Subcontracting- with two company codes.

Hi PP Gurus,
We got two company codes say company code 1000 and company code 1100. We're having plants 4000 in company code 1000 and 5000 in company code 1100. Manufacturing of all SFG and FG take place at plant 5000 in company code 1100.
Now the requirement is all Raw materials are supplied from plant 4000 in company code 1000 to plant 5000 in company code 1100.
Client want all the RM cost to be captured in company code 1000 and plant 5000 will only invoice for Services that are utilized for manufacturing....
How could we map this scenario? Either through making BOM and Routing in both plants 4000 and 5000. and in Routing of plant 4000 need to activate operation subcontracting and material to be supplied to plant 5000 and latter service cost to be captured through Service entry sheet. OR MRP area or Special prcurement key to be configured in plant 5000 to suffice the requirement?
Please reply with your prompt comments.
Thanks and Regards,
Abu Arbab

Hi,
This you can handle through the special procurement. Both the plants you need to maintain the material master. In Plant 4000 is your supplying plant. In plant 4000 the raw materials you need to maintain as external procurement. Plant 5000 you need to maintain this materials as special procurement as withdrawal from alternate plant. Since your production plant is 5000, you need to maintain the BOM in this plant. In Plant 4000 you need not maintain the BOM. When you run MRP in plant 5000, the planned orders will be created in Plant 4000. This you can see in MD04 screen as planning plant as 5000. But the planned order number will be same in both the plants.
Regards,
V. Suresh

Similar Messages

  • One controlling area  with two company codes assigned with one CoA

    Hi,
    I   am having one controlling area  with two company codes assigned , i am using the same  gl for two company codes  as cost element , when i am positng the  miro for vendor purpose  it posted the error  , to avoid the  price difference purpose , i have given  one cost center  of  first company code in OKB9 , and  overcome the error , entries posted, when i am posting new entry for MIRO   in secod  company codes with same cost  element ,  price difference of that account should go to the other cost center  which specifically created for second company code,  in the OBK9 i have given  cost center first company code   of the same GL  account , now this is another new entry in the second company code with other cost center in the second company code  since the price difference  account should sit in the other cost center of second company code,  how to  over come  this problem, pls help me
    Thanks and regards
    Murugesan

    Hi,
    First, remove the default cost center in the cost element. Then, for the system to derive the correct cost center for each company codes, define one cost center for each compny codes in OKB9 just like this:
    Co Code   Cost Element   Cost Center
    1000          1000000              A
    2000          1000000              B
    So during MIRO, the system will derive these values you maintain in OKB9.
    Regards,

  • Asset Transfer with two company codes

    Hi
    We have a requirement in which we need to transfer the asset from one company to another. However, there is VAT calulated on the transfer of asset from one company code to another. We need to create an invoice, calculate taxes and then transfer the asset.We do not have SD & MM  Module and we cannot create one company as a customer or vendor
    Regards
    Sanil Bhandari

    hi,
    If the country is same for both the CCs, then you must have been assigned the same COD also to your CCs.
    One thing i didnt understand is that, why this taxation is required while transfering an asset from one company code to another CC within the same country.
    Because the COD will be maintained at country level.
    And one more thing is that if both CCs were assingned to same company ID, then there would be no need of caluculating tax.
    This asset transfer cannot be treated as a new asset purchase in the receiving company code, since it is just a internal transfer within a group company.
    But still if you want to calculate tax, you have to manullay calculate the tax and need to post a JV.
    Please correct if i am wrong....
    Thanks,
    Srinu

  • Subcontracting b/n two company codes

    Hi friends
    i have caome across the subcontracting scenario which takes place between two company code with their respective plants, Please Provide best way to map the scenario
    Thanks
    Regards
    Deepak.Goura
    SAP-Consultant

