    They are fine with the application.
    In Crystal Reports, the note field shows only values.
    User is questioning that why we could not see in report we enter.
    I checked in .Net application and SQL server database it is fine. It is displaying values and blank line.
    Please help me out how to display values followed by blank lines in Crystal Reports - the way they enter in the application.
    Thanks and Regards,
    Manjunath N. Jogin

    Hi,
    Sharonmat,
    I tried as you suggested. It is still displaying only values.
    I would like to explain again.
    it is not exactly null values.
    In .Net application it is called 'new char line'.
    it shows those many lines look like null.
    it is working fine in database.
    Why it is not working in Crystal Reports? I am wondering...
    Thanks for your suggestion.
    Debi,
    User may enter any number of blank lines or they may not enter blank lines.
    That is the reason I can not always give more height or blank text object.
    Thanks for your suggestion.
    Please suggest me some more suggestions,
    Thanks and Regards,
    Manjunath N. Jogin

  • How to set the focus on the new added line in ALV list (OO)

    Dear Friends,
    I have an ALV list based on OO(using alv_grid->set_table_for_first_display), when I click the 'new' button to add a new line, the mouse arrow is always pointing to the first line - not the new created line for user to input!!.
    So how to set the focus (mouse arrow) on the new added line in ALV list for user to input it friendly?
    Thanks a lot!!

    Hello,
    To get the selected line row first we have get all the rows in the internal table.
    When u click on the button when it is creating the new line we have to pass the row number to the call method
    CALL METHOD <ref.var. to CL_GUI_ALV_GRID > ->get_selected_rows
       IMPORTING
          ET_INDEX_ROWS  =   <internal table of type LVC_T_ROW > (obsolete)
          ET_ROW_NO      =   <internal table of type LVC_T_ROID > .
    CALL METHOD<ref.var. to CL_GUI_ALV_GRID>->set_selected_rows
       EXPORTING
          IT_ROW_NO  =  <internal table of type LVC_T_ROID>
       or alternatively
       IT_INDEX_ROWS  =  <internal table of type LVC_T_ROW>
          IS_KEEP_OTHER_SELECTIONS  =  <type CHAR01>.
    http://help.sap.com/saphelp_erp2004/helpdata/EN/22/a3f5ecd2fe11d2b467006094192fe3/content.htm

  • Replacing a package with a self-build package

    If I have a self-build package that provides something (another package) that I allready have installed and also conflicts with, how do I replace the installed package with the self-build?
    When I try to install it with
    pacman -A /path/to/package
    pacman first tells me that my self-build package conflicts with the installed and whether I want to remove it. If I tell him that he should remove the installed package I get a list of dependencies that would get broke and the installation aborts.
    Any hints on how to solve that problem?

    Use -U (upgrade) switch if updating the package with the same name.
    Use -Rd (remove without dependencies) to uninstall a package and then install the one that provides the same.
    Last edited by lucke (2007-02-11 23:15:27)

Maybe you are looking for