Sub Contracting Sale of component

Dear All,
Is it possible to sell Subcontracting component provided to sub contractor if there is an underconsumption of the component, to the same subcontractor without taking the components into companys own stock.
Bestg Regards,
SK

Hi,
This procedure provides the way of manual payment for Subcontract expense.
I want to clear Accrued revenue by deduction AP using T code /n/SAPNEA/JSCR19
While posting, I am getting error message “Amount too large to clear", maybe the system set the limit for the tolerance value for clear document. Please suggest me, where to change the settings.
Rahul

Similar Messages

  • Sub-contracting with chargeable component.

    Hi All,
    I am doing following scenario
    Scenario: Sub-contracting with chargeable component.
    Activity: Clearing (Consumption-Based)
    T Code - /n/SAPNEA/JSCR19
    Amount: 23,100,000
    While action posting, we are getting following error message
    Error Message: E The difference is too large for processing
    Kindly suggest where to do necessary changes in the system.
    Rahul

    Hi,
    This procedure provides the way of manual payment for Subcontract expense.
    I want to clear Accrued revenue by deduction AP using T code /n/SAPNEA/JSCR19
    While posting, I am getting error message “Amount too large to clear", maybe the system set the limit for the tolerance value for clear document. Please suggest me, where to change the settings.
    Rahul

  • Sub Contract Process

    Dear Experts,
    I need to complete a sub contract sales process in SAP.
    My requirement is
    We will dispatch Rawmaterial ex: 10000 TON to sub contractor who will process the Raw material and will supply us back ex: 6000 TON of finished good.
    I tried completing this process through standard SAP process
    (1 ) Creation of 3rd party sales order
      2) Creation of 3rd party PO against the PR number generated from sales order
      3) Stock transfer through MB1B
      4) GR through  MIGO
    My issue since I have tp dispatch TONs of raw material, I need a system to record all the good moevemnt truck by truck.
    ex: Against a PO 30 truck dispatched, but through MB1B i am able to do only bulk.
    Please guide on how I can include this process alsoin SAP.
    Thanks.

    you try to achieve this?
    - Create a PO for 100000 Ton of material.
    - This should be carried/transported by 30 trucks/dispatches to the Subcontractor.
    - Create a goods Issue to Subcontractor
    The conversion of base unit of measure seems a bit complex here due to the variance in truck weight ( one truck can be loaded 1 Ton and a second truck be loaded 3 ton).
    Are these trucks leaving the plant at the same time/day?
    Do you need to issue goods on a per truck basis, or can you do it on weight basis?
    regards
    Sidi

  • Sub contract in sales

    I need sub contract in sales.
    Ex:
    Customer sent material to plant they need some process in our plant for that I need scenario and configuration.
    How we allow customer material into plant?
    After finished work how to deliver products to customer and billing also.
    Please help me any one

    Hi Dharmananda rao
    Sub Contracting Cycle :
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    DR FG Stock/ SC By-Product Stock
    CR Change in Stock (FG/ SC By-Product )
    (for finished goods received)
    DR Subcontracting Charges
    CR GR/IR Clg
    (for moneys payable to Subcontractor)
    DR Consumption (Components)
    CR Change in Stock (FG/ SC By-Product )
    (material provided to Vendor is now charged to expense)
    5) You do the IV for SC Invoice, and the process is complete.
    Process of Subcontract in MM :
    Sub-contract business process:
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
    Vendor shall process the item / use the item provided & supply the final item.
    SAP process:
    1.Create the finished goods material code.
    2.Maintain the BOM for the material.
    3.Create PO with item category as "L" .
    4.Issue material to vendor with movement type 541
    5.Receive the material against the PO with movement type 101.
    6.MIRO to account for vendor's invoice for the service charge& material used by him.
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting.
    1. Item code(material master) to be created at the stage of before dyeing.
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
    3. Bill of material to becreated for the material(2) calling for material(1)
    4. Inforecord and source list to be created for material(2) with the corresponding vendor
    5. PO to be released for material (2)
    6.Along with PO the material(1) to be issued to vendor
    7.On receipt of material when GR is made the stock with vendor will get updated.
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows:
    Enter the material you want to order and the item category for subcontracting (L) in the order item.
    Press ENTER to display the screen for component processing.
    Enter the components that the vendor requires to manufacture the product.
    Please note:
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check.
    If you entered a bill of material as the material in the subcontract order, the components are created automatically.
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
    Save the purchase order.
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Reward if useful to u