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity. 
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor. 
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor.  As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" 
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated: 
    DR FG Stock/ SC By-Product Stock 
    CR Change in Stock (FG/ SC By-Product ) 
    (for finished goods received) 
    DR Subcontracting Charges 
    CR GR/IR Clg 
    (for moneys payable to Subcontractor) 
    DR Consumption (Components) 
    CR Change in Stock (FG/ SC By-Product ) 
    (material provided to Vendor is now charged to expense) 
    (5) You do the IV for SC Invoice, and the process is complete. 
    Process of Subcontract in MM
    Sub-contract business process: 
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor . 
    Vendor shall process the item / use the item provided & supply the final item. 
    SAP process: 
    1.Create the finished goods material code. 
    2.Maintain the BOM for the material. 
    3.Create PO with item category as "L" . 
    4.Issue material to vendor with movement type 541 
    5.Receive the material against the PO with movement type 101. 
    6.MIRO to account for vendor's invoice for the service charge& material used by him. 
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations  1)weaving 2)dyeing 3)cutting & packing 
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    Vijay 
    The following process to be followed for subcontracting. 
    1. Item code(material master) to be created at the stage of before dyeing. 
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30) 
    3. Bill of material to becreated for the material(2) calling for material(1) 
    4. Inforecord and source list to be created for material(2) with the corresponding vendor 
    5. PO to be released for material (2) 
    6.Along with PO the material(1) to be issued to vendor 
    7.On receipt of material when GR is made the stock with vendor will get updated. 
    B.N.Rao 
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows: 
    Enter the material you want to order and the item category for subcontracting (L) in the order item. 
    Press ENTER to display the screen for component processing. 
    Enter the components that the vendor requires to manufacture the product. 
    Please note: 
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER. 
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F). 
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check. 
    If you entered a bill of material as the material in the subcontract order, the components are created automatically. 
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material. 
    Save the purchase order. 
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product.   In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    SAP MM Tips by : Sundaramoorthi
    Email                     : [email protected]
    Editor Note:
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N

  • Different Bank charges GL account for two company codes with same COA

    Hi,
    While configuring OBXK ( Automatic GL account for bank charges)  , I see there is provision to enter only one GL account per chart of accounts.
    We have two company codes using same chart of accounts but different bank charges GL account. Please tell me how to configure this.
    Thanks,
    suresh

    Hi,
    Thanks Krishnan and Chandra.
    I agree with you it could be the same GL account for bank charges, but the business requirement is such that in one of the two company codes, bank charges are required to be tracked separately to be subsequently transferred to the other company code. This means two separate GL accounts are required for two company codes which needs to be configured in OBXK.
    Hope this clarifies my query further.
    thanks,
    suresh

  • Same material master in two company codes with batch management

    Hi,
    There are two company codes in one client. In one batch management is already active. But in another company code batch management is not required. Is it possible to have batch management active in one company code and inactive in another company code where both the co. codes are in the same client? The same material master to be used in both company codes.
    Thanks,
    Satya.

    Hi Satyabarata,
    As far as you dont want to move the same materiel i.eStock Transfer with Inter comapy billing scenario then it  will be fine.
    If you try to Transfer a Batch manged material into a non batch manged CC it will work fine. But on the other hand when do via-versa the system will ask for the Batch information where the Batch management is active.
    If you want to use same Material Master for both CC then its not advisable.
    Please let me know if you need any other information.
    Thx.
    MJ

  • Operating concern for two company code with different currency

    Hi,
    We are merging two company code into one SAP server.
    We decide to use on chart of account, and to use one operating concern.
    For company code A: the currency is CNY, for company code B: the currency is TWD.  The operating concern currency is:CNY.
    So i need to in KEA0(maintain operating concern) active company code currency, right?
    So every posting in company code B will be posted in TWD and CNY to COPA same item, right?
    In KE30 report, where to add characters: Currency type that i can show company code B report in TWD?
    Thanks.

    Dear David,
    Yes. If you have different compancy codes within one controlling area, you have to maintain currency type with 10-Company code currecny and while maintaining the operating concern also you have to choose the company code currency only.  Then only you will get the reports with respect of your company code currecny level. This will be basing on your company code-sales organisation, plants and other charcters assignment basis in your configuration.
    All the best,
    Dharma Rao. Yekula.

  • Stock Transport Order between Two Company codes

    Dear All
    Scenario-- Stock transport order Between two company codes.
    The valuation of Comapny Codes is at Moving Average Price.
    I have a scenario
    MAP of Issuing Plant-- Rs. 10 / kg
    I am able to pick up the price of Rs.10 (MAP) of issuing plant while creating PO.
    in receving plant.
    At the time of Goods issu the MAP has changed & become Rs.12/kg. Hence the goods issue takes place at Rs.12/- perkg.
    When we make GR at receiving plant ,the valuation of GR is at Rs.10 i.e at PO price.
    Is it possible to have a GR valuation at Goods issue price for that delivery note?
    Request Your feedback urgently.

    The invoice has the material costs at time of goods issue.
    You receipt is valuated to PO price. But when you post the invoice, then the MAP is adjusted,
    By setting up EDI, SAP will probably post the invoice before the goods receipt is done, hence the GR should be valuated with the invoice price.
    from Note 518368 - FAQ: Valuation for the purchase order;
    With which price is the goods receipt posted for a purchase order?
    Answer:
    If the goods receipt is executed before the invoice receipt, the goods movement is valuated with the purchase order price. If an invoice is already posted, the system uses the price of the invoice. If a partial invoice is received, the partial quantity corresponding to the invoice is valuated with the invoice price, the rest is valuated with the purchase order price.
    For more detailed information, refer to both the documentation of the material valuation and Note 380883.
    see as well Note 547570 - FAQ: VPRS in pricing

