While calulating WIP I am getting below error:
There are values for cost element 80000 that are not assigned to any line ID
Message no. KJ161
Diagnosis
Not all values for the cost element are assigned to a line ID.
Procedure
Assign the cost element to a line ID. If you don't want to include the cost element in results analysis, assign it to a line ID of category N.
You can access a detailed list of unassigned cost elements as follows: Start results analysis in the individual processing mode (transaction KKA1, KKA2, or KKA3). Select the field Full log. Execute the function. On the next screen, choose Logs -> Parameter List in the menu. A list is generated. The unassigned values are shown at the end of the list.
If cost element "+++++++++" was shown in the message, this is because in the assignment of costs and revenues to line IDs, you have not used a cost element other than the full masking "+++++++++". In this case a presummarization eliminates the information on the cost element.
Cost Element 80000 is of type 43 Internal activity allocation, I have Masked this in OKGB as below:
Controlling Area = FLGP
RA Version = 0
Masked Cost Element = 000008++++
Masked Cost Center = ++++++++++
Masked Activity Type = +++++
ReqToCap= COS (Secondary Cost)
I have Configure OKGA also but still system is giving error.
Please help me to understand.
Regards,
Vivek

I was wondering if you could help me I am trying to configure the RA key for Refurb orders and when I go into txn OKGB for the Assignment of C/E for WIP there is sample config already there which I copied.  But I am having difficulty getting the KK1A to work I am getting the message as outlined above.  Could you explain how this OKGB works and how to configure it a bit more fully.  In my sample config there is a ReqTOCap section and in it there are letters like ABR, EK, FK, EL what do they mean.  This is a screen shot of it.  I am not sure how to go about this entirely so any light you could shed would be greatly appreciated.  Can you suggest a good resource or documentation you may have, would be greatly appreciated.

Similar Messages

  • BEx:Hierarchies in DIM and FAC are different for Cost Element

    Hi Experts,
    Whenever we execute a report we are getting a warning message as "Hierarchies in DIM and FAC are different for Cost Element", but in report level we are not maintaining hierarchy properties for Cost Element.
    We have executed Master Data tests in RSRV also and still the problem.
    Is any other to do to get rid of this warning message?
    Thanks in Advance.
    Regards,
    RAO.

    Hi all,
    I face the issue like this but with transaction KOAP - Plan settlement
    But, the problem is that, I do not active reconciliation ledger, so I do not maintain any thing relate to reconciation ledger or adjustment posting? I can do transaction "actual settlement"  without error
    So, How this error come to me?
    And how I can fix it?
    Thanks all!

  • Is there a update for Photoshop Elements 8 that will support raw files from a Canon T3i 600d?

    Is there a update for Photoshop Elements 8 that will support raw files from a Canon T3i 600d?

    You have two alternatives:
    (1) Upgrade to PSE 9,10 or 11. (2) Download and install the free Adobe DNG converter to convert your raw files to the Adobe universal Raw format and the files will open in all versions of PSE (keep your originals as backups and for use in the camera manufactures software)
    Windows download click here DNG Converter 7.3
    Mac download click here DNG Converter 7.3
    You can convert a whole folder of raw images in one click. See this quick video tutorial:
    You Tube click here for DNG Converter tutorial

  • Cost element not assigned to any line id

    when i excute the transction kkax i am getting cost element is not assigned to any id
    would you please explin the wip configuration steps.
    i am not aware the masked cost element
    with regards
    Srinivas

    You need to read the error to find out which cost element needs assignment.
    You need to assign the source cost elements (through t-code OKGB),  that are expected in the production order to various line ID already created. You maintain this data for CO area, RA version and RA key combination. You use masking when you mention which cost element to be assigned to various IDs. You can also direct various cost element, if it comes with a combination of particular cost center and activity type to a particular Line ID. If you need to keep it simple, just enter +++++++++ for cost centers, activity types and Business processes. Cost elements can be masked as follows; for eg. All cost primray cost elements for materials, if they start from 210001 to 219999, the you can mask them like 00021+++++. Give the line ID in the column Required to Capitailze.
    Your line IDs typically would reflect the cost component structure.

  • Value BLANK/SPACE not valid for cost element "Fund"

    Hi!
    We use funds management in our solution. It has worked fine in development but when doing the module tests we get the following error when creating a shopping cart:
    Value BLANK/SPACE not valid for cost element "Fund"
    When creating a PR in backend we do not get an error. So it should not be a problem in funds management.
    Everything works fine when using BBPSC01 (central)
    Any ideas?
    Sincerely
    Anders
    Edited by: Anders Öhrling on Sep 29, 2008 11:33 AM

    Ple provide the solution for Problem Resolve.

