One of the customer is asking the following query:
"How Disaster recovery site can be synchronized with the production server and how do they switch? Will the web logic server do this for them?"
This customer is having two sites one live and one a DR (Disaster Recovery) site on different location.
Can somebody answer my query?
Thanks in advance.,
Regards.,
Naveen

Firstly
Is your Datagaurd Physical( Redo Apply) or Logical( SQL apply)?
Does it have Datagaurd Broker?
When Datagaurd is setup in your environment - on the primary database( live database) the Datagaurd users LGWR or/and ARCH process to collect redo data and ship this data to standby ( DR site) and the FAL process to provide client-server mechanism for shipping archived logs to standby.
On standby database, The Datagaurd users RFS process to receive redo records from primary database, the MRP process applies redo information to standby database.
If the Data Gaurd Broker is enabled, Datagaurd also used DMON process to manage and monitor both primary and standby databases as a unified configuration.
When there is any connectivity issue to the standby and when connection is re-established, the accumulated archive logs are automatically shipped and apploed to stanby, until stanby is resynchronized with the primary. This process does not require any administrative intervention.
If there is a very large Archive Gap between the primary and secondary due to some major issue. Then the unshipped archive logs need to be shipped manually from primary to standby and needs to be applied in standby to sync up with primary. For some reason there will also arise rare issues like problem with not applying of archive logs though log shipping is success. So some work arround will solve it.
Comming to planned /unplanned outages of production site.
Datagaurd has Failover and Switchover( planned ) methods, These are not automatic, but have to be explicitly initiated by the administrator( So there will be downtime but minimal). Once initiated, Datagaurd automates the processes involved.
- S K A
Edited by: user12297346 on Jan 27, 2010 7:13 AM

Similar Messages

  • Fusion Middleware, Disaster Recovery Sites with Oracle Applications

    I have oracle applications EBS R12.x.x deployed with one disaster recovery site. I have some composite applications built on SOA 11g suite deployed at OFM which is taking care of my EBS R12.x.x (not disaster recovery site) instance. When my EBS R12.x.x down, is it possible that services deployed at OFM starts taking care of my disaster recovery site.
    Regards

    There really aren't any stupid questions, just dumb answers :-)
    Have taken a look at B/R section in Admin Guide?
    For 10.1.3.x refer this:
    http://download.oracle.com/docs/cd/B32110_01/core.1013/b32196/part5.htm#i436649
    For 10.1.2.x refer this:
    http://download.oracle.com/docs/cd/B14099_19/core.1012/b13995/part5.htm#i436649
    Hope this will help.
    Thanks
    Shail

  • Disaster Recovery site for Exchange 2013

    Hi, I have to build DR site with Exchange 2013 environment and unable to see document for Exchange 2013 perspective.
    In new environment will contain 10 CAS/MBS co-located servers in primary datacenter with two mailbox copies and disaster recovery site with 5 Exchange 2013 CAS/MBS co-located servers with one database copy in blocked activation mode. Any document related
    to this screnario would be helpful. The required solution is when all the servers in PDC goes down then DR site would be activated at DMZ level and Server level. Can I use same IP subnet/Site for the DR site?

    Hi,
    Yes, you can use the same subnet for DR site. If you use the same subnet, you need to use stretched VLAN.
    Here is a related thread for your reference. (This case is for Exchange 2010, but it also applies to Exchange 2013 DAG deployment)
    http://social.technet.microsoft.com/Forums/exchange/en-US/80ca452f-f950-4496-83e8-3067d571bb57/exchange-2010-dag-across-sites-different-subnets-vs-stretched-vlan?forum=exchangesvravailabilityandisasterrecovery
    Best regards,
    Belinda Ma
    TechNet Community Support

  • Best Way to setup a disaster Recovery site for a logical standby database

    I have a logical standby DB (L1DB) as a reporting db on the same machine as the primary (P1DB). We are planning on building a disaster recovery site with similar hardware and potentially have disk mirroring of atleast the redo log files.
    The DR site can hold an additional physical standby (S1DB) for the primary (P1DB). I am trying to understand what would be the best way to setup the Disaster Recovery site for the L1DB logical stdby. Ideally, when the disaster happens, and I no longer have P1DB and L1DB, I should be able to switch to S1DB as the new primary. But how do I setup to have a L2DB that takes the place of L1DB and has its contents and can be setup as a logical standby of S1DB?

