Set a completed operations alert

This question was posted in response to the following article: http://help.adobe.com/en_US/photoshopelements/using/WS287f927bd30d4b1f626a494c12e28b3ab58- 7ff1.html

If that is turned on, an operation such a filter that takes 8 seconds or longer is supposed to beep when, for example, the filter is done.
If you make sure your volume control is not muted and turn on that option and use Filter>Blur>Radial Blur with the settings cranked to max, you should hear a beep when the filter operation has compteted.
To be honest that's one feature i never used except to see what it did.

Similar Messages

  • Checkpoint not complete in alert log file Oracle 11gR2 RAC

    Hi,
    I found checkpoint not complete in alert log file, almost every 3 seconds .
    In metalink i saw for this error, archive_lag_target=0, already this value was set to 0 in my database.
    We have 7 redo log groups for each instance, each group is of two redo log files, each file size is 50m.
    To avoid this error what i need to do..........
    please help me..................

    When you "checkpoint not complete" messages in your alert log this normally means your online redo logs are defined too small to handle the load and you have filled and need to switch to a new online redo log before the checkpoint triggered by the previous log switch has been completed.
    Increasing your online redo log size is normally the fix for this.
    HTH -- Mark D Powell --
    PS - The following Oracle support document may also apply:
    Checkpoint Not Complete In Alert.log Due To Setting Of Archive_lag_target [ID 435780.1]
    Edited by: Mark D Powell on Nov 7, 2011 8:29 AM

  • "checkpoint not complete" in alert log file.

    Hi, all.
    I have got a message of "Checkpoint not complete" in alert log file.
    Thread 2 advanced to log sequence 531
    Current log# 7 seq# 531 mem# 0: \\.\REDO231
    Current log# 7 seq# 531 mem# 1: \\.\REDO232
    Thread 2 cannot allocate new log, sequence 532
    Checkpoint not complete
    Current log# 7 seq# 531 mem# 0: \\.\REDO231
    Current log# 7 seq# 531 mem# 1: \\.\REDO232
    I searched "Checkpoint not complete" issue in this forum.
    As solutions,
    1. add more redo log groups
    2. increase the size of redo log
    3. check I/O contention
    4. set LOG_CHECKPOINT_INTERVAL, LOG_CHECKPOINT_TIMEOUT or
    FAST_START_MTTR_TARGET
    I think No.4 is the possible first approach in our environment.
    I think No.1 and No2 are not the ploblems in our environment.
    I ask the above issue oracle support center, but
    I was told that "if you are not getting this message frequently, you do not need to worry about it" from an oracle engineer.
    Is this true?? If I am not getting this message frequently, there is no problem
    in terms of database integrity, consistency, and performance?
    I will be waiting for your advice and experience in real life.
    Thanks and Regards.

    Redo Log Tuning Advisory and Automatic Checkpoint Tuning are new features introduced in Oracle 10G, if you are on 10g you may benefit from these features.
    The size of the redo log files can influence performance, because the behavior of the database writer and archiver processes depend on the redo log sizes. Generally, larger redo log files provide better performance, however it must balanced out with the expected recovery time. Undersized log files increase checkpoint activity and increase CPU usage. As rule of thumb switching logs at most once every fifteen minutes.
    Checkpoint frequency is affected by several factors, including log file size and the setting of the FAST_START_MTTR_TARGET initialization parameter. If the FAST_START_MTTR_TARGET parameter is set to limit the instance recovery time, Oracle automatically tries to checkpoint as frequently as necessary. Under this condition, the size of the log files should be large enough to avoid additional checkpointing due to under sized log files.
    The redo logfile sizing advisory is specified by column optimal_logfile_size of v$instance_recovery. This feature require setting the parameter "fast_start_mttr_target" for the advisory to take effect and populate the column optimal_logfile_size.
    Also you can obtain redo sizing advice on the Redo Log Groups page of Oracle Enterprise Manager Database Control.
    To enable automatic checkpoint tuning, unset FAST_START_MTTR_TARGET or set it to a nonzero value(This is measured in seconds and by default, this feature is not enabled, because FAST_START_MTTR_TARGET has a default value of 0). If you set this parameter to zero this feature will be disabled. When you enable fast-start checkpointing, remove or disable(set to 0) the following initialization parameters:
    - LOG_CHECKPOINT_INTERVAL
    - LOG_CHECKPOINT_TIMEOUT
    - FAST_START_IO_TARGET
    Enabling fast-start checkpointing can be done statically using the initialization files or dynamically using -
    SQL> alter system set FAST_START_MTTR_TARGET=10;
    Best regards.

