Show Meeting WorkSpace Calendar in another WorkSpace

Hi,
At my organization, we have an area for Meeting Workspaces.
Within the Meeting WorkSpace, a user has created a list for a Calendar. Within this list, there is a Calendar called Governors Key Dates.
The Meeting WorkSpace has a number of Meeting WorkSpace lists. A large number of these lists needs to be able to display the "Governors Key Dates" calendar. I can easily create a hyperlink to the calendar but the user would like the actual calendar
showing as a web part (or similar) in a number of lists.
Do you guys have any ideas of how I can go about achieving this? I have tried manipulating the content web part to no avail.
Thanks
Sanjay

Hi Sanjay,
According to your description, my understanding is that you want to show the calendar list in the Meeting Workspace.
I recommend to use the Event Calendar Listing Web Part (SharePoint 2010) to display the calendar list in the Meeting Workspace.
http://www.codeproject.com/Articles/78532/Event-Calendar-Listing-Web-Part-SharePoint
Or you can create a SOAP data source of the calendar list in SharePoint Designer and then insert a data view web part of the calendar list in the page you need.
http://www.codeproject.com/Articles/93558/Displaying-a-SharePoint-List-from-another-team-sit
Best regards.
Thanks
Victoria Xia
TechNet Community Support

Similar Messages

  • How to import a page from one workspace to another workspace appication ?

    In oracle apex 4.1 version :-
    I am trying to import one page from a application which is present in one workspace to another application which is present in another workspace.
    In which way could i import that export page to a workspace?
    Edited by: 945115 on Jul 12, 2012 4:46 AM

    there are 2 ways to do it.
    if your confidant and the page is not exist in the imported application then then modify the script
    look for the following like should be at the begging of the script change the workspace id with your imported workspace id
    wwv_flow_api.set_security_group_id(p_security_group_id=>nvl(wwv_flow_application_install.get_workspace_id,25719530510628410));
    and change the application id
    prompt  Set Application ID...
    begin
    -- SET APPLICATION ID
    wwv_flow.g_flow_id := nvl(wwv_flow_application_install.get_application_id,100);
    second option is
    export the full application form workspace 1 and import into WS2
    in WS2 open the application where you want to copy the page. open any page and click on the Create drop down menu and select new page as copy then select Page in another application and follow the screens.
    Edited by: pkpanda on Jul 13, 2012 5:00 PM
    Edited by: pkpanda on Jul 13, 2012 5:01 PM

  • With IOS 7.0 How do you change the Color Red, that shows up on the Calendar to another color? People with certain eye problems cannot tolerate the color Red.

    How do you change the Color Red, that shows up on various points of the Calendar to another color? Persons with certain eye problems have visual irritations that can be caused by the color Red. This problem came up with the update to IOS 7.0.

    Sorry but you cant

  • Copying CS SDK InDesign Extensions to Another Workspace

    For Win7, ActionScript
    I built an InDesign extension in ActionScript using the Creative Suite Extension Builder.
    I wanted to copy the Creative Suite Extension Builder project to another folder and import it to another workspace. The "Import Flex Project" from the new folder succeeded, but any attempt to build it produces the dreaded error message
    ""Could not find project's extension manifest file. Make sure the manifest exists at .staged-extension/CSXS/manifest.xml. <MyProjectName>  line 1 Problem"
    Needless to say, ".staged-extension/CSXS/manifest.xml." exists.
    Any idea????
    TIA,
    mlavie

    I just ran into this problem again - and fixed it by exporting the project from its original worksapce using Export Project, instead of just cpoying the project folder manually.
    mlavie

  • How can I get the meeting record in my personal workspace?

    Dear All,
    Does anyone know how can I get the beehive conference meeting record in my personal workspace?
    The recording message looks like below:
    Recording Location: st > [email protected]'s Personal Workspace > Documents
    Any comments will be highly appreciated!