  • Swap between two different item categories in sales orders for sub-contracting

    Dear gurus,
    my requirement is to have the ability to swap between two different item categories for sales orders for sub-contracting.
    This should be controlled by a combination of the material and a value maintained the Usage field in the Customer Material Info Record (for example by entering a ‘V’).  A combination of Sales Doc Type, Item Cat Group and Usage should result in the creation of a purchase requisition.
    In the event that a process order is required instead of a purchase requisition (i.e. the product is to be manufactured in-house instead of sub-contracted) the user must have the ability to change the Item Category within the sales order to produce a process order.
    The user would just change the item category within the sales order, and the system would automatically remove the purchase requisition assigned to the SO, and create a process order and assign it to the SO.
    Can you suggest any possible solution?
    Thank you in advance.

    Hi Majlo,
    In my system, I checked.  First created sales order with third party line item and then changed item category to normal item category.
    Till Purchase order not created, I can change Item category of my sales order line item.
    In this case SAP inform by log and once save delete purchase requisition of that line item .
    For this you need to assign another item category as an manual item category in SPRO Item category assignment.
    After this user can manually change item category to other one manually, if PO do not exist.
    Please let me know if your query is different.
    Regards

  • Sub-contract order as sales order

    how to treat the sub-contract order as a sales order....the stock is not getting reserved for sub-contract orders...

    In copying Control for Contract to Sales order (tcode VTAA), in header deselect Copy item number from reference. As it indicates whether the system copies the item numbers from the source document into the target document.
    Thanks & Regards
    JP

  • Sub contract cost against sales T.codes & path

    Hi,
    Please find out the T.code and path for subcontract cost against sales.Very urgent.
    Regards
    R.Manigandan

    Hi,
    I check it but did`t solve my problem,actually my problem is my client want to generate list of sub contract list against sales he wants any tcodes or path.

  • Profit Center Assignment for Component of Sub Contracting PO

    Hello all!
    I apologize in advance if this is not the correct forum to post this question in. Additionally, I am an ABAPer with a focus in SD and MM, so much of FI is foreign to me.
    To the problem...
    Currently when a MIGO 101 is processed for a Sub Contracting PO Line item, a consumption transaction (543) is generated for the component materials on the PO Line. These consumption transactions are "tied", this is how my finance co-worker described it, to a Cost Center dedicated to Sub Contracting.
    We would like to change the configuration as follows:
    When the consumption transaction posts, it "ties" to the Profit Center (and thus cost center) of the Parent SKU (actual material received on PO Line) of the transaction.
    Is this possible?
    Thank you,
    Steven Coolbaugh

    Hi Steven:
    Not sure if I understood correctly your requirement but let me try to explain:
    For consumption items (Account assignment category K in PO line), it is consumed immediately on GR and consumption is posted to a cost center attached to PO line. And that is what happening in your exising process also, right?
    Now when you said "TO Be" change as consumption ties to the profit center (and then to cost center) of parent SKU??
    It is other way round. A cost center is linked to one profit center (whereas as a profit center can have many cost centers attached to it). Also since profit center is not a TRUE cost object (it is a statistical object), PO line would need a true cost object like cost center. So based on the information you provided in your post, it is not technically possible to book consumption at profit center (And then to cost center).
    Are they two separate cost centers (one for sub contracing and one for Parent SKU)? If yes, can you attach parent SKU cost center to PO line (from business point of view) so that consumption posts directly to parent SKU and then to the attached profit center?
    Hope it helps.
    Thanks.
    Rahul

