Hi,
I am working on integrating a non SAP ERP backend system with SNC 5.1.  I want to avoid sending Purchase Order data to SNC from the backend system and this will require me to turn off the ASN validation check for reference documents.  Does anyone know what checks I will need to flag as inactive?  I have tried several options, but I am not seeing a change when trying to create the ASN without the PO reference.  I am also seeing an error "Validation profile not found" even though it has been defined.  Maybe I'm not doing this correctly.  Any help would be great, especially a step by step instruction.

Hi,
please check the [LINK|http://help.sap.com/search/highlightContent.jsp]
Regards,
Srinu

Similar Messages

  • SNC 'due quantity is Zero' error in Release prcesse - ASN creation.

    Hi~
    I am facing problem while creating the ASN' s for the Schedule Line releases. Error message is " Schedule line due quantity is Zero". But due quantity field is not getting populated when I create confirmations and also it is not editable.
    Status of my confirmation line is "Published". This problem is coming only for Scheduling agreement, for Purchase Orders ASN' s are getting created successfully.
    Please suggest how to resolve this or am I missing any processing step here?
    This is same as below thread. But there are no answer.
    Error in SNC Release Processing
    Please help.
    Bestregards,
    SKY

    Hi SKY,
    You need to do the below setting:
    Path go to SPRO>Supply Network Collaboration>Delivery>Due Quantity Calculation>Determine Due Schedule Line Quantities
    In that you have to maintain for which level of commitment ASN should be created.
    Level of Commitment:
    1)Fixed dates and quantities
    If you maintain Fxd Ds&Qs=Consider Release schedule line.
    If your schedule line of the schedule agreement is having level of commitment =Fixed dates and quantities system will allow to create ASN for this schedule line.
    2)Production and material go-ahead
    If you maintain ProdMatGo-Ahead=Consider Release schedule line.
    If your schedule line of the schedule agreement is having level of commitment =Production and material go-ahead system will allow to create ASN for this schedule line.
    3)Material go-ahead
    If you maintain Mat. Go-Ahead=Consider Release schedule line.
    If your schedule line of the schedule agreement is having level of commitment =Material go-ahead system will allow to create ASN for this schedule line.
    4)Forecast
    If you maintain Forecast=Consider Release schedule line.
    If your schedule line of the schedule agreement is having level of commitment =Forecast system will allow to create ASN for this schedule line.
    5)Missing quantity / backlog
    If you maintain Miss.Qty/Bcklg=Consider Release schedule line.
    If your schedule line of the schedule agreement is having level of commitment =Missing quantity / backlog
    system will allow to create ASN for this schedule line.
    6)Immediate requirement
    If you maintain Miss.Qty/Bcklg=Consider Release schedule line.
    If your schedule line of the schedule agreement is having level of commitment =Immediate requirement
    system will allow to create ASN for this schedule line.
    Depnding upon your business requirement you can maintain setting for ASN creation for scheduling agreement release.
    By default this settings are not there in SNC you have to maintain above setting as per your business need.
    As per SAP standard defination for Level of Commitment  is:
    The level of commitment informs the supplier about the schedule line type and how binding a schedule line is.
    Level of Commitment
    001
    Fixed dates and quantities
    Quantity and date of the schedule line are fixed and will remain unchanged. The schedule line belongs to a delivery-relevant release. The supplier can deliver the quantity without waiting for another acknowledgement or the customeru2019s request.
    002
    Production and material go-ahead
    The schedule line belongs to a forecast delivery schedule that is not relevant for delivery and is in the production go-ahead period. The supplier can, therefore, procure the materials for manufacturing the ordered products and start with production. If the customer cancels a schedule line, the supplier can invoice the material and production costs.
    003
    Material go-ahead
    The schedule line belongs to a forecast delivery schedule that is not relevant for delivery and is within the material go-ahead period. The supplier can, therefore, procure the materials that s/he requires for production. If the customer cancels a schedule line, the supplier can invoice for the material costs.
    004
    Forecast
    The schedule line belongs to a forecast delivery schedule that is not relevant for delivery. The schedule line is not binding and may possibly change. The supplier can use the data for his or her own planning, however.
    005 *
    Missing quantity / backlog
    The schedule line is in the past. The customer has already transferred the schedule line in a release but the supplier has not yet delivered the schedule line.
    010 *
    Immediate requirement
    The customer has not yet transferred the schedule line in a release, but needs the schedule line quantity immediately.
    These values are relevant if you use a DIMP system as the customer back-end system.
    Regards,
    Nikhil

  • Valid size not available for this creation when using Greeting Card feature

    Using PSE9 with a Mac.  When attempting to create a greeting card, after selecting the photo, the Greeting Card, I receive a pop up error message as follows:
    "Valid Size Not Available For This Creation".  (All other Create functions such as Photo Book, Photo Calendar, and Photo Collage appear to be working).  I have been in contact with Adobe Support and have been instructed to do a number of things from creating a new preferences file to uninstalling and re-installing the PSE software, with no result.  Has anyone else run into this problem, and if so have found a fix?  Thanks.

