Setting "automator" for a task

hello, i'm not sure if it's a software bug or what but it seems this issue is still going on. my volume reverts back to internal speakers when awaking from sleep even though line out is selected. i go into prefs and select line in, then line out and i have volume on my external speakers.
can i have automator do this for me when awaking from sleep? i've never used automator before so i'm a newbie.
thx

I have a similar problem with my new Mac Pro. I thought that it might be an issue with either Snow Leopard, which I hadn't had before, or with the Mac Pro. I thought I had found the problem: that I was using the old Apple sphere speakers that get their power via FireWire. Since this computer has no FW400 ports, I have the speakers' FW plugged into an external drive. Prior to this I had an iMac with FW400 ports. So I thought that it wasn't being recognized by the Sound Preferences as being plugged in upon startup since the drive starts just a hair after the computer. My solution was to do an Automator workflow for iCal since my computer is scheduled to come on at the same time every day. I scheduled the iCal script to run a few minutes after scheduled startup.
There were a couple of things to figure out there I tried doing it all with the Watch Me Do. Unfortunately, it always screwed up which menu item to choose when I used a drop down menu to open System Preferences. I solved that by using the Launch Application command, and chose System Preferences. Then I recorded the rest of the actions, and that worked.
My only problem now is that every time I restart or startup the computer manually, the Sound Pref reverts back to Internal Speakers. It seems to be fine awaking from sleep. The selection of Line Out is retained.
I was an old QuicKeys user, and with that, you were able to set conditions like upon startup, upon waking up, and that sort of thing. I don't see that in Automator. I saw recently that QuicKeys is available for OS X now. I may check that out. The old versions worked great.

Similar Messages

  • Using Automator for scheduled tasks for my media folder.

    Anyone with automator experience that are able to help me set up a scheduled task for my media folder, using for example iCal?
    I have 2 programs for cleaning and adding metadata for my media folder:
    iFlicks and iDentify.
    And I want them to scheduled clean new files in my folder. iFlicks first, and iDentify next.
    Complicated? Doable?

    If you are not too keen on running those commands you might want to try http://www.igetter.net/iGetter.html This download manager seems to allow the scheduled downloading that you need. I think you would have to go to the Apple site and find the url for the standalone updaters to find the link after Software Update identifies them. Then use this program to schedule the downloads. Sometimes those seem more stable anyway.
    The program us shareware. It appears from the description that the program remains fully functional but puts up a nag screen if the program has not been registered.

  • About shell scripts for large-scale automation of  encoding tasks

    in the user menu of Compressor, it said that we can use the command line to write shell scripts for large-scale automation of encoding tasks.
    I would like to have more information about the shell script for compressor, is that any document link?
    Thanks

    You can use a script function to set-up a more secure environment that you call at the start of every admin script. This could be your main stamp album for stuff that can be moved there.
    A few more stamps to add to the collection (be sure to read up on them before use):
    1) reset the command hash
    hash -r
    2) prevent core dumps
    ulimit -H -c0
    3) set the IFS
    4) clear all aliases  (see unalias -a)
    Also you can remove the ALL from sudo and add explicit commands to the the sudoers file. There's a lot of fine tuning you can do in sudoers - inc. env variables as teekay said.
    But I'm no expert so best to check all of the above.

  • How to set View for Completed items inside Tasks?

    How to set button for 'View' and see Completed items or not completed inside Tasks?

    Hi,
    You want to set custom views for Tasks folder so that when we click a view button, it will show all Completed or incomplete tasks, am I correct?
    Which version of Outlook are you using? There are existing views for completed/incomplete tasks in Outlook. In Outlook 2010 and Outlook 2013, we can find the buttons under View tab > Change View. Click Completed button to view all completed
    tasks; Click Active button to view incomplete tasks.
    In Outlook 2007, just click View > Current View to switch between different views.
    If I've misunderstood something, please feel free to let me know.
    Regards,
    Steve Fan
    TechNet Community Support
    It's recommended to download and install
    Configuration Analyzer Tool (OffCAT), which is developed by Microsoft Support teams. Once the tool is installed, you can run it at any time to scan for hundreds of known issues in Office
    programs.
    Please remember to mark the replies as answers if they help, and unmark the answers if they provide no help. If you have feedback for TechNet Support, contact
    [email protected]

  • Is there a way to allow setting of "Due Date for All Tasks" to current date in OOB Workflow

