The GP for Production order Rescheduling
Hi Folks
I have finished executing the Production order Rescheduling scenario in the DS.
Now I want to find out how the blocks, the actions and the callable objects of it has been arranged.
I am logged in as username j2ee_admin.
I cannot see folder for the Production order Rescheduling in
Guided Procedure -> Design time.
There are folders for the scenario of procurement, travel expense exception, store specific consumer prices and so on.
Can somebody help me know where can I locate it?
many thanks
sudeep
Hallo ,
Create the G/l account using transaction FS00 for the company code COM2.
Regards
Ramesh
Similar Messages
-
How to restrict the GR for Production Order when Goods Issue is not done
Hi Gurus
How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
Pls suggest best solution.
Abhijit.Hi,
You can club together the GI nad GR at the time of confirmation..
I.e Backflush for the components and auto GR for the Product.
So that you can stream line the Process.
The best Option would be to use the User Exit:
Enhancement - MBCF0002
Functional Module - EXIT_SAPMM07M_001
Include - ZXMBCU02
Refer below link for further details..
How to stop the goods receipt before issueing the goods for production orde
Regards,
Siva -
How to stop goods receipt before issueing the goods for production order
Hi All,
I try to follow the thread SAP ERP Manufacturing - Production Planning (SAP PP) to do it, however it is not working. I already created the status profile, assigned it to 'StatusProfile Header' in OPJH for the correct order type. However when I change the status to permitted GR, it is still not able to give me to do it in MIGO. Any idea?
Thanks.Hi Justin,
User status will not sutiable for your requirement, the best way is to use User exit or BADI
Implement the BADI - WORKORDER_GOODSMVT in this there is method
MANUAL_GOODS_RECEIPT under that
write this code
if_ex_workorder_goodsmvt~manual_goods_receipt.
data: lt_resb type standard table of resb,
wa_resb type resb.
select * from resb into table lt_resb where rsnum eq i_order_header-rsnum and xloek eq space and bdmng gt 0.
check sy-subrc eq 0.
loop at lt_resb into wa_resb.
if wa_resb-enmng < wa_resb-bdmng.
message E499(sy) with 'Order is not fully consumed. Processing is STOPed'.
endif.
endloop.
endmethod.
Enhancement: MBCF0002
Function module: EXIT_SAPMM07M_001
Code for your copy pasting in the source code of ZXMBCU02.
Remember to activate the program. In SMOD enter the enhancement, press F8 and then click on activate button.
*& Include ZXMBCU02
Regards,
Sankaran -
IDoc Configuration for Production Order Creation and Change
Hi All,
Please Help me out for IDoc Configuration for Production Order Creation and Change
I have found the IDoc for Production Order
Messgae Type : LOIPRO and IDoc type : LOIPRO01
Actually my requirment is to send the (LOIPRO01 )IDoc from SAP R/3 to XI system ,when ever the Production Order Created and Changed,
I have done following Configurations:
1. RFC Destination created for XI system
2. PORT was created for XI
3. Partner profile created WE20 and LOIPRO01 IDoc is added in OutBound Perameter.
I need to know how to do the followning.
1. How do i configure the outbound Production order idocs when Production Order is created or changed.
2. in NACE (Output control) which is the Application for Production Order.
3. How can I set IDoc as output Type for Production Order Creation.
Thanks in advance
Dhanabal THi Michal,
I know that it is the old thread but still want to get clarified from you out of curiosity.
Unlike other IDOC, i actiavated change pointers for LOIPRO
1.message and idoc type is linked
2.function module , message type , idoc type is linked
function module used is CLOI_MASTERIDOC_CREATE_LOIPRO
3.BD64, distribution model is created and distributed
4. port and partner profile is in place.
5. IDOC is not getting generated after creating the process order.
do we need to activate the change documents for the message type in BD52,
if yes can you please provide the object types for the same.
or i am missing something else. please guide me in this regards.
Thanks in advance for your time.
S.Janagar -
Abolish product cost collector for production order
Dear Experts,
we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
Best regards
SteffenHi Ajay,
thank you for your answer.
We have tested two variants:
1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
Best regards
Steffen -
Hi Experts,
Can anyone tell me which is the table for Production Order Planned Values.
The one which we get to see in CO02.
Thanks,
RaviHi Ravi,
<b>AFKO</b> Production Order Header
<b>AFPO</b> Production Order Position (details)
Regards
Sudheer -
How to find out the list of Production orders created for sales orders
Dear All,
Our company wants to generate a report for a List of Materials sold out in a particular Product Hierarchy. Along with that we want to know the list of Production orders created for the sales orders.
