Service PO Split

Hi
Why system split service po qty by default ?
I am using BAPI_PO_CREATE for PO creation.
Suppose Service PO 2000
System showes  1000,1000 with two account assignment.
Regards
Vivek

Check the service master record in ac03.

Similar Messages

  • Calling two Business service using split join in osb

    Hi,
    While trying to call two business service using Split Join in osb i am getting selection failure message in Bpel em console. i am using invoke activity to invoke the BS and assign to assign the input. in the assign i am assigning *$request.payload/input* to input.payload . In the em console i am getting input like this
    receiveInput
    Jun 19, 2012 5:05:45 PM Received "process" call from partner "bpelprocess1_client"
    <payload>
    <inputVariable>
    <part name="payload">
    <client:process>xxxxx</client:process>
    </part>
    </inputVariable>
    Assign (pending)
    Jun 19, 2012 5:05:48 PM Error in evaluate <from> expression at line "65". The result is empty for the XPath expression : "/client:process/client:input".
    <payload>
    <client:process>xxxxxx</client:process>
    Jun 19, 2012 5:05:48 PM The following exception occurred while attempting to execute operation copy at line 63
    <payload>
    <bpelFault>
    <faultType>0</faultType>
    <selectionFailure/>
    </bpelFault>
    Jun 19, 2012 5:05:57 PM "BPELFault" has not been caught by a catch block.
    Jun 19, 2012 5:06:00 PM The transaction was rolled back. The work performed for bpel instance "650002" was rolled back, but the audit trail has been saved for this instance.If this is a sync request, please resubmit the request from the client. If it is an async request, please recover from the recovery console by resubmitting the invoke message.
    Can anyone help on this?
    Thanks in Advance...

    maybe this one helps a bit, it's the same pattern
    http://www.xenta.nl/blog/2011/07/03/oracle-service-bus-implementing-aggregator-pattern-by-use-of-split-join/
    if you're using a dynamic split join easiest way is to do something like
    assing <yourresponse/> to $response
    at this moment your assign an empty placeholder to the response variable
    now you go into the for-each looping and for each iteration you need to insert the response of your bpel call in the $response variable
    so in the looping as last step you add something like
    insert $mybpelresponse/rootelement into $response/yourresponse
    with the insert it will insert the reponse 1..x times into the $response variable (so actually aggregating all the responses for you)

  • Multiple web service calls - Split message,1 WS call for each message

    Friends,
    We have designed a BPM which will pick the files, make web service call and merge these message structures and map them to the target.
    We have to modify this design as follows,
    We have to split the message based on purchase order number, meaning one message for each order number and then we need to make a web service call for each of them,after we get all the responses we will merge the files using transformation. (merging files and transformation is already taken care, its the web service part which iam looking for)
    Thanks in advance for all your help/ideas.

    Friends,
    Can you please help me out with this logic? Thanks!

  • Oracle Service Bus 10.3 - Invoke a REST service in split join flow

    Hi
    I am using WebLogic Workshop to design a split-join service that needs to call 2 services and combine their responses.
    Service A - WSDL based service
    Service B - REST service
    In the split join flow I am able to invoke Service A just fine. However I do not have a way to call Service B. When I open the invoke dialog it only list WSDL based services.
    Does this mean in a split join I can only invoke WSDL based services or is this a bug in Weblogic Workshop.
    I can get around this by creating a WSDL based proxy that calls the REST service but was hoping I do not have to go down this route.
    Any guidance is appreciated.
    Thanks,
    -Nilay

    I think that Split-Joins are implemented in BPEL. Just look at your .flow file and you will see all those BPEL directives. That's why you probably need your service to be described by WSDL, so you are probably on the right way.
    http://technology.amis.nl/blog/1273/invoking-http-services-from-oracle-bpel-pm-soa-enabling-php-servlets-rss

  • Invoke secured service through Split-Join

    Hello,
    I create a new Split-Join (in the OSB workshop application). Then
    I use an action "Invoke Service" to call a not secured business service. So far no problem. When I assign a security policy to my business service, the OSB does not accept. Here is the error message in the OSB workshop:
    [Parallel, Scope, Invoke Service]
    The WSDL Binding for BusinessService "OSB/1_0/BusinessServices/TestBS" is not supported: The service feature "WS-Security" is not supported.
    How can I call a secured business service in a splitJoin?
    Thanks

