Thir party + subcontracting without PP component

My client gives material for subcontracting to a subcontractor who is physically near to the customer. There is no point in bringing all the material from  Chennai to North India. So the requirements is that the material should be given for subcontracting (scenario of steel industry with the concept of external processing agent) and the subcontracting instead of sending the materials back to the client should deliver the material to the customer. He shall send a copy of the GR to me and on that basis he shall send me the bill. After miro of the bill my accounts department shall give him the payment. As far as I know SAP does have the provision of creating a new item category which shall work both as third party and subcontracting. This matter is pending since  a long time. Currently they are doing it outside SAP.
Send information on  settings and esy.
Regards

Hi
I think you can straight away use the third party process and sub con. Please try and let us know
Thanks

Similar Messages

  • Returnable Packaging ...Third party subcontracting

    Hello SAP Eperts,
    This is third party subcontracting scenario but is for RTP material.
    1. Import Vendor "A" will send material in returnable packaging RTP to plant "P"
    3. Bank guarantee will be provided to return the RTP within 6 months. If not returned, "P" will have to pay duty with penalty on the same
    4. The movement of RTP should generate alerts say at end of 4,4.5,5 5.5 months
    5. GR will be done for RTP in "P"
    6. RTP material is dispatched to subcontracting vendor "B",
    7. RTP will be returned to "P" by subcontracting vendor "B"
    8. "P" has to send back the empties [RTP] to "A" without payment of duty
    How to configure in SAP. Please describe complete process
    Thanks
    Tushar

    It is realy a complex business to be mapped in SAP..
    1 RTP can be received as free tick or with transport equipment..
    2 For mapping bank guarranty consult with FI...for FI functionality..
    3 movement of RTP should generate alerts say at end of 4,4.5,5 5.5 months---->
    For this u have to maintain work flow..  Consult Abaper
    4 RTP subcontracting can be mapped in STD,
    5 By return PO or 122/502  this can be send back to vendor

  • Third party subcontracting

    Hi Expert,
    I have some subcontractor related problem.
    In subcontracting process component to be supplied by " Third party" not by our company,we create the purchase order and given the delivery address to the subcontractor address. in this process which movement type is use for transport the material to the vendor and which movement type is use by system to consume the supplied material. what is the procedure please explain in detail.how many PO have to be created in this process.
    Please explain step by step with T-code ,item category and with movement type

    Hi,
    The third party sub con scenario involves two PO's as below,
    1. The third party PO , u need to create third party PO for ur component material to be supplied by third party to ur SC vendor.
    The PO will be std NB , wr in delivery adrs tab u will check the check box for SC vendor and maintain the SC vendor
    and when u do the GR for this PO , the material will be with SC vendor stk, u can chk in MMBE. The movement type will be 101 only for doing GR
    2. The second PO is the finished material PO which u will place for ur SC vendor - which will std doc type NB , with item category L.
    The finished material will have BOM maintained.
    The main point in third party sub con scenario is the transfer posting ie goods issue will not be done ie 541 movement type for component material will not be done. Since the third party PO has already supplied material to SC vendor.
    Here u do direclty GR for SC vendor PO, at that time 101 will recieve ur finished material and 543 will consume ur component material which u have supplied to ur SC vendor via third party vendor.
    And u can chk after this in MMBE the sub con stk will get reduced for component material.
    Pls go through this step , u will get it.
    Pls reply for any clarification

  • Intercompany Third Party Subcontracting

    Hi everybody,
    our case is an Inter company third party subcontracting.
    Plant A in company code 1000 sends Component X to Plant B in company code 2000.
    Plant A asks his third party to send Component Y to Plant B.
    Plant B assemble X and Y and deliver finished material Z to Plant A at last.
    I proposed SAP standard scenario for third party subcontracting:
    1- plant A creates PO (item category L) for material Z and vendor = 'Plant B'.
    2- Plant A do transfer posting (ME2O) component X to Plant B. so X would be provided to vendor.
    3- Plant A creates PO (third party) for component Y with delivery address = 'Plant B' and also set Plant B as SC Vendor.
    4- when Plant B receives component Y, informs Plant A.
    5- Plant A do GR based on PO ( third party). so component Y would be provided to vendor.
    6- when Plant B sends finished material Z to Plant A, Plant A do GR based on PO (SC). SAP receive Z and consumes X and Y right off.
    the Project team didn't accept my scenario for 2 reasons:
    1- it is not sap best practice for intercompany subcontracting.
    2- they said there is an extra GR in my scenario.I mean when plant A creates PO for third party, and Plant B do GR, the components must be provided to vendor Auto, and there is no need to do GR in plant A place.
    please help me.
    Does really SAP has another scenario for intercompany third party subcon?

    you totally miss the production part in plant B.
    if your plant B produces material, then they usually do this in the PP module via production or process orders. they have to record the machine ours, the labor , the have to plan etc etc.
    How can plant B take the material from subcontractor stock  which is just special stock in plant A? What movement type does plant B use to send the produced material to plant A?
    Subcontracting via the purchasing module is used for external processing.
    You better do standard stock transfers and production instead of the subcontracting process.