  • Not enough memory to complete operation when writing TDMS file.

    Hello,
       I am new to Labview and having a bit of trouble. I attach some code here. What I want to do is sample from a NI 9220 DAQ from 16 channels at 20kHz, while from a second NI 6009 sample from 4 channels at 1000 kHz. I want to append these together and then write to a TDMS file. 
       I have tried to write this code using NIDAQmx VIs but when I have it has resulted in the two DAQs not having the right timing with each other. The 6009 samples for a longer time. 
       I have now tried instead to use the DAQ assistant to read from the two VIs and it works in that TDMS files produced have the correct timing between the two DAQS. However, if I record for more than 2 minutes, in the end I want to end up recording for a much longer time, I have the "Not enough memory to complete operation" message appearing. This still happens even if I get rid of my charts to display the data, and also if I get rid of the NI 6009 completely and just keep the 9220 sampling at 20kHz. It happens even if I repalde my TDMS write and put a write measurement assistant in which I tell it to write a series of files that are each less than 2 minutes long. 
        I think it is something to do with the amount of data I am reading and is being held in memory. What can I do about this? Also, my charts display very slowly, basically evey second when the 20k are read in. However if I lower the amount of data read the charts don't display all the data points. 
        I attach my code, thanks for your help!
        Alfredo 
    Attachments:
    03_02_15.vi ‏688 KB

    alfredog wrote:
    Hello,
       I am new to Labview and having a bit of trouble. I attach some code here. What I want to do is sample from a NI 9220 DAQ from 16 channels at 20kHz, while from a second NI 6009 sample from 4 channels at 1000 kHz. I want to append these together and then write to a TDMS file. 
       I have tried to write this code using NIDAQmx VIs but when I have it has resulted in the two DAQs not having the right timing with each other. The 6009 samples for a longer time. 
       I have now tried instead to use the DAQ assistant to read from the two VIs and it works in that TDMS files produced have the correct timing between the two DAQS. However, if I record for more than 2 minutes, in the end I want to end up recording for a much longer time, I have the "Not enough memory to complete operation" message appearing. This still happens even if I get rid of my charts to display the data, and also if I get rid of the NI 6009 completely and just keep the 9220 sampling at 20kHz. It happens even if I repalde my TDMS write and put a write measurement assistant in which I tell it to write a series of files that are each less than 2 minutes long. 
        I think it is something to do with the amount of data I am reading and is being held in memory. What can I do about this? Also, my charts display very slowly, basically evey second when the 20k are read in. However if I lower the amount of data read the charts don't display all the data points. 
        I attach my code, thanks for your help!
        Alfredo 
    As far as your charts updating very slowly - the way your code is designed, your charts only get data when both 20K samples & 1M samples are done collecting.  Have you tried setting up DAQ assistant for continuous sampling instead of 20K samples or 1M samples?
    -BTC
    New Controls & Indicators made using vector graphics & animations? Click below for Pebbles UI

  • DB13 Check, Oracle BR0973W Database operation alert warning

    Dear all master and Gurus,
    when i run check DB process on DB13 it was completed with following errors. i've serched over googling, SDN, and others but couldnt get any exact answer.
    BR0973W Database operation alert - level: WARNING, operation: aeghclvm.dsv, time: 2011-07-09 13.35.38, condition: Last successful 'dsv' operation older than 10 days
    BR0973W Database operation alert - level: WARNING, operation: beghcgas.afd, time: 2011-07-09 12.30.18, condition: Last successful 'afd' operation older than 10 days
    BR0973W Database operation alert - level: WARNING, operation: beenppkm.aff, time: 2010-11-10 22.35.48, condition: Last successful 'aff' operation older than 10 days
    What is the meaning of dsv, afd , and aff?
    Should I ignore these warning?
    How to resolve ?
    Any advise is needed, Thanks
    Gustria Weka