    Well, another way is a custom WSDL.
    The problem, I believe, is not the PS or BS by themselves, but the WSDL Split-Join "sees" from them. So, if you make a version of the same WSDL with no offending policies and supply it to Split-Join, it should work. I suspect you'd still have to build the intermediate PS with that stripped WSDL though.
    In fact, forget about PS. Strip the policy from WSDL and add them to the BS from a policy resource. I would believe Split-Join in this case will not see the policies, while BS would use the ones configured for it.
    Vlad
    http://vladimirdyuzhev.com

  • Split-Join, unable to set SOAP:HEADER in OSB at Invoke Service Component.

    Hi Experts,
        i created a Split-join for parallel processing and invoke third party services, but this service requires some mandatory elements in soap:header like WS-Addressing and, WSA-TO and some security infomation, but i don't know  how to pass header in invoke service step. Please help me to setup Header for Invoke services in split join.
    Please help me to resolve this issue.
    Thanks
    Ankit

    see this :https://forums.oracle.com/thread/951618
    not the most fancy way, but you can create some sort of  wrapper proxyservice in front of your business service to make it work

  • I need to split a huge PDF.  136 MB.  I paid for the service some months ago.    I  know it is way over the limit, but I cannot find a way to divide it.

    I paid for the service,   figured splitting it would be easy.  But I cannot seem to do it.  How do I save the original "in pieces"???

    OK, so no Acrobat 8 after all (so sorry about that hard drive failure, that's no fun at all!). But all hope is not lost.
    I think this what needs to happen:
    Go to www.adobe.com/products/acrobat.html and click Try It Now.
    Click Download Now.
    After the file has downloaded, double-click the installer file that you downloaded to install Acrobat XI.
    Open your PDF your newly installed copy of Acrobat XI.
    Follow the steps in the video that I linked to in a previous post.
    Note that Acrobat and Reader offer different functionally, so the copy of Reader that you have won't do what you're after.
    Best,
    Sara

  • OSB example calling multiple business services using a single proxy service???

    Hi,
    I have three business services created using http urls i.e.
    1. LoginBS
    2. GetListBS
    3. LogoutBS
    My requirement is to get a list of names from GetListBS using a single proxy service and to call GetListBS I have to first call LoginBS then GetListBS i.e. after authentication and then finally logout.
    Kindly help with a detailed example for this and I am new to OSB.
    Thanks,
    Vik

    Hi Eric,
    Thanks for the response. We figured that it is possible to call multiple services with Split Join. However, we ran into the issue you described. We had a blocking call and had to wait until each of the services returned a response.
    However, we needed a Async model for our design and felt that this might not be a right fit.
    We are now looking at implementing the publish option with QoS configured as this fits our usecase better. Thanks for the help again.
    Rudraksh

  • Best practices for Calling Multiple Business Services in OSB

    Hi All,
    I have a requirement where I need to call multiple business services in OSB. We are presently calling them sequentially in a proxy pipeline. I was wondering if we could accomplish the same task in a better way. Each of the business services are mutually exclusive.
    Thanks in Advance,
    Rudraksh

    Hi Eric,
    Thanks for the response. We figured that it is possible to call multiple services with Split Join. However, we ran into the issue you described. We had a blocking call and had to wait until each of the services returned a response.
    However, we needed a Async model for our design and felt that this might not be a right fit.
    We are now looking at implementing the publish option with QoS configured as this fits our usecase better. Thanks for the help again.
    Rudraksh

  • Split joins in OSB

    Hi,
    Actually i do have a requirement where i need to call 2 business services simultaneously(in parallel) in OSB(Like using Flow activity in SOA) using split joins. Is it possible to call 2 business services parallely in OSB?
    Can any one please help me out with any blogs or steps that i can follow to achieve this.
    Your help is appreciated.
    Thanks,
    Naveen

