Our BW server has been upgraded from SAPKW70016 to SAPKW70019 in Quality server. We have been given few days to test the quality server thoroughly, then after basis team will apply same to the production server.
I wanted to know, what are the steps of thoroughly testing the quality server? what all transactions needs to be tested? how do we come to know what are the additional benifits of upgrading to SAPKW70019.
Regards,
Nirav Shah
Hi,
It could be any kind of test like data matching, data consolidation test, routine test, functionality test, report test....its basically to test your system...whther it meets the user requirement or not.
Regards,
Gunjan.
Similar Messages
-
Hi Gurus,
I just have started doing negative test of upgraded following patch level. But I am not coming ahead.
Kernel release: 640
Patch Level: 247
Can anybody tell me about the procedure doing negative test of patch level?
Thanks
SIMThanks Uday,
As far as I know, it is DB Platform
We have loaded the folowing support packages in system:
EA_APPL 16
EA-IPPE 26
SAP_APPL 31
SAP_ABA 65
SAP_BASIS 65
EA_FINSERV 16
ABA_PLUS 21
Regards
SIM -
Download SAP 9.1 patch level 4 upgrader
Dear Experts,
I want to upgrade SAP 9.1 PL 0 to PL 4.
Can you please tell how to and where to download SAP 9.1 Pl 4 upgrader ?
Thanks & Regards
HirenYou can install RSP, and check software update there, or you can contact SAP partner and ask for downloading.
BTW, PL05 and PL06 is out for 9.1.
Frank -
Dear All,
I am facing one problem at the time of Patch Level 08 Upgrade, Currently I am using SAP B1 2007 B PL00, At the time of Connection with SQL Server for SBO-COMMON Upgrade System throughing me bellow error
The connection to the specified server has failed. Check your password and that the server exist on the network
I had verified SQL User ID and Password.
Thanks & Regards,
Siddique Shaikh.Hi,
As you are using SAP B1 2007B PL00,it is not supported with MS SQL server 2008.
Only as 2007B PL10 MS SQL Server 2008 is supported,i think this is the cause of your issue.
Kinldy the check the supported platform from the below link,under product availability
https://websmp210.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000705857&_SCENARIO=01100035870000000183&_ADDINC=011000358700001192682007E&
Also check this note:1289748 -
DB space history not updating in DB02 after upgrading to NW7 patch level 11
We upgraded our NW04 system to NW7 patch level 11 and now when I go into DB02 and click on DB space history there is no new data since the upgrade. SAP_Collector_For_PerfMonitor runs every hour without error. I've checked st22 and there are no shortdumps and I can't find any timeout issues. Ideas?
You may need to a newer release of saposcol. Saposcol comes with your kernel, if you haven't updated your kernel recently that could be a conflict with your saposcol.
Lee -
Kernel upgrade to patch level 196, ECC 5.0, MSCS resource issue.
Hi,
We have 3 system landscape DEV, QAS & PRD on win 2003, oracle 10G, ECC 5.0.
Our PRD system is on MSCS with CI on node A and DB on node B.
Recently I successfully upgrade kernel off DEV & QAS system to patch level 196 of stack 18.
When I tried to upgrade the kernel of PRD system one of the cluster resource drive (The drive contains the usr folder) is automatically moving from Node A to Node B and I got the error u201Capplication server shut downu201D. We donu2019t have additional application server in the landscape.
Please suggest the solution.
Regards,
RajeshHi Juan,
How are you? Thanks for your reply.
We are using ECC 5.0. I have found more errors in dev_w0 as follows,
ERROR => ShmCreate( ATTACH 62, 85588600) failed 1 [mpixx.c 843]
ERROR => DpInitMpi: MpiInit failed (1) [dpxxtool2.c 3556]
in_ThErrHandle: 1
ERROR => tskh_init: DpInitMpi (step 1, th_errno 17, action 3, level 1) [thxxhead.c 9621]
Info for wp 0
stat = 4
reqtype = 1
act_reqtype = -1
rq_info = 0
tid = -1
mode = 255
len = -1
rq_id = 65535
rq_source = 255
last_tid = 0
last_mode = 0
int_checked_resource(RFC) = 0
ext_checked_resource(RFC) = 0
int_checked_resource(HTTP) = 0
ext_checked_resource(HTTP) = 0
report = > <
action = 0
tab_name = > <
LOCATION SAP-Server sapcigrp_ECP_00 on host sapeccprddb (wp 0)
ERROR tskh_init: DpInitMpi
TIME Sun Nov 16 05:13:07 2008
RELEASE 640
COMPONENT Taskhandler
VERSION 1
RC 17
MODULE thxxhead.c
LINE 9806
COUNTER 1
PfStatDisconnect: disconnect statistics
Entering TH_CALLHOOKS
ThCallHooks: call hook >SAP-Trace buffer write< for event BEFORE_DUMP
TrThHookFunc: called for WP dump
ThCallHooks: call hook >ThrSaveSPAFields< for event BEFORE_DUMP
ERROR => ThrSaveSPAFields: no valid thr_wpadm [thxxrun1.c 730]
ERROR => ThCallHooks: event handler ThrSaveSPAFields for event BEFORE_DUMP failed hxxtool3.c 254]
Entering ThSetStatError
Entering ThReadDetachMode
call ThrShutDown (1)...