    Hi
    When a backup of database or archive log is triggered, it writes a log file and the extension is based on the type of backup executed
    Names of the BRBACKUP Detail Logs
    http://help.sap.com/saphelp_nw70ehp1/helpdata/EN/0d/d30ec54a0c11d182b80000e829fbfe/content.htm
    Names of the BRARCHIVE Detail Logs
    http://help.sap.com/saphelp_nw70ehp1/helpdata/EN/0d/d30ec54a0c11d182b80000e829fbfe/frameset.htm
    Hope this helps you.
    Regards,
    SBK

  • WCM: Complete Operational WCD when WCI items still in Test untagging status ETUG

    Greetings Experts, Gurus and SAP Sages!
    I am facing a requirement to prevent the WCD from being set to "Completed" (CLSD) system status if there are items on the WCD that are still in "Untagged Temporarily" (ETUG) status.
    As per the Operational Cycle process described here,the the EUG status should follow the ETUG status in the flow. My understanding of this business process is that you want to set the technical object of the WCI in a final operating condition status after it's been test-ran and untagged, so that it is apparent it is running operationally, and you can't switch the operating condition status once the WCD is complete. Therefore, I would expect the flow to be: ETG -> BTUG -> ETUG -> EUG -> CLSD
    I seem to remember from a previous project, but am uncertain: Is there a setting in the configuration, or an authorization object that controls wheter the CLSD status can be set with the WCIs in status ETUG, or in EUG only? Is that standard behaviour? Can we prevent the ECD from being closed from ETUG status in any other way that using a BADI?
    I am on ECC6 EHP5.

    Hi Sebastian,
    no there does not exist such kind of setting. It is a standard behaviour. You must implement for example the following BAdI:
    BAdI: BADI_WCM_WCMOBJ; Method STATUS_CLSD_CHECK
    You can use this method to check whether a WCM object can be closed.
    Regards, Uwe
    You can find a reference list of all BAdIs on the WCM website.

  • Setting monitoring and SLA Alerts via Workspace studio

    Hi,
    Is it possible to set monitoring and SLA Alert rules via workspace studio. If yes, could you please help me how to do it.
    Thanks
    James

    Hi..
    Operational settings such as enabled, tracing, monitoring etc are easily set within eclipse by editing with the text editor rather than the proxy editor..
    The SLA Alerts are possible to modify in the same way, but they're a bit more tricky to figure out..
    ..Mark.

  • "You're all set to complete your order" emails

    I'm not sure if this happens to others but it is getting old how many of these emails I get. While browsing, I place items in my cart on BB.com to see the price when that's the only way to see the price or to save them until I'm finished browsing. After I'm finished, I remove all the items from my cart. However, later that day and even the days following I get emails saying "You're all set to complete your order" or "You're all set to check out at Best Buy". These emails seem to have snapshots of my cart at various points while I was browsing but do not know that my cart is currently empty. I have gone back to BB.com, signed in, and verified my cart is empty. I realize the email is considered a marketing email and I can unsubscribe from these emails. But I like getting the emails for the daily deals and such and this type of email seems to be broken. It would be nice if this could be fixed so I could stop getting spammed with emails. Thanks.

    Hi there basmith2004, 
    Sifting through various marketing emails can be monotonous, and I apologize if you have found an overabundance of these in regards to items that were or are in your cart. 
    Presently, we are unaware of any issues with such emails. With that said, you should still be able to unsubscribe from these emails and still view the weekly deals and such via the Deals tab on BestBuy.com.
    Would you like me to opt you out of the marketing emails? 
    Sincerely, 
    Tasha|Social Media Specialist | Best Buy® Corporate
     Private Message

  • Sales order not set to complete status in CRM from R/3

    Hi Gurus,
    I need some advice. We are working on CRM 2007 and the issue we are facing is....when a sales order is created in CRM it gets successfully copied over to R/3. It is then processed in R/3 and is then set to a Completed status. But this status is never updated across to the original sales order in CRM which hence stays in Incomplete status...
    We know this is a config issue and we have also looked at program "CRM_SET_STATUS_COMPLETED" but can anyone point us where exactly we need to change the configuration.
    Thanks,
    Sushant.

    Hi sushant,
    When the R/3 Order status is set to 'Completed' then the system status for order in CRM system is automatically changed to 'Completed'.
    So firstly check whether the User status ('Completed')in SAP CRM has the Business transaction event set to 'FINI'. So when the system status is set to 'Completed' the user status will also change to 'Completed.'
    Secondly even check what are the statuses of item in the Orders.
    regards,
    Anubhav

  • "Impossible to complete operation" with PC Suite 6...