    That is not entirely true. Split Join itself is based on single operation, i.e. the input to split join will be a single message, but within the split join you can invoke multiple services in parallel. You can either dynamically decide the number of parallel flows at runtime (similar to FlowN) or you can have static number of parallel calls (like Flow activity of BPEL) within split join.
    In case you want to call two business services in parallel, create a WSDL(if needed, in most cases you can reuse the WSDL of the Proxy Service itself for SplitJoin as well unless you are doing enrichment within Proxy before calling business services) for split join which has request message which contains data for both business services. Within the split join you can configure calls to both business services in parallel and you can also add transformations for each business services in respective branches.
    You can than aggregate the response from both services if needed and return that as a response of split join.
    Here is an example of Static Split Join:
    http://www.xenta.nl/blog/2011/07/03/oracle-service-bus-implementing-aggregator-pattern-by-use-of-split-join/

  • How do I configure snow leopard server to allow local client to access the server using its public domain name

    I have SLS 10.6 running on my local network with DNS configured.
    I can access the server from a client on the lan using server.local or server.domain  where domain name is my publically registered domain,
    From the internet I can access my server using the registered domain name i.e. www.domain.com. 
    Is it possible to set my server up so that www.domain.com  also reaches the server when used by a client locally?   At present I get a page not found error.

    The configuration you're aiming for is called split-horizon or split-brain DNS, and it's quite possible.  It can get slightly hairy when you have different stuff using the same host name for different purposes, for instance, and you'll need to track all external DNS entries in your internal DNS server when you're running "split". 
    Here is how to set up DNS services.   Split-horizon is one of the options listed there.
    My preference is to use a different domain or subdomain within the network, and to avoid using split-horizon where I can reasonably manage it.  One domain name is configured for and reachable outside and is effectively public, and the other domain (or a subdomain) is inside and private and only reachable directly or via VPN, for instance.

  • Exchange 2013 and 2010 co-existance

    We will have 2013 and 2010 exist together for a while...we plan to move away from using Unified Access Gateway for HTTP redirection to our Exchange services and implement Kemp
    load balancers...two at our HQ site and two at our DR stie...
    We plan to have a one arm configuration...from what I gathered...each load balancer will have a network connection and only one network connection and be on the same network as
    our new Exchange 2013 servers.  Can someone take a look at my config and give some input whether or not this will work and some suggestion on Ex13 urls, cert SAN names, etc.
    HQKemp 2400 A    
    HQKemp 2400 B               
    DCKemp 2400 A        DCKemp 2400 B
    172.16.1.104        
    172.16.1.105                     
    172.25.1.104          
    172.25.1.10
    Virtual IP   172.16.1.106          
                             Virtual IP 
    172.25.1.104
    From the video I’ve watched for Kemp install…we’ll create the following internal DNS records for the Exchange services that will be configured on balancers.
    OWA/ECP   
        mail.corp.local.com
                  172.16.1.107
    EWS               ews.corp.local.com          
    172.16.1.108
    OAB               oab.corp.local.com           
    172.16.1.109
    ActiveSync      mobile.corp.local.co         
    172.16.1.110
    OA                 oa.corp.local.com            
    172.16.1.111
    Autodiscover   autodiscover.corp.local.com 172.16.1.112
    Question: 
    We will configure the Exchange services with these ip addresses linked to each service on all four load balancers? 
    Or will DR site load balancers have different IPs configured for same Exchange services?
    Exchange services are split between our two sites…meaning Outlook Anywhere is configured for our CAS servers at our DR site and ActiveSync comes to HQ CAS servers as an example…so
    I want all Exchange services to come through the newly installed load balancers at HQ and if they don’t respond…the Exchange services get redirected to the load balancers at our DR site. 
    Can you give some insight on the config of load balancers as to how we can do that?
    I have a question about the cert we will have. 
    Our Microsoft rep says we should get a new wildcard cert…currently we have a UCC cert with the following SANs attached.
    Will this new cert have to be installed on load balancers? 
    If so…can you suggest some ideas as to what new SANs I need if any of the new cert with Exchange 2010 and 2013 co-existing for a while. 
    Below are the SANs on our current UCC cert.
    Outside resolvable SANs
    Webmail.corp.local.com          
    205.223.19.25           portal.corp.local.com     205.223.27.78
    Portal2.corp.local.com             
    205.223.19.25         
    Autodiscover.corp.local.com     
    205.223.19.25
    Internal SANs  
    Hqcas1.corp.local.com              
    Hqcas2.corp.local.com              
    Dccas1.corp.local.com              
    Dccas2.corp.local.com              
    Owamail.corp.local.com     
    (this CAS Array server name that HQ CAS servers create)
    What do you suggest we use for the external urls on Exchange 2013 for these services?
    Our firewall guy says we’ll use same names, 
    but I’m not sure if we try to use same name if we’ll get an error? 
    Active Directory may say name already in use?
    We plan to have firewall to just redirect requests for external urls to load balancers…sound correct? 
    Meaning load balancer won’t have an external NIC defined…which makes it a one arm config…correct?