    Is there a way to allow setting of "Due Date for All Tasks" to current date in OOB Workflow
    I need to set it today because there are tasks that is needed to be completed on the same day.
    Is there a way without modifying the page/form. like a configuration or something?
    ----------------------- Sharepoint Newbie

    Hi ,
    As Ajeet said,  for implement your requirement, you can change the data validation on the Due data field.
    You can do as the following :
    Open the site with SharePoint Designer 2010
    Click on Workflows on the left launch, then find ‘Approval-SharePoint 2010’, click on it
    On the Forms section, click ‘ReviewApproval_***.xsn’
    Then you can find Due Data for All Tasks, and change the validation
    In addition, if you create an approval workflow with SharePoint Designer, you can use a specific date, it contains hour and minute.
    I hope this helps.
    Thanks,
    Wendy
    Wendy Li
    TechNet Community Support

  • How to set the Expiration Date for a task which is been assigned explictly.

    Hi,
    When I assign a task to myself and not work on it for couple of weeks the task is getting released automatically into the original unassigned pool. The TaskActionHandler WSDL is causing that to happen. I don't want a task to be automatically released into the pool when I don't work on it for couple of weeks, how can I make that happen? TaskActionHandler is something which comes with the BPEL so I can't change the way how it behaves. Do I need to set the expiration date or duration explicitly when a task is created?then how do I do that?
    If anybody could let me know how to make TaskActionHandler not to release a dehydrated task, I would be glad.
    Thanks,
    Mythili.

    Hi,
    Make AUTO RELEASE a restricted action for the task by adding the following line:
    <restrictedAction>AUTO RELEASE</restrictedAction>
    to the <restrictedActions> tag in the task configuration file.
    Works effectively.
    Alternatively, you can specifiy the auto release durations on a per task priority basis. There is more on that in the BPEL Dev Guide.
    Hth, Sjoerd

  • Setting Notes for a process task.

    Hi All,
    In a custom adapter I want to be able to set the notes for a task. How do I get the taskId for the task I am currently in and then call it's method (somewhere?) to set the notes.
    Thanx
    Fred

    Thanx Kevin,
    I was looking for something that can be gotten at runtime. i.e. I'm inside some code that
    just drops a record on a database as part of a provisioning task. some kind of error occurs so I want get the current task instance at runtime and populate the notes.
    Thanx
    Fred

  • When accessing the any tasks from Fusion Applications homepage, "An error was received for the task Manage Worker Goal Setting Lookups. This task is identified with the code HRG_MANAGE_WORKER_GOAL_SETTING_LOOKUPS that invokes program /WEB-INF/oracle/apps/

    We have installed HCM and CRM modules on Fusion Application 11.1.7 version.
    This is 2 node architecture ie IDM components installed in one node and Fusion components installed in another node.
    We are able to start the IDM components and Fusion components successfully, but when users are trying to access any task from Fusion application home page, they are getting the below error
    A portlet consumer error was received for the task Manage Worker Goal Setting Lookups. Report the error details to the following owning product Goal Management.
    An error was received for the task Manage Worker Goal Setting Lookups. This task is identified with the code HRG_MANAGE_WORKER_GOAL_SETTING_LOOKUPS that invokes program /WEB-INF/oracle/apps/fnd/applcore/lookups/publicUi/flow/ManageCommonLookupsTF.xml#ManageCommonLookupsTF of module code fndSetup. Review the consumer and producer logs for more details on this error.

    This may be related to the other issue regarding "FUSION_APPS_WSM_APPID-KEY" as the logs contains exceptions like:
    oracle.wsm.policymanager.PolicyManagerException: WSM-02081 : Failed to login to perform requested action.
    Please refer to document Fusion Application Service Account Password Expiration Causes Portlet Producer Errors (1486388.1) for steps on how to verify and set the password. There is also exception:
    javax.security.auth.login.FailedLoginException: [Security:090302]Authentication Failed: User FUSION_APPS_PROV_PATCH_APPID denied
    This is also likely caused by an expired password, please see Fusion Apps Servers Are Not Starting Up - Password Policy Error :9000: GSL_PWDEXPIRED_EXCP :Your Password has expired (1629927.1).
    Jani Rautiainen
    Fusion Applications Developer Relations
    https://blogs.oracle.com/fadevrel/

  • Setting a recurrence for a task

    I seem to be having problems setting a recurrence for a task.  Whenever I set one it sets the end date as the date I start the task.  Does anyone have the same issue?