    Preface:
    With all version of Pc Suite before the 6.86.9.3 all works fine.
    Issue:
    With the 6.86.9.3 version of Pc Suite when I try to launch the application to manage the contacts, I always have following error: "Impossible to complete operation". Others applications in pc suite work fine. I already tried to register again, the ole32.dll but the problem persists. My phone model is Nokia 6267.
    Does anyone know the solution at the problem?
    Thanks
    Bix123

    have you tried the soloution in this thread?
    http://discussions.nokia.co.uk/discussions/board/m​essage?board.id=pcsuite&message.id=263

  • Receiving Error : Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables. while trying to create a new Customer.

    Hi All,
    We have set up a new Operating Unit in Oracle Apps. Now when I am trying to create a new Customer in that Operating Unit, I am receiving following error:
    ERROR MESSAGE:-Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables.
    We do have MO: Operating Unit and MO: Default Operating Unit set properly at Responsibility level for the Responsibility through which I am accessing this form.
    Your help is appreciated!
    Thanks in advance,
    SKA

    You can refer this thread and check your MO operating unit is set or not https://community.oracle.com/message/3937028 thanks

  • How to set delv. completed in 2nd line item which created in PO by default

    Dear guru,
    When creating 1st line item by default the 2nd line item has been created. I understand that the 2nd line item is free because no net price has been stated but free good check box in not ticket. Further more the 2nd line is grayed out including all tab in item details. Meaning we can't do any changes in this line item.
    User set delivery completed in 1st line item but couldn't set in 2nd line item. This caused to this PO show still pending for delievery when run the report. How we can set this 2nd line item has delivery completed eventhough GR haven't done fully.
    rgds,
    nantha

    Dear Mahesh,
    The 2nd line is free good that assign with 1st line item. This has been set in purchasing info record under condition view. Thus when I create PO for 1st line item, system created 2nd line item as auto default. The issue here is the 2nd line item & all the field that in item details in PO become grayed out eventhough I go to ME22N. I cant do any changes on 2nd line item. I believe there would be some control maintain for free good. Please advice. Thank you.
    rgds,
    nantha

  • "Invalid menu operation" Alert bug - CS6

    CS6.0.5
    In the last couple of weeks I have started getting this alert:
    I have tried to pay attention to what I have do to create this alert.
    Occasionally it simply appears on opening a Project.
    Reliably, it pops up when I hit Ctrl > z (undo), and Ctrl > s (save)...
    but after clearing the alert, Ctrl > [Anything] does not make it reappear.
    This happens regardless of the Project.
    edit:
    I have just discovered that if I try to use File > Save
    instead of Ctrl > s to save, the alert appears
    as soon as I touch the File Menu header.
    This also happens with the Clip, Title, Window & Help headers.
    As in the replies in the thread below, there seems to be
    no detriment to any functionality when this alert appears.
    Maybe it's a fairly inconsequential bug, but it does appear to be a bug.
    I had worked in CS6 for almost a year without this alert occurring.
    Invalid Menu Operation Error in CS6
    http://forums.adobe.com/message/4913886

    Even if this errant "Invalid menu operation" alert is not
    indicative of any real problem and does not seem to cause
    any functionality problem within Premiere, it is still an obtrusive
    alert that requires the extra steps to clear (at least once).
    If not cleared, any 'real' alert would be missed since
    all it will do is add a new entry to an un-cleared list.
    Any suggestions aside from filing additional bug reports?

