Subcontracting scenario in Warehouse management

Hello,
We have an existing subcontracting scenario in IM.
Recently  we have implemented WM.
I would like to know whether there are any customizing settings required to be made to take care of WM part.
And what would be the additional transactions required in WM( I think it will be  LT03 after ME2O and LT06 after MIGO ??).
Thanks & Regards,
Pankaj

HI ,
In Ware house management you can block the stock for Physical Inventory purpose. You cannot post the stock to the warehouse using Physical Invenory.
If there is a count going on so the concerned Warehouse bin is to be blocked during Inventory so that no further goods movement is possible during that period.
Once the Physical Inventory ids done the block can be released so that the movement can again happen.
The Inventory mangement initiates the transfer requirement. This transfer requirement is used for creating the transfer orders. The transfer order confirmation is done then which actually places the stock in the concerned bin mentioned in the order.
The stock in WM can be checked in LX24/ LX26 which is same as theat of MMBE of MM.
Hope this helps.
Regards,
Prasanna
Award pls if helpful.

Similar Messages

  • How to manage the Vendor supplied components in Subcontracting scenario.

    Hi experts ,
    I have to complete the finished product say "A" by subcontracting scenario.
    I am supplying A1, A2, A3 to the vendor as components.
    Component A4 is the item required for the final product "A" but this will be supplied by the Vendor.
    Please let me know how can I handle both the material movements and the cost of the product in this scenario thru Subcontracting PO.
    Thanks & regards,
    Rachan.

    what did your purchasing department negotiate?
    do you get billed for the component A4 separately? or is the cost for A4 inlcuded in the service charge for subcontracting?
    does your purchasing department order A4?
    is it in your bill?
    if it is in your bill and you create an extra order for this part, then you should set the SC flag in the delivery address tab of your PO along with the vendor number of your subcontractor.
    Subcontractor will then tell you when the material arrvied and you post a goods receipt, this is then directly posted into special stock at subcontractor. When you receive the finished material A and post GR with MIGO all components will be issued.
    you will then receive a bill for subcontracting fee that is posted to your subcontract order, and another bill for the component A4 that is posted to this component order.
    If costs are included in subcontract fee, then you dont need to manage inventory, do not need an extra PO and extra invoice, and dont need the A4 in your BOM
    Edited by: Jürgen L. on May 6, 2010 9:01 AM

  • Bare minimum configuration for warehouse management

    Hello,
    For one of our Projects, there is a requirement of Warehouse Management merely just to enable the tracking of Material received to the Storage Bin level, as they manage the Inventory in Storage Bins in the existing Warehouses.
    Other no major requirement is expected from WM like, automation of Putaway, etc.
    Few of the Inventory scenarios are like Goods receipt, Goods Issue, Warehouse to Warehouse transfer, Bin to Bin transfer, Physical Inventory,  Subcontracting for repairs, Vendor Consignment, also they will handle Project Special stock.
    Now the configurations for Inventory Management are enabled for all the above processes. I now need to know, what are the bare mimimum configurations required so as to enable the WM related process, following each of the IM processes, like Putaway after Goods Receipt, Stock removal before Goods Issue, etc.
    The Configuration for the Enterprise Structure to support Warehouse Management have been completed by creating the Warehouses & assigning the Storage locations to these Warehouses.
    A detailed step by step process would be very helpful for me at this stage.
    And i surely will assign points for all the useful answers.
    Regards,
    Zafar.

    Hi,
    If you want to define new storage types other than the standard ones, please define them. Otherwise, you can assign
    the existing storage types to the newly defined warehouse.
    Also you have to define storage bin types and storage bin structures.
    All this you can find under the IMG path:
    SPRO->Logistics Execution->Warehouse Management->Master Data.
    Regards,
    Pavani.

