Specified a 3D scale for each axis

Hi,
I'm plotting a 3D graph but i don't want to use the autoscale function. I would rather specified my maximum value of scale for each axis.
How can can i achieve this?
Thanks.
GERARD Florian.

Oops, forgot the attachment, Here you go
-Paul
Paul Falkenstein
Coleman Technologies Inc.
CLA, CPI, AIA-Vision
Labview 4.0- 2013, RT, Vision, FPGA
Attachments:
Axis Maximum.jpg ‏17 KB

Similar Messages

  • Relative Time Scale for X-Axis when creating a Line Graph in CS3?

    Is there a way to get the APPROPRIATE RELATIVE scale for the X-Axis (Category) when you're using dates?
    Example:
    If this is my data set:
                        Group A          Group B
    01/03/99                1                5
    01/04/99                11                3
    01/05/99                6                12
    11/27/07                63                54
    If I plot this in Xcel, by default, each date (x-axis) will be spaced the same distance apart. However, there is a checkbox to "time-scale" the X-Axis which will place the dates relative to one another. In other words, if we're talking about a bar graph, the first three bars would be close together on the left side of the chart, and the 4th bar would be waaaaaay on the right side of the graph.
    So, below, if 'x' is a bar, I keep getting this in CS3:
    x     x     x     x
    I want to get this:
    x x x             x
    Get it?

    Is there a way to get the APPROPRIATE RELATIVE scale for the X-Axis (Category) when you're using dates?
    Example:
    If this is my data set:
                        Group A          Group B
    01/03/99                1                5
    01/04/99                11                3
    01/05/99                6                12
    11/27/07                63                54
    If I plot this in Xcel, by default, each date (x-axis) will be spaced the same distance apart. However, there is a checkbox to "time-scale" the X-Axis which will place the dates relative to one another. In other words, if we're talking about a bar graph, the first three bars would be close together on the left side of the chart, and the 4th bar would be waaaaaay on the right side of the graph.
    So, below, if 'x' is a bar, I keep getting this in CS3:
    x     x     x     x
    I want to get this:
    x x x             x
    Get it?

  • How to specify precision and scale for a datatype in create procedure statement

    Specifying precision and scale in the datatype when creating a procedure does not work:
    create or replace function SqlTxFunctionTesting(inparam in number(9,2)
    Error(1,48): PLS-00103: Encountered the symbol "(" when expecting one of the following: := . ) , @ % default character The symbol ":=" was substituted for "(" to continue.

    user4928701 wrote:
    Specifying precision and scale in the datatype when creating a procedure does not work:
    create or replace function SqlTxFunctionTesting(inparam in number(9,2)
    Error(1,48): PLS-00103: Encountered the symbol "(" when expecting one of the following: := . ) , @ % default character The symbol ":=" was substituted for "(" to continue.
    And one of the cons in the PL/SQL language in my view.
    The language does not allow parameters to be declared in the fashion you are attempting to. Even declaring a subtype and using that, does not enforce either the precision or scale, on the parameter value passed.
    Even worse - the parameter value can be a different data type all together from the defined parameter type - and a silent and implicit data type conversion will be done at run-time.
    So you can expect run-time errors in your code unit caused by the caller passing invalid values, despite the compiler okaying the call from the caller to your code.
    There are pros and cons to this approach. But if you are from a very strong type language environment like C or Pascal, you tend to see more cons than pros in this specific case.

  • How to specify a unique integer for each local variable defined in TestStand?

    I have a .net application that reads all TestStand local variables, but for the .net application each local variable should have a unique integer number. Iterating through the locals and storing the index is not a good solution, because if a local variable is moved or deleted, the index will change.
    Does anyone know how to do this in TestStand or having an idea how to this in my .net application?
    Thanks.