  • Trading with Sub-Contracting Scenario

    Dear All,
    I have one requirement of Traded Material Scenario, where the material is delivered by Sub-Contractor directly to Customer.
    The details are -
    Sub-Contractor delivers material A to customer.
    The material A has BOM maintained, where component B is maintained in the BOM.
    My company purchases B from another Vendor & which is again directly supplied to Sub-Contractor. Sub-Contractor processes the component B to manufacture material A & delivers the same to my Customer.
    The following issues need to be addressed -
    1) Item category is L in Sub-Contracting, where as it is S in Third Party scenario. How can I have two item categories in same line item of Order.
    2) Excise paid by Vendor (supplier of component B) can be availed by Sub-Contractor as set-off & I have to debit the same to Sub-Contractor, as payment to Vendor for component B is  done by me.
    3) Excise paid by Sub-Contractor is to be inventorized at my end (as it is cost to me) & can be availed for set-off by the customer.
    Can anybody has any input for this?
    Regards,
    Prashant

    I think this process was earlier called as 52 A operations. 
    This is what we had done 52A did not have requirement of jobwork challan)
    1: Create the Subcontractor' Location as a "non excisable-Plant " in SAP.( The subcontract vendor was supposed to maintain his own excise records)
    2.PO for raw material /Component will be raised from Subcon Plant .
    3.The Excise in the PO will have to be configured as a Condition similar to VAT Deductible(so that during  MIRO it is sent to another GL account for tracking and further FI-debit note to recover from jobworker )
    4. The Production of the Main FG can be shown by Subcontracting PO .
    5. There has to be another Virtual Plant ( A RG23D registerd depot normally) which will depict your companys local office near the Subcontractors Location , as the Final SALES Invoice should be from your companys Name.
    6. Goods will first be sent by a STO to this Virtual Plant , here in This STO you can also add the Excise Duty condition types for Inventorization purpose.
    7. Create Sales Invoice (and if RD23D then  Depot invoice) from your Virtual Plant .( Excise invoice will be created by the subcontracting  vendor , against which your customer can claim Modvat)
    I have mentioned the Process above , for config settings of each process  you can check many threads here in SDN.

  • Delivery order for sub-contract processing scenario

    Hi experts,
    We got a requirement from our users to sub-contract certain production processing steps (or called external processing per SAP). Same part number would be used for the goods issue and goods receipt. But would like to make the delivery for the goods issuing as the delivery for normal sales parts. (Purchase order -> Delivery order -> Shipping and Packing)
    Sub-contract processing will generate purchase order like service order which only contains service fee item, and we found that no outbound delivery order can be created with reference to purchase order in standard SAP.
    Have you experienced such scenario before and could share to us please?
    Regards

    When moving subcontracting part to your subcontractor you can do it via:
    1. simple goods movement
    2. delivery
    1 Simple goods movement (transfer posting)
    - /w reference to PO (MB1B + 541)
    - w/o reference to PO (MB1B / MIGO + 541)
    2 Delivery
    Using the before mentioned ME2O you can create the delivery w/o reference to PO
    Please note that even if you use the MB1B541PO reference solution, system just suggests the component qunantity on the PO w/o making a real link between PO and goods movement. You can example do the MB1B541PO reference "as many times" as you want...
    So, as per my best knowledge there's no solution for your requirement.
    I guess one reason of system's behaviour might be that provision of compoenents doesn't depend on one single PO - if you want to reduce your shipment cost you will send out lots of components at once, more than the amount needed for one call-off.
    Regards,
    Csaba