  • Serial Numbers in Inventory Management – Warehouse Managed storage location

    Serial Numbers in Inventory Management u2013 Warehouse managed storage locations
    We want to run inventory cycle at the warehouse for materials. These materials are u2018serial numberedu2019 in the material master. During the initial entry (say GR) of the materials, systems prompt for the serial numbers. At this point, system offers option of assignments of serial numbers automatically.
    While running an inventory cycle for warehouse u2013 and posting difference at WM level (LI01), system is throwing error as u201Cmaintain serial number for totol quantityu201D. System does not promt me to enter the serial number for the materials (count) which are found excess/shortage duing the inventory cycle.
    Is there any configuration where this scenario can be managed; system should prompt us to enter serial number while posting differenes at WM level (LI20).
    The inventory cycle is -
    1.     Create Physical Inventory Documents - LI01N
    2.     Activate Physical Inventory Document -      LI02N
    3.     Enter Count -     LI11N
    4.     Post Differences at WM level -     LI20
    5.     Post Differences at IM level(If Differences are posted at WM ) -     LI21

    Curious to know: The WM Inventory transaction - LI11N - (where we enter physical count. )
    1. Compared to MI04 - IM Inventory Transaction: where a pop-up window asks for serial number of the material.
    2. We expect a similar pop-up at LI11N transaction- where the system should ask serial numbers.
    Q.1 How can we achieve this?
    Q.2 Will this be a standard SAP practice?  (if we do customizing to get serial nos. pop-up window at LI11N)
    thanks,

  • Decentralize warehouse management

    Dear Friends,
    This is the question related to warehouse management system.
    My requirement is that we are going to set decentralize management. Presently we are having CWM in our present system. At another place there is local ERP , we want to replace it and need to go for decentralise WM there.
    Then this decentralised WMS and my present WM willl communicate with each other.
    Could you please let me know what will be it process ? Transaction cycles ? and its configuration?
    Regrads,
    Mahesh