    If you already setup one logical standby, then you know how it works, so not sure what question you are asking ?
    Personally I would setup L2DB as a standby of the original primary P1DB. Having downstream standby databases complicates things, and adds additional lag between primary transaction time and L2DB apply.

  • There is a problem with the proxy server's security certificate. The name on the security certificate is invalid or does not match the name of the target site "Mailserver"

    Good day Guys
    First of all I am not an Exchange Expert, and I might be asking a very stupid question, but please bare with me. :) 
    While I was on leave our Mail server fell over and The company got a Specialist to help out for the time being.
    We where\are on Microsoft Exchange 2007 , which Fell over, and the specialist was able to recover as much data as he could.
    They then installed Exchange 2013 and tried to migrate everything from 2007 to 2013 and not everything migrated over.
    But the problem is, Outlook Anywhere was enable on 2007 and worked a 100% (before the disaster)
    With Exchange 2013 I get the following error message when trying to connect With Outlook 2013, using an external connection:
    "There is a problem with the proxy server's security certificate. The name on the security certificate is invalid or does not match the name of the target site "Mailserver"
    Outlook is unable to connect to the Proxy server. (Error Code 0)"
    Has anyone had the Similar when migrating over from 2007 to 2013 or is this an Issue on IIS and nothing to do with Exchange migration?
    Your assistance will be greatly appreciated.

    Hi,
    Firstly, I would suggest we use Exchange 2013 FE as the Outlook Anywhere proxy server.
    For the certificate issue, it mostly occurs because the host name that Outlook are trying to access does not match the certificate SAN. Please check with this point. If they do not match, you
    can change the host name by referring to the following article:
    https://support.microsoft.com/kb/940726/en-us?wa=wsignin1.0
    Thanks,
    Simon Wu
    TechNet Community Support

  • Not all of my photos upload to my website when I publish it. when my site finishes publising I get an error that says, "There was an error communicating with the FTP server. Try again later, or check with your service provider."

    Not all of my photos upload to my website when I publish it. when my site finishes publising I get an error that says, "There was an error communicating with the FTP server. Try again later, or check with your service provider."

    I am publishing directly to an FTP server (option 1).  Is this the optimal method or should I be publishing to a folder and then (how do/would I?) publish to my hosting domain?
    I'm wondering if this has really anything to do with the publishing process, or whether it just has to do with the photos and/or the photo albums.  I've deleted the photo albums with the missing pictures from my site on iweb thinking a file might be corrupt. (I'm getting the albums from iphoto -- drag/drop method into iweb) I then replaced these albums with the same albums as the previous ones from iphoto and then published my site again -- and the EXACT same photos were once again missing in the NEW albums as were missing in the old albums...
    Maybe it is a publishing issue, or it could be a photo/file issue.  However, these albums aren't very large -- the largest containing 135 photos --
    Please! if you have any suggestions or ideas as to what is happening I would be greatly appreciative!
    I'm pulling my hair out here trying to diagnose the problem...

  • Disaster Recovery Plan for BW Production db

    Hello Experts,
    We at IP are trying to evaluate and institute a sound and
    cost-effective disaster recovery plan for the BW production system.
    In this regard, we would like to hear from you(or from your infrastructure folks) about the experience(s) at
    client sites of such scenarios for BW.
    We are specifically interested in knowing answers to:
    0. Customer Name
    1. Do you have currently have Disaster Recovery Plan for BW Production?.
    2. How large is your BW production database?
    3. Is the alternate server being replicated real time or using tapes or ......?
    4. What are your target service levels?
    5. Location specifics or any other pertinent info.
    Any input is highly appreciated.
    Thanks in advance,
    Kumar Gudiseva.