  • Testing strategy after legal merge of two company codes

    Hi All,
    This is my first integration project. Please help me out with my query:
    My company is going through a merger and we have merged two company codes.
    for e.g. company code 1 is in ABC company and company code 2 is in XYZ company. ABC is buying XYZ company. This means that company code 1 will remain and company code 2 will merge into company code 1. They are going to bring in the open line item AR/AP data from company code 2 into company code 1.
    Any of you guys who have worked on an integration project before please guide me to some documents online or state some kind of testing strategy to adopt to test after the legal merge has taken place. I am mostly looking for a strategy to test intercompany process.
    Thanks,
    MS

    Hi
    There are lot of issues that you need to take care of:
    1. is there any relation bwteeen the two company codes before merger. have they done any transactions between them? If yes, what wewould be the accounting treatment for the same. Would it be transferred at cost or Cost+Price (Transfer Price)
    2. If you are in India, there would be effects of taxation like excise and vat calculations
    3. One of the most important issue, is that of the new fiscal year. What strategy would you follow for the merged entity? In Sap, changing a fiscal year is a critical issue. Request you to refer SAP Help for the same. There are notes available for the same
    4. What would be the strategy for Asset valuations? Are there different asset valuation procedures followed in the two company codes?
    Thanks & regards
    Sanil K Bhandari

  • Merge two company codes

    Hi All,
    This is my first integration project. Please help me out with my query:
    My company is going through a merger and we want to merge two company codes.
    for e.g. company code 1 is in ABC company and company code 2 is in XYZ company. ABC is buying XYZ company. This means that company code 1 will remain and company code 2 will merge into company code 1. Currently they feed account cumulative balances from company code 2 into company code 1. But they want to stop that and move out the current balances and bring open line item data.
    I want to find out some kind of strategy on how to move the current balances and bring in the open line item AR/AP data from company code 2 into company code 1.
    Please help me out with this.

    hi,
    Check the possibility of uploading the balances of the merging company code into the existiong company code. For this you may have to to some customization like asset transfer date & have to uplaod the master data.

  • Issue with Cross-Company code transactions and Extended Withholding tax

    Hi Gurus,
    I am having an issue with Cross-company code transaction while posting expense with 2 different company codes.
    In the 2 company codes, one company code is setup for Withholding tax and other was not set.
    While posting in FB50, I am getting the below message and system does not allow to post the invoice.
    Company codes have different settings for withholding tax treatment
    Message no. F5786
    Diagnosis
    You are entering a document containing at least one vendor or customer item and which has line items in several company codes. The extended withholding tax treatment has been set to active in one of these company codes, but not in one of the other company codes.
    System Response
    You cannot enter this kind of document.
    Procedure
    Enter the transaction in two documents.
    For this I tried to test the transaction by activating of extended Withholding tax for both the company codes. Then the invoice is posting correctly now.
    The point is if I activate extended withholding tax for the Company code which is not using the setup, will it face any issues in other areas? and also kindly advice whether is this a right way to set up to fix the current problem.
    Thanks for the Support and early response will be appreciated.
    JBC.

    Hi Mamta,
    Thanks for the Response. I think you misunderstood my scenario.
    For Eg in FB60 with Co code 5065:
    I am debiting the Expenses for Co Code 1000(Witholding tax not active) and crediting the Bank Account of Co Code 5065(Withholding tax setup is done for this co code). When I tried to post with these line items I have getting the error.
    Posting        GL                   Co Code
    Dr          106520(Exp)            1000
    Cr          202020(Bank)           5065
    For this I tried by activating the Withholding tax for Co code 1000 which is not active before and post it. The system allows me to post the invoice.
    I want to know whether is this a right way to solve this issue and will it impact on any other areas by only activating the Withholding tax for a Co code?
    Thanks,
    Bapu

  • Exchange Rate Maintenance for two company codes..

    Friends,
    My client is having two company codes
    X = India
    Y = USD
    US Company code is live for the last few years and India Company code is created recently and the same is live now.
    Now when the US company code creates Purchase Orders /  Scheduling agreements, the following error is encountered.
    "Enter rate INR/EUR rate type M for 31.07.2008 in the system settings.:"
    Now my question to the forum is that
    1. If we maintain the exchange rates in OB08 will there any other effect ?
    2. Is this error because One more company code is added to the same client which is operating in INR ?
    3. When US Company code is not all transacting with India Company Code why is this error encountered.
    Appreciate if some one can explain the pros and cons of this please. I am basically an MM consultant and I would also like to know the FI impact in this scenario, hence posted this question in FI forum.
    Regards

    Hi,
    At the time of initial installation SAP would make EUR as base currency, so any new company code you create needs to have an exchange rate defined to the base currency EUR.
    In your case you can define exchange rate to EUR and process PO, as per my knowledge there will not be any impact of this.
    Thanks,
    Ramesh.