How to identify the production orders which are created based on Sales orders.
Kindly suggest.
Regards,
MullairajaCheck these threads
[Sale Order & Production Order|Sale Order & Production Order;
[Re: Linking Production Order against a Sale Order MRP run|Linking Production Order against a Sale Order MRP run;
thanks
G. Lakshmipathi -
How to use the selection profile and status profile for production order?
Hi expert,
I want to know how to use the selection profile and status profile for production order. what's the usage for these two selection profile and status profile ?
Please help me.
thanks in advance.
george.shiHi George,
There are are two types of statuses.One is system status and second one is user status.These statuses will tell us current situation of an order.
We can't change system statuses.But we can create our own statuses through status profile.With this profile we can control user statuses.
In this status profile,
1.We define the sequence in which user statuses can be activated,
2.We define initial statuses
3. Allow or prohibit certain business transactions.
Selection profiles are used to select the objects (say production orders) with different status combinations.We assign status profiles to selection profiles in BS42 T-Code.
Regards,
Raja.
Edited by: Rajarao on Oct 30, 2008 6:21 AM
Edited by: Rajarao on Oct 30, 2008 6:22 AM -
Print indicator assigned to the MM movement type 101 F ( GR for Production Order )
Hello!
I'd like to know how to assign a print indicator to the movement type GR for Production Order 101_F
When I use the IMG path : Material management/ Inventory Management and Physical Inventory/ Print Control/ Maintain Print Indicator for Goods Receipt Document, I can only assign the movement type 101 (Goods receipt) but not the movement 101_F.
Thank you for your help!
CharlotteHello Dev!
The movement 101 F is Goods Receipt for Production Order. The letter "F" corresponds to the movement indicator.
I'd like to dissociate the movements types 101 and 101_F to have only one printed label.
Regards,
Charlotte -
Changing the Assignment of production order in sales order in MTO scenario.
Hello all!
I have following problem:
After the MRP a production order was created for a sales order. Because of the production in another plant
the production order which was created automatically had to be technically completed and a new one
created.
If you want to check now the availability, the sales order finds nothing, because it's linked to the one,
which was technically completed. Now is the question how can I change the production order for this
sales order. (In the production order the correct sales order is connected!)
As I found out it's connected to the field AUFNR in the table VBEP. But how can I change this
field within a transaction and not in the database?!?No replies
-
Error during goods receipt of Finished goods for production order
hi friends
pls help me iam struggle this issue and mentioned the issue .
when i do goods receipt for production order system getting error like
No price could be determined for material/batch FG/ plant ZTP
Message no. CK 465
Diagnosis
The system could not calculate a price for material/batch FG/ in plant
ZTP for valuation view 0, because none of the valuation strategies in
valuation variant 007 was successful.
System Response
User-defined error management enables you to specify whether the message
is an error message, a warning message or an information message.
o If you have defined the message as a warning message or an
information message, the costing item will be entered in the cost
estimate with a value of zero.
If you have defined the message as an error message, the cost
estimate contains an error or errors.
- In the case of a material cost estimate, the system sets the
status KF.
- If it is a cost estimate without quantity structure, or base
object cost estimate (that is, a unit cost estimate), the
system cannot proceed with costing until you have corrected the
errors.
If the system issues a termination message, the cost estimate cannot
be processed, and processing is terminated.
procedure
o Check the master data for material/batch FG/ in plant ZTP.
o If you have authorization for Customizing, check the valuation
strategy for materials in valuation variant 007.
Note
If the message is a warning message or an information message, there is
a danger that materials with errors will be ignored by the system.
If, because of this, you issue a warning message and at the same time
include materials with a zero value in cost estimates, you can make the
following settings for these materials in the costing view of the
material master:
1. Enter a very low price in the planned price 1, 2 or 3 fields
manually, for instance 0.01 USD. These prices are used for costing
purposes only; they are not read by other applications.
2. Enter the highest price unit possible, for example 10000.
Note: If you enter a new price unit that is higher than the costing
lot size, the system increases the costing lot size accordingly.
3. Change the valuation strategy, such as strategy 4, where you could
enter the planned price field in which you entered the low price.
The system now costs as follows:
Using the valuation strategy, the system finds planned price 1, 2 or
3. Due to the low price and high price unit, the system rounds the
value to zero. However, the cost estimate still obtains status KA
(free of errors), and no error message is issued.