    I don't think people will give this information out - especially the customer name will certainly not be published in a public forum.
    For DR plans check http://service.sap.com/ha
    Markus

  • Disaster Recovery Plan for BW Production

    Hello Experts,
    We at IP are trying to evaluate and institute a sound and
    cost-effective disaster recovery plan for the BW production system.
    In this regard, we would like to hear from you(or from your infrastructure folks) about the experience(s) at
    client sites of such scenarios for BW.
    We are specifically interested in knowing answers to:
    1. Do you have currently have Disaster Recovery Plan for BW Production?.
    2. How large is your BW production database?
    3. Is the alternate server being replicated real time or using tapes or ......?
    4. What are your target service levels?
    5. Location specifics or any other pertinent info.
    Any input is highly appreciated.
    Thanks in advance,
    Kumar Gudiseva.
    Edited by: Kumar Gudiseva on Jan 9, 2008 3:35 PM

    Hi,
    The disaster recovery strategy should include a backup and restore plan that determines which data should be backed up and the procedures that will be used to recover it.
    Please check these links:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/001ef297-9bbf-2910-bbaa-babedc1b01ca
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/6efca1a6-0301-0010-6f9d-82cf87340e45
    /people/nicholas.holshouser/blog/2006/09/07/the-square-root-of-an-it-disaster-is-recovery
    Hope it helps.
    Regards,
    Mona

  • MaxDB disaster Recovery site setup

    Hello Experts
    We are hosting SAP apllication in our datacentre. For one of our customer we need Disaster Recovery site. As planned by our maneegment we are going to have a DR centre at some other location. Our DC and DR are connected by suffcient link.
    My SAP Instance is running ion MaxDB database and RHEL5. Can you please suggest me how I should look forward to set up the DR site?
    Can I setup a SAP server in my DR site with same SID server will restore the initial backup from DC and then go for log mirroring?  In this case I will have to install SAP system with same SID? IP address?

    There are several possibilities to approach your goal, for a start check
    Note 952783 - FAQ: MaxDB high availability
    It has a nice comparison of the different possibilities.
    Markus

  • Planning Disaster Recovery Site for SAP ERP ECC 6.0

    Dear All,
    I am planning for DR ( Disaster Recovery ) Site. Our current environment is
    Production Site
    OS        : AIX 5.3
    DB        : IBM DB2      version 8.2
    SAP      : SAP ERP 6.0 ECC 6
    Disaster Recovery Site
    OS        : AIX 6.1
    DB        : IBM DB2      version 9.5
    SAP      : SAP ERP 6.0 ECC 6
    I have following confusion in planning the solution.
    1 - If I export the data at db level from production site and import that data in DR Site ...  than DR Site will be equivalent to Production Site or not.
    2 - if answer of point 1 is yes then for SAP DR ...  HADR is the best solution or there is any other better solution exist.
    regards
    Syed Saifuddin

    Hello Syed,
    If you export from the prod db and import into the disastor recover db then they will be the same provided that SAP environment is all the same. I would recommend that you update the prod side to the same db2 release and fixpack level as soon as possible though as 9.5 (or even better 9.7) has some advanced features that make administration alot easier and save much space.
    HADR would be the best setup for disaster recovery in db6 environment.
    Check the following documentation which should answer most of your queries.
    SAP Note 960843 # DB6:Installation SA MP
    "High Availability and Disaster Recovery Options for DB2 on Linux, UNIX,
    and Windows"
    http://www.redbooks.ibm.com/redbooks/pdfs/sg247363.pdf
    "Data Recovery and High Availability Guide and Reference"
    http://publibfp.boulder.ibm.com/epubs/pdf/c1042280.pdf
    Please update if questions remain unanswered.
    Regards,
    Paul

  • What will I do with the SQL Server (2012/2014) (Standard/Enterprise) Licenses?

