Stop running asm rebalancing proecss

Hi,
I'm working on an Oracle Database 11g Release 11.1.0.6.0 - 64bit Production With the Real Application Clusters option.
I added a new disk to a diskgroup, and the rebalacing process started.
Is it possible to stop it, and re-run later manually?
If it's possible, there are some bad side effects of this operation?
Thanks in advance,
Samuel

No this is not possible.
You should have waited adding the disk until it was more convenient, or manually set the rebalance power to e.g. a value of 1 ( one ), so it is not very resource consuming
HTH
FJFranken

Similar Messages

  • How do I get an actor to wait for its nested actors to stop running before stopping itself?

    I'm developing a series of projects that are based on the Actor Framework and my actor dependency hierarchy is starting to get some depth. One of the issues I'm facing now is making sure that each actor will only stop running (and signal this via a Last Ack to a higher-level actor or via a notification to non-AF code that launches it) once all of its nested actors have stopped running.
    For instance, say I have a type of actor that handles communication with a microcontroller over USB - a USB Controller Actor. I might want to have an application-specific actor that launches USB Controller Actor to issue commands to the microcontroller. When shutting down, I want this top-level actor to send a Stop Msg to USB Controller Actor and then wait to receive a Last Ack back before sending a notification within a provided notifier to the non-AF application code, which can then finish shutting down completely.
    I'm sure that having actors wait for all nested actors to shutdown before shutting down themselves is an extremely common requirement and I'm confident National Instruments have made it possible to handle that in a simple, elegant manner. I'm just struggling to figure out what that is.
    The approaches I've experimented with are:
    Creating a pseudo "Stop" message for an actor that won't actually stop it running straight away, but instruct it to stop all nested actors, wait for their Last Acks and then shut itself down by sending Stop Msg to itself. This isn't elegant because it means the client will be forced to fire off these pseudo stop messages instead of Stop Msg to certain actors.
    Instantiating an internally-used notifier and overriding Stop Core.vi and Handle Last Ack Core.vi. The idea is that within Stop Core.vi, I send Stop Msg to each of the nested actors and then make it wait indefinitely on the internal notifier. Within Handle Last Ack Core.vi, I make it send a notification using this notifier which allows Stop Core.vi to continue and perform deinitialisation for the top-level actor itself. Figures 1 & 2 below show this approach. I wasn't confident that this would work since it assumed that it was possible for Stop Core.vi to execute and then Handle Last Ack Core.vi to concurrently execute some time after. These assumptions didn't hold and it didn't work. It would have been messy even if it had.
    Overriding Stop Core.vi, making it send Stop Msg to each nested actor and then waiting for an arbitrarily long period of time (100ms, 200ms, etc.). What if a nested actor takes only 10ms to shut down? What if takes 400ms?
    The figures below show how I implemented the second approach. Ignore the broken object wires - they only appear that way in the snippets.
    Figure 1 - Stop Core.vi from the second approach
    Figure 2 - Handle Last Ack Core.vi from the second approach

    tst wrote:
    It wasn't that hard to find - https://decibel.ni.com/content/thread/27138?tstart=0
    But with dozens of posts, I have no intention of rereading it now.
    Also, when crossposting, it's considered polite to add a link, so that people can see if the other thread has relevant replies.
    Thanks. I've only read the first page for now but I find this interesting (I'm not sure how to format non-reply quotes, sorry):
     "AristosQueue wrote:
    CaseyLamers1 wrote:
    I think that this would be a nice addition. I think how a program stops is just as important as how it starts.
    I think everyone who has worked on AF design agrees with this. Indeed, managing "Stop" was *the* thing that lead to the creation of the Actor Framework in the first place. The other issues (deadlock/hang avoidance and resource management) were secondary to just trying to get a clean shutdown.
    CaseyLamers1 wrote:
    I find the current code a bit lacking.
    My concern would be that the mixing of a verified stop and a regular stop could create confusion and lead to people having trouble during editting and testing with the project ending up locked (due to VIs left running which did not shutting down).
    Your concern is to some degree why no verified Stop exists in the AF already. We looked at each actor as an independent entity, and left it open to the programmer to add an additional managment layer for those applications that needed it. But over time, I have seen that particular management layer come up more often, which is why I am exploring the option."
    So that gives one of the reasons why this hasn't already been implemented but also points out that it's something quite a lot of people want.
    > Also, when crossposting, it's considered polite to add a link, so that people can see if the other thread has relevant replies.
    Noted. Here's the discussion: https://decibel.ni.com/content/message/104983#104983
    Edit: since there doesn't seem to be any NI-provided way of doing this yet, I suppose I'll try rolling my own at some point. The ideas posted in the discussion you linked seem pretty useful.