***LOG Q02=> wp_halt, WPStop (Workproc 0 4000) [dpnttool.c 357]
Please suggest the solution
Thanks & Regards,
Rajesh -
When will SAP GUI for Windows 7.20 patch level 9 be available?
When will SAP GUI for Windows 7.20 patch level 9 be available?
I can't see the SAP GUI patch version in the PAM (https://websmp102.sap-ag.de/pam).
Thanks.Hi,
Latest is SAP GUI for Windows 7.20 patch 8
http://service.sap.com/swdc
> Software Downloads
> Installations and Upgrade
> Browse our Download Catalog
> SAP Frontend Components
> SAP GUI FOR WINDOWS
> SAP GUI FOR WINDOWS 7.20 CORE
> Installation
> gui720_8-10007878.exe SAP GUI for Windows 7.20 patch 8
The NetWeaver 7.x BW/BI Front-End Patch Delivery Schedule can be checked
via note 1085218.
Thanks,
Venkat -
B18.8 DB upgrade from Patch level 12 to 15 Patch level
Dear Experts,
When I am trying to Upgrade database 8.8 PL 12 to SAP 8.8 PL 15 following are error.
I had completed the Downloading process of 8.8 patch level of 15.
WINRAR Diagnosis Error...................
! C:\Documents and Settings\amol(sap)\My Documents\Downloads\B18800_21-10003894.ZIP: The archive is either in unknown format or damaged
Please suggest.
Regards
AmolHi,
The setup file has corrupted so better you again download the file using SAP Download Manager.
*Close the thread if issue solved.
Regards
Jambulingam.P -
How to check IGS version and procedure for upgrading IGS patch level
Hi all,
We are on BIW 3.5 .Iam not clear about how to check the version of IGS and its patch level .I went through various notes but still iam confused with tracing it , can someone plz help out?
Secondly want to upgrade IGS version i went through note 454042 but still confused with doing that , Can someone plz refer other notes or detailed procedure for upgrading IGS.
Our BIW Production and Test are on AIX and Development is on HP-Unix OS .
Points guaranteed for the same. Requested to revert at earliest as this is urgent .
Regards,
SaumyaHi,
Check this link which may help u:
http://sap.ittoolbox.com/groups/technical-functional/sap-basis/igs-upgrade-1455477
The installation/upgrade procedures for the integrated IGS are as follows:
Integrated Version Installation
The integrated IGS is automatically installed with the SAP Web Application Server.
Integrated Version Upgrade
You find the upgrade files for the integrated IGS version on the SAP Service Marketplace:
http://service.sap.com/swdc ® Download ® Support Packages and Patches ® Entry by ApplicationGroup ® SAP Frontend Components ® SAP IGS ® SAP IGS .
There, you find the IGS executables and libraries (igsexe_.sar) as well as the IGS folder structure (igshelper_.sar) containing among others font files.
With the upgrade files of the executables and libraries, proceed exactly like you would with kernel patches (for example, extract the Archive to the same location). More information about kernel patches can be found in the related note 19466 in the section Copying and Installing a Patch.
The upgrade files for the IGS folder structure must be extracted to the instance directory (DIR_INSTANCE). More information can be found in note 1028690.
After a restart of the Web AS the new IGS is up and running.
Information about finding out your IGS patch level is provided in note 931900.
For an upgrade of an integrated IGS please also check note 896400.
For more info check this SAP Help doc:
http://help.sap.com/saphelp_nw04s/helpdata/en/4b/72d43ac66e1f08e10000000a114084/frameset.htm
Hope these helps u...
Regards,
KK. -
PI 7.1 upgrade - PI_BASIS patch level in ECC
Hello
We are looking at upgrading our XI 7.0 SP12 to PI 7.1. Our backend ECC system is at PI_BASIS SP11. Most of our interfaces with the backend are through ABAP proxies.
Will an upgrade to PI 7.1 demand an upgrade to PI_BASIS in the backend ECC system as well?
If not, what is the minimum SP level the PI_BASIS component in the backend ECC system should be at?
I don't find this information in upgrade guide; where will this information be normally available?
Thanks
KKYou can use PI 7.1 with any SAP system.
However, if you want to use Abap proxies based on message interfaces of type "stateless" with WS-RM protocol, the ECC requires SP 14.
The Abap proxies based on XI 3.0 protocol do not require any special patch level.
Regards
Stefan
Edited by: Stefan Grube on Aug 28, 2008 4:34 PM -
Problem after upgrade from patch level 36 to 43
Hi,
Recently our system is upgraded from 36 to 43 patch level. After this there are problem in doing hiring action, IT0000 is saving but the next infotype IT0001 does not gets saved and also no error message. So, really not able to figure out what could be the problem.