  • STO between two company codes

    Hi,
    we are doing the inter company process between two company codes.
    i have one reference document,
    1) how can we find the supplying plant sales area and receving plant sales area.
    2)In spro settings "Assign sales organization - distribution channel u2013 plant" which one we need to assign here(supplying plant sales area or receving plant sales area).
    3)In customer master record sales area tab which one we need to assign as a Delivering plant(supplying plant or receving plant)
    please tell me anyone.
    thanks,
    pandu

    Hi,
    1. Are you referring to the config area of transaction area?
    If config, then you can find the configured sales area of the supplying & receiving plant in IMG --> Materials Management --> Purchasing --> Purchase Order --> Set Up Stock Transport Order --> Define Shipping Data for Plants (here you assign the relevant sales area to the relevant Supplying Plant and the created Customer number (in XD01) to the Receiving Plant. Thise customer number is used in SD shipping processing to identify the ship-to party if provision has been made in Customizing for a stock transfer to be carried out with an SD delivery). This sales area is to subsequently trigger the shipping point (based on shipping point determination) for delivery.  
    You also assign the supplying plant to a vendor. To do this, from the SAP menu choose Logistics --> Materials Management --> Purchasing --> Master Data --> Vendor --> Purchasing --> Create; on the screen for purchasing data, choose Extras, and you assign the supplying plant here.
    2. In the SPRO, you assign the Supplying Plant to the relevant sales organization and the distribution channel in IMG --> Enterprise Structure --> Assignment --> Sales and Distribution --> Assign Sales Organizationu2013Distribution Channel-Plant.
    3. This is not required, as this delivery plant in the "Sales" tab is relevant when you create a Sales Order to automatically populate the delivery plant for the particular customer. For cross-company STO, the customer number is used to identify the ship-to-party to carry out the shipping processing. You would instead need to ensure that the shipping condition etc. in the customer are maintained properly for the shipping point determination.
    Hope the above helps.
    Thanks.

  • STO clearing account between two company codes

    Hi, every body, when trying to do STO between two company codes, I am getting error to configure the *clearing account between that two company codes, please guide me in resolving the issue, if anybody gives me perfect step by step explanation regading this issue, I will surly reward them with highest points

    Hi Azeem,
    When there is a transaction between two company codes, then you need to define the clearing accounts for those two company codes in the TCode: OBYA.
    It will ask for Company code 1 and Company code 2.  there you give your 2 company codes and define the posting keys and clearing GL accounts over there.
    I think your problem will be solved with this.  Please let me know the status and please reward points if found useful.
    Regards,
    Sreekanth....

  • Automated Sale cycle within two company codes

    Hi to all,
    i have a requirement:
    there are two company codes A and B. A transfer goods to B through sale/purchase cycle and B sells goods to the customer.How can the system be automated?
    to be more specific:A sells goods to B which is intercomapny sales and B finally sells to customers.requirement is as soon as B generates delivery and billing ,automatic order delivery and billing should happen from A to B with different prices.
    Waiting for the response.
    thanks
    Nakul

    Hi,
    you can solve this with 2 schedule agreements and douplicate of the idoc´s, if you work with idoc´s
    or you can work from A to B with a purchasing and B to customer with a sales order.
    For the second process, you can work with a message EDI into purchasing document, which create autom. the sales order for B. EDI-Type = ORDERS with type Orders05. Definition for WE20 must be logistic system.
    Regards
    Nicole

Maybe you are looking for

  • Header footer

    I want to eliminate the header and footer form from the template so i can have that space for text. Is this possible..or is the header/footer template permanent?

  • Changes in sunone directory

    A user is already provisioned to sun one directory .Now I am changing the first name of that user in the OIM user profile and needs get changes in sun one. How that will configure

  • How To Hide Adobe Tool Bar in Web Dynpro For Java.

    Hi To All,             I'm using NetWeaver 2004's. In Project i require to Hide Adobe Tool Bar.I already used Hide Reader Tool Bar Button from  Standard Library for Web Dynpro.But it was not Working. I want Programatical way to Hide Adobe Tool Bar.  

  • Best mouse for a person with trembling hands

    My Grandfather recently acquired a new Mac (an iBook) on which I am typing this message. I didn't want to let him use the integrated track pad because I found it very unpractical, so I ordered an Apple (wired) mouse for him. Unfortunately his hand is

  • Problem with running a DTS package from CF Code

    i am using a CFQUERY Tag with EXEC dbo.storedprocname to execute a stored procedure on our sql server which runs a DTS package. the cf template allows them to upload a text file to the server for import to a sql table via this DTS package. the proble