  • I have the lastest (10.7) I tunes software running on a 64 bit windows 7 system. Today it stopped running all of the tv shows I have downloaded. The error message says that a "problem has stopped i tunes from working and windows is shutting it down" ?

    i have the latest (10.7) itunes installed on a 64 bit Windows 7 based system. Up unitil today I had NO  problem running the TV shows that I have downloaded from I Tunes.
    Today it stopped running all videos. It loads the information in the top box about length & name. An error message pops saying "an error has caused I tunes to stop working". "Windows will check for a solution and notify if therer is a solution."
    Music plays fine so i know that something works on itunes.
    Any ideas?

    Try the following user tip:
    iTunes for Windows 10.7.0.21: "iTunes has stopped working" error messages when playing videos, video podcasts, movies and TV shows

  • TS5376 I have a laptop that i am running with Windows Vista. A while ago, it stopped running iTunes and comes up with the error : Runtime Error: R6034 - An application has made an attempt to load the C runtime library incorrectly.

    I have an iMac as my home computer, upgraded to this about a year ago from a windows pc and love it.
    However...
    I have a HP Compaq laptop that i am running with Windows Vista, which I use when travelling. A while ago, I believe on an update, to either windows or itunes, it stopped running iTunes and comes up with the error : Runtime Error: R6034 - An application has made an attempt to load the C runtime library incorrectly.
    I have a reasonable amount of tunes stored on my laptop, and am unable to ascertain as to whether this fix for allowing itunes to work again will delete my music folder and lose all the tunes i have on my laptop already?
    The contents of my music folders on my laptop and iMac are not the same, as they are not synced!
    Any help please on this would be appreciated!
    Pete

    See Troubleshooting issues with iTunes for Windows updates. The second box covers the basic removal and repair steps. The rest is links to other useful resouces.
    tt2

  • Is there any way to stop running apps from showing in dock

    Is there any way to stop running applications from showing in the dock

    MacUpdate.com for OnyX or TinkerTool, one of those has the ability to lock the Dock so no changes occur, basically giving you what you want.

  • I tunes won't open. No warning message, just the first terms agreement opens and when i agree itunes stopes running. I just wiped and reinstalled everything including windows. I updated everything fully. Deleted spybot unintalled and reintalled new

    I tunes won't open. No warning message, just the first terms agreement opens and when i agree itunes stopes running. I just wiped and reinstalled everything including windows. I updated everything fully. Deleted spybot unintalled and reintalled the newest and one older version of itunes. still nothing. I tried to delete some files that is hidden as directed by apple. I have been trading emails with customer support but it has been no help at all. I am running Windows XP. Before i wiped my computer I ran itunes with no problem, on this computer, this week.

    WOOOOOOOOOOOO!!!! JUST WANTED TO UPDATE Y'ALL THAT BY SOME STROKE OF HEAVENLY GLORY, ITUNES DECIDED TO WORK AGAIN!!!
    WOOOOOOOOOOOOOO!!!
    How did I do it you ask??
    after all the stuff I updated you about, I tried one last time to install....still didn't work...so once again I wiped my system of everything itunes and apple related
    well today I was trying to watch a video that required me to get the quicktime plug in, and it too me to a page that was a quicktime install + itunes 7.blah blah blah instead of the other way around
    well, don't ask me why, but low and behold
    IT WORKS!!!!
    I HAVE MY ITUNES BACK!!! (JUMPS FOR JOY)
    Just wanted to share my shear elation

  • I get a window pop up after every click into a new site that reads : Safari is no longer responding because of a script on the webpage "    ". Do you want to stop running the script, or let it continue? If I  click on continue it just continues,

    I get a window pop up after every click into a new site that reads : Safari is no longer responding because of a script on the webpage "    ". Do you want to stop running the script, or let it continue? If I  click on continue it just continues, stop, it stops.  How to correct this annoying message?