I was debugging the standard code i.e once the 'save' button is clicked in IT0001 in PA40, but in vain. I am not able to find out where or in which program/include the data gets saved in PA0001. If any one aware of this please let me know.
Since IT0001 is not getting saved, there are probs with IT0007 and IT0008.
Please let me know your views.
Thanks,
ArunsriHi Raju,
Thanks for the reply. Ya, the problem was not due to upgrade,but some other issue. Not able to find till now. I checked IGMOD features and it is in 'Active' mode only. No luck.
Edited by: Arunsri on Jan 27, 2012 4:18 PM -
Should we follow the sequence while upgrading to latest patch level?
Hello,
While applying patches in any module say HR,if my current level is SAPKE60028,Can I dirrectly download SAPKE60034
& upgrade it or should I follow the sequence?
SAPKE60028,SAPKE60029,SAPKE60030,SAPKE60031,SAPKE60032,SAPKE60033,SAPKE60034.
Regards,
Rachel.Hi Rachel,
You cannot directly upgrade from a lower level SP level to higher SP level directly for ABAP stack by skipping the ones in between.You will have to follow the sequence and it will also not let you to proceed say from SAPKE60028 to SAPKE60030 unless you have the SAPKE60029 in between.The prior level is checked as a prerequisite in order to advance to the next level.
However, for JAVA statck upgrade it is possible because in Java whatever patch level u choose it is consolidated.For instance, if you are at patch leve 12 at present and want to upgrade to level 17 then the patch level 17 is a consolidated package consisting of all the levels from 1 to 17.While upgrading it removes all the existing previous SP and deploys SP level 17 right from the beginning i.e level 1 to 17.
Thanks,
Saby.. -
Dear Expert, what is the rule in upgrading Patch Level?
If my existing PL=10 can I update it directly to PL=18 w/ going from PL11 to PL17?
If my existing PL=0 can I update it directly to PL=18 w/ going from PL1 to PL17?
thank you for your valued advices.Hi Jojo........
Follow this option....
If my existing PL=10 can I update it directly to PL=18 w/ going from PL11 to PL17?
Regards,
Rahul -
Patch level upgrade from SP00 PL 42
Hi Experts,
I need to upgrade a client to the newest SBO Patch Level from SP00 PL 42. Which Patches are manditory to install?
Regards,
MarliHi dear,
download the sap latest path from below link
https://websmp210.sap-ag.de/sbo-swcenter
https://websmp109.sap-ag.de/~sapidb/011000358700007392752004E
upgrade your server to the highest path level then upgrade the clients. -
Kernel upgrade - 640 patch level 247 - subsequent patches needed
Hi community,
I recently upgraded the kernel of our system SAP ECC 5.0 to kernel release 640 patch level 247
I used the the two files EXE and EXEDB as I usually do in this cases.
Unfortunately this kernel is affected with the problem described in note 1239685, which is critical for us.
To solve the problem SAP recommends upgrading kernel to patch level 252, which is not present in my files, but is present in the single disp+work package, which is level 273
What is the correct procedure in this case? I have to unpack only the disp+work package or all the archives listed in the download place?
Regards,
ValerioDear Valerio,
The packages SAPEXE.SAR and SAPEXEDB.SAR contain a complete set of database independent (SAPEXE.SAR) and database dependent (SAPEXEDB.SAR) executables. A kernel patch is delivered as a dw.SAR package. It is sufficient to extract the content of the dw.SAR into DIR_EXECUTABLE (normally /usr/sap/<SID>/SYS/exe/run for a 6.xx system on UNIX). Of course, this should be done while the system is down.
Best Regards,
Tim
Maybe you are looking for
-
How do I store an Int, a short, and multiple bytes from file in byte array
I'm attempting to do this for a project but can't figure out how to store the three values in one byte array. This is what i've tried public void send(byte[] input) // TODO ByteArrayInputStream bais = new ByteArrayInputStream(inpu
-
The office building I work in is too close to my favorite Starbucks and Passbook is constantly offering to load the Starbucks card every time I turn on my iPhone. What can I do? I'm sure the phone is using Location Services way more than I want it
-
WARNING: ldc_close: (0xb) unregister failed
Hi We're running Solaris 10 on a T3-2. The T3 is configured purely as a physical server; there are LDOM's created. We're running Oracle 11.2 databases on this server, and it's been running fine since May ( date of last reboot ). However, two days ago
-
Leave Entitlement defining using Exit
Hello Gurus, I have a requirement according to which I need to redefine entitlement days depending on the probation period of employee. An employee can have 3 or 6 months as probation period. In probation period he is getting NIL pay.. and After prob
-
Hi All when I schedule any BDC pgm in Background by giving job name in SM36 . It is giving an runtimr error OBJECTS_OBJREF_NOT_ASSIGNED and Exception CX_SY_REF_IS_INITIAL . Error analysis An exception occurred that is explained in detail below.