Transaction CO11N- difference between confirmation dates
Hello,
I have a problem with the transaction CO11N when I do the confirm of the production order. I have a difference by 1 hour, between Confirmation entry date and Confirmed date for execution finish.
Thanks in advance.
Best Regards
Vincenzo
Hi,
In simeple terminology co11n is opration wise conformation where as co15 is batch level conformaiton.
hope you better understand.
Thanks and regards
E.Rambabu
Similar Messages
-
Difference between master data and transactional data
Hi experts i have just started learning BW can u plz let me know the difference between Master data and Transactional data in bw ? and why is master data is first loaded before the transactional data ? thanks .....
Hi
Transaction data represents any transaction occured between two parties like Customer and Vendor.
We maintain id's to maintain the Customer and Vendor.
When we look at the id we don't have a clue like who is the customer, where does he live,,....
So all this info is maintained in Master data in three categories:
1. Attributes
2. Text
3. Hierarchies.
Collection of Attribute, Texts and Hierarchies is called master Data in BI/BW.
Eg: 0MATERIAL, 0CUSTOMER,,,,,
Master data: is data that remains unchanged over a long period of time. Master data contains information that is always needed in the same way. Characteristics can bear master data in BW. With master data you are dealing with attributes, texts or hierarchies.
http://help.sap.com/erp2005_ehp_03/helpdata/EN/58/a4513ce4af0a40e10000000a114084/frameset.htm
Master Data is one form of the historical data. There is no frequent changes in the data.Every application has it's own Master Data.
In BI the master Data has been divided into
Characterstics
Texts
Hierarchies
We can load Master Data through different ways.
Pls. find the below link
http://help.sap.com/erp2005_ehp_03/helpdata/EN/58/a4513ce4af0a40e10000000a114084/frameset.htm
hope it helps u
regards
gaurav -
Difference between confirmation cancellation and return delivery
Dear Gurus,
can you explain to me the difference between confirmation cancellation and return delivery in terms of processes and impact on ECC postings?
Thank you in advance for your collaboration,
Fuffo
Edited by: Fuffo Fuffi on Dec 21, 2010 2:36 PMHi
Confirmation Cancellation --> is used for reversing a confirmation which is posted wrongly in the system. This is generally used for reversing a faulty transaction.
Return Delivery --> is used for sending the goods back to vendor. This happens when we receive goods from vendor and for some reasons the delivery does not meet customer's specification due to any reason. In these cases you record the goods movement as Return delivery sent back to Vendors.
Regards
Virender Singh -
What is the difference between delivery date and actual goods issue date?
Hi ,
Can you please tell me the difference between Delivery date and Actual goods issue date ?
Delivery data can be be greater than goods issue date?
Thanks,
AjayHi Ajay,
Delivery date means its the original date on which the delivery should be done.Actual goods Issue date is the date on which goods to be delivered according to the purchase order.There can be delay in the delivery so we maintain 2 objects.
Yes delivery date can be greater than Goods Issue date.
Hope this clears
Regards
Karthik -
As to the data type of the data type of the difference between two date type of datas
Hi,
I have a question about the data type of the difference between two date type of datas.
There are two date type of datas as:
SSHIPMENTS.RECEIVEDATETIME
SSHIPMENTS.PROMISEDATETIME
I try to use the following SQL Script in Oracle SQL*Plus as:
SELECT CASE
WHEN (SSHIPMENTS.RECEIVEDATETIME - SSHIPMENTS.PROMISEDATETIME) < '000 01:00:00.000' THEN 'OnTime'
WHEN (SSHIPMENTS.RECEIVEDATETIME - SSHIPMENTS.PROMISEDATETIME) < '000 01:30:00.000' THEN '60-89 Minutes'
ELSE '3+ Hours'
END
FROM SSHIPMENTS;
The error message of "Invalid Number" for the '000 01:30:00.000' happens.
I don't know if the data type of the interval is wrong.