    Disable Javascript for those webpages.  Note, your Javascript is probably antiquated by now.  Try a different web browser, or contact the website and let them know they aren't as accessible as they could be*:
    http://www.macmaps.com/browser.html

  • In the middle of my vacation and the sync of my photos stopped running, what happened?

    In the middle of my vacation and the sync of my photos stopped running, what happened?  I have looked for online answers and cannot find anything.

    For transfers to occur, you must be using wifi and the photo app must be shut down.  It may also take some time for photos to sync across, and many users claim thier photos don't sync via photo stream.  My impression is that photo stream is still beta, given the problems with it.

  • XLreporter scheduled tasks stopped running

    Hi Experts,
    We are experiencing problems on XLreporter scheduled tasks.
    They worked properly with sending emails as daily routine. However for some reason they stopped running in windows Task Scheduler. We can still run the jobs thru manually in XLreporter Organizer with correct result and sucessful logs. In the mean time the service of Task Scheduler is ok for other tasks than XLreporter.
    What we can see in Event Viewer is the error message with two other information message below for each run:
    Error:
    The VB Application identified by the event source logged this Application IXExecutor: Thread ID: 5904 ,Logged: An error occured while Initializing Job
    Object variable or With block variable not set
    Info:
    The VB Application identified by the event source logged this Application IXExecutor: Thread ID: 5904 ,Logged: Before deleting mclsIFDSApp
    Info:
    The VB Application identified by the event source logged this Application IXExecutor: Thread ID: 5904 ,Logged: IXExecutorProxy - ExecuteJob: Before Exit Sub
    The SBO version 8.8 PL14 on windows server 2003 R2 SP2 ,SQL Server 2005
    Can you please advise? Many thanks Ryan
    Edited by: Ryan Fu on Jun 22, 2011 3:55 AM

    Just found this one too:
    Note 855021
    If you want scheduled report jobs in XL Reporter to be executed independently of the logon status of the user who defined the job, you must allow Microsoft Excel to be started by the scheduled job.
    1. Choose Run from the Windows Start menu and type dcomcnfg.exe. A window called Component Services appears. Choose Component Services->Computers->My Computer->DCOM Config->Microsoft Excel Application from the list.
    2. Right-click on Microsoft Excel and choose Properties. Choose the Security tab.
    3. Choose Customize under Access Permissions and choose Edit...
    4. Choose Add... and choose Users and/or User Groups that require access to Excel. Then choose OK.
    5. Repeat the procedure for Customize under Launch Permissions.
    6. Choose the Identity tab.
    Choose This User.
    Choose a user that is a member of the administrator group from the browse button and enter password.
                  This user will be the one that is given access to Microsoft Excel when executing scheduled jobs. Normally this would be the Administrator user.

  • Tomcat 6 stop running while Oracle XE runs

    Hi All,
    =========
    My Env:
    Ubuntu 10
    =========
    After a full day's research & work I managed to install Tomcat 6, Cocoon & Java files successfully. The following is my problem.
    I have an existing Oracle XE running with Apex 3.2.
    When I start Tomcat 6 it gets started fine, but in few seconds it stops running and gives the message " Tomcat servlet engine is not running, but pid file exists.". I can stop & start this, or restart this but the same problem happens again after few seconds with the same message ( I know this by checking the status). During this few seconds running I am able to access it via the browser by http://localhost:8180 ( I modified the port from 8080 to 8180). Apex uses port 8080. During this time I don't have any problem with Apex (set to run at start up).
    When I stop the Oracle Database and start Tomcat 6 it works fine, it continues to run perfectly. Again when I start the database, I am unable to access Apex via port 8080 & get the message "can't establish a connection to the server at 127.0.0.1:8080."
    Can anyone please help me?
    Thanks ever so much
    Naushad

    Hi Naushad,
    you probably have missed a setting to migrate the tomcat to port 8180. The behaviour you describe fits to the one I'd expect for a port conflict - either service runs perfectly when he's "alone", but doesn't work if the other one started before.
    You can fix this on both sides. Reconfiguration of the port your EPG hosts your APEX may be a little easier. You just have to login as sys and execute the following block:
    begin
      dbms_xdb.sethttpport(8081);
    end;
    commit;Change the port to whatever value you want.
    To change your Tomcat port configuration, you probably edited the following piece in your server.xml
    <Connector port="8080" protocol="HTTP/1.1"
    ...You'll find other ports used by the Tomcat in that file as well. Make sure you don't have a conflict with some other service.
    I'm running a Tomcat next to XE on Ubuntu 8.04. Since I had to reconfigure the Tomcats default SSL Port (8443 was already used by another web server on that machine), I moved all Tomcat ports from 80XX to 100XX, keeping the EPG on port 8080, and it works fine for me.
    -Udo

  • How to take action when vi stops running

    Sorry for the newbie question but I can't seem to find the answer anywhere. How do I go about taking action such as turning off leds or reseting some variables when my vi stops running. Is there some sort of boolean flag that I can read to determine if the vi is running or a flag that gets set when the vi terminates? Thanks in advance.
    Solved!
    Go to Solution.