    I have the same issue.  I can set a recurrence but it forces the "end date" to be the due date of the task.  The "Date" drop down under Recurrence - End is greyed out and not clickable.  Why bother creating this field if you can't set it.

  • Maxl Automation for sequential calc scripts - just stops without giving any error

    Hi,
    I was running an automation for calculations using MaxL. by scheduling the Steps.bat in the task scheduler of windows.
    _________ Steps.bat ___________
    StartMaxl Steps.mxl
    _________ Steps.mxl ___________
    Login .....
    Sppol on to log.log
    Execute calculation 'DB'.'DB'.StepA1;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepA2;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepA3;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepA4;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepA5;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepA6;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepA7;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepA8;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepB1;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepB2;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepB3;           Iferror 'StopError';
    Execute calculation 'DB'.'DB'.StepB4;           Iferror 'StopError';
    define label 'StopError';
    exit;
    Not when I check the log file on execution it shows ...
    ___________________ Log.log _______________________
    MAXL> execute calculation 'DB'.'DB'.'StepA1';
    OK/INFO - 1012579 - Total Calc Elapsed Time for [StepA1.csc] : [173.87] seconds.
    OK/INFO - 1013274 - Calculation executed.
    MAXL> execute calculation 'DB'.'DB'.'StepA8';
    OK/INFO - 1012579 - Total Calc Elapsed Time for [StepA8.csc] : [2000.00] seconds.
    OK/INFO - 1013274 - Calculation executed.
    MAXL> execute calculation 'DB'.'DB'.'StepB1';
    OK/INFO - 1012579 - Total Calc Elapsed Time for [StepB1.csc] : [1200.00] seconds.
    OK/INFO - 1013274 - Calculation executed.
    MAXL> execute calculation 'DB'.'DB'.'StepB2';
    If you see the last line - it just halts - doesn't show any error or any other message. And the task in the windows task scheduler keeps showing the task as running - without any error there as well.
    Any ideas on why it is just going to a limbo (no sessions also appear on EAS console)
    Ankur

    Yes the script can be manually executed. Also if I again put a mxl file starting from the step where it last stopped - it continues execution normally. (i.e. executes StepB2 as well and continues executing)
    And today's execution result - I kept monitoring the server, it ran for 3hrs and then halts after around 80% of the steps with 20% were still remaining. I created a new Mxl to start from the last 20% and it ran successfully again.
    @Amarnath : Restart database ?
    I checked the logs - and this is what I can see (modified the big fields to show what the logs are showing)
    [Wed Oct  9 09:54:43 2013]Local/....... Ankur.....
    Calculation executed
    [Wed Oct  9 09:54:43 2013]Local/DB///47450147858752/Info(1013210)
    User [Ankur.....@Native Directory] set active on database [DB]
    [Wed Oct  9 09:54:43 2013]Local/DB/DB/Ankur......
    Received Command [Calculate] from user [Ankur......@Native Directory]
    [Wed Oct  9 09:54:43 2013]Local/DB/DB/Ankur......
    Received Command [Calculate] from user [Ankur......@Native Directory] using [StepB2.csc]
    [Wed Oct  9 10:24:59 2013]Local/DB///47341561242320/Info(1002035)
    Starting Essbase Server - Application [DB]
    [Wed Oct  9 10:24:59 2013]Local/DB///47341561242320/Info(1200480)
    Loaded and initialized JVM module
    [Wed Oct  9 10:24:59 2013]Local/DB//47341561242320/Info(1200445)
    External [GLOBAL] function [@ESSBASEALERT] registered OK
    [Wed Oct  9 10:25:01 2013]Local/DB//47341561242320/Info(1019008)
    Reading Application Definition For [DB]
    So indeed the essbase server is starting again - but why ?
    Ankur

  • Using Automator for to do reminders?

    Hello,
    I need to create an automator flow for ical that will, when I enter a date, create a series of to do tasks and alarms for those tasks over set periods.
    Example. I need to set deadline dates from Monday 5/16/11; need the workflow to take that date, go to to ical and enter a) to do items with b) alarms 7, 15, and 30 days from 5/16/11. The start date will always change, but the schedule for tasks completion (7,15, 30 days) will not. If I can name the deadlines that would be good too.
    Any help appreciated, thanks!