Many Thanks,
CathySELECT CASE
WHEN (to_char(SSHIPMENTS.RECEIVEDATETIME,'hhmiss') - to_char(SSHIPMENTS.PROMISEDATETIME,'hh24miss')) < '010000' THEN 'OnTime'
WHEN (to_char(SSHIPMENTS.RECEIVEDATETIME,'hhmiss') - to_char(SSHIPMENTS.PROMISEDATETIME,'hh24miss'))< '000 01:30:00.000' THEN '60-89 Minutes'
ELSE '3+ Hours'
END
FROM SSHIPMENTS;
just try it out.. -
Difference between Invoice Date, GL Date and Accounting Date Oracle AP
Hello,
I have a question that might help a lot of people too later.
I tried to run these queries
select aia.INVOICE_ID
from AP_INVOICES_ALL aia, AP_INVOICE_DISTRIBUTIONS_ALL aida
where aia.INVOICE_ID = aida.INVOICE_ID
and aia.INVOICE_DATE <> aida.ACCOUNTING_DATE
select aia.INVOICE_ID
from AP_INVOICES_ALL aia, AP_INVOICE_DISTRIBUTIONS_ALL aida
where aia.INVOICE_ID = aida.INVOICE_ID
and aia.GL_DATE <> aida.ACCOUNTING_DATE
I can see that there are lot of results for these queries, where the Invoice Date is not equal to the Accounting date and the GL_Date of an invoice is not equal to the accounting date in the distributions table.
So, what is the difference between these dates.
And if I had to take the Invoice Accounting document entry date, which date do i have to take for these invoices in AP
Thanks
BobHi
Let me try to explain this with an example.
Suppose I buy some stationary from a vendor and he provides me with a detailed invoice of the goods puchased.
In this case the invoice will always have a date printed on it and this date should ideally be entered in the invoice date at AP_INVOICES_ALL level.
Now suppose the invoice happens to be received by me in february and for some reason I could not capture the invoice in my books in february and made a provision for the liabilities and close the books.
However in march i want to book the invoice say on 10th of march in my books and pay the vendor the amount payable.(I Have to reverse the already provided liability in march to reverse the accounting effect).
In this case my book entry date of invoice is the accounting date i.e. 10 March.
In case of oracle, the accounting is maintained so that the invoice header hits the liability account while the invoice distribution hits the charge account(expense account so to say). And to gain more flexibility oracle provides date in both header and distributions to provide an option of booking liability and charge on different dates..
As per the 11i checks there is no check on any of these dates except that accounting date at header and ditribution level must be in an open AP and GL period.
Thanks
MAV. -
Difference between doc date,posting date and invoice date
hi bw guys
can someone give a brief on the difference between doc date,posting date and invoice date.and the invidual definitions
thank youHi,
Posting Date: Date which is used when entering the document in Financial Accounting or Controlling. The posting date can differ from both the entry date and the doc date.
Document Date: The document date is the date on which the original document was issued. Ex: Inv date, Bill date etc.,
Invoice Date : Usually the date when goods are shipped. Payment dates are set relative to the invoice date.
-Vikram -
hi..Experts
Req: In OBIEE,Difference between Start date and end date. Result should be in hh:mm:ss fromat
I Tried with
TIMESTAMPDIFF(SQL_TSI_SECOND, " Closed Date", "Scheduled Start Date")
it gives me No.of Seconds.
in Data format tab, custom= [FMT:Timestamp] then i am getting in hh:mm:ss tt fromat and the difference is incorrect
i need format in hh:mm:ss
Please give suggession......Hi User,
Try this one
Cast(TimeStampDiff(SQL_TSI_MINUTE,LAST_UPD,CUR RENT_TIME STAMP(0))/1440 as VARCHAR(10)) || ':' ||
Cast(Mod(TimeStampDiff(SQL_TSI_MINUTE,LAST_UPD ,CURRENT_ TIMESTAMP(0))/60,60) as VARCHAR(2)) || ':' ||
Cast(Mod(TimeStampDiff(SQL_TSI_MINUTE,LAST_UPD ,CURRENT_ TIMESTAMP(0)),60) as VARCHAR(2))
Please note that the output of the Desired Format will be in VARCHAR.
Thanks
Don -
Difference between Posting Date & Baseline date in MIRO
HI,
What is the difference between Posting Date & Baseline date in MIRO?