    Dear All ,
    I got some information I am sharing with you and closing this ticket.
    1) Process :
    rocesses Between the SAP System as ERP System and as WM System
    Purpose  The variant for the SAP System as an enterprise resource planning (ERP) system and as a Warehouse Management (WM) system describes the link-up of an external warehouse management system to an SAP System. The stand-alone system that executes all warehouse management functions is an SAP System.  Prerequisites  Two systems are involved in this scenario. The first system is an ERP system that performs inventory management, purchasing and sales tasks and distributes existing master data and movement data to the Warehouse Management system (WMS). The second system is a WMS that performs warehouse management tasks such as putaway/picking and goods receipt/goods issue and is responsible for carrying out the physical material transfers.  Process and Data Flow    General inventory postings:  If the decentralized scenario is used, inventory postings are not directly processed in Inventory Management (IM). If a goods movement is created in IM, the system generates inbound or outbound deliveries and distributes them to the WMS. In the WMS, the goods are put away or picked based on the existing delivery. As a result of the goods movement posting in the WMS delivery, the system sends the completion verification to the ERP system and then uses the delivery to post the actual goods receipt or goods issue in inventory management. Deliveries with a purchase order or a sales order as a source document are handled in the same way.    Goods receipts based on purchase orders:  You use the ERP system to create purchase orders and send them to the vendors. To give notification of the delivery that is due, the vendor returns a shipping notification that is recorded in the ERP system as an inbound delivery. The inbound delivery is distributed to the WMS using a Business Application Programming Interface (BAPI). In the WM system, the inbound delivery is a request to put away or pick goods. When the vendor physically delivers the goods, a transfer order is generated in the WMS which is used to place the goods into stock. After the transfer order is confirmed, goods receipt is posted for the inbound delivery. This clears the interim storage bin. As a result, the completion confirmation is sent to the ERP system and the goods receipt is processed in inventory management.  An inbound delivery based on a purchase order can be created in different ways, depending on the confirmation control key in purchasing. If the vendor usually sends a shipping notification, the inbound delivery is created when the shipping notification is recorded in the system. In all other cases, you have the option of creating inbound deliveries automatically using collective processing.    Process for goods receipts based on a purchase order:  Creating the purchase order in the ERP system  Generating the inbound delivery (automatically/manually)  Distributing the inbound delivery from the ERP system to the WM system using BAPI method "InboundDelivery.SaveReplica" (this process is automatically executed in the background)  Physically receiving the goods into the warehouse (WMS)  Creating the transfer order  Putting the goods away  Confirming the transfer order  Posting goods receipt for the inbound delivery (as a result, a completion verification is sent to the ERP system using BAPI method "InboundDelivery.ConfirmDecentral")  Goods receipt for the inbound delivery is automatically posted in the ERP system (in inventory management) when the verification is recorded.    Quality management in decentralized WMS using handling units (HUs)  Quality management is also available in the goods receipt process in the decentralized warehouse. In this scenario, the quality management function is in the central system.  If there are handling units in the inbound delivery for which an inspection lot has been created, the inspection lot number is copied into the decentralized WMS and stored in the quants there.  The inspection lot does not exist in the decentralized system. You make the usage decision for the inspection lot in the central system, which triggers the system to create a posting change delivery and distribute it to the decentralized system. Then, the stock that belongs to this inspection lot is found in the warehouse and the corresponding posting change is made. From this point on, the procedure is the same as that of a posting change (see below).      Other goods receipts:    All other goods receipts are recorded in the ERP system. When the document is saved, the system creates an inbound delivery and sends it to the WM system using a BAPI. The inbound delivery is then processed in the WM system as described above. When the verification for the inbound delivery is sent to the ERP system, the goods receipt posting is automatically initiated in inventory management.    Stock transfers:    A stock transfer usually involves two storage locations (plants): the issuing storage location for picking and the receiving storage location for putaway. If the stock transfer is recorded in the ERP system as a two-step procedure and if one of the storage locations involved is a WMS-relevant storage location, the system creates a delivery for this posting and sends it to the WMS. Both storage locations involved are copied into the delivery to allow the actual posting to be executed after the verification is received from the WMS.  One-step stock transfers using a WMS-relevant storage location are only possible if a storage location that is not WM-relevant is involved in the posting change.    Process for stock transfers:  Entering the goods movement in the system  Automatically creating the delivery  Distributing the delivery from the ERP system to the WM system using BAPI method "InboundDelivery.SaveReplica" (this process is automatically executed in the background)  Physically receiving the goods into the warehouse or removing the goods from the warehouse (WMS).  Creating the transfer order  Putting away or picking the goods  Confirming the transfer order  Posting goods receipt for the inbound delivery (as a result, a completion verification is sent to the ERP system using BAPI method "InboundDelivery.ConfirmDecentral") or posting goods issue for the outbound delivery (as a result, a completion verification is sent to the ERP system using BAPI method "OutboundDelivery.ConfirmDecentral").  Goods receipt for the inbound delivery or goods issue for the outbound delivery is automatically posted in the ERP system (in inventory management) when the verification is recorded. When the goods receipt or goods issue is posted in the ERP system, the stock transfer is simultaneously posted in inventory management.    Goods issues based on sales orders:  The system uses sales orders to generate deliveries in the ERP system. The deliveries are then sent to the WMS. You use the WMS to create the transfer order, pick the goods and confirm the transfer order. When goods issue is posted, the picking quantities are passed on to the delivery of the ERP system.    Process for goods issues based on deliveries:  Creating the sales order  Creating the outbound delivery  Distributing the delivery to the WMS  Creating the transfer order for outbound delivery  Physically picking the goods in the warehouse  Confirming the transfer order  Printing the shipping documents, if appropriate  Posting goods issue for the outbound delivery (as a result, a completion verification is sent to the ERP system using BAPI method "OutboundDelivery.ConfirmDecentral")  Goods issue for the outbound delivery is automatically posted in the ERP system (in inventory management) when the completion confirmation is recorded.    Posting changes  You can also initiate transfer postings in the central system, in which case the stock change will be compared with the stock in the decentralized system and adjusted, if necessary.  If you use inventory management to make posting changes in the central system, the system first generates a delivery. This delivery is technically a request for the decentralized system to make a transfer posting for the stock involved. The central system does not create material documents or make any changes in stock at this point.  The delivery is transmitted to the decentralized system and, as of this point, can only be changed there. You can make settings in the decentralized system so that the system automatically creates a transfer order that corresponds to this delivery that does not require confirmation. You can also set the system to make the appropriate transfer posting in the WM stock automatically at the end of the process.  The transfer posting in the decentralized system simultaneously verifies the appropriate quantities to the central system. When the central system receives this verification, it automatically makes the stock change and creates a material document. You can display the material document in the delivery’s document flow.    Production supply  If the decentralized warehouse is also responsible for production supply, the following two methods of material staging are available in the system:  Production staging by switching storage locations  Production stock is managed in a storage location that is located somewhere other than in the decentralized warehouse. In this case, the production storage location is not managed in the decentralized warehouse.  If you switch the storage location in the central system, the system generates a delivery, for which you can then pick and post goods issue in the decentralized system.  At this point, the stock that has been staged using this method can be used in a manufacturing order in the central system.  Goods issue posting for a manufacturing order  In this scenario, the raw materials are taken directly from the decentralized warehouse’s storage location and used in the manufacturing order. If goods issue is posted for the manufacturing order in the central system, the system creates a delivery that is sent to the decentralized system. The rest of the process is the same as regular goods issue processing.    Note the following distinctions with regard to reservations:  Delivery does not trigger request generation  If the goods issue posting that generates the delivery refers to a reservation, the reservation number is copied into the delivery. In this case, the delivery does not check for availability and no requirements are generated, since that was already done in the manufacturing order. The reservation is canceled when the actual goods issue posting is made.  Changes disappear after the delivery is distributed  Keep in mind that if the reservation is changed in the meantime (if the production quantity has changed, for example), this change will not affect the delivery. Similarly, a change in the delivery will not result in a change in the reservation.  The WM/PP interface, which you can use for production supply in an integrated system, is not supported for decentralized warehouse processing. This function is not available decentrally because the WM/PP interface is based on the assumption that WM and PP are running in the same system, which is not the case in a decentralized system.  Goods receipt for a manufacturing order  You can process goods receipts from manufacturing orders in the decentralized WM system. For goods receipt postings, the central system first creates an inbound delivery for the manufacturing order and distributes it to the decentralized system.  In the decentralized system, the inbound delivery serves as a basis for putaway in WM. You can correct quantity differences here. Once you have confirmed the putaway transfer orders, goods receipt is posted in the decentralized system. The decentralized system then reports the quantity that was posted back to the central system. This verification automatically makes the actual goods receipt posting for the manufacturing order, along with the material document, in the central system.       
    2) Config we will get from Google also we will get standard idocs for ib and out bound.
    Regards,
    Mahesh