  • There are many apps I purchased for my android phone that are exactly the same for the iPhone, do I have to buy these again or would the license transfer?

    There are many apps I purchased for my android phone that are exactly the same for the iPhone, do I have to buy these again or would the license transfer?

    Yes you need to buy them again. Apps written for one device will not run on the other.

  • Maintain default cost element in controlling area USD

    Hi All,
    I were trying to clear vendor down payment with vendor invoice ( error)required me to Maintain default cost element in controlling area USD.
    Is that a way to do without making to default cost elemnt
    Thank you for your help
    Regards
    bali

    Hi,
    As process you should clear the down payment first and then vendor thry F-44.
    It should not be asking you for default cost centre untill there is validation rule set.
    hope this helps you.
    Regards
    Bharat

  • KB15N_No adjustment account found for cost element Message no. K5112

    When I am trying to post Manual Cost Allocation through TC KB15N with the following input data I am getting the following error message and the same could not be posted.  Kindly advise.
    Screen Variant used: 01 SAP Cost Center
    Input Type: List Entry
    Item No.1
    Sender Cost Center : 3402100942
    Cost Element: 6200001
    Amount : 62,201.56
    Receiving Cost Center: 3405100945
    First four digits represent profit center code.  If first four digits are equal the above error is not coming. But posting is needed with different profit centers.
    No adjustment account found for cost element
    Message no. K5112
    Diagnosis
    Neither standard account determination nor the enhanced function found an adjustment account for the reconciliation posting.
    System Response
    No adjustment account could be determined for cost element  in company code SCCL.
    Procedure
    Maintain the standard or enhanced account determination for transaction KAMV. Information on maintenance can be found in the program documentation.
    Execute

    Hi all,
    I face the issue like this but with transaction KOAP - Plan settlement
    But, the problem is that, I do not active reconciliation ledger, so I do not maintain any thing relate to reconciation ledger or adjustment posting? I can do transaction "actual settlement"  without error
    So, How this error come to me?
    And how I can fix it?
    Thanks all!

  • Update Functional Area on Secondary Cost Element

    Hi gurus,
    I'm trying to update Functional Area on Secondary Cost Element. I've created a LSMW to make it but when I run the bacthinput the system give me a message in order to inform me that this changes might need a lot of time because there are several internal changes to do.
    The problem is that no functional area is updating, and I'm trying with just an item and the system needs a lot of time to update just one Funcional Area, more than a hour!
    So, I don't know if some of you already had the same problem or is a problem with performance of system, because in Develop System I didn't have any issue to update this information.
    Is there any form to update this information than LSMS or Individual transaction?
    Kr
    Jorge

    Hi Jorge
    I was trying to change it manually in KA02 and there are tasks the systems does before confirming.
    This is the root cause.
    "Field changes to field Functional Area lead to
    complicated tests of the data involved, which
    may take some time. Do you really want to change
    the field online? "
    There is an option to change it in background.
    Regards

  • Maintain default cost element in controlling area Message number FI660

    Hi All,
    We found the Down Pay Request (doc. booked by F-47)  cannot be picked up by F110. In Job log the error shown as Maintain default cost element in controlling area.
    Long text error details.
    Maintain default cost element in controlling area
    Message number FI660
    CO down payment update is active in controlling area WAPC. You  must  therefore maintain a default cost element and a revenue element  for down payments.
    Maintain the default cost element for dow payment for controlling area in the project system implementation guide.
    Kindly advice.
    Note
    In the define dafault cost elemens for down payments in Project system-OKEP  the CE for vendor and cusotmer downpayemnt  is missing

    hi srinivas
    OKEP configuration is necessary
    if while creating down payment request you have not assigned cost element
    maintain cost elements there.
    regards
    rohit

  • How to extend cost element to controlling area?