  • Third Party Subcontracting Process doubt

    Hello all Gurus,
    I have one doubt regarding the third party subcontracting process. I have created a PO with delivery address as that of SC vendor.
    Now how to do the GR for components if the SC vendor lets me know that he has received the materials from the 3rd party vendor??
    Can someone tell me the process after a PO is created for this scenario???
    Thanks and Regards,
    Umakanth.

    Hi,
    As I perceive you are speaking about the provision of subcontracting components from one of your vendor directly to another one,
    In this case you did well if you wrote the vendorID in the suitable field on 'Delivery address' tab of your PO. 'SC Vendor' thickbox should be also checked. This is not the subcontracting PO itself, it is only a PO to procure the components for subcontracting - your SC vendor receive the components directly. That's why there's no point in speaking about 'L' item category.
    After getting information from your SC vendor about the arrival of the goods (components) the only thing you have to do is to do a GR against your PO. The goods will get to your SC vendor's special stock via mvt 101 + 'O'.
    That's all.
    BR
    Csaba

  • ME59N - Intercompany Third party subcontracting Process

    Hi Experts,
    In Intercompany third party subcontracting process, PR is created from the sales order. PR has the account assignment category X and Item Category L.
    Fixed source of supply exists. Subcontracting Info record has been created.
    Material components icon has been deactivated as it is generating from Sales order.
    While using ME59N, it throws Requisition could not be converted. One of our collegues told that if the subcontracting item has been automatically generated from SD Module, then ME59N will not convert the PR to PO.
    Please let me know if there are any settings needs to be done. Or standard ME59N will not convert the above scenario.
    by
    Prabhu

    There is no restrication that Automatic PO will not be created if the PR is created from the Sales Order.
    Please elobarate on the exact error you are getting.
    However please follow & check if these general settings are in place.
    1.Material has the auto PO checked in Material Master.
    2. Vendor has the Auto PO checked in Vendor Master.
    3.Source list is maintained if material master has source list checked.
    4.Valid conditions exist in the Sub Contracting info record.
    5.Right variant ex - doctype,Plant etc exist or are entered in ME59N.

  • Third party & subcontracting combine

    Dear Experts,
    I am having the following scenarios:
    Customer C1 send  the PO for Material F1 that i am not producing.
    So i send the Raw Material M1 reqd for F1 to Vendor V1 that he directly ship to Customer C1 and invoice to me. Accordingly i bill to Customer.
    So it is a scenario of third party & subcontracting combine.
    Please tell me how to handle such scenario along with all the accounting & excise effects.
    Plz suggest
    Thanks

    Hi,
    Follow the below process;
    1. VA01 - Create Sales order for material F1 and Customer C1
    2. As a result of this a Subcontracting PR will get generated automatically. (For this take help of SD Consultant, it is controlled by Schedule Line category in VOV6, take copy of CS and change Item category to 3 i.e. Subcontracting)
    3. ME21N - Subcontracting PO w.r.t. PR (Considering BOM is in place). In PO under "Delivery Address" Tab, maintain the Customer Code as C1. As a result of this, vendor will get information that stock is to be dispatched to Customer C1.
    4. MB1B - Transfer Posting of raw materials via 541
    5. J1IF01 - Create Subcontracting Challan w.r.t. TP mat. doc.
    6. MIGO - GR w.r.t. PO (Here it will update stock of the material F1 via 101 and auto consumption of components via 543 O). Refer Subcontracting Challan.
    7. J1IFQ - Challan Reconciliation
    8. J1IF13 - Challan COmpletion
    9. MIRO - LIV w.r.t. Subcontracting PO
    10. VL01N - Create Delivery w.r.t. Sales Order to write-off the stock of material F1
    11. VF01 - Create Billing Document on Customer C1
    12. J1IIN - Outgoing Excise Invoice (I think, it is not required)

  • How to listen for inputs without a component? For creating bots

    I mean, for example, I want to write a a program that listens for keys f12 to (for example) skip the track in a media player and f11 to skip back. Thinks like the like :P. But I want to do this without any component, becasue the program won't have the focus at all.
    If it is needed to create a dll just tell as much as you pacience affords.

    I mean, for example, I want to write a a program that
    listens for keys f12 to (for example) skip the track
    in a media player and f11 to skip back. Thinks like
    the like :P. But I want to do this without any
    component, becasue the program won't have the focus
    at all. >Translation : I need a system keylogger.
    You can't do this in Java. And it will be OS specific.

  • Is it possible to create a component without a component controller?

    Hi every one,
    Is it possible to create a component without a component controller?If yes , how and what is the purpose of this?
    Thanks in advance. Points will be rewarded.

    Hi Prosun Bondopadhyay  ,
                   Component controller is the base of a wda component. its can be considered as the base class. all the other views can be considered as the sub classes of component  controller. so without the base class there is no existence for sub class rt?
    like we can use all the methods and attributes of a component controller(main class) across all the view(sub class) and the viceversa is not possible.
    hence we cannot create a wda without component controller.
    Regards
    Sarath

  • TS1702 How do you close a third party app without deleting it?