    What will I do with the SQL Server (2012/2014) (Standard/Enterprise) Licenses?
    Are these the same as software product keys, or just some pieces of paper the company needs to have on hand?
    In which case, when we install SQL Server 2014, (and when looked for videos) - there is only 1 product key value to be put in, is there some other screen in the setup to input the License bought ( in our case will be Core licenses).
    So in addition to the Core Licenses do will a Product key be needed? Would product key from an msdn work, as it is the licenses that we will buy to indicate that we bought to run the software on server X?
    Thanks for any indications.

    1. What will I do with the SQL Server (2012/2014) (Standard/Enterprise) Licenses?
    Are these the same as software product keys, or just some pieces of paper the company needs to have on hand?
    2. In which case, when we install SQL Server 2014, (and when looked for videos) - there is only 1 product key value to be put in, is there some other screen in the setup to input the License bought ( in our case will be Core licenses).
    3. So in addition to the Core Licenses do will a Product key be needed? Would product key from an msdn work, as it is the licenses that we will buy to indicate that we bought to run the software on server X?
    Thanks for any indications.
    I will answer your question point wise
    1. Keeping license key is good idea it helps you during audit and you have proof that you are using a valid Microsoft License. Plus in scenario of disaster where whole box gets damanged you might need to install SQL Server again in that case during
    reinstallation on setup page where you need to enter key you might need need it. If you are missing your paper then you are in trouble.
    2. Only on product key page license key is required and it is not required anywhere else during installation. Unless you enter valid product key installation will not proceed further.
    3 License makes you a valid owner of Microsoft product with restrictions on how much hardware resource you can use how much max connections you can make etc. Key lets you install it on Windows machine making sure that you are using valid Microsoft product.
    This was just a general idea please speak to your licensing specialist for more details. This is technical forum and we generally ask user to speak to licensing expert for such queries.
    Please mark this reply as answer if it solved your issue or vote as helpful if it helped so that other forum members can benefit from it.
    My TechNet Wiki Articles

  • SSO issue in the production server,com.sap.mw.jco.JCO$Exception: (103)

    com.sap.mw.jco.JCO$Exception: (103) RFC_ERROR_LOGON_FAILURE: This system rejects all logons using SSO tickets
    in the production server.....
    while testing the jco maintained for Ess applications.
    if i go for uidpw method for modeldata destination i am getting the error. in the Ess pages that administrtor not in this peroid(administrator with which id i maintained jco destination)
    if i assign one employee to the admin in pa30......for every employee getting the same details of admin)
    I guess this problem with modeldata ......i should maintain the usermanagement method for modeldata jco destination is logon ticket.
    while maintainig that ping is successfull but getting the above error.
    it is the problem with production server.......of E.P
    in dev and quality everything is working fine.
    plz help me out.
    thankyou
    swapna

    Hi Swapna,
    Please check the logon group properties for SAP system in t-code SMLG. If there is any issue with logon group then it might cause for this issue.
    Refer to [Click here|https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/user-interface-technology/wd%20java/7.0/portal%20integration/how%20to%20configure%20the%20jco%20destination%20settings.pdf] and [System Landscape Directory Process and JCo Configuration|http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0c1d495-048e-2b10-babd-924a136f56b5?QuickLink=index&overridelayout=true]
    Hope it will helps
    Regards, Arun Jaiswal

  • Cisco SPA525g2 Date and time Not Synced with the PBX server

    Hello,
    We have a couple of SPA525g2 phone connected and registered to our PBX server. We were able to configure 3 extensions on different lines of the phone. However, at times we were encountering issues with the other lines configured on the phone. There are times wherein 1  extension configured on the phone is having one way audio issue, but the other extensions configured on the same phone is working fine. and we have to reboot/reset the phone several times for all the extesions configured on the phone to work.
    Also, whenever we reset the phone, the date and time will be way way behind the current date and time, eventhough we have already set the correct date and time before we reset the phone.
    How can we resolve the one way audio issue on 1 or 2 extensions of the phone, while the other extensions configured to it is working fine?
    How can we make the phone sync the date and time with the PBx server?
    Any input and help regarding this issue is greatly appreciated...
    Btw, date and time  issue not sync with the PBX server is just happening on SPA525g2, we have other phones like SPA303, SPA504, and SPA232D/SPA302D. All other phones' date and time is in sync with the server even though we reset them except SPA525g2.
    Thank you very much,