    The state of the LEDs should not be important if the VI is not running (edit mode), it is however probably important that they are off next time you run the VI.
    To make sure that indicators start out at the desired defaults when the VI starts running, go to "VI properties...Execution" and enable "clear indicators when called".
    LabVIEW Champion . Do more with less code and in less time .

  • How does one get officeclicktorun.exe to stop running?

    Since installing Outlook 2013 I noticed that officeclicktorun.exe has been consuming the most CPU of any running app.  It takes focus of the machine when I'm in the middle of working on another app which is very annoying.
    I understand that it's installed on any machine with an Office 2013 product and automatically set to run.  I can't understand why a simply update program would consume so much CPU.  Is this a known issue?
    I found that there is a scheduled task that was set to run automatically. I turned that off and now the program won't run until I run Outlook.  But once I run that, the program takes off and becomes a resource hog. 
    I went to Office -> Office Account and disabled all updates.  The program still runs like crazy.  I tried disabling the service but then Outlook won't start.  How can I use outlook without an additional app that appears to be a resource
    hog?
    I got in the habit of using Outlook and then killing that .exe.  That doesn't work.  The .exe keeps coming back for no known reason.  I can disable the service to get it to stop running again but then I have to re-enable the service if I want
    to run Outlook again.  This is crazy!
    I can't believe that a simple method of stopping all automated upgrade activity isn't being provided by Microsoft.

    Hi,
    Officeclicktorun.exe runs as a service named 'Microsoft Office ClickToRun Service' (ClickToRunSvc). It helps manage resource coordination, background streaming, and system integration of Microsoft Office products.
    As far as I know, this service is required to run during the use of any Microsoft Office program, so you cannot just stop it permanently.
    It shouldn't consume "that" much CPU. Is your Outlook update to date? Try to update it to the latest version and then verify result. Or you might need to
    repair your Office 2013 and see if it's due to an improper installation.
    Regards,
    Ethan Hua
    TechNet Community Support
    It's recommended to download and install
    Configuration Analyzer Tool (OffCAT), which is developed by Microsoft Support teams. Once the tool is installed, you can run it at any time to scan for hundreds of known issues in Office
    programs.

  • Installing Patch 9.2.0.5: Weird "Stop Running Services" Screen

    Hi to all.
    I found this issue in several places, including this forum, but I never saw a working proposal for a satisfying solution. Installing Oracle Patch 9.2.0.5 over a 9.2.0.1-Installation on XP Pro, I was confronted with a "Stop Running Services" screen, that listed ALL running Windows Services, even the most basic ones, which are required for a working OS and cannot/should not be stopped. Of course I had stopped the Oracle listener and instance services (including the recovery service, omtsreco.exe).
    I found using TASKLIST.EXE or LISTDLLS.EXE, that many Oracle DLLs like ORAPLS9.DLL were used by a command "svchost -k netsvcs". But I could not find out, where and for what reason this command is launched and how I can prevent this launching without hazarding the system. The string "netsvcs" can not be found in the registry, for instance.
    At least, somehow I managed to do the job, but I cannot exactly recall all the steps I took! At the "Stop Running Services" screen I chose "Abort current component and continue installation", and after install finished (it said something like "install finished with errors" or that like), I was left with a non-functioning Oracle client. Whopee! It told me "Bad function entry point" when I tried to start SQL*Plus. Desperately, I started the patch installation a second time. THIS time I installed OUI 10.1.0.2 as a first step (which I did NOT during the first round), and then started patch install. Strangely, this time I was presented another flow of dialogs (Sorry, but I missed to make notes about the exact titles and the dialog flow), which took MUCH MUCH longer ("Analyzing Dependencies" for example, took 1.5 hours to complete), and I really do not know, how or whether I was confronted with a "Stop Running Services" issue), but after all I really managed to complete the second try successfully, and the client functions worked again (SQL*Plus reported the correct version, 9.2.0.5).
    Before I'm driven through this hell again (I have to patch several workstations running 9.2.0.1), I'd like to know,
    - Whether the issue has been solved, that the "Stop Running Services Screen" lists
    most basic services like "Event Manager". Could it have been caused by using the
    wrong OUI version or under what circumstances will it appear?
    - Secondly, what is this mysterious "svchost -k netsvcs" (netsvcs = NETSerViCeS ?)
    locking many of the DLL files in the Oracle "BIN" folder. It is definitely NOT
    one of the Oracle listener or instance services (all of which start with "Oracle").
    How can this service be disabled or be prevented from loading the Oracle DLLs?
    Sorry for the long story and partially unclear details, since I do not recall all of the long installation session. Any input is welcome.
    Werner