  • Handling unit mangement without Warehouse management

    Hello,
    We are working on a scenario,wherein we are planning to use handling unit management without warehouse management.Does HU management and WM go hand in hand?
    Do you foresee any inconsistencies if HU management is implemented without WM?
    What does SAP recommend?
    Thanks,
    Pankaj

    Hello,
    WM and HU functionality are independent solutions. WM and HU could be implemented based on your business scenarios. It is pretty common to have WM and HU solutions for the business.
    It will be sort of difficult to answer about inconsistency in HU solution without WM. Based on what process you define and what are the intricacies involved you may or may not have true inconsistencies.
    You could refer to the SAP best practices help library and see if for your business scenario SAP has a solution and that way you could best define an integrated solution.
    Hope this helps.
    Thanks,

  • Warehouse Management for Third Party Logistic Company

    Dear All,
    I need your input for the following scenarios:
    Company having 5 legal entities
    One Legal entity ( X) is Mnaufacturing Cosmetics
    Legal entities ( A, B & C ) are the Distribution Companies
    5th legal entity ( Y ) is 3PL for the 3 Distribution Companies, A, B & C. Y has a warehouse which stocks the goods of the 3 distribution companies A, B and C. Inventory and goods still belongs to A, B & C
    We need to implement warehouse management for Y ( 3 PL) company
    Our proposition is to create warehouse structure which will address all the 3 legal entities ( A, B & C). So essentially the assumption is that warehouse is above the company code
    We wanted to know the folloiwing:
    1)If Y has to service all A, B and C at the same time and it needs to plan the routes for the deliveries created across the legal entities, how is this possible?
    2) How will this impact the shipment planning, pick pack and the shipment cost?
    Thanks in advance.

    I would assume you have separate sales orgs and distribution channels for A, B and C.
    But you would have to tie them together at a higher level may be at the comp code level and plan the supply chain from a higher level.
    A good forecasting tool will help in distributing and managing inventory across the 3 different distribution companies.
    There has to be some type of segregation of distribution between the 3 companies either at geographic level or by volume or something else. Otherwise it will be a real complex business planning and forecasting process if the 3 companies overlap in all aspects.
    Hope this helps.
    Good Luck.
    M.