    Hi Techy,
    According to your description, I am still not quite sure about your environment. Could you please provide more information about it, such as:
    1. How many Exchange servers in your coexistence environment? One Exchange 2010 with all roles and one Exchange 2013 with all roles? Or several Exchange 2010 and multiple Exchange 2013?
    2. Are there two sites in your environment? What’s the Exchange deployment in different sites?
    3. Please confirm if both Exchange 2010 and Exchange 2013 are Internet-facing.
    Additionally, if you are using different namespaces for different services for internal access and external accessing, we need to include all service namespaces in your certificate with IIS service. Personal suggestion, we can follow ED Crowley’s suggestion
    to use split-brain DNS in your environment and only use the same namespace for Exchange service URLs.
    The following article described the details about how to configure different namespace for Exchange services by using Load Balance in Exchange 2013:
    http://www.msexchange.org/articles-tutorials/exchange-server-2013/high-availability-recovery/introducing-load-balancing-exchange-server-2013-part2.html
    Regards,
    Winnie Liang
    TechNet Community Support

  • [BPM] problem with

    Hi,
    I created a BPM, that split an incoming message into three parts: hardware, software and service. Then I I open a fork with three branches. Every branch is for one of the splitted parts and include a forEach-block that sends emails.
    After the fork I map the mail receipt to a message I use for closing a S/A-bridge.
    If the source messeage includes a hardware, software and service entry, it works fine, but if only one or more hardware is given, it breaks at the last mapping of the email receipt. I think this happen because no software or service is given and he try to map an empty mail receipt to the response message.
    How can I handle this??
    Thanks
    chris

    Hey,
    now I tried the function MapWithDefault, but without success.
    To understand what I want to do:
    1) receive a message from a rfc sender -> open s/a-bridge
    2) split this message to software, hardware and service container
        (splitting messages are saved in 3 different mulitline container in bpm)
    3) open a parallel fork
    4) forEach sending of the messages out of multiline container
        (in this forEach, I use XLST to map from multiline element to email message)
    5) close parallel fork and map email response to close s/a-bridge message
        (but don't know which response he uses, but doesn't matter. Don't need
        the information, just need to close s/a-bridge)
    6) at the end, close s/a-bridge
    Two problems:
    1. He crashes if only hardware, service or software is given
    2. the forEach sending only ONE email, even if 2 or more items (of hardware for example) is given.  But if I test my mapping he creates the required number of messages.
    Any idea how to debug this??

  • OSB SplitJoin editor too slow

    I've tried this on two different PCs and the problem is the same.
    When editing a splitjoin flow in workshop or OEPE, any task takes way too long to do. If I want to view the xquery statement behind an assign action, I click the link next to Expression, and then have to wait a good 30-60 seconds for the expression editor to finally appear. During that time, the cpu fan kicks on to full speed, and javaw.exe usage is at 99%
    Both PCs run 2.4GHz intel dual cores with 2GB of ram on XP 32bit.