    Thanks Doug for your reply. Using a GUID is not an option because this ID is too long. I will try to explain why I need this ID for. I have a lot of C# code that generates code to deal with a lot of instruments. For example to configure a device, user defined variables can be used to specify some settings or to store results. These variables are not stored in the generated code with a name but with an integer number. Now I want to try to be use all our existing device driver code with the TestStand sequencer. So, I need a translation between the name of a TestStand local variable and an integer number. After constructing the interface to my code I want to read all the variables from TestStand and now I need the integer ID to do the mapping to my variables. I know that I can use use your proposition 2 by encoding the unique ID into the name of the variable and parse the name of the variable to get it back, but this is not an automated way. This will be rather difficult if there are several hundreds of variables. For this reason I am looking for an alternative way. Looking forward for your response. Best regards   

  • Creating a KD Tree and only sorting the points once for each axis

    So right now I have some code for creating a KD Tree (2-Dimensions) but I am sorting the x and y values for the node each time I create a new node. Then I am taking the median, setting that as the nodes point, and passing on the left half and right halves of the remaining array to their respective children. I am using Arrays.Sort which I believe takes O(n log(n)) time per sort (once per node), but I have been reading a lot of stuff that states you can get the median in linear time so that the total build time is O(n log(n)). Unfortunately I am having difficulty understanding how. Here is a snippet of an explanation I found.
    Each node has both x-list (ordered in x-coord.) and y-list (ordered in y-coord.)
    Each pi in x-list and y-list is linked to each other.
    Both x-list and y-list can be built in linear time using the two lists of its parent.
    Thus total time to build all x-lists and y-lists is:
    T1 (n) = O(n) + 2T1 (n/2) = O(n log n).
    Since each splitting line can be found in O(1) time (via sorted lists), and there are n − 1 splitting lines in a kd-tree,
    Thus total time to find all splitting lines is
    T2 (n) = (n − 1) · O(1) = O(n).
    Hence, total prepossessing time
    = T1 (n) + T2 (n) = O(n log n).My question is, how can I build the arrays in linear time at each node? I have tried working it out on paper for the past few hours but lets say I sort the array using X first and I know that indices 0 - median will be on the left, however even if I had sorted the array by Y also, there is zero guarantee that all the points I need from x[0-median] will be in y[0-median]. They will obviously be included in x[0-median] but they will be sorted by x and not y, forcing me to resort at every single node.
    Any idea?

    swinte1 wrote:
    My question is, how can I build the arrays in linear time at each node? I have tried working it out on paper for the past few hours but lets say I sort the array using X first and I know that indices 0 - median will be on the left, however even if I had sorted the array by Y also, there is zero guarantee that all the points I need from x[0-median] will be in y[0-median]. They will obviously be included in x[0-median] but they will be sorted by x and not y, forcing me to resort at every single node.
    Any idea?So for example, you have 5 points and you sort them by x and y coordinates in two separate arrays:
    x-list: 6 1 4 3 2 5
    y-list: 6 5 1 2 3 4
    Now you want just the points to the right of 4:
    x-list: 3 2 5
    y-list: 5 2 3
    Create the x-list by iterating from the midpoint to the end.
    Add each element in the x-list to a set..
    Iterate through the y-list from left to right:
    If the point in the y-list is contained in the set, add it to the new y-list.
    This creates the arrays in linear time while keeping the points sorted. It does iterate over twice as many points in the y-list as needed though.

  • Specify log off page for each system in WebUI

    I am trying to define log off URL for the CRM WebUI. I have been able to define the URL on the technical profile. The problem for me is that the url points to a system specific page. In other words, when I define in the development system that I want to go to the logon page when I log off I use the URL of that points there. When this customizing later is transported to the quality system and later to the production system, the log off URL still points to the log on page of the development system.
    Is there any way to specify that this url points to the log on page of the system that were logged off?