    Hi,
    Is the problem getting the file to be saved in your personal Workspace or accessing the Personal Workspace to get the recording?
    Phil

  • How to place the calendar in the Workspace page?

    HI.
    I would like to place a calendar in the workspace so that everyone in my group can see and add coming events in the monthly calendar.
    Can any one guide how to realize it with beehive?
    Thanks.

    Hello
    As specified by Arnaud, when you create a team workspace, a calendar is automatically associated with, as well as an Inbox etc.
    You will have access to the team workspace Calendar either through Outlook, Zimbra, Sunbird, lightning or the Web Workspace client (http://hostname:port/workspaces)
    If you use the workspace client application, to create a new event; go to the left of the page on the banner, click on the New button, then select "Event"
    A page appears to create your appointments.
    Whatever the application used to create your appointments, you will be able to see them through the other clients.
    Regards
    Fred

  • What is the best way to show a message on page "Planning Workspace"

    Hi,
    I would like to warn my users about the update of the data. Is it possible to show a message on page "Planning Workspace Home"
    Thanks !

    Hi!
    Have a look at Broadcast massages http://download.oracle.com/docs/cd/E12825_01/epm.111/hp_admin.pdf
    read chapter "Using Broadcast messeging"
    regards
    alexander

  • Access another workspace object

    I am working in a workspace "a" as a developer. Another developer is working in his workspace "b". Both workspaces are in one database. I have to access a table (which is in workspace b) from workspace "a". Can it be possible?

    Hi Bill,
    You can't access each others APEX objects but you can both access the same tables. The tables are database/schema specific and are not restricted to use only in APEX. In the application definition you can define the "Parse as Schema". Set that to the same schema that your colleague is working on. If you can not the other schema, you'll need to log into the APEX administration (workspace = INTERNAL) and grant yourself access to that schema.
    Martin

  • How to move page from One workspace to another workspace

    I have a production web site in one workspace and a development web site in another workspace. I want to move a page(not all) from production workspace to development workspace. How to achieve it?
    Thanks for your help.

    Hi Scott,
    I have the same issue, and I can answer your questions.
    1. I'm Bill and my handle is wcmanes
    2. I have APEX 3.0 in both dev and prod database.
    3. Their are two different databases with a workspace in each.
    Some additional info:
    The workspace names are the same in each database
    The application names and ID are the same
    The production app was created as a full export/import of dev app
    Not I want to move one modified page from dev to prod. I used the page export from the dev page. When I try to import the file in the production workspace, I get the error message:
    Logged Into Workspace: Q2DW_RPT
    Export File Workspace ID: 938732400343783
    Export File Application: 101
    Export File Page: 1003
    Export File Version: 2007.01.08
    Page Origin: This page was exported from a different application or from an application in different workspace. Page cannot be installed in this application.
    Thanks,
    Bill

  • OEPE causes Eclipse Kepler to start with wrong workspace, overrides Eclipse's workspace configuration

    I'm a new OEPE user, and found that after installing it, Eclipse (Kepler) now starts up with the wrong workspace every time. I have to explicitly do File > Switch Workspace... to get Eclipse to restart with the correct workspace. Also, the workspace I want to use is the only one listed in the Workspaces preferences panel (Window > Preferences > General > Startup and Shutdown > Workspaces). So I can't figure out why Eclipse is using the wrong workspace, and why it's even finding this wrong one.
    I found that many other users of OEPE with Kepler are having this same problem:
    Eclipse Community Forums: Eclipse Platform &amp;raquo; Kepler: On start up, I no longer get prompted for workspace locat…
    And this sounds curiously like this old problem reported right here on the OTN Community site:
    https://forums.oracle.com/thread/2191740
    Any suggestions for how to get around this? I assume this is a bug, but don't know the correct process for reporting OEPE bugs.

