Time period between inventories

We noticed that if we do a physical inventory adjustment to a material a few weeks before a full wall to wall inventory, that this material doesn't show up on the count sheets. Is there someplace to adjust how often a material can be inventoried, or how many inventories you can do in a year? Thanks in advance.
Eric

Hallo ,
Goto transaction OMCO for the required settings .
Thereafter the indicators are to be maintained in the respective material master in Plant Data / Stor.1
Regards
Ramesh .

Similar Messages

  • Time Period between Minor Revisions?

    Hey,
    I was just wondering how long it usually takes Apple to release the new "model" so to speak of a computer with minor revisions, such as working out the bugs? I was considering buying a Macbook during this summer before going on vacation, and was wondering if it would be wise to wait? The thing is, I don't want to wait too long. I realize that the Macbook was just recently released and I am not expecting a new revision in the next couple of months. Any advice would be greatly appreciated, and thanks very much.
    Regards,
    ES

    Typically, they go about 6 months between revisions. But, they have done it in as little as 3 months or so on occasion.
    If you're waiting for bug fixes, you might be waiting a while.
    It took them 2 years to get the major bugs out of the iMac G5. And, some of the bugs still remain in the new iMac CoreDuo that were in the original G5 series.
    So, you can wait a long time for bugs to be worked-out.
    There is no way of knowing whether bugs will be fixed until after the next model is out and has been field tested.
    I wouldn't count on major fixes to come very fast. They may make significant improvements with the next model. But, history has shown that they make small steps and improve over time.
    The most reliable version will likely come right before they introduce a successor (which will naturally introduce it's own problems and start the process over).

  • Minimum time period for 6602

    I'm using 6602 counter with the application of ND_BUFFERED_PERIOD_MSR with countinuous buffer to measure the time period between the consecutive pulses. If I send in constant time period pulse from frequency generator at 300kHz, the board returns "dataLossError" while 250kHz pulses give no error at all. It means the minimum time period is about 3 to 4 microseconds. However, if I send random pulses at 1kHz average frequency, the card sometimes gives "dataLossError". It seems if there is a single pair of pulses with spacing less than 3 to 4 microsecond, the card gives "dataLossError" although most pulse pairs are separated by a long time. Is that right?
    Thanks,

    I would suggest you use a shipping example to measure your pusles. If I recall from your previous post, you are using CVI. So you could go to Help->Find Examples (see screen shot below) and select an appropriate example.
    Attachments:
    Period Measurement CVI Find Example.JPG ‏107 KB

  • How to find out the rows inserted between a time period.

    Hi,
    Please help me to solve this.
    Table - emp.
    Colmns - empno(Primary Key),ename, mgr
    How to find out the rows inserted between a time period.
    For eg:- Between 02-Oct-2006 1 PM and 03-Oct-2006 2 PM.
    regards,
    Mathew.

    Hi,
    Maybe work:
    For each row, ORA_ROWSCN returns the conservative upper bound system change number (SCN) of the most recent change to the row. This pseudocolumn is useful for determining approximately when a row was last updated. It is not absolutely precise, because Oracle tracks SCNs by transaction committed for the block in which the row resides
    e.g.:
    SGMS@ORACLE10> create table test(cod number);
    Table created.
    SGMS@ORACLE10> insert into test values (1);
    1 row created.
    SGMS@ORACLE10> insert into test values (2);
    1 row created.
    SGMS@ORACLE10> commit;
    Commit complete.
    SGMS@ORACLE10> insert into test values (3);
    1 row created.
    SGMS@ORACLE10> commit;
    Commit complete.
    SGMS@ORACLE10> select SCN_TO_TIMESTAMP(ora_rowscn),ora_rowscn,cod from test;
    SCN_TO_TIMESTAMP(ORA_ROWSCN)       ORA_ROWSCN        COD
    06/11/06 08:56:56,000000000         727707205          1
    06/11/06 08:56:56,000000000         727707205          2
    06/11/06 08:57:05,000000000         727707210          3Cheers

  • How to generate n random dates between 2 time periods

    Hi,
    I'm trying to write a method that generates n random dates between 2
    time periods. For example, lets say I want to generate n random dates
    between Jan 1 2003 and Jan 15 2003. I'm not sure how to go about
    doing the random date generation. Can someone provide some direction
    on how to do this?
    The method signature should look like this.
    public String[] generateRandomDates(String date1,String date2,int n){
    // date1 and date2 come in the format of mmddyyyyhh24miss.
    // n is the number of random dates to generate.
    return dateArray;
    Thanks.
    Peter

    first take a look at the API concerning a source of randomness (Random might be a good guess), then take a look at stuff concerning dates (Date might be cool, maybe you will find some links from there).
    Who wrote this stupid assignment?