    Project has 3 Business Services, 1 Split-Join, 1 Proxy Service, 2 XQuery resources, and about 20 xsds.
    eclipse.ini
    -vm
    C:/osb/jrockit_160_05/jre/bin/javaw.exe
    -startup
    C:/osb/tools/eclipse_pkgs/2.0/eclipse_3.3.2/eclipse/plugins/org.eclipse.equinox.launcher_1.0.1.R33x_v20080118awtswtbridge.jar
    --launcher.library
    C:/osb/tools/eclipse_pkgs/2.0/eclipse_3.3.2/eclipse/plugins/org.eclipse.equinox.launcher.win32.win32.x86_1.0.3.R33x_v20080118
    -vmargs
    -Xms384m
    -Xmx768m
    -XX:MaxPermSize=256m
    -XX:PermSize=192m
    -XX:NewRatio=3
    -Xss256k
    -DprodMode=production
    -Dweblogic.home=C:/osb/wlserver_10.3
    -Dsun.lang.ClassLoader.allowArraySyntax=true
    -Dnitrox.boot.jar=file:C:/osb/workshop_10.3/nitrox-boot.jar
    -Dosgi.install.area=C:/osb/tools/eclipse_pkgs/2.0/eclipse_3.3.2/eclipse
    -Dosgi.instance.area.default=C:/osb/user_projects/workspaces/default
    -Dosgi.configuration.area=C:/osb/workshop_10.3/workshop4WP/eclipse/configuration
    -Declipse.product=com.bea.workshop.product.workshop
    -Dosgi.splashPath=file:C:/osb/workshop_10.3/workshop4WP/eclipse/plugins/com.bea.workshop.product

  • Is This Porting Scenario Possible?

    I saw the other post that was similar to this, and it didn't answer my question.
    I was wondering if it is possible to port out my main line's phone number to Ring Central (since I use my main FS line as my main business line), and have Verizon reassign me a new number (for my main line on the FS account) without getting charged a ETF?
    Can the porting department make a note on the account so once the main number is ported, it will be replaced with a new number? That way I will not be charged an ETF since I still want to continue my service (just split my business number into a new service to separate it from my personal FS plan).
    If it is possible, how would I go about doing this? I would have to port out the main line's number to Ring Central first since it takes up to 10 business days to complete the porting process to Ring Central.
    Are there any fees involved in this?
    Thanks in advance for anyone's help.

    Hello eja185,
    Thank you so much for reaching out to us in the community forums on this issue. We are making a change in our billing system to meet the needs of our customers with this EXACT concern! We are currently migrating to a bill format called account level pricing (ALP). ALP is when the account is bill for the minutes and each line on the Family Share Plan is bill individually for access to the minutes. Now I know what you are thinking! What does that mean to ME? It means that there is NOT a primary line anymore and you can move lines as you see fit. In addition to that, access to the minutes will be distributed evenly amongst the mobile numbers, thus making it easy to identify who's responsible for any overages that may occur. 
    You mentioned in your posting that you want to keep your main line separate from your personal line for business purposes. We have a great option that can accommodate this type of request. I can transfer your primary line into a sub-account under your name that will be bill out completely separate from your current account. This way you will have two separate bills and won't incur an early termination fee if your agreement hasn't been fulfilled. Many people take advantage of this option for accounting purposes with their company and/or for tax purposes. If you are interested in this option then feel free to send me a private message with your full name & mobile number. We can discuss this option in further details for you. I look forward to hearing from you.
    Thank you...

Maybe you are looking for

  • HDV to SD in FCP 6

    I've been disappointed in the quality of HDV down converted to SD in FCP 6. After editing my HDV project I copied all of the clips into an SD timeline, DV 720 x 480. FCP automatically scaled the clips to fit in letterbox. It also added a Field Shift

  • How come adobe flash player does not work on my macbook air

    when on yahoo and i select to watch a video it doesn't play and any other website with a similar format. But i have downloaded and installed adobe flash player but yet i am still experiencing these problems. Is there another way or am i just missing

  • I can't drag and drop an image into Photoshop CS5

    I don't know what's going on. I've never had this problem before. When I try to drag and image into photoshop I get the black circle with a black line through it I took of the administrative settings also. I've tried everything, I've uninstalled it t

  • Problem installing latest version

    Everything was fine yesterday, I watched many videos with my flash player, then a video told me I needed to upgrade my flash player to view... So I downloaded, got the logo above & message below on the download page confirming version 10... was insta

  • Export Results in Unix Executable Files Instead of .jpg

    When I try to export an album to a folder, the exported files are in "unix executable file" format instead of .jpg How do I fix this?   Mac OS X (10.4.6)