    Ok, "netsvcs" CAN be found in the registry, but I used FINDSTR.EXE to seach a UNICODE .REG file, and of course had no hits. Meanwhile, I learned more about SVCHOST.EXE and it's service groups, one of which is "netsvcs". In HKLM\SOFTWARE\Microsoft\Windows NT\CurrentVersion\SvcHost, I found a value and a key named "netsvcs", the value contains this string (abbreviated):
    "6to4
    AppMgmt
    AudioSrv
    Browser
    CryptSvc
    helpsvc
    xmlprov
    wscsvc
    WmdmPmSN".
    These are the symbolic names of the services presented to me in the "Stop Running Services" screen! Now it's clear, why this screen appears, since "svchost -k netsvcs" is the process locking the Oracle DLLs.
    But the question remains: WHY does "svchost -k netsvcs" need access to Oracle DLLs? Which system or application setting controls whether svchosts tries to load the DLLs?
    Still puzzled. Werner.

  • Interface Trip Stop Run - Log file showing an Error

    Hi
    When I run Interface Trip Stop Run - SRS, Request completed successfully but it has the following error. " Failed GMI_Shipping_Util.GMI.UPDATE_SHIPMENT_TXN for Delivery Id 38237"
    In Sales Order the Line Status is Closed.
    In Shipping Transactions Form the Status is Showing Shipped.Next Step it Run Interfaces.
    When I checked the Lot Qty in Lot Genealogy the on hand qty of that lot is Zero.
    And the transaction is showing Pending in Item Transaction Inquiry.
    Please tell me how to proceed with this sales order.
    Thanks in Advance
    Prem.

    Its a concurrent program.
    Submit a request with name: Interface Trip Stop - SRS.
    i have tested and this will resolve your query too.

  • Ios 7.0.2 issue: how to stop running programs

    I am a new iPhone5 user and just installed ios 7.0.2 (maybe I should not have but I did). Now I don't know how to stop running programs. Previously
    I double-clicked the Home button, then saw the icons that represented running programs, then could lightly touch one of them which led to all of them
    showing a X for a potential delete. That does not work now so how do I do it?

    Double click the home button and then swipe up on the app screenshots.

Maybe you are looking for

  • Smartview 11.1 - Excel 2007

    Hi We have just upgraded from Excel 2003 to Excel 2007, and are using Smartview 11.1 and HFM 9.3.1. When refreshing on the Excel 2003 files it is extremely slow, are there any changes that are to be made? Regards

  • COM License bridge :addons works fine on server side but not on client side

    hi, i'm using the com license bridge to fetch license information for my addon. When i start my addon on the server where the license bridge was installed and registered everything works fine. But when i start my addon at client side the following er

  • Dataslices are not considerd in case of certain drill down

    Dear Expers, we are using SAP BW with EHP 1. The planning scenario is following: We are having 4 Characteristics (A, B, C, D) and one Keyfigure (K1) and we create a dataslice for A, B, C, D via Exit-Class. Now in our plan query we have following dril

  • SAP IDU-IDE

    HI SURELY THERE ISNT ANYTHING CALLED SAP IDU-IDE? or is it SAP ISE-IDE? aslo is there anything called workflow in IDE? and is there ayn documentation shwoing how this works ?

  • Mass UD and result recording in QM

    Hi, please suggest a method how mass result recording and usage decisions can be given in QM, also kindly advice the table for UD and RR. thanx,