    Hi Erik,
    this is not possible in the SAP standard AFAIK.
    The URL in the customizing of the technical role profile is read using the method CL_CRM_UI_TP_SRV->GET_URL_PART( ). In order to implement your requirement you could, e.g. implement a custom table containing the client, system name and URL. Additionally, you could then enhance CL_CRM_UI_TP_SRV->GET_URL_PART( ) using an implicit enhancement spot to read this custom table an return the entry for the system ID if present and the default customizing otherwise.
    Best,
    Christian

  • Log scale of the axis and the best-fit line

    I try to plot a graph and set the scale of the x-axis to log scale and then i try to plot a linear trendline (best fit line). but the linear trendline does now show on the graph. but if i set the axis scale to linear, then the trendline does show.  i will need my graph in the log scale and also a linear best fit line. please help me out

    0
    100
    3.00E-09
    71.52
    1.00E-08
    57.3
    3.00E-08
    39.15
    1.00E-07
    24.13
    3.00E-07
    14.77
    1.00E-06
    7.22
    i meant you these data, and left column is x-axis and gonna use log scale for the axis. the right column is the y axis. and then i need a best fit line for this graph.. hope you can help me

  • Default email for each contact when emailing to a group?

    Hi
    When I use Mail.app's shortcut for sending email to a group, I don't seem to have control over which of several emails (work, home, etc.) that exists is being used for each contact.
    I want to specify a default email for each contact so that I don't have to manually adjust each contact.
    Is there any way to do this?
    Thanks!

    Make 2 contacts with an email address each rather than 1 contact with 2 addresses.

  • Sql query - Selecting last recorded values for each date in specified period

    Hello,
    Can someone please help me with my problem.
    I'm trying to get last recorded balance for each day for specific box (1 or 2) in specified period of days from ms access database using ADOTool.
    I'm trying to get that information with SQL query but so far unsuccessfully...  
    My table looks like this:
    Table name: TestTable
    Date Time Location Box Balance
    20.10.2014. 06:00:00 1 1 345
    20.10.2014. 12:00:00 1 1 7356
    20.10.2014. 18:45:00 1 1 5678
    20.10.2014. 23:54:00 1 1 9845
    20.10.2014. 06:00:02 1 2 35
    20.10.2014. 12:00:04 1 2 756
    20.10.2014. 18:45:06 1 2 578
    20.10.2014. 23:54:10 1 2 845
    21.10.2014. 06:00:00 1 1 34
    21.10.2014. 12:05:03 1 1 5789
    21.10.2014. 15:00:34 1 1 1237
    21.10.2014. 06:00:00 1 2 374
    21.10.2014. 12:05:03 1 2 54789
    21.10.2014. 15:00:34 1 2 13237
    22.10.2014. 06:00:00 1 1 8562
    22.10.2014. 10:00:00 1 1 1234
    22.10.2014. 17:03:45 1 1 3415
    22.10.2014. 22:00:00 1 1 6742
    22.10.2014. 06:00:05 1 2 562
    22.10.2014. 10:00:16 1 2 123
    22.10.2014. 17:03:50 1 2 415
    22.10.2014. 22:00:10 1 2 642
    23.10.2014. 06:00:00 1 1 9876
    23.10.2014. 09:13:00 1 1 223
    23.10.2014. 13:50:17 1 1 7768
    23.10.2014. 19:47:40 1 1 3456
    23.10.2014. 21:30:00 1 1 789
    23.10.2014. 23:57:12 1 1 25
    23.10.2014. 06:00:07 1 2 976
    23.10.2014. 09:13:45 1 2 223
    23.10.2014. 13:50:40 1 2 78
    23.10.2014. 19:47:55 1 2 346
    23.10.2014. 21:30:03 1 2 89
    23.10.2014. 23:57:18 1 2 25
    24.10.2014. 06:00:55 1 1 346
    24.10.2014. 12:30:22 1 1 8329
    24.10.2014. 23:50:19 1 1 2225
    24.10.2014. 06:01:00 1 2 3546
    24.10.2014. 12:30:26 1 2 89
    24.10.2014. 23:51:10 1 2 25
    Let's say the period is 21.10.2014. - 23.10.2014. and I want to get last recorded balance for box 1. for each day. The result should look like this:
    Date Time Location Box Balance
    21.10.2014. 15:00:34 1 1 1237
    22.10.2014. 22:00:00 1 1 6742
    23.10.2014. 23:57:12 1 1 25
    So far I've managed to write a query that gives me balance for ONLY ONE date (date with highest time in whole table), but I need balance for EVERY date in specific period.
    My incorrect code (didn't manage to implement "BETWEEN" for dates...):
    SELECT TestTable.[Date], TestTable.[Time], TestTable.[Location], TestTable.[Box], TestTable.[Balance]
    FROM TestTable
    WHERE Time=(SELECT MAX(Time)
    FROM TestTable
    WHERE Location=1 AND Box=1 );
    Tnx!
    Solved!
    Go to Solution.