  • Query to search between two specific dates and time period

    Hi,
    Need a query to search between two particular dates and time period
    Like i want to search table having one date field .
    Suppose the date range is '01-JUL-06' and '01-AUG-06' and time frame
    is 23:00:00 to 08:00:00
    i.e i want to search between dates 01 july to 01 aug and also within the time frame i.e 23:00 to 08:00 hrs only

    The general principle is
    SELECT * FROM your_table
    WHERE some_date BEWTEEN to_date('01-JUL-06') and to_date('01-AUG-06' )+0.99999
    AND  ( some_date <= trunc(some_date)+8/24
               OR  some_date >= trunc(some_date)+23/24 )
    /Cheers, APC

  • How can i compute the time elapsed between two pulses or the period of an encoder signal if I dont have a constant rpm?

    I need to compute the rpm of an engine using information from an optical encoder attached to it. the engine is running in transient mode so the encoder pulse doesnt have a constant frequency. I need to get the period betwwen two rising or falling edges using DAQmx.
    Any ideas?

    Using an M Series or TIO device you can measure the period between two edges (on two different signals) using the two edge separation measurement.  I'm assuming that you don't want to use position measurement because the frequency is varying so much?  If not, you may be able to set the sample clock period short enough that you get a decent average RPM measurement.
    gus....

  • How to calculate the % of time difference between different state

    Hi there,
    The below query returns the follwoign outptut. I need to calculate the % of time period that a specific state ( state ex: open or closed or all report )exists.
    I have to find the time difference between the 2 states . How could I do that ?
    The first row shows null for the previous state . How could get actual previous state for the first row?
      SELECT si.station_name,
                    vppstation.avi_control_state_code.STATE_SHORT_NAME,
                    ash.state_id ,
                    lag(ash.state_id) over (order by ash.STATE_EFF_DATE desc) previous_state,
                    TO_NUMBER(TO_CHAR(ash.state_eff_date, 'SSSSS')) "periods in sec",
                    TO_CHAR(ash.state_eff_date, 'dd-mon-yyyy hh24:mi:ss am') "Date"
               from vppstation.avi_state_history ash
    left outer join vppstation.avi_control_state_code
                 on ash.state_id = vppstation.avi_control_state_code.state_id
    LEFT OUTER JOIN vpproadside.stations_installed si  
                 ON ash.station_id = si.station_id               
              where ash.state_eff_date >= to_date('28/02/2010', 'dd/mm/yyyy')
                and ash.state_eff_date <= to_date('03/03/2010', 'dd/mm/yyyy') ;
           group by si.station_name
                         ash.state_id
           order by ash.state_eff_date asc ;
    STATION_NAME                   STATE_SHORT_NAME STATE_ID               PREVIOUS_STATE         periods in sec         Date                   
    IRDNCST02                      Open             1                    NULL                  85166                  01-mar-2010 23:39:26 pm
    IRDNCST02                      All Report       3                      1                      85159                  01-mar-2010 23:39:19 pm
    IRDNCMT01                      Closed           2                      3                      81376                  01-mar-2010 22:36:16 pm
    IRDNCST02                      Open             1                      2                      78723                  01-mar-2010 21:52:03 pm
    IRDNCST02                      All Report       3                      1                      76023                  01-mar-2010 21:07:03 pm
    IRDNCMT01                      Open             1                      3                      55922                  01-mar-2010 15:32:02 pm
    IRDNCMT01                      Closed           2                      1                      54931                  01-mar-2010 15:15:31 pm
    IRDNCHA01                      Closed           2                      2                      41291                  01-mar-2010 11:28:11 am
    IRDNCAS01                      Open             1                      2                      38847                  01-mar-2010 10:47:27 am
    IRDNCAS01                      All Report       3                      1                      37947                  01-mar-2010 10:32:27 am
    IRDNCST02                      Open             1                      3                      35332                  01-mar-2010 09:48:52 am
    IRDNCST02                      All Report       3                      1                      32632                  01-mar-2010 09:03:52 am
    IRDNCST02                      Open             1                      3                      31502                  01-mar-2010 08:45:02 am
    IRDNCST02                      All Report       3                      1                      28802                  01-mar-2010 08:00:02 am
    IRDNCHI01                      Open             1                      3                      25368                  01-mar-2010 07:02:48 am
    IRDNCHI02                      Open             1                      1                      23939                  01-mar-2010 06:38:59 am
    IRDNCMT01                      Open             1                      1                      20696                  01-mar-2010 05:44:56 am
    IRDNCCH02                      Open             1                      1                      13452                  01-mar-2010 03:44:12 am
    Edited by: Indhu Ram on Mar 11, 2010 1:34 PM
    Edited by: Indhu Ram on Mar 11, 2010 2:20 PM