    PeterMacSF,
    It appears that in the past few days you have not received a response to your
    posting. That concerns us, and has triggered this automated reply.
    Has your problem been resolved? If not, you might try one of the following options:
    - Visit http://support.novell.com and search the knowledgebase and/or check all
    the other self support options and support programs available.
    - You could also try posting your message again. Make sure it is posted in the
    correct newsgroup. (http://forums.novell.com)
    Be sure to read the forum FAQ about what to expect in the way of responses:
    http://forums.novell.com/faq.php
    If this is a reply to a duplicate posting, please ignore and accept our apologies
    and rest assured we will issue a stern reprimand to our posting bot.
    Good luck!
    Your Novell Product Support Forums Team
    http://forums.novell.com/

  • What's wrong with the activation server? i just bought my ipad wifi celllular... and have a 3g cellular network connection... when i press the bottom to activate my ipad it says the activation server cannot be reached. what to do then?

    what's wrong with the activation server? i just bought my ipad wifi celllular... and have a 3g cellular network connection... when i press the bottom to activate my ipad it says the activation server cannot be reached. what to do then?

    Hey aries35,
    I found the following that goes over troubleshooting the same issue for the iPhone. I know you have an iPad, but the steps should still apply:
    Perform the following steps:
    Restart the iPhone.
    Try another means of reaching the activation server and attempt to activate.
    Try connecting to a known-good Wi-Fi network if you're unable to activate using a cellular data connection.
    Try connecting to iTunes if you're unable to activate using Wi-Fi.
    Restore the iPhone.
    If you receive an alert message when you attempt to activate your iPhone, try to place the iPhone in recovery mode and perform a restore. If you're still unable to complete the setup assistant due to an activation error, contact Apple for assistance.
    via: iPhone: Troubleshooting activation issues
    http://support.apple.com/kb/TS3424
    Cheers,
    Delgadoh

  • Trying to publsh changes to my website. I get a message "There was an error communicating with the FTP server. Try again later, or check with your service provider." I did, and all my settings are correct, but still cannot publish

    Trying to publsh changes to my website. I get a message "There was an error communicating with the FTP server. Try again later, or check with your service provider." I did, and all my settings are correct, but still cannot publish.
    Any other ideas?

    Most likely you are suffering from a bug in iWeb that doesn't let you publish websites if an image you have added to your site begins with space. You can either search for that image and remove it.
    <Link Edited by Host>

Maybe you are looking for

  • Workflow not starting in production

    hi all i am having problem starting workflow in production,same workflow has been tested in development and has been transported accordingly error that is coming is that workflow cant be activated ,when i check the workflow log ,it tells that there i

  • Can't Update 1st-gen Shuffle

    I have iTunes 7.0.2 and Mac OS X 10.4.8. My (1st-gen) shuffle is recognized and syncs older or non-DRM songs just fine, but won't sync some newer songs purchased through the iTunes Music Store. I get a message telling my to perform an update from the

  • Traffic Signal Implementation in webdynpro View

    Hi, I want to implement the traffic Signal indicator for reporting status(RED, GREEN and YELLOW) in my webdynpro view. Is there any UI element available for the same in webdynpro or any API to consume them ? Any alternative suggestion would be helpfu

  • Number Group Not Maintained for Section IEQIN02 and Business Place 194B

    Hi, We have not deducted TDS under 194 B until now but using other sections only like 194 C. Currently there is a deduction under 194 B section and we want to pay through J1INCHLN against this deduction. But we are getting the errror messege "Number

  • HT4623 In my I pad have no software update sine

    Dear sir In my iPad have no any software update sine so how to update my iPad plz suggest