  • Sub-Contracting for Make to Order

    Hi all
    We are having Make to Order Scenario. We have created a sales order and some materials for BOM have to send for Sub-Contracting Process.
    I have created a PO with Acct Assignment "E - Ind. cust. w. KD-CO"  and Item Category as "L".
    But as per Standard SAP Acct Assgnmt "E" and Item Category "L"  is not possible.
    Consider the Header material is "X "  and Component is "Y".
    I am having Material "Y " in Sale Order Stock. Now when i do MB1B using 541 mvmgt type the system is not allowing me to post .
    please suggest me this scenario how to proceed. 
    <b>For a Make to Order scenario how to do Sub-contracting Process.</b>
    Regards
    Kumar

    Hi,
    For transfering sale order stock to sub-contractor the movement type is 311-E. Here, you have to create the sub-contractor storage location & then transfer the stock (of BOM material) to sub-contractor storage location by movement type 311-E in transaction MB1B. While posting GRN of the upper material, system posts the consumption of the BOM material against the upper material.
    Hope this works.
    Regards,
    Prashant
    - Reward points if answer is helpful

  • Sub-contracting P.O

    Hi All,
    We have created sub-contracting P.O and while doing ME2O- create delivery.  We are getting below error msg.
        Depending on the category of the delivery being created, the system needs the following transfer data:
        o   Outbound delivery
            -   Shipping point, Sales organization,Distribution channel
                 Division,Material number,Delivery quantity,Ship-to party
                  Base unit of measure
    Inbound delivery
    Base unit of measure,Conversion factors for converting base and sales units (not for creating/replicating an inbound delivery in a decentralized Warehouse Management system)
    Goods receiving point (shipping point) when a delivery is
        created in decentralized WM
    Outbound and inbound deliveries from goods movements
    Shipping point
          -   Sales organization,Distribution channel,Division,Material number,Delivery quantity,Ship-to party,Base unit of measure
      Plant and sales unit transfer data is always mandatory.
    Please Anybody can tell me what configuration we have to do.
    Thanks and Regards
    Chandru

    You have to set up the shipping details just as you would do for a stock transport order with transfer posting happening through SD route. You have to set the delivery type for this document and the material should have sales/shipping data. Only then will the system be able to pick up the delivery type & thus create a delivery.
    This is given in detail in help.sap.com -
    From SC Stock Monitoring for Vendor as a Delivery via Shipping
    From the SC Stock Monitoring for Vendor list, you can also create a delivery via Shipping. The advantage of this procedure is that you have shipping documents and delivery notes for the shipment of the materials to be provided to the subcontractor (refer to  Goods Movements via Shipping)
    To create a delivery, the following data has to be maintained in the system:
    the plant must be assigned a sales organization, a distribution channel, and a division. You can define this in Customizing for Purchasing, in the step Set Up Stock Transport Order.
    A delivery type has to be defined for the plant from which the items are to be delivered. You can define this in Customizing for Purchasing, in the step Set Up Subcontract Order.
    If you want to reference a reservation when you create a delivery, you also have to set the Predecessor necessary indicator to L (Provision to subcontractor necessary) when defining the delivery type. This means that the requirements generated by the reservations can be correctly offset against the deliveries created. You can define this in Customizing for Shipping, in the step Define Delivery Types.
    The vendor for the stock with subcontractor must be entered as the customer in the organizational units in the delivering plant, such as sales organization, distribution channel, and division.
    The material to be provided has to be entered for the organizational units in the delivering plant, such as sales organization, distribution channel, and division.
    The combination of shipping condition (from the subcontractoru2019s customer master record), loading group (from the material master record for the components to be provided), and the plant have to be assigned to a shipping point. You can define this in Customizing for Shipping, in the step Assign Shipping Points.
    To create a delivery, choose Edit ® Create delivery. A dialog box appears, in which you can enter the data required to post the delivery. The system posts the delivery in the background and, after posting, it informs you in a dialog box how many items were posted.