    77e559c0-cd28-48cd-916f-3f755e9683b5 wrote:
    Hi.
    I suspect that some action by the OEPE code somehow modifies the OSGi Cache so that it no longer asks you what workspace you'd like to use (and forces usage of the workspace in top user directory.)  I found that if you put in "-clean" in your eclipse.ini, then you get asked what workspace you'd like to use.  This flag clears out the OSGi cache (hence my theory that it is this cache that is messed up)
    That said, there are arguments for not doing this all the time.  See this discussion: java - How to run eclipse in clean mode? and what happens if we do so? - Stack Overflow
    Finally, I suspect you have another workspace on your system now.  Presuming you are on a PC, go to your user dir - I'd wager there is a "workspace" dir there now.  That is where OEPE wants to work.
    Good Luck!
    OEPE should be able to work with any workspace; it has in the past!  If a specific workspace is required with this release, that is a step backward in my opinion.  That said, if that is the direction of the product, so be it.  I find it hard to believe that is the direction of the product, however!

  • Moving events from one calendar to another

    Is it possible to move events from one calendar to another?
    Here is our scenario:
    User abc123 has set up a calendar abc123:boardroom for other users to book slots in the board room (he didn't know about resource calendars at the time and so didn't request one be created).
    Now abc123 is leaving the company, so his calendars are going to disappear, along with all the bookings for the board room.
    So my question is, can these events (and tasks) be moved to another calendar?
    I've tried creating a resource calendar and exporting/importing the calendar data, but this appears to leave the organizer of each event set as abc123:boardroom, with the result that the owner of the new resource calendar cannot modify the imported events.
    Maybe I'm missing something blindingly obvious here, but there doesn't seem to be any way to actually move events from one calendar to another. Does anyone have any advice as to how I might achieve this?
    Many thanks in advance.
    Regards,
    Mike.

    here is one way:
    Click on a meeting to get a Compose window. In the upper right Calendar box, click on the dropdown icon and select the calendar you want to move to from the list. Click on OK to save.
    Of course, if you have a lot of meetings to move, this will be a pain, but it does work.
    Note: before you do this, make sure you are an "owner" of the calendars(s) you want to move meetings to (or otherwise have access), and are subscribed to those calendars.

  • Showing Timezone in calendar

    I am frequently moving between timezones and get meeting invites from other parties for events scheduled according to their timezone.
    While Calendar manages the knighted correctly, there is a risk of confusion when the iPad (or iPhone) is set to automatically accept the location timezone. Switching the setting for time and calendar timezone support is a bit tedious.
    Is here a way to display the current timezone possibly in the top bar (next to the time), and also on the calendar page (since they timezones for displaying the time and managing calendar events is handled separately)?
    Would greatly help in reducing confusion about timings of events for frequent travelers.
    Cheers,
    Michael

    Hello,
    Did you found a solution for showing timezone in calendar?
    Thanks,

  • My iphone has calendar history for 10 years.  my icloud only shows about 6-8 weeks back.  how can i get icloud to show all the calendar events in the past that are on iphone?

    my iphone has calendar history for 10 years.  my icloud only shows about 6-8 weeks back.  how can i get icloud to show all the calendar events in the past that are on iphone?

    I encountered a similar problem when finally (and with much regret) I was obliged to migrate my MobileMe to iCloud last month.
    Many years of iCal history vanished without trace during this automated transition by Apple and iCloud then kindly synched the resulting vacuum back to iCal on my Mac.
    Fortunately, iCloud wasn’t able to decimate iCal on my other Macs because (1) they are still running Snow and (2) I had switched them off as a precaution.  Good job I did.
    My solution was to export my iCal data on one of those other Macs to a backup file – then I imported that backup file into my Lion-updated Mac’s iCal. That restored all the iCloud-deleted iCal data back on to my Mac and this was promptly synched automatically to my Calendar on iCloud.  So now it’s all there and showing.
    Perhaps you could do something similar?  In the meantime, be very careful not to let iCloud’s amnesia get synched to your iPhone (and other devices).
    Experience has taught me never to trust an “upgrade” until it is proven to be working correctly and always to keep in reserve another Mac with a properly-functioning system and all synching to it switched off...