  • Warehouse Management: WM vs EWM

    Hi all,
    I need information about the features of WM and EWM (included in SCM and ECC 5.0) to compare them: which are the new features, functionality comparison, extensions, etc.
    Another question, i read in a SAP doc that EWM is included in ECC 6.0 in mySAP ERP 2005 and  SCM 5.0. so... does it means that EWM runs in both systems? with the same functionality?
    thanks

    Hi Hector,
    Welcome to SDN.
    SAP's Warehouse Management functionality include running ERP WM in an integrated scenario, ERP WM in a decentralized scenario, or SCM EWM 5.0 in a decentralized scenario
    Online Help (http://help.sap.com/)
    Select Documentation ==> mySAP Business Suite ==> SAP Supply Chain Management ==> SAP SCM 5.0 (select language) ==> SAP Extended Warehouse Management (SAP EWM)
    http://help.sap.com/saphelp_scm50/helpdata/en/5f/c69040bca2ef4ae10000000a1550b0/frameset.htm
    SCM Portal (http://service.sap.com/scm)*
    Choose Warehousing, and then either ERP EWM or SCM EWM
    *Requires login credentials to the SAP Service Marketplace
    Regards,
    Ferry Lianto

  • About thread in New to Materials Management / Warehouse Management?  in MM

    Hi forum experts,,
    in  New to Materials Management / Warehouse Management?  there is a thread on CIN  by Mohammad Arif
    INDIA business scenario / CIN
    I am not able to open the link.
    can anybody try why it is not opening or alternatively give the address of this site .
    Thanks and regards

    Use this link
    http://help.sap.com/bp_blv1500/BL_India/index.htm

  • How to know Warehouse Management is active or not in the system ?

    Hi Guys,
    How to know Warehouse Management is active in the system ?
    I have found Table TCURM and Field LVS_CUS to know WM is active or not. If thsi field LVS_CUS is 1 means WM is active and other than 1 means WM is not active. I have tried to run scenarios in WM by making this field is in active but all scenarios are running properly.
    So, what is the use of this and how to control this ?
    Give your valuable answers for this.

    Hello Narsimha..
    Just go to Transaction:EC01
    Go to Structure ,then Navigation,
    select your Co.Cd(eg:1000) ,open it by double clicking it..
    drill down to you plant and storage location,
    check wether Warehouse is assigned.
    If assigned WH is active ,if not not active..
    Hope this helps
    Arshad

  • Warehouse Management - XML standards

    Hello Everyone,
    For an upcoming project, we are at present evaluating the various XML based open standards. All our interfaces would be Warehouse Management (e.g. Stoks, Inventory, Orders, Invoices etc.) related. Please suggest some widely accepted XML based standard which could be used for such integration scenario. This would mean that we would get some standard schema to be used for various typed of communication. We have opted out EDI as it is not really XML based.
    I have posted this on Standards forum (in a different way)
    Business Specific Schema Standards
    Best regards,
    Prateek

    Hi Prateek,
    For Rosettanet
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0222aba-0516-2c10-67a9-d8d37af83861
    Rosettanet PIP codes
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/xi/rosettanetPIPCodesinOrder+Management
    Regards
    Ramesh

  • Complex Subcontract scenario

    Dear Sir,
    We have a following complec Subcontracting scenario .
    We are in the business of Machine Manufacturing . The Frame of Machine is manufactured on subcontract from outside vendor . As per the BOM of the Frame , it consist of  3 different cut-size plates in some specific profile . Depending upon the workload situtation , we some time give cut size plates to Vendor as the input material .  But some time we do not give the cut size plates , rather we give to Vendor a Full long size plate and Vendor cut the plate and fabricate the Frame . The remaining  plate is used by Vendor in the Subcontract orders which will be comming in future .  The amount is paid to Vendor based upon the weight of the Frame received .
    Pl guide us , as what steps we have to follow in SAP so that we are able to send /control the material to Vendor and make the correct payment also .
    We assure to give full marks for the suggested solution please .
    Rgds
    B Mittal