This procedure can be used for all materials that have caused error
message CK465 to be issued.
with regards
dinesh
Edited by: code acess on Nov 8, 2010 4:06 AMhi ragavendra,
this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
with regards
dinesh
Edited by: code acess on Nov 9, 2010 4:01 AM -
Report for Production orders with name of Customers
Dear Expert,
Kindly suggest to view the production orders with customer numbers for which the sales orders is created.
I tried in MB51 with layout settings but the customer number comes out be blank despite the sales order number is populated for an production order.
Kindly suggst a way or any report in the system to get the corresponding information of production order number and corresponding customer name mentioned in the sales order .
Thanks in advance for your help and inputs..
Best regards,
Nitish jainNitish,
MB51 is a Material Document list. Many production orders exist that have no entries in this report, so it would be an unlikely candidate to be a solution for your requirement..
The standard production order reporting tool is COOIS. The output for MTO orders can be configured to display Sales order and Item and Soldto.
Obviously, displaying even the customer order number in COOIS is impossible in a MTS scenario.
In addition, a user experienced in using SAP Query (SQVI or SQ01/SQ02/SQ03) could also create a production order report without having to know ABAP, by properly linking tables AFKO, AUFK, AFPO (production order data) with VBAK (sales order header data) to get customer number, and KNA1 to get customer name..
If you are not expert in SAP Query, I suggest you discuss this requirement with a local ABAPer.
If you are feeling like educating yourself in the wonders of SAP query, try this doc. Although old, SAP query hasn't changed very much since this document was written.
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCSRVQUE/BCSRVQUE.pdf
Rgds,
DB49
Edited by: Dogboy49 on Apr 20, 2010 10:47 PM -
Report to check open reservations for production orders where GI not posted
Hi experts,
Can we get reservation details from any report/ table for production order where material has not been issued, report should also display the value of the reserved material.
I could not find desired details in RESB (it has price but not value) and MB25.
Thanks in advance, useful ansers will be rewarded.
Thnx
AnandHello Anand,
there is no report but you may use the production order info system with list "components" and create a layout contaning the issued quantity and/or the final issue indicator. With a correct sorting, the list should show all orders with non-issued components at the top.
Regards, Andreas -
Report for Production order operation
Hi
Is there any standard report which will give the list of production orders which are confirmed upto a particular operation.
For Ex: Lets say routing has operations 0010,0020 and 0030. I want to know which production orders are confirmed upto operation 0020 and not beyond that.
Thanks in advance.
Maruthi RamHi,
Options:
1. Use COOIS.
In the drop down LIST options select Operations. In the Select at Operation Level specify the Syst. Status as CNF & CRTD, click exclude check box, specify the Plant at Select at Header Level & execute the report.
The output will display all operations which are not confirmed or created, now you can set filter on the operation column & get the info you're looking for.
2. Use MCP1 - Check if this report helps.
Hope the above answers your query.
Regards,
Vivek -
Different GL accunts during GR for PO and GR for production order
Hi
For posting GR for PO and GR for Production order we use movement 101 only then how we can define or e different GL accounts for both the transactions ?Hi,
As per my undestanding
If you want to hit different GL for same material type for e.g. GR for PO and GR for Production order.
you can define split valuation, Suppose material A has two Split valuation External Procurement or Inhouse Production.
Now For valuation type External Procurement assign valuation class 1000 and for Inhouse Production 2000.
Now in GBB for valuation modifier BSX assign two separate GL
Like
GBB BSX 1000 120000(External Procurement)
GBB BSX 2000 130000(Inhouse Production)
Solution 2 :-
Define other movement type for Production create and create a new event key and assign GL to that one.
Hope HElp U !
Regards,
Pardeep Malik
Maybe you are looking for
-
How do you tell what sim company my iphone is
i dont know what it is because i just bought it recently off a friend and i have to activate it but i cant because it needs a sim with no code
-
hi friends.. i want to download my smartform in pdf format.. what can i do... kindly help me
-
Why my bluetooth does not work anymore?
Why my bluetooth does not work anymore? What can I do? Before I just turn on bluetooth then turn off it, and it worked properly. Now it does not work. I don't understand why.......
-
Hi I have a CSS11050 running fine with 9 servers in 3 different pools. I use 1 port of the CSS to connect to a switch, and I use the switch to connect the 9 servers. I have plans to connect an addition 2 servers in the same manner. At present the CSS
-
Hi. I have a BB Torch 9810. after updating the whatsapp app it rebooted and start working fine. after a couple of minutes it turned off and when i tried turning it back on with the power on bar it wouldn't turn on. So i pulled out the battery and whe