    You'd want the *do shell script* command in AppleScript for this
    http://developer.apple.com/technotes/tn2002/tn2065.html
    however you're not going to be able to use it as you would tools such as Expect which allow you to wait and provide additional input on stdin. If all you're doing is updating an IP address why not simplify the entire mess with BIND's dynamic updates?

  • Design the New process set up for Materials in one physical stock plant

    Hi Experts,
    The requirement is one physical plant as two different logical plants in the system. The main issue is how to administrate or how to find the set up which allows one Physical warehouse in Hamburg which we have supplying two Logical warehouses in the system without having thru really physically separate the warehouses into two different ones. Materials physically will be only for one warehouse.
    Requirement is for Design the New process set up for Materials in one physical stock serving plant into two different system plants.
    Most of the things are pointing in the direction that order Backlogs will not be converted into new organization. We have backlogs for the material requirements for purchase orders, sales orders whatever we have in the current setup; then there will have all are new orders from the certain dates taking in the  new organization set up. These backlogs are very long at least three to four years.
    We would like to find some way to have the all the material requirements ending up in one basket instead of two baskets. That still be able to deliver at least in system point of view from two different baskets.
    We need to do analysis on one physical stock serving plant into two different system plants that could be done either by material master data or as i understood that could be from PS side.
    can any one please tell me how we can maintian this setup in the system.
    Please provide your valuable inputs.
    Brgds,
    RK

    RK,
    Sorry, the creation of such an end-to-end solution is outside the scope of an online forum.  Most consulting companies would send a multi-disciplinary team to perform this task, and would take several weeks to research your requirements, and come up with a prototype.
    Sales order availability checking is described in SAP online help
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/93/744b51546011d1a7020000e829fd11/frameset.htm
    I will say this.  If your goal is to have two plants, with two company codes, and you wish to only procure or produce in one of the plants, then generally I would recommend using Special Procurement via Stock Transport Order (in standard SAP, Special Procurement 40).  This based on a very small knowledge of your requirements.  I have already cited the Sap online help for special procurement.
    SAP online help for Warehouse management is at
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f8386f4afa11d182b90000e829fbfe/frameset.htm
    As you begin to read the required topics, I am certain you will realize that this task is beyond the capability of an untrained person.  I again suggest that you search for professional consulting services to assist you in this project.  It will be money well spent.
    I am now closing my responses to this thread.  Good luck in your project!
    Best Regards,
    DB49

  • "No administrator found for the task" in the front end

    Hi all,
    My issue is, whenever approval request is raised from the front end ( JAVA WEB-DYNPRO), it triggers the workflow through the "<b>sap_wapi_start_workflow</b>" and when the workflow proceeds to the first level of approval, the front end application provides the approver with <b>Approve</b> and <b>Reject</b> options.
    On click of approve, from the java webdynpro, the approve status is written in the container using "<b>sap_wapi_write_container</b>" and then a call is made to "<b>sap_wapi_workitem_complete</b>". Upon excution, the message line is "<b>No administrator found for the task</b>" and the return code is "<b>1</b>".
    But if we do the same steps from the backend (R/3), the workitem is getting completed without any such error.
    Please advice.
    Thanks.

    Hi Balaji,
    I think I have an answer for you.  This has happened with us when approving a WD java task using UWL (in our case for travel).  The key is the return code of 1.
    What has happened is this.  The return code actually comes from the function SWW_WI_STATUS_CHANGE_NEW which is called deep in the WAPI wrapper.  It means "infeasible_state_transition = 1".
    This is due to the fact that after updating the container, your wapi call from web dynpro tries to change the workitem from status of "Ready" to status "Completed".  This will not work.
    What you will have to do is call "SWW_WI_STATUS_CHANGE_NEW" to set the status to 'SELECTED' beofre setting the item to complete.
    The reason for this is that when you are executing from R3, the status change is done for you.  When calling from the WD, no reservation of the workitem occurs.
    Sorry about last night, I live well outside of town and the phone reception at my place is poor.
    Regards
    Gareth

  • Return the scheduled start date from one task to a custom field for all tasks

    Hi all
    I am trying populate an entire custom task date field with the scheduled start date of one of the tasks. I thought the easiest way would be to:
    1) identify the date I need with a custom task flag field set to 'yes'
    2) create a formula to look for the 'yes' flag in that field and populate the custom task date field with it.
    This worked only for the task where the flag was set to yes (task #36) and the rest of the 49 tasks returned an error message. I'm unsure of how to set this up so that the date with the 'yes' flag populates in this column on
    all 50 tasks.
    This would also need to scale for situations where there were more or less than 50 tasks.
    Thanks in advance...
    Using MSP 2010 Pro   

