Hi gurus,
I'm trying to update Functional Area on Secondary Cost Element. I've created a LSMW to make it but when I run the bacthinput the system give me a message in order to inform me that this changes might need a lot of time because there are several internal changes to do.
The problem is that no functional area is updating, and I'm trying with just an item and the system needs a lot of time to update just one Funcional Area, more than a hour!
So, I don't know if some of you already had the same problem or is a problem with performance of system, because in Develop System I didn't have any issue to update this information.
Is there any form to update this information than LSMS or Individual transaction?
Kr
Jorge

Hi Jorge
I was trying to change it manually in KA02 and there are tasks the systems does before confirming.
This is the root cause.
"Field changes to field Functional Area lead to
complicated tests of the data involved, which
may take some time. Do you really want to change
the field online? "
There is an option to change it in background.
Regards

Similar Messages

  • Functional Area assigned to Cost Elements

    Hi All,
    Where can i see the list of cost elements assigned to different functional areas.
    Thanks in advance.

    Use tr. KA23 for collective processing of cost elements.
    You can use the radio button to display all cost elements, or you want to filter the cost element list for only certain functional areas you can use the option for a Selection Variant.  Just click on the Create icon and input your functional area(s) and save the variant and give it a name and description.  Then return to the KA23 screen and use F4 help or input the variant you saved. 
    After you execute the report and the list is returned, you may not see functional area immediately by default.  Simply use the icon to change the layout and send the functional area field from the column set on the right to the displayed columns on the left.
    If you have access to tr. SE16 or SE17 you can also simply look at the table contents of table CSKA to see the assignments of functional area to cost elements.
    Best regards,
    Jeffrey Holdeman

  • Secondary cost element........

    Hi,
    Is it necessary to create number of activities = to number of secondary cost element.
    or
    only one cost element is enough for all activities for posting to cost center.
    Regards,
    Imran

    Dear,
    Secondary Cost Element
    When cost element carries cost with in CO, then they are called secondary cost element.
    Example.... - Take Product Costing
    On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
    The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
    Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
    In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
    Operational Cost - Activity (Production Order) Dr Rs.XX
    To Operational Cost - Activity (Cost Centre) Cr Rs.XX
    The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
    In CO the production order and cost centre are co object including but not limited to.
    and further notes and configs see below link.
    http://www.copacustomhelp.state.pa.us/infopak/nav/finance/controlling/301/index.htm
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Secondary Cost Element Setting Criteria

    Hello all SAP usrs
    I am quite green for Controlling.
    I have a question need all your help.
    Could I know what criteria to be used to set secondary cost element? Also I would like to know the usage of the secondary cost element. Please share some knowledge on it. Thanks!
    Best Regards!
    Gavin

    Hi Gavin
    Secondary cost elements are like production costs, material overheads, production overheads, they can be created and administered in only CO.  These are used in internal cost allocation, overhead calculation, settlement transactions., it does not flow to FI...
    When cost element carries cost with in CO, then they are called secondary cost element.
    Example.... - Take Product Costing
    On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
    The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
    Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
    In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
    Operational Cost - Activity (Production Order) Dr Rs.XX
       To Operational Cost - Activity (Cost Centre) Cr Rs.XX
    The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
    In conclusion there is need to creatre a secondary cost element when when you want to disribute the cost with in CO module not in FI
    Reagrds,
    RKD

  • Report on Secondary cost elements

    Hi all,
    Can any one tell me how to see line item report on the secondary cost element that are used in asessment cyles and also how to display the documents that are generated for these secondary cost elements after running the asessment cycles.
    Thanks

    Hi MKR,
    I am assuming that your assessment cycles are tied to cost center as senders, so even though you don't look by assessment cycle you could use transaction S_ALR_87013611. Set the selection criteria for the Controlling Area, month year/period combination and version you need, leave the cost center fields blank and enter as cost element the secondary cost element(s) of your cycles. After executed, double click on the total actual cost amount associated individually to each cost element and an additional screen would be displayed, from where you can select the option to display actual line items report. The list of line items is displayed. If you have the ALV functionality additional columns can be added in the display to segregate the information based, transaction type, origin, etc.
    Hope it helps , if it does please award points.
    Thanks,
    GG