    For loop
    following query keep day (here 24 in below query) Variable from ( 1 to 28-29/30/31 as per month)
    SELECT TOP 1 TestTable.[Date], TestTable.[Time], TestTable.[Location], TestTable.[Box], TestTable.[Balance]
    FROM Test Table.
    WHERE  Time=(SELECT MAX(Time) FROM TestTable WHERE Location=1 AND Box=1 )
    AND DATE = "2014-10-24";
    PBP (CLAD)
    Labview 6.1 - 2014
    KUDOS ARE WELCOMED.
    If your problem get solved then mark as solution.

  • Axis scale for scatter plots

    I'm trying to create a specialized scatter plot, which functions similar to Excel's scatter plot. I'm having problems determining what the min and max values should be for the axes. I would like the program to determine from the input data what the initial min and max values should be on the x- and y-axis, the user can adjust later.
    So, I don't want the program to just look at the maximum value imported and round up. For instance, data = {523.7, 514.4, 271.8, 128.5}. The max value is 523.7, round up to 524. Instead, I would like to program to make 600 the largest value on the axis, because that makes it nice round number for the user to view the dataset.
    Then, I thought it really depends on the range of the data. For instance, data = {523.4, 523.8, 523.2, 522.8, 523.9}. Here, the range is very small, so it doesn't make sense to have 600 the largest value on the scale. The largest value should be 524 or 525, and the small value on the axis scale should be 521 or 522.
    Has anyone else ever worked with this problem, or have a good solution? I would really appreciate it, I've spend way too many days working on this.
    Thank you,
    Joe

    This is off the top of my head and based on a slight variation of your data.
    data: 52.34, 52.38, 52.32, 52.28, 52.39
    min=52.28 max=52.39 range=0.11
    Looking at the range we see it is "on the order of" 0.1. Ie, it is closer to the next lower power of 10 (0.1) than it is to the next higher one (1.0). So we round min down to the next lowest multiple of 0.1 (52.2) and round max up (52.4). 52.2 and 52.4 can serve as the nice numbers.
    The range is just a little bigger than a power of 10, so it might be a good idea to check what happens when it's a little less.
    data: 135 226 141 143 etc
    min=135 max=226 range=91
    range is on the order of 100, and the nice numbers are 100 and 300.
    As a variation on this strategy if we always find the power of 10 below the range (10 in the second example) we get a tighter fit but the numbers are slightly less nice - 130 and 220.
    (I'm pretty sure I've seen - and used! - some java software from the Internet somewhere to find the best scale for axes, so it might pay to look around)
    Had to edit my second example and, while I was waiting, found what I have used for this sort of thing: http://geosoft.no/software/index.html (The NiceNumbers class - it finds numbers along a range suitable for major and minor "ticks" but, if memory serves me correctly it extends the range so that the ends are nice too.)

  • How to specify height dynamically for each showDetailItem

    Hi,
    I'm using JDeveloper 11.1.1.6 version.
    I have the following requirement:
    I have a create page with one <af:region>.
    The <af:region> displays a page with <af:PanelTabbed> component having 4 <af:showdetailItem> components.
    For each tab I would like to specify the height dynamically based on the content of the tab.
    Any pointers would be helpful.
    Thanks
    Ravi

    Hi,
    actually its the parent component (panelTab) that determines the size
    To quote from http://docs.oracle.com/cd/E23943_01/apirefs.1111/e12419/tagdoc/af_showDetailItem.html
    Geometry Management
    This component should never have any width or height specified in its inlineStyle because it will always gets its dimensions from its ancestor component.
    Frank

  • Specify datafile name for each partition - possible?