Regards
Chandan
Edited by: Chandan H N on Dec 14, 2009 11:11 AMDear,
Posting Date:
Posting Date in the Document
Date which is used when entering the document in Financial Accounting or Controlling.
Use
The fiscal year and the period for which an update of the accounts specified in the document or cost elements is made, are derived from the posting date.
When entering documents, the system checks whether the posting date entered is allowed by means of the posting period permitted.
Note
The posting date can differ from both the entry date (day of entry into the system) and the document date (day of creation of the original document).
Baseline Date
Baseline Date for Due Date Calculation
Date to which the periods for the cash discount deadline and the due date for net payment refer. This is the case for line items in open item accounts.
For line items in G/L accounts, the item is due immediately on this date because there are no cash discount specifications.
Procedure
During document entry for open item accounts, the date may be defaulted. For this, a terms of payment key must have been specified in the customer's/vendor's master record for which a default value is requested in the document.
The proposed date can be overwritten.
If the cash discount rates (and days) have not been entered, the baseline date for payment is the same as the due date.
Regards
Utsav -
Differences between using Data Pump to back up database and using RMAN ?
what are differences between using Data Pump to back up database and using RMAN ? what is CONS and PROS ?
ThanksSearch for Database backup in
http://docs.oracle.com/cd/B28359_01/server.111/b28318/backrec.htm#i1007289
In short
RMAN -> Physical backup.(copies of physical database files)
Datapump -> Logical backup.(logical data such as tables,procedures)
Docs for RMAN--
http://docs.oracle.com/cd/B28359_01/backup.111/b28270/rcmcncpt.htm#
Docs for Datapump
http://docs.oracle.com/cd/B19306_01/server.102/b14215/dp_overview.htm
Edited by: Sunny kichloo on Jul 5, 2012 6:55 AM -
How to build a difference between to dates
Hi @All,
Hope you can help me :) ..
I'd like to build the "difference" between two dates (e.g. date of the invoice and date of the payment receipt). As the result I expect an Integer.
I tried several functions and operations, but still get the error code: [nQSError: 22023] An arithmetic operation is being carried out on a non-numeric type.
I also tried to cast the date format into an Integer or double, but I still get an error ...
Here is my code:
CASE WHEN "2_Forderungsstruktur_Fälligkeiten".DIM_DATUM_FAELLIGKEIT.DDAT_DATUM_DE < 0
THEN NULL
ELSE
"2_Forderungsstruktur_Fälligkeiten".DIM_DATUM.DDAT_DATUM_DE - "2_Forderungsstruktur_Fälligkeiten".DIM_DATUM_FAELLIGKEIT.DDAT_DATUM_DE
END
Hope you guys have some good ideas to solve these problem :)
best regards
Matthi,
TIMESTAMPDIFF(SQL_TSI_MONTH,"Dim - Time"."Date",CURRENT_DATE)
"Dim - Time"."Date"--->Column1
Current_date--->Column2
thanks,
saichand -
Calculating the difference between to dates.
All,
I've a requirement where I need to calculate difference between to dates. If the given date is less than the current date, it should return '0'(zero) other wise should return 1. How can i do this?
Regards,
VenkySQL> select decode(sign(sysdate-to_date('01/02/2008','DD/MM/YYYY')),1,0,1) as datecomp
2 from dual;
DATECOMP
0
SQL> ed
Wrote file afiedt.buf
1 select decode(sign(sysdate-to_date('01/12/2008','DD/MM/YYYY')),1,0,1) as datecomp
2* from dual
SQL> /
DATECOMP
1
SQL> ed
Wrote file afiedt.buf
1 select decode(sign(sysdate-to_date('11/11/2008','DD/MM/YYYY')),1,0,1) as datecomp
2* from dual
SQL> /
DATECOMP
0
SQL>Edited by: BluShadow on Nov 11, 2008 1:27 PM
couple of further examples. -
Get Date Difference between 2 date values as days
Hi,
How to get the difference between 2 dates in number of days format. Say if i need the difference between 2012-08-23 and 2012-08-20 as 3
Please help..Hi,
You can do it in XSLT since the dates are in ISO 8601 format...
http://www.w3.org/TR/NOTE-datetime
Here is a sample XSLT...