    ShelleyBrodie,
    That's because the syntax of your formula isn't quite what you intend. The correct syntax is:
    IIf( expression, truepart, falsepart )
    For your case that converts to:
    IIf([Flag1],[Scheduled Start],{not sure what you want for the false part but I assume is is not Scheduled Start})
    Note, the "Yes" for Flag1 is implied, so the first part (i.e. Scheduled Start) is the truepart, but you don't give a value for the falsepart (i.e in both cases your formula is looking for Flag1 to be "yes". Let's say you want the Date1
    field to have the Scheduled Start date if Flag1 is "yes" and to have today's date if Flag1 is "no". Then the formula will be:
    IIf([Flag1],[Scheduled Start],[Current Date])
    However, As I indicated in my previous response, you won't be able to do what you described in your initial post by using a formula. Are you now trying to do something different?
    John

  • R1: tcAPIException: Duplicate schedule item for a task that does not allow multiples.

    Hi,
    I'm struggling with the following task:
    I have to assure an account exists for a given resource. I do provision it with the .tcUserOperationsIntf.provisionObject().
    I've created a createUser task to create the account.
    The task code checks if there is already matching account.
    If no account exists, is is created in the disabled state, and the object state of OIM account is set to 'Disabled' by means of task return code mapping.
    If it exists, it is 'linked' to OIM account.
    The problem is if the existing account is enabled, I have to change the OIM account state to 'Enabled' either.
    To implement this (thanks, Kevin Pinski https://forums.oracle.com/thread/2564011 )) I've created an additional task 'Switch Enable' which is triggered by a special task return code. This task always succeeds, and its only side effect is switching the object status to 'Enabled'.
    By I've getting the 'Duplicate schedule item for a task that does not allow multiples' exception constantly:
    This is the stack trace:
    Thor.API.Exceptions.tcAPIException: Duplicate schedule item for a task that does not allow multiples.\
      at com.thortech.xl.ejb.beansimpl.tcUserOperationsBean.provisionObject(tcUserOperationsBean.java:2925)\
      at com.thortech.xl.ejb.beansimpl.tcUserOperationsBean.provisionObject(tcUserOperationsBean.java:2666)\
      at Thor.API.Operations.tcUserOperationsIntfEJB.provisionObjectx(Unknown Source)\
      at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)\
      at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:57)\
      at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:43)\
      at java.lang.reflect.Method.invoke(Method.java:601)\
      at com.bea.core.repackaged.springframework.aop.support.AopUtils.invokeJoinpointUsingReflection(AopUtils.java:310)\
      at com.bea.core.repackaged.springframework.aop.framework.ReflectiveMethodInvocation.invokeJoinpoint(ReflectiveMethodInvocation.java:182)\
      at com.bea.core.repackaged.springframework.aop.framework.ReflectiveMethodInvocation.proceed(ReflectiveMethodInvocation.java:149)\
      ...skipped
      at Thor.API.Operations.tcUserOperationsIntfDelegate.provisionObject(Unknown Source)\
      ... skipped
    What did I wrong?
    Regards,
    Vladimir

    Hi Vladimir,
    Please select 'Allow Multiple Instance' checkbox for the process task.
    Thanks,
    Pallavi

Maybe you are looking for

  • Limiting a Guest Account

    I am in the process of opening a B&B and wish to make an iMac available to guests. I'm OK about setting up a guest account and the ability to limit certain aspects of that account (non admin, parental controls etc) but can I limit the apps available

  • Retrieving subjects and information

    Hi All, Is it possible for me to only retrieve the subjects, and information (size, type etc) for an email without actually retrieving the mail from the server? I'd like to be able to see what the email is before using the bandwidth of actually havin

  • How to add search help to a report.

    How to add search help to a report.

  • Picking UTF-16 coded xml file thru file adapter

    Dear All, We are working on an interface in which we are receiving an XML file in UTF-16 format. Now we want to send this file to a RFC in SAP. We are getting an error in picking the file as UTF-16 file format is not getting picked. Also we are not a

  • How to preset the Enable pin functions by software using the frame graber 1422?

    Hi I'm looking for any information related to how to configure by software the enable pins on Frame grabber PCI-1422. I found some examples on NI WWW showing that Frame synchronisation signal was wired to Enable A and Line signal synchronisation sign