  • Secondary cost element in KB11N

    Hello.
    I'm not allowed to use a secondary cost element in a reposting.
    What do I have to modify?
    Thank You

    Hello,
    You cannot use secondary cost element. You need to use primary only.
    Please go through the following:
    DISTRIBUTION =========== Distribution was created for transfer primary costs from a sender cost center to receiving controlling objects. During distribution, only cost centers or business process can be used as sender. A distribution receiver can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary Postings (such as, energy costs) are collected on a cost center, and allocated at the end of the period by means of the user-defined key. You can only distribute primary costs. During this process, the original cost element remains the same. Line items are posted for the sender as well as for the receiver, enabling the allocation to be recorded exactly. You can reverse distributions as often as required. You use the Cycle-Segment method to define sender-receiver relationships. PERIODIC REPOSTING ================= Differences between periodic reposting and distribution are due to information content and performance. For periodic reposting, no separate credit record is written on the sender for the cost element in the summary report. Instead, the totals record for the cost element is reduced on the debit side, which means that the original debit amount can no longer be checked there (u201Cunclean creditu201D). However, during distribution, the system writes a totals record for the credit (u201Cclean creditu201D). The information on the receiver is the same for periodic reposting and distribution (u201Cclean debitu201D). Compared with periodic reposting, during distribution, the system also updates the partner in the totals record for the sender. This means that the partner can be displayed in the information system on the totals record level. As fewer totals records are written during periodic reposting, performance is better than during distribution. ASSESSMENT =========== Assessment was created to transfer primary and secondary costs from a sender cost center to receiving controlling objects. During assessment, cost center or business processes can be used as senders. The receivers for an assessment can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary and secondary posting are allocated at the end of the period by the user-defined key. During assessment, the original cost elements are summarized into assessment cost elements (secondary cost element category = 42). As the system writes fewer total records, the assessment has a better performance than periodic reposting and distribution. The system does not display the original cost elements in the receivers. Therefore, assessment is useful if the cost drilldown for the receiver is not important. Similar to distribution, the partner is updated in the totals record during distribution You can reverse assessments as often as required. You use the Cycle-Segment method to define sender-receiver relationships. Regards, Ravi

  • There are values for cost element 80000 that are not assigned to any line I

    Hi,
    While calulating WIP I am getting below error:
    There are values for cost element 80000 that are not assigned to any line ID
    Message no. KJ161
    Diagnosis
    Not all values for the cost element are assigned to a line ID.
    Procedure
    Assign the cost element to a line ID. If you don't want to include the cost element in results analysis, assign it to a line ID of category N.
    You can access a detailed list of unassigned cost elements as follows: Start results analysis in the individual processing mode (transaction KKA1, KKA2, or KKA3). Select the field Full log. Execute the function. On the next screen, choose Logs -> Parameter List in the menu. A list is generated. The unassigned values are shown at the end of the list.
    If cost element "+++++++++" was shown in the message, this is because in the assignment of costs and revenues to line IDs, you have not used a cost element other than the full masking "+++++++++". In this case a presummarization eliminates the information on the cost element.
    Cost Element 80000 is of type 43 Internal activity allocation, I have Masked this in OKGB as below:
    Controlling Area = FLGP
    RA Version = 0
    Masked Cost Element = 000008++++
    Masked Cost Center = ++++++++++
    Masked Activity Type = +++++
    ReqToCap= COS (Secondary Cost)
    I have Configure OKGA also but still system is giving error.
    Please help me to understand.
    Regards,
    Vivek

    I was wondering if you could help me I am trying to configure the RA key for Refurb orders and when I go into txn OKGB for the Assignment of C/E for WIP there is sample config already there which I copied.  But I am having difficulty getting the KK1A to work I am getting the message as outlined above.  Could you explain how this OKGB works and how to configure it a bit more fully.  In my sample config there is a ReqTOCap section and in it there are letters like ABR, EK, FK, EL what do they mean.  This is a screen shot of it.  I am not sure how to go about this entirely so any light you could shed would be greatly appreciated.  Can you suggest a good resource or documentation you may have, would be greatly appreciated.