    If you look at the table which is output of the given query , there is column called "STATE_ID" It shows the current state ie open or closed or all report.
    The column 'PREVIOUS_STATE' shows the state before the current state. .In the table in 2nd row in previous_state column there is state_id = 1 (open)which is the state before 'all report state'

  • Report workload by calculating how many versions of SharePoint list items created in a certain time period

    I have a total of 66 SharePoint 2010 lists - yes, 66! - each lists contains between 1500 and 3200 list items.  My employees update these various list items throughout their workday.  Each update to a list item creates a new version of the list
    item.  On average each list item will have anywhere from 5 to 10 versions before it is done.  I need to create a report that tells me how many list items they've updated in a certain time frame.  I have come close but still cannot arrive at
    the data I'm looking for. 
    This is what I have so far:
    I've created a report using SQL Report Builder 2008 v3 where I've filtered it to show only items MODIFIED between, for example, Feb1 and Feb28.  Of those records, I want the report to tell me how many versions were created during that time
    frame.  The result is one list item with 5 total versions.  Versions 1.0, 2.0, & 3.0 were created on 12/12/14.  The last two versions, 4.0 and 5.0, were created on 2/24/15.  Therefore, the answer I'm looking for is 2 because they
    created 2 versions between Feb1 and Feb28.
    However I get the following results using these queries:
    If I do a =Sum(Fields!owshiddenversion.Value) in the expression field I get the total versions which is 5
    If I do a =Count(Fields!owshiddenversion.Value) in the expression field I get the instance which is 1
    Is there a way to count ONLY the number of versions created in a time period?  Is there another hidden field in SharePoint that I can use in the expression that will give me results I'm looking for?

    Hi Rafael70,
    Per my understanding that you have already get all the need fields and informaiton of the updated version of list items and now you want to calculate how many versions of SharePoint list items created in a certain time period, you can't get desired result
    using sum and count function, right?
    I have tried to tested on my local environment but because I am not clear what is value in the field "owshiddenversion", I assumed you have two datatype parameters (StartDate and EndDate) to help filter the report in a certain time period.
    Generally, if you have add the filter correctly, it will filter the correct number's updated version in this time period, I would like you to provide details information as below to help better analysis the requirements:
    Could you please provide sample data of the table.
    Please provide snapshot of the report structure you have currently designed.
    Please try to provide all the expression you have used.
    If you still have any problem, please feel free to ask.
    Regards,
    Vicky Liu
    Vicky Liu
    TechNet Community Support

  • Query for Old Data that does not match New Data within a given time period

    Hello all,
    One of the reports I need to create is for all associates who went from one department to another within a given time period. The way I ran this report in Reportsmith (pulling from our old system) was to compare the dept field from the beginning date to the dept field at the end date and it would give me those associate's that had moved. I had to do it this way b/c dept changes can happen using several different types of actions (supv change, promotion, etc.), none of them exclusive to just dept changes. We are now using Oracle HRMS and I need to create this same report with this system using SQL.
    Does anyone know how to compare data between two different dates and pull the ones that don't match? Your help will be GREATLY appreciated!
    Warm Regards,
    Yasmin E. Alberto
    HRIS Analyst
    [email protected]

    Hi, Yasmin,
    In the sample data you posted, nobody changed departments between May 1 and May 11. In fact, there were no assignments of any kind between January 16 and May 17, so I wouldn't expect any output for that period.
    A person (or rather, a duck) did change deptartments on May 20, so if you change the upper limit of the date range to
    AND    ASG_LAST_UPDATE_DATE < TO_DATE ('05/21/09', 'MM/DD/RR')you should see her.
    You've probably noticed that this site likes to compress white-space.
    To post formatted text (such as table results or indented code) type these 6 characters:
    (small letters only, inside curly brackets) before and after sections of formatted text, to preserve spacing.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       

  • I have a 1st generation Time Capsule with current firmware. Can I define the time periods when my children's devices have access to the wi-fi network?