    Hello Mittal,
    You can also carry out planning for components to be provided in subcontracting using an
    MRP area by defining an MRP area for every subcontractor and assigning the components to be
    provided to the MRP area of the subcontractor. You therefore plan the requirements to be
    provided for these components for one subcontractor separately from all other requirements.
    a. Create Purchase Requisitions with item category L (SC). You can use standard Purchase Requisition (AB)
    b. Create and release Purchase Order with item category L(SC).
    We can use standard purchase order document type NB.
    c. Provide the components in the PO that are required to
    manufacture the items. If the items are created using CS01 (BOM) use explode BOM button and select the parts that are required to be provided to the vendor.
    d. Check the availability of the goods.
    e. Provision of components to vendor. The stocks are managed
    under stocks provided to vendor. The components are transfer posted from UR stock to Stocks provided to the vendor.
    f. The vendor delivers the goods and the GR is made.
    g. You can check the stocks provided to vendor using MR8
    transaction.
    h. The SC vendor furnishes Invoice that can be entered using
    MIRO
    And as per last reply  you can manage the goods you are sending out while creating a outbound delivery from ME2O.
    Regards
    R.Brahmankar

  • Can not see warehouse management data screens for material while extending.

    I want to extend material for warehouse managment views.I can not see these views for the material in MM01.Looks like this is some thing to do with material type configuration.Can some one assist me how to do this?

    1)Check whether the material exist for that plant and storage location which is assigned to warehouse number .
    spro->enterprise structure->assignment->logistic execution->assign warehouse number to plant/sloc.
    2) Check in OMS2 tcode in the material type setting WM view is selected.

  • Report for List of Transfer orders in warehouse management

    hi,
    i want generate a report for list of transfer order orders in warehouse management
    is there any report with you guys kindly help me,
    or any standard report is there to display list of transfer orders in warehouse management
    Thanks,
    Rajesh
    Edited by: rajesh kumar kandagatla on Feb 11, 2009 9:27 PM

    Hi,
    If it is one time requirement, you can run the report LT23 and download the data to excel sheet and donwload material details in another sheet and you can match the temperature column in excel file.
    If it is permanent requirement, create a query and attach transaction code to that or write a seperate report for this requirement.
    Please let me know.
    Thanks
    Nagarajan

  • Q&A db for warehouse management and inventory management

    Hello Everybody,
    i read on the help.sap website that standard as well as industry specific versions of Q&A db are available. but the website doesnt say where. i searched a lot but the links dont lead to the actual Q&A db.
    i would like to request you to kindly share the Q&A db for inventory management and warehouse management with me as i need it for preparing the AS IS documentation.(preferably automotive industry but if not then even standard Q&A db is fine).
    thanks a lot.
    sapman.

    Now QADB will not help to map the clinets requirement. Instead of QADB get AS IS information form Coreusers... thats best practice now....
    Go through www.sap-img.com for further details...
    Edited by: Ganti on Jul 26, 2008 7:26 AM

Maybe you are looking for

  • Problème inactivité VISA GPIB

    Bonjour, Je travail sous LB8.5 J'utilise une centrale d'acquisition AGILENT 34980A pour switcher sur 32 pièces dans un banc de mesure. Mon programme est du type séquentiel dans une boucle infinie ( je fait un tas de mesure, j'enregistre, je switch su

  • Flash audio bug on Firefox Mozilla on PC

    - Quoted from Bugzilla@mozilla: https://bugzilla.mozilla.org/show_bug.cgi?id=289873 To see the problem, go to http://www.spellingcity.com User-Agent: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.7.6) Gecko/20050317 Firefox/1.0.2 Build Identif

  • How to display icon status in table control

    hi, i trying to display icon in table control its not displaying i given below statment. DATA: BEGIN OF WA_MARA,         ICON1(4) TYPE C,          END OF WA_MARA.      INCLUDE <list>. MOVE ICON_GREEN_LIGHT TO IT_MARA-ICON1. APPEND IT_MARA.. when i de

  • Apple Product Environmental Specifications for Mac Pro

    Hey there everyone: Can anyone point me to the Apple Product Environmental Specifications for the New Mac Pro? I cannot find the Environmental Specifications for the Mac Pro. I am considering a Mac Pro and a MacBook Pro. The Mac pro obviously has the

  • IOS text field problem.

    I need the user to enter a word, so I added a simple text field to the stage.  However, it behaves strangely on the actual device (iPod Touch). Attached are two screenshots that show how the font size increases when the input is activated.  Has anybo