  • Oracle BR0973W Database operation alert warning

    Hello experts,
    I hope you can help me with the following:
    In transaction DB13 the checkdb job reports the following errors:
    BR0973W Database operation alert - level: WARNING, operation: sdvgirhz.dbp, time: 2007-05-14 15.46.27, condition: Last 'dbp' operation failed with rc = 4
    BR0973W Database operation alert - level: WARNING, operation: sduxubpz.tse, time: 2007-03-30 08.58.27, condition: Last 'tse' operation failed with rc = 4
    BR0973W Database operation alert - level: WARNING, operation: sduxuaou.dfa, time: 2007-03-30 08.46.40, condition: Last 'dfa' operation failed with rc = 2
    I would like to get rid of these messages in dbcheck but can't figure out how to do it.
    I searched the notes database, google and this forum and still couldn't find an answer.
    Some data regarding oracle and sap versions:
    SAP_ABA     700     0009     SAPKA70009     Cross-Application Component
    SAP_BASIS     700     0009     SAPKB70009     SAP Basis Component
    PI_BASIS     2005_1_700     0006     SAPKIPYJ76     PI_BASIS 2005_1_700
    ST-PI     2005_1_700     0003     SAPKITLQI3     SAP Solution Tools Plug-In
    SAP_BW     700     0006     SAPKW70006     SAP NetWeaver BI 7.0
    SAP_AP     700     0003     SAPKNA7003     SAP Application Platform
    BBPCRM     500     0003     SAPKU50003     BBPCRM
    ST-A/PI     01I_CRM500     0000          -     Application Servicetools for CRM 500
    Database system      ORACLE   
    Release              10.2.0.2.0
    Thanks in advance for helping.
    Regards
    Dirk Visser

    the operations mentioned were not succesfully done...check the corresponding logfiles
    -> dbp = alter database parameter (brspace)
    -> tse = extend tablespace (brspace)
    -> dfa = alter data file (brspace)
    GreetZ, AH

  • Can we set u0093Delivery Completed Indicatoru0094 in PO wrt the Invoice(not GR)?

    Hi All,
    I have Query about the “ Delivery Completed Indicator in PO”.
    Can we set “Delivery Completed Indicator” automatically in PO wrt the Invoice Receipt instead of GR?
    As in our scenario:  When the customer places Order. If there is no Stock avail, PO is created automatically against the S.O. and,
    Goods that received for PO are delivered to the customer directly and not received to our premises.
    So, we are not able to set the “Delivery Completed” indicator wrt GR. But as we receive the Invoice against the PO. And we can verify the PO Amt and Invoice amt.
    So, my question is:
    Is there any way to set “ Delivery Completed” indicator wrto the IR?
    PL. guide me for Urgent help. I appreciate for your help.
    Thanks,
    Dan.

    Hi
    This setting can be done at plant level.
    the delivery completed indicator for goods receipts if the delivered quantity lies within the under/overdelivery tolerance.
    The "delivery completed" indicator has the following effects:
    The item is regarded as closed, even if the total quantity was not delivered.
    A further delivery is not expected, may, however, arrive.
    In the next goods receipt, the item appears on the selection list but has no selection indicator.
    The item can be reorganized even if the total quantity has not been delivered.
    Even if the "delivery completed" indicator has not been set, an item is considered closed once the total quantity has been delivered. This means that the "delivery completed" indicator is not necessary in this case.
    This can be set at plant level, please check below navigation if it is relevant to your problem
    SPRO --> Material Mangement --> Inventory Management and Physical Inventory --> Goods Receipt --> Set "Delivery Completed" Indicator
    please check
    regards
    Srinivas

Maybe you are looking for

  • Multithreading in Flash 11.4?

    Flash Player "Dolores" Adobe is planning an additional Flash Player release in the second half of 2012. Code-named "Dolores", this release focuses on enabling features and functionality for the gaming market, as well as improvements for general Flash

  • Need program to print from microsoft surface for 4680c printer

    need to print from microsoft surface using 4680 c printer. when i try to load driver on surface get message printer is not compatible with surface computer.

  • Live cache upgrade on Windows 2003, IA64 clustered environment

    Hi, We are currently upgrading the Live Cache from 7.6.03,    BUILD 008-123-159-187 to 7.7.03   BUILD 023-123-174-368. Note # 508979 is being referred to. The upgrade has completed successfuly on one Node A but is interruopted on Node B. The error lo

  • Automated Phoneline Checking Catch 22

    Using BT Infinity Boardband and Telephone. Only problem cannot receive incomming calls. To any caller the phone just keeps ringing. Used internet based system to check line. It found no problem. I used test socket using a different phone and it still

  • Compatibility of Digital Foci pocket album with Mac OS 10.3

    I am considering purchasing the digital fci pocket album. I called the company and they told me that it was compatible with osX 10.4, but not yet with osX 10.5. I have OSX 10.3. Did anyone tried it with this version of OS10? Thanks!