  • BAPI/FM for goods receipt for a Sub Contracting PO

    Hi All,
    Is there a BAPI/FM to perform goods receipt for a sub contracting PO? BAPI_GOODSMVT_CREATE can not perform goods receipt for sub contracting PO.
    My purpose would be served if I can know how to find the component material of a subcontrcting PO.
    Please help.
    Thanks,
    Rana

    Thanks for your input
    Well, I wanted to ask if the BAPI is capable of performing GR for SC PO. Instead of a question, that went as a statement :-). Your recommendation helped me to find answer to my question.
    Thanks again.

  • Inbound delivery for Sub-Contracting Scheduling Agreement

    Hi All,
    I am working on inbound delivery creation --> PGR for sub-assembly (Semi-finished product) which we receive from sub-contracting vendor through scheduling agreement. At time of PGR, it should do MVT#101 for sub-assembly and 543-O for raw components.
    I already created JIT/FRC releases and did PGI (MVT # 541-O) for raw components. Now I am manually creating inbound delivery (VL31n) to post PGR. When I am doing PGR with VL60, I am getting below error.
    Any help or suggestion please ?
    As observation, I have seen that in inbound delivery I am only seeing sub-assembly (semi-finished) product. I am not able see "SC Component" tab which I have seen on other environment (ECC 6.0 with EHP4). Is it related to system limitation where we can't do PGR for sub-contracting ?
    Thanks.

    Hi AKPT,
    Sorry if i miss understood but note 352243 says to refer note: 338119
    "In the current release, it is not possible to process the components to be cleared when you post the goods receipt for the inbound delivery. (See Notes 338119, 197864 and 199703 also).
    However when you implement these corrections, the error log is also displayed for the subitems to be cleared and further processing can be carried as described in Note 338119."
    When I refer note : 338119, there is no correction. Am I missing anything ?
    Again my issue is I am not able to perform Post Goods Receipt. Even after doing PGR, if system do 543 for raw component, I am fine.
    Thanks.
    Regards,
    Ravi

  • Goods receipt through Inbound delivery for Sub-Contracting Purchase order

    Hi
    I am trying to do goods receipt for the inbound delivery /shipping notification created for a sub -contracting Purchase order. The Finished product and the component part are batch managed, When I try to perform PGR in VL32N , I am getting a blank screen as error message and Goods receipt is not getting triggered . I checked for OSS note and found 645119 close to my issue but not an exact match . We are in ECC 6.0 with EHP 4. Can some one clarify whether it is possible to post GR through inbound delivery for a Subcon Purchase order .
    Thanks in advance for your immediate response.
    with regards,
    Joseph Anand B

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

Maybe you are looking for

  • How to delete photos from iPhone 4 which have synced from computer

    I believe this dilemma has been documented many times before and I have in fact had to resort to resetting my iphone to factory settings to remove the thousands of photos which were synced from my computer in the past. Today however, after many attem

  • "AFP 10.3 download did not pass integrity check 162103.304.450"

    We have attempted to download AFP enumerable times on a Dell Inspiron with Win Vista 32 bit. We have followed so many suggested methods to download and trouble shoot that I cannot remember... 15, 20 or more.... And yes, security/antivirus were always

  • Tab rule in forms fields

    Hello Friends, Ive created input form with 15fields. How to set tab sequence during online using this form? E.G. sequence of field creation is f1,f2,f3,f4,f5. I want to set  tab sequence in online work in portal to: f1,f3,f5,f2,f4.  Default, the tab

  • I cant redownload OSX 10.8 in Mac App store

    I purchased a copy of OSX 10.8 in Mac App store. After that, when i wanna re-download this, i can't find it in the purchased list, even when i use the Option button! So please show me how to re-download the installer again without cost, i paid it! I

  • Can't get onEnterFrame working on MC in a class

    Hi, Can anyone take a look at this class file that's in the works, and help me understand why the onEnterFrame that's created in the startRewind() method is not working? Much thanks!