  • Line item report on secondary cost element (cat - 21)

    Hi Gurus,
    Secondary cost element with category 21 is used for internat settlement from order to wbs or wbs to cost center. But can we see line item report on this cost element. Or we cannot see any line item report on this cost element. it is just used for internal settlement purpose.
    Please clear this doubt. thank you

    Hi Mohit,
    I hope you can have line item report @ order and WBS element stright away...
    for orders use: KOB1 transaction code for actual line items, where you have the facility of entering CE or CE group to find the vaues related to particular cost elements in the order. If you are flexible with CEs related to 21, give there otherwise create a CE group specific to 21 category and enter the group and find the results you want.
    same way for WBS elements/projects: we have transaction code CJI3 for actual line items, here also we can enter CE or CE groups
    Not only for actual line items, we have the option of viewing plan line items, budget line items, and commitment line items @ both order and WBS level with different transaction codes other than mentioned above, like KOB2, KOB3, CJI4, CJI2 etc
    I hope it helps a lot if I understand your query right
    Regards..
    Jose

  • Display of secondary cost elements in KSB1

    Hi
    One of our customers wants to delete the view of Secondary Costs to a particular cost center in Actual View of Cost Line Items (through T Code KSB1). The costs flow to the secondary cost elements based on the activity type carried out. The system is calculating the total cost and then deducting the secondary costs again from the total cost as a result of which the overall costs are in the negative. The customer wants to display the total costs only and not the flow to the secondary cost elements, even, though the data is posted for the current fiscal year for the said cost elements.
    Some transaction data already exists for the secondary cost element. We tried to changed the settings in allocation cost settings to Allocation Type 4, Manual Entry, no allocation for a future date, but still the costs are flowing to the cost element. Pls suggest a way out.
    Would assign points if the problem is sorted.
    regards
    Sanil Bhandari

    Solved

  • Difference between type of Secondary Cost Element Category?

    Hi,
    I checked the system, and during the secondary cost element (CE) creation, I can select some of the CE category as follows:
    21 Internal settlement
    31 Order/project results analysis
    41 Overheads
    42 Assessment
    43 Internal activity allocation
    50 Project-related incoming orders: Sales
    51 Project-related incoming orders: Other
    52 Project-related incoming orders: Costs
    61 Earned value
    My question, what kind of report that I can read entries with these kind of CE?
    Reason: I want to check what has been posted to these secondary CE.
    Or
    Could anyone explain the use of above-mentioned CE category in brief?
    Thanks.

    Cost element that is used to allocate costs for internal activities.
    Most often used categories are
    21 Internal settlement
    (When ever an order is settled e.g internal order settling to cost center through this type of cost elements)
    31 Order/project results analysis
    (WIP in production orders are calculated and posted using this category)
    41 Overheads
    (Used in costing sheet to do an overhead allocation)
    42 Assessment
    (whenever cost is allocated between cost centers through allocation method - Assessment)
    43 Internal activity allocation
    (found in production orders when a routing activity is confimed the charge goes to the production order through this cost element)

  • Reports for display secondary cost element

    Dear SAP consultant
    After run settlement cycles we going to display reports for secondary
    cost elements but it is return zero balance, i know that when i am trying
    to drill down it will get the whole data. but it is not practical because
    the huge amount of data that transferred to this report. In the other
    hand it will display the data with +/- sign which is not be helpful.
    Is there any report to display the result from settlement run on the
    secondary cost elements.
    << Moderator message - Everyone's problem is important. But the answers in the forum are provided by volunteers. Please do not ask for help quickly. >>
    Edited by: Rob Burbank on Jan 12, 2011 4:12 PM

    hi
    goto S_SL0_21000007 > select as per your requirement > give Cost Element Group for Sec CE and execute
    Kkumar