<xsl:stylesheet version="2.0"
xmlns:xsl="http://www.w3.org/1999/XSL/Transform"
xmlns:xs="http://www.w3.org/2001/XMLSchema"
xmlns:fn="http://www.w3.org/2005/xpath-functions">
<xsl:template match="/">
<xsl:variable name="date1" select="xs:dateTime(/root/date1)"/>
<xsl:variable name="date2" select="xs:dateTime(/root/date2)"/>
<xsl:value-of select="fn:days-from-duration($date2 - $date1)"/>
</xsl:template>
</xsl:stylesheet>The above XSLT will result *4* for the following input...
<root>
<date1>2012-01-11T00:00:00.000-05:00</date1>
<date2>2012-01-15T00:00:00.000-05:00</date2>
</root>You can test this example here...
http://xslttest.appspot.com/
Hope this helps...
Cheers,
Vlad
It is considered good etiquette to reward answerers with points (as "helpful" - 5 pts - or "correct" - 10pts)
https://forums.oracle.com/forums/ann.jspa?annID=893 -
Date difference between two dates
hi All,
i have to right a stored proc to find the difference between two dates.
for example of i give
startdate as 4/1/2015 and enddate 14/1/2015
i should get 1 year , 10 days and 0 months .
i have tried the DateDiff function but it does not calculate the leap year.
please help.DECLARE @from datetime
DECLARE @to datetime
SET @from = '20150104 8:00'
SET @to = '20150114 10:30'
SELECT DATEDIFF(minute,@from, @to) % 60 as Minutes
SELECT (DATEDIFF(minute,@from, @to) / 60) % 24 as Hours
SELECT DATEDIFF(minute,@from, @to) / (60 * 24) as Days
SELECT DATEDIFF(month,@from, @to) as Months
SELECT DATEDIFF(year,@from, @to) as Year
Best Regards,Uri Dimant SQL Server MVP,
http://sqlblog.com/blogs/uri_dimant/
MS SQL optimization: MS SQL Development and Optimization
MS SQL Consulting:
Large scale of database and data cleansing
Remote DBA Services:
Improves MS SQL Database Performance
SQL Server Integration Services:
Business Intelligence -
Difference between two date in bex query
Hi all,
I need to do a difference between two date using formula variable processing type customer exit beaucause I must use factory calendar in the formula.
How can I do it?
Can you give me an example of the routine?
Thanks a lot
GianmarcoHi,
You can still use the same code to copy it and customize as per your need. All you need to do is to subract the dates using the class: CL_ABAP_TSTMP after converting to timestamp and resulting seconds you convert back to days....Please get help from the developers to do this...
Also, ensure that you write back this difference value to your variable so you get it on the reports for your calculations...
Cheers,
Emmanuel.
Maybe you are looking for
-
I have tried to upgrade Firefox 3.5.x (currently 3.5.13) to several versions of Firefox 3.6.x (currently 3.6.10). Whenever I try to open Firefox after the 3.6.x install, nothing happens. This occurs even if I uninstall 3.5.x first. If I uninstall 3.6
-
Can Struts and JSF coexist?
I have a Struts based application and now I want to build an additional module on top of that using pure JSF. My question is, can Struts and JSF co-exist in the same application? If yes, what are the cons of that approach? What are the places I need
-
I had an error that I have listed below and had to clear the metadata cache to fix it. I do not have the metadata cache activated under user option so I am not sure why I had to clear the cache to get things working. Can someone explain why I had t
-
My company has LabView 2011 installed on one of our process control PCs. We had a 3rd party contractor develop an app that uses LabView. Occasionally, this app will lock up and the task associated with the app will need to be restarted. Other time
-
DG standby db recovery mode idle, and lag for days.
We have a RAC 2 node primary and 2 node RAC standby qa environment in redhat linux. two nights ago, some maintenance caused primary down, and db failed over to standby. and now I found out by dgmgrl the following error: DGMGRL> show configuration Con