  • Ical keeping both events when I move events from one google calendar to another

    Hi all!
    I use multiple google calendars and sync them with my iPad, iPhone, and MacBook Air. I like to move events from one calendar to another (for color coding purposes), and am coming across a unique issue that I hope someone has a solution to.
    When I edit an event by moving the event from one calendar to another the events show up correctly on the iPhone and iPad, but not in my iCal on MacBook Air. (Only when I make the changes on my iPhone and iPad). For example, when I switch an event originally created in my 'appointments' calendar to my 'done' calendar the event shows up appropriately on iPhone and iPad, and even in my Google calendars on the web. But, the iCal on my MacBook Air keeps both events. This only happens when I make the changes from the iPhone or iPad. If I make calendar changes on my computer, then there are no hiccups on any of the devices.
    It seems like a syncing issue with iCal, and I can't figure out how to prevent the duplications in my iCal on my computer from showing up. Quite annoying because I have to go in and delete all of the duplicated events on the computer at the end of the day.
    I have the Mavericks OS on my MBA and the software on my iPad and iPhone are updated to the latest software.
    If you have any suggestions, please let me know! Thanks!

    Petrill,
    Thank you. I was trying to do that yesterday, but it was grayed out. It seemed to work alright today.
    Thanks,
    Sheena

  • Issues: new events show from google calendar but not the other way round

    Hi,
    I've just followed the instructions to the letter on these pages: http://support.google.com/mobile/bin/answer.py?hl=en&topic=14252&answer=138740
    & http://support.google.com/mobile/bin/answer.py?hl=en&answer=139206 and looked at the known issues page, but I am still stuck.
    Entries in my Google Calendar have now synced in iOS Calendar (and weekcal which I use instead of iOS Cal) - however, none of my existing entries in my iOS Cal have synced with Google Cal.
    Here are the issues:
    A recurring event created by someone else and me invited showed in iOS when I set this up
    None of my events from iOS show in Google Calendar
    New events I create in Google Calendar do not show in iOS
    New events I create in iOS don't show in Google Calendar
    To test, I deleted the recurring event which was the only one showing on iOS - immediately it was also deleted on iOS which indicates it is set-up to sync betweeb Google and iOS
    Cannot find any information on help pages about this.

    I'm not sure what else to suggest. As the Nokia 5800 is not natively supported by iSync you must be using an iSync Plugin, so I'd advise contacting the author of the plugin - it may be buggy and need fixing.

Maybe you are looking for

  • What's wrong with Keychain?

    On my MacBook, running Leopard, Keychain just does not store passwords as it used to do in Tiger. I always have to fill in my passwords in Mail, DreamWeaver, Transmit, even though I activate the box 'save my password'. Other passwords (e.g. for Skype

  • Report links from one dashboard(report) to another dashboard with prompt

    There are two dashboards 'Chart' and 'Transaction details' . I am trying to link from one report(dashboard called 'Chart') to another dashboard(Transaction details). In first dashboard (screenshot 1) there is a column called 'Day' which is like date.

  • Premier Pro CC 2014 crashing

    Ever since I moved a project to a new RAID 0 array, premier pro cc 2014 crashes within 20-30 seconds.  If I open the the project in the old location, no problems. In looking at the Windows Application log, the error shows a a faulting module that is

  • Issue with displaying images from bestseller.inc.jsp

    Hello all, I'm new in developing with NWDI and I'm having this small problem: in bestseller.inc.jsp (which includes productlist.jsp) there are two links with a product's code and a products description, which when clicked, navigate to productDetailsI

  • In SQL server, how can I pass a date and return on any specific day of the week (e.g. Sunday/Monday/Wednesday, etc.)

    In SQL server, I want to be able to have a function to return the date of any specific day of the week by passing two parameters. E.g.: parameter 1: a selected date (e.g. 8/3/2013) parameter 2: any specific day of the week (e.g. Wednesday) result: sh