    Hello all,
    I created a new cost element via FSP0 and then created cost element via KA01.
    Now whwen I am trying to do cost center assignment in OKB9, it throws me error that cost center in controlling are not exit for today's date with error message KI217
    I made sure the cose center's validity date cover's today, so why does it show me that error?
    Do I need to extend the cost center for perticular controlling area? if yes than how acan I do it?
    Regards,

    Hi,
    if you want to extend validity period for Cost centre - KS02  & for Cost element KA02 and select particular Cost centre & Cost element - go to edit in main menu - select Analysis Period - press F6 - and change valid period as per your requirement
    but we can't change one controlling area to another controlling area ,
    if you do not want use cost centre , cost element whatever already created - just go and Block/lock for posting
    Thanking you
    Regards
    Mahesh

  • Plannig values at cost element group level instead of at cost element lev

    Is it possible to plan values at cost element group level instead of at cost element level in BPS or SEM?
    Similary I have another question for financial statements.
    Is it possible to plan values at financial statement level instead of at G/ in BPS or SEM?
    Thanks

    You mean that I am on the wrong forum. Which forum is useful  for me for this question?
    Thanks

  • Is there a pdf for premier elements?

    is there a pdf for premier elements?

    pagerox1
    The answer to your question can be found in the links that John has posts. The ones that you seek are specifically
    Premiere Elements 12 Help PDF (319 pages)
    http://helpx.adobe.com/pdf/premiere-elements_reference.pdf
    Elements Organizer 12 Help PDF (238 pages)
    http://helpx.adobe.com/pdf/premiere-elements_reference.pdf
    Each can be saved to your computer or printed if you want to invest the print on so many pages.
    But, you may also be interested in my own "manuals" of sort, that is, my blog posts
    Premiere Elements 12 First Look
    ATR Premiere Elements Troubleshooting: Premiere Elements 12 First Look Details
    Premiere Elements 12 Daily Discoveries
    ATR Premiere Elements Troubleshooting: Premiere Elements 12 Daily Discoveries
    Lots that you will useful and not necessarily found in the Help PDFs
    ATR

  • HT201210 I'm trying to update my iOS to 6.0, using iTunes (with my 4s connected via USB and WiFi is on also). I get a message that 'there are purchased items on my iPhone that have not been transferred to my iTunes library. Yet, I can't find those items!

    I'm trying to update my iOS to 6.0, using iTunes (with my 4s connected via USB and WiFi is on also). I get a message that 'there are purchased items on my iPhone that have not been transferred to my iTunes library. Yet, I can't find those items! Help!  There is not error message number just the text message. I've searched for an answer but have found nothing on "transfering items purchased to your iTunes library".

    Right click on your device icon on the left pane of iTunes and click on transfer pur....

  • HT201209 My mom who lives in Canada send me an iTunes gift and I can't open it. I live in the USA. Is there a way for me to redeem that gift?

    My mom who lives in Canada send me an iTunes gift and I can't open it. I live in the USA. Is there a way for me to redeem that gift?

    No, all iTunes gifts and gift cards are country-specific - so a Canadian gift can only be redeemed in Canada onto a Canadian iTunes account.
    I assume that it's an emailed gift ? She can try resending it to somebody else in Canada : http://support.apple.com/kb/HT1541
    Or, and if she's been charged, she can try contacting iTunes Support and see if they will refund or credit her : http://www.apple.com/support/itunes/contact/ - click on Contact iTunes Store Support on the right-hand side of the page, then Purchases, Billing & Redemption

Maybe you are looking for

  • How to identify difference between Configure To Order (CTO) and Engineer To Order (ETO) items

    Hi All, We are working on Oracle Database 10g We have to develop a code which involves Configure To Order (CTO) and Engineer To Order (ETO) items. Can anyone advise is there any table and the corresponding column in the database which will help ident

  • Items on screen enlarged

    All info on all screens of my iphone 4 are enlarged and unresponsive. I have managed to turn the phone on and off. I have also connected it to my computer and all appears to be fine. However I can not open any apps. What should I do?

  • White lines around a swatch in Illustrator

    Hi there, I need help with a swatch that I have created in illustrator. Once the swatch is applied as a fill there is a white line surrounding the original pattern. I have read other blog posts about the issue that state that the lines are just on sc

  • S820 came with no Play Store, also has language issue.

    I bought an S820 in China and it has 2 problems that I cannot solve.  First, even after switching the laguage to English, much of the interface, apps, settings, etc. are still in Chinese. Additionaly, this phone did not come with the Google Play Stor

  • Preview keeps quitting when trying to save

    Something is going on with my Preview application, I've tried to open a map and it's unreadable, looks like I have a bug or something with a combination of photos and docs. And now, I'm trying to save a PDF file and it keeps quitting.