  • In controlling secondary cost element cost is considerble for financial rep

    in controlling secondary cost element cost is it considerble for financial reporting requirment. In controlling for pm orders based on planning in kp26 they are booking man hours  activity price. when at time of confirm of the order planning converted to actual.
    Client is giving activity price based on primary cost, when we plan the activity price It will double booking what we incured in primary cost. let me clarify for financial report requirment can we consider secondary cost or not

    Hi,
    Secondory cost is a re allocation of Primary cost. It should not be considered if you are considering primary cost. Secondary cost is used for analysis and should not be confused with Primary cost
    Ex. Cost gets collected to cost centers, The activity is a carrier which carries cost to Process/ production order. So that doent mean that the cost is gernerated twice once you book the financial and second when you acutally allocate the cost.
    In controlling we allocate the cost in a more meaningful way to get the required analysis which will support the decision.
    So both the cost should not be considered
    This may be useful
    Regards
    Shantanu

  • For financial report requirment can we consider secondary cost element cost

    For financial reporting requirment can we consider secondary cost element cost to profit and loss a/c

    In our senario _ cost is booking cost centers and revenues booking concern profit centers .
    for Financial reporting requirment can I include secondary cost to profit and loss a/c
    what is the impact on the report
    exp: salary booking in primary cost,than Per hour man hour cost computed by costing dept for allocate to concern department
    it is cost center activity price we specify in kp26 at the time of pm order confirm it will confim the activity quandity price will from planning area only,  so for salaries in primary g/ls already captured, if we consider secondary it may double booking
    srinivasa reddy

  • Creation of secondary cost element

    Hai SAP Gurus
    Could any one please let me now how to create secondary cost element in SPRO.
    Thanks.

    You can create secondary cost elements in KA06. There is no pre-requisite of creating GL accounts.
    Cost elements describe the origin of costs. Cost elements are defined as either
    primary and secondary. Primary cost elements arise through the consumption of
    production factors that are sourced externally. Secondary cost elements arise
    through the consumption of production factors that are provided internally.
    The Chart of accounts contains all general ledger (GL) accounts belonging to
    Financial Accounting.
    Expenses and Revenue accounts in Financial Accounting correspond to
    Primary Cost and Revenue Elements respectively.
    Secondary Cost Elements are used exclusively in CO to identify internal cost
    Flows such as assessments or settlements. They do not have corresponding
    General ledger accounts in FI and are defined in CO only.
    When you create a cost element, you must assign a cost element category. This
    Assignment determines the transactions for which you can use the cost element.
    You can create cost elements automatically by making default settings that are used
    To specify the cost element, or cost element interval that you wish to create.
    You can create cost elements manually in bulk with the help of LSMW or BDC.
    Primary Cost Element Categories:
    1 - Primary costs / cost-reducing revenues
    3 - Accrual / deferral per surcharge
    4 - Accrual / deferral per debit = actual
    11 - Revenus
    12 - Sales Discounts
    22 - External Settlement
    Secondary Cost Element Categories:
    21 - Internal Settlement
    31 - Order / Project results analysis
    41 - Overhead Rates
    42 - Assessment
    43 - Internal activity allocation
    50 - Project related incoming orders: Sales
    51 - Project related incoming orders: Others
    52 - Project related incoming orders: Costs
    61 - Earned Value
    Regards,
    Ravi

  • Instance where Secondary Cost Element Linked to GL also

    Hello Gurus,
    What are the instances where secondary cost element is a GL also.
    Regards
    Rohit

    Dear Rohit,
    You will not find any instances were secondary cost element is linked to GL.
    Secondary cost element can be use within co. Linking cost element to GL means integration between FI and CO.
    That can be possible only for General Ledger (FI) and Primary cost element (CO)
    Rupesh Kumar Singh

Maybe you are looking for