    Is it possible to specify datafile to be used for each partition of a large table (in 10g or 11g)?

    movilogo wrote:
    Thanks for replies.
    My intention is that Oracle access only the relevant datafile on disk depending on what query I execute.
    I wanted to separate each datafile so that no unnecessary disk access happens.
    So, I understand that I can specify tablespace for partitions and data will be written in underlying datafiles.True,
    As such am not sure why you think oracle would unnecessary do disk access for anything in which he is not interested it or is not required even if your partiton happened to be in same tablespace
    Regards

  • Dynamic series in flash chart & color specified for each series

    Example of data:
    Date     Series 1     Series 2     Series 3     Series 4     Series 5     Series 6     Series 7     Series 8
    A     12     22     23     22     22     10     10     10
    B     10     9     55     8     8     20     20     20
    C     55     2     5     88     5     15     15     15
    In excel, I can get a stacked horizontal bar chart with the numbers of different series stacked and it is easy to specify the color for each series (it works with Dephi aslo).
    I use a PL/SQL to generate the dynamic series for the chart. And in my application, I need to show some serires with the same color (group of series, each has a specified color). One of the solution I am trying is to input a fixed color sequence and loop it many times in the custom color theme and then insert dummy series into the SQLS. But this could be a disaster while the number of group goes up.
    Anyone has better idea on this? Or is this a limiation of apex?
    Thanks.

    As I tried, apex can support 300 series at most. Dynamic series here is not a good solution still.

  • Specify duration for each assignment stage in an approval task - sharepoint designer workflow

    HI
    I am trying to create an approval workflow in sharepoint designer. How do I configure different duration for each participant in a approval task .?

    I had a similar issue. Best way I found was to go into the 'Before a Task is Assigned' of the task and then Set Task Field Due Date - to the date needed.  If you need to get into specific time of the day, it presents additional issues.  First the
    workflow doesn't have a 'current time' function.  If the task is being created at the start of the workflow, you can use Workflow Context Date/Time started and calculate from there.  If you are adding a task, or the
    task is occurring after a previous task, you can make a workflow field and on the 'When a Task Completes - assign it the value of Current Task Last Modified.  Also, it seems their is bug where it doesn't recognize the
    time-zone correctly when you update the Due Date in the workflow process.  So if you see unexpected results for the time in the duedate value, may have to adjust for however many number of hours your timezone is from GMT.

  • Is there anyway to scale the x-axis when I have an uneven interval for my values?

    It looks like this and I need the values to scale...

    Change the first column so it is NOT a header and use an X-Y scatter chart.  Also make the first row a header like:
    now select the data in the table then select the X-Y scatter from the charts menu:
    Same chart using a log scale for X:

Maybe you are looking for

  • Frozen Pointer HP G62 Notebook PC Windows 7 Home Premium

    Every 3 or 4 days my PC's mouse pointer stops moving when I touch the touch pad.  The light on the touch pad also illuminates. To continue, I press the Microsoft key (between the <fn> and <alt> keys, then <tab> <tab> which shuts down. The shutdown cl

  • ITunes Submit Podcast - difficulty downloading episodes from feed

    Was instructed to start a need thread after reading several of the others. This is the error I am receiving when submitting my podcast feed, "We had difficulty downloading episodes from your feed." I tried a couple of the solutions offered but I am s

  • Siri working all the time

    siri working all the time unable to reset to avoid siri

  • Invoke SWF files in Forms 6i

    hi, i like to invoke my flash animated file in a form runtime is any one have any idea about. Khurram Kazmi

  • Scripts Listed Forever? How to delete?

    I use iCal to run a number of scripts that repeat, some weekly and some on certain days. I just reorganized my script directory. I have tried to "select" the scripts in their new locations and found that I couldn't (Bummer). To solve the problem I ne