    How do you close a third party app without deleting it?

    The same way any other app gets closed.
    Tap the home button to return to the home screen.
    If you want to force quit the app, after returning to the home screen, double tap the home button to pull up the multi-tasking bar.  Then press and hold the icon for the app in question until the red x appears.  Tap the x and the app will force quit.
    All of this is covered in the User's Guide.

  • URGENT: FM to update subcontract  PO item component's field batch 'CHARG'

    Hi, Experts,
    Is there a FM to update subcontract PO item component's field batch 'CHARG' ?
    Thanks

    Hi,
    I want to change filed <b>]BATCH</b> in subcontracting PO item using FM 'BAPI_PO_CHANGE' , but the parameter TABLES 'POCOMPONENTS' doesn't contain filed 'BATCH', is there another FM to substitute this one ?
    Thanks,
    Sun Jimin

  • Kinect without vision component.

    I could learn from some web site,it is requirement both Labview and vision component to get and use output from Kinect with Labview.
    Is is possible to use output from Kinect without vision component?Because I don't have licence of this component and I need to get and use only depth info from kinect to subject.
    It means I don't need any RGB image and depth image etc....
    Please advise if I can connect and use Kinect without vision component.
    Thanks for all

    My own mistake. Trigger in database that truncated my date-field. Stupid me!

  • Messages show without message component

    Hello,
    in netweaver 2004s, sp09, we use in webdynpro for abap
    "messages show without message component"
    but in netweaver 2004s, sp12 we don´t find the option.
    Is this option depricated?
    Best regards
    Oliver Prodinger

    Hi Oliver,
    we made this change together with changes in the message area in SP11. These changes were done due to usability and UI Design specifications. Futhermore there are missing features implemented.
    For details have a look at:
    http://help.sap.com/saphelp_nwmobile71/helpdata/en/d8/2a934259a5cb6ae10000000a155106/frameset.htm
    Regards,
    Rainer

  • Subcontracting GR creation without changing component quantity

    We are using subcontracting process in SAP. When GR document is created the user sometime by mistake changes the quantity of component that is going to be consumed through material movement 543. Is there any setting through which we can restrict user from changing quantity of the component

    Hi
    Why user will change the quantity for BOM component?
    If you are using BOM for sub contract process, I hope you can't change the BOM items.
    Otherwise check function module EXIT_SAPLMBMB_001 with the help of developer.
    regards
    Srinivas

  • Subcontracting Semifinished Product, without providing component to Subcon.

    Dear all
    I have the following scenario for subcontracting, all involvoing placing Subcon PO for Semifinished Product, GI raw materials and GR Semifnished Product back for further production processing in the own factory.
    Scenario:
    My factory places a subcon PO for chroming a raw metal (FG = Chromed Metal). We only provide the raw metal but do not provide the Chroming paint (GI only raw metal to subcontractor), Subcontractor will use their own Chroming paint. After chroming the raw metal, we will perform a GR for Chromed Metal from the subcontractor.
    My question, how do we tackle this in subcontracting? As we never provide the Chroming Paint. Does it mean I create a single item single level bom and at the time of Invoice verification, I will put in 2 lines item Subcon Service + Chroming Paint?
    Please advise.

    Sorry, YMREDDY, I just want to confirm.
    Hi
    Question: In that case, I just changed the BOM Header to put HALB (Chromed Metal) and Component as ROH?
    Question: In that case, I will only GI Raw Metal (ROH Material in BOM Component) and then GR the HALB, that is it?
    If you are doing as above , you can as well go ahead with subcon it self ?
    And you include the cost of chrome paint in your subcontrating cost.
    Pl. try.
    Regards
    YMREDDY
    You put a question mark at "you can as well go ahead with subcon itself?". What does it mean? Is my previous 2 quesions set the correct logic?
    Thanks.

Maybe you are looking for

  • Can I use Organizer to change the .jpg size of all photos in a folder in one batch process?

    We're using wa-a-ay too much disk space for a growing photo collection.   My daughter is a camera freak with four kids -- need I say more?  In my current test folder the sizes of the original photos range from 2.3 MB to 4.2 MB.  I picked one photo at

  • Branch Office - client network (Unauthenticated)

    Hi There, I have a remote office(RO) (just two users) that I want to connect to our head office (HO). The HO subnet is a 192.168.4.X/23 with GW 192.168.4.1. The RO subnet is 10.10.10.x/24. I am using a non-microsoft site to site IPSEC vpn tunnel betw

  • What application do I use to run an installment CD?

    Okay, so I just got a iMac, and I'm verrry new to them (I know nothing about them). I'm pretty sure its a g5 powermac and it has Mac OSX. I'm trying to install a Netgear N300 Wireless USB adapter (its a WNA3100). I tried to run the installment cd but

  • Wildcards?

    Hi, What is wildcard in LSMW? What is the use of that? How can we can datas from various files in LSMW?

  • Pending MDBs

    I am using MDBs and Stateless Session Beans, transaction timeout for the beans is 120 sec. I face this problem of all messages not being processed (some value in Messages Pending) but not always. I don't see any exceptions in my server log either. It