    I have a 1st generation Time Capsule with current firmware. Can I define the time periods when my children's devices have access to the wi-fi network?

    Can I define the time periods when my children's devices have access to the wi-fi network?
    Yes, using the Timed Access feature in AirPort Utility, you can setup specific rules for each wireless device which define the exact timeframe each day that the device will be allowed to connect to the wireless network.
    Example....junior's iPhone can connect.....
    Everyday......Between.....9 AM and 10:00 PM
    or
    Weekdays.......Between......4 PM and 9 PM
    and Weekends.....Between......9 AM and 11 PM
    At the same time, your own personal devices will have Unlimited Access at all times.

  • Comparing a time period and a date via trigger....

    Hi ,
    There are among others three tables....
    Table material
       material_code number
       onomasia   varchar2(50)
       guarantee_end_date date
    Table supplier_contract
         contract_code number
         start_date date
         end_date date
        supplier number(5)
    Table supplier_contract_material
          contract_code number
          material_code numberThe table material , for each material contains the guarantee_end_date , whereas the other two contain info about the materials that should be replaced/fixed/ e.t.c by the supplier in the specific time period (start_date - end_date).
    The thing that has to be done is there have not be any overlap of the dates.... In other words , when a material is bought then this is covered for replacement by the end of the date (guarantee_end_date in the first table). After this date there should be contract with the supplier for this material for a specific period (start_date - end_date , in the second table).
    I want to secure the database that when the end_user tries to update this time_period(start_date - end_date) before or between the guarantee_end_date ("when i say between the guarantee_end_date " , i mean the condition guarantee_end_date between start_date and end_date is not acceptable) then an alert would be raised ....
    So , I wrote the following trigger:
    create or replace trigger trg_check_eggisi
    before update on supplier_contract
    for each row
    declare
    guarantee_end_date_var date;
    begin
       begin
         select guarantee_end_date 
           into guarantee_end_date_var
           from material a, supplier_contract_material b
          where a.material_code=b.material_code
           and b.contract_code=:new.contract_code;
         exception
          when no_data_found
           then return;
        end;
       if guarantee_end_date_var>:new.guarantee_end_date_var
         then
         raise_application_error(-20021,'NOT_APPLICABLE');
       end if;   
    end;The problem is that the error ORA-01422 is raised ... because more than 1 material may be contained in the specific contract....
    Do you have any idea...????
    many thanks ,
    Simon

    Hi  John,
    As you want to  display the planned value of Depreciation for future years,
    since this is not possible you can display the planned values only for that year and that too for subsequent periods,  you  will  see  the Yellow icon stating it is planned which is not yet posted in the posted value Tab,
    Since if  you  want to display planned values for future year you have to  post Depreciation for subsequent period and close the fiscal year and again same procedure follows....
    Regards,
    Imran M Arab

  • Use of MS Project Management 2010 to Manage Multiple projects over a given time period

    Is there some information (article/s) I can research about using MS Project Management 2010 for managing multiple projects over a given time period? I'm being asked by a potential client to take a job as a Program Manager to manage five projects all
    at once. Each of the projects has it's own MS Project Management software, project leader, and project team. An overall project plan has to be put together to manage this large project. There are some dependencies with these projects inorder to complete
    on a specific date.
    Thanks

    SSCDML --
    In order to manage this program of five projects using Microsoft Project 2010, I would recommend you do the following:
    Create a shared resource pool file containing the resources in all five projects.
    Connect each of the five projects as sharing files with the shared resource pool file to share the resources.
    Create a master project for the program containing each of the five projects as subprojects.
    In the master project, set cross-project links as needed to show dependencies between projects.
    Hope this helps.
    Dale A. Howard [MVP]

  • Division of time periods

    I will be working with periods in time. Each period has a start and end date (along with other data..but for the help I need only the start/end are relevant). I have a list of default periods. The default periods are arranged perfectly so the start of one is exactly one day greater than the end of the previous..etc.
    Now the fun part.
    I need to be able to add new periods to the existing group (defaults). The new period being added may span more than one "existing" period. Existing periods need to adjust their start/end as needed to fit in the incomming period.
    Here is an example showing 2 default periods and one custom period being added:
    period - start=1000 end=2000
    period - start=2001 end=3000
    ..new incomming period: period - start=1500 end=2300
    After the addtion of the new period I would have the following:
    period - start=1000 end=1499
    period - start=1500 end=2000
    period - start=2001 end=2299
    period - start-2300 end=3000
    Any help/pointers in the right direction would be helpful.
    One last note: I realize as dates the values will be nothing like "2300". I'm not looking for a date specific answer. I am looking for the core concepts behind being able to take a group of objects which have start and end values and adding new objects to that group such that the final result is a sorted group of objects (by start value) which have been diveded up correctly to accomadate any new incomming objects.

    Find the last period whose start attribute is earlier than the new start attribute. Find the first period whose end attribute is greater than the new end indicator. Adjust these periods to fit around your new period, delete any periods in between these periods, then insert your new period between.

  • Is it possible to set delivery retry time-interval between messages?

    Hello!
              I use Wls 8.1.5 and would love to be able to set delivery retry time-interval between message.
              The complete situtaion looks like this.
              We got one queue (queue_A) that retrives alot of messages.
              At queue_A we got a BMT-MDB that consumes all messages (one by one).
              The BMT-MDB is supposed to forward the messages to an other queue (queue_B). (We also do some other things as well)
              But if we can not forward the message to queue_B because of some Exception is thrown, the transaction is Rolledback exactly as we want.
              But when this happens (for eg the server where queue_b resides is down) our BMT-MDB keeps trying to post the message like an enegizer-bunny. It would feel better if it waited for some seconds before it try again.
              We have tried to set play around with RedeliveryDelayOverride="5000" at the queue_B. But if we set to anything bigger then RedeliveryDelayOverride="-1", then other messages is passing throug and also put into "pending". This ended up in out of memory when the load was big.
              So what we would love to be able is to have all messages in a FIFO-row at the queue_A. And if queue_B is out of order then keep on trying consume the firts messagesd for every 5 sec.
              So if any one know if and how to configure a Wls 8.1.5 please let us know!
              Best regards
              Fredrik

    Hello Again Fredrik!
              Later versions have several more options, but here are some that might work on 8.1:
              (A) A good bit of coding: Write code that undeploys the MDB on certain failures, and redeploys it sometime later.
              (B) A small amount of coding: On a failure, simply force a tx rollback, then put a Thread.currentThread.sleep() in the MDB application itself. (Just make sure the MDB is setup with a dedicated thread pool to avoid using up default threads.)
              (C) Requires no coding: Have the MDB forward the message to a local destination rather than the remote destination (so the forward always succeeds), then use the messaging bridge to forward the message onward. The messaging bridge automatically does a periodic retry on failure, and doesn't need to use redelivery delays.
              (D) Requires no coding: Raise a support case with BEA - I personally consider the fact that redelivery delay messages fail to page out likely indicates that there's a bug in 8.1. (Upgrade to 9.x quite likely doesn't have this problem.)
              Hope this helps,
              Tom

Maybe you are looking for

  • U430 power off while on battery

    Hi, I have had my Lenovo U430 touch for about a month now, and have noticed a problem with it. Sometimes when I leave my Lenovo u430 touch alone (with full battery), and sometimes it will just power off without me doing anything. It even happens occa

  • Financial Analytics Version

    Folks, I've been tasked with providing a document about the design & customization drivers of Oracle Financial Analytics..mostly, what are the best practices of how the source system should be(Oracle EBS R12), level of detail etc in order to gain ful

  • Auto-run SubVI closes before I can edit

    Hi-  I created a subVI that runs upon call, then quits LabView when done (it's a diagram popup).  But now I cannot edit the VI, b/c it automatically runs, and then exits. I unforunately do not have the abort button being display on toolbar. Is there

  • How to test hard drive performance?

    Hi, I just wanted to know how I can test my Mac's hard-drive's performance. I've used HD-Tune on Windows, but I don't know free app that's available for the Mac. I've got a MacMini mid-2011. Thanks for any help!

  • FCPX not showing projects or events

    Please see the above screenshot. I am trying to access events and a completed project in Final CPX from my hard drive and instead of the project appearing in th project llibary like it usually does, it is showing up with my blue folders. I cannot acc