    I've been tearing my hair out over this one also. I've been on hold for over 10 hrs with Adobe Support waited over almost 2 weeks and still no resolution. I'm trying to create the Save the Date cards for my wedding and I can't wait for Adobe. Removing the preferences file and uninstalling/reinstalling does not fix the problem.
    That said I did figure out a workaround for this. It's easy but it does require Windows. For me this was no big deal as I do own a Windows box.
    Get the free trial version of PE9 for Windows and install it. If you don't have a Windows computer get to a friend that has one
    Upload some of your photos to the PE9 Windows Organizer (it's identical to the mac version)
    Select Create and then Greeting card. Photoshop will launch the guided edit feature for greeting cards.
    Select the Layout feature and once you find out that you like save it as Photoshop project. Repeat this step for as many layouts as necessary.
    Copy your Photoshop project files (and any folders) to your mac.
    Open the project files as you would with any other Photoshop file.
    You can now select the Create feature. You will be able add your pictures and resize them, you will be able to add/remove text, you'll be able to change the backgound/borders, add graphics...pretty much anything...EXCEPT automatically modify the layout. If you click on Layout, PE9 returns nothing. You can however go into full edit mode and if you have decent Photoshop skills you can make any changes to the layout manually.
    If I had to put money on this I'd say that there is a problem with the PE9 Mac installation package. For some reason it is not deploying the layout data/files or it is not putting them in the right place. For this reason the program can't find the layouts when the user selects the greeting card guided edit.
    Good luck.

  • Creation of profile for CO28

    Hi,
    We needto create the profile for display of components with some particular fields for CO28 transaction.
    I am aware of COIS transaction in SPRO to do that. There is also the transaction OPLM linked for creation of profiles.
    Can anyone tell me the exact way and step by step rpocedure for creating a new profile with required fields.
    Proper expalantory answer will receive good points.
    Rg,
    Vipul

    Hi Vipul,
    Go to SPRO-shop floor ctrl-information system-define profile for order info system.
    Here u will find all the objects with the profiles attached for each objects under the Standard profile.
    These profiles are used in reporting transactions like
    Profile for order info system - COOIS, CO28
    profile for picking list - CO27
    profile for missing part info system - CO24
    Folllowing profiles are assigned to ordertype dependent parameters at plant level - OPL8, Here under display you have to assign these profile in "Display Profile" tab.
    profile for missing parts list
    profile for documented goods movement
    Hope this has answered your query. Reward your points
    Regards
    R.Brahmankar

  • Creation of order information profile for COID Transaction

    Hi PP Friends,
    Could anybody tell me the procedure to creation a Order iformation profile to use in COID tranaction, I need to create a profile for the object Material.
    I have created but not showing in drop dowin of COID transaction. It look I missed some where.
    Pl give me the solution for my issue of any body knows.
    regards,
    Purna

    You can use transaction COISN
    (Following taken from IDES help )
    Define Profile for Order Information System
         In this step you can define overall profiles for the order information
         system.
         The overall profile controls
         o   what information is displayed in the order information system
         o   the layout of the information.
         An overall profile contains a number of individual profiles. Each
         individual profile contains parameters for the object overview list and
         the object detail list.
         In the overall profile you define the following:
         o   which objects are to be read from the database
         o   which objects are to be displayed in the list
         o   up to which object the objects are to be expanded in the overview.
         Activities
         Define which objects you want to display in the object overview.
    Using Production Order Information System Profiles
    The objects selected and the layout of the screen can be determined by an overall profile defined in the initial screen of the production order information system. The overall profile embodies various subordinated single profiles.
    An overall profile can be assigned the following specifications:
    u2022 A variant which can be used to suppress selection criteria
    u2022 Which objects to read from the database
    u2022 Which of these objects are to be displayed in the list
    u2022 The object up to which objects are to be expanded on the object overview
    u2022 Single profiles for all objects
    A single profile is made up of sets of parameters. The first set of parameters applies to both the object overview and the object detail list. The other sets of parameters are subprofiles that apply only to the object detail lists. A profile controls the following aspects of the information system display:
    u2022 Fields displayed in both object overview and object detail list
    u2022 Subprofile defining the fields to be displayed in the object detail list
    u2022 Specifications on how the list is formatted with respect to column width, field grouping,
       format of the values displayed
    u2022 Sort criteria
    u2022 Subprofile sort specification for the object detail list
    u2022 Grouping criteria
    u2022 Subprofile field grouping for the object detail list
    u2022 User filters
    u2022 Filter criteria to be used for selecting objectsu2014defined as a report variant for each set
    of criteria
    u2022 Status filtersu2014objects that are status controlled can be filtered according to a selection
    profile

  • A valid provisioning profile for this executable was not found

    I have built an enterprise APP. It has been installed in hundreds of machine. It can run smoothly at the begining. After two months, a few of the machice cannot open the APP anymore. I have tried to read its crach log and it has nothing. Finally, i found out the reason by tracing the console log.
    The error is "A valid provisioning profile for this executable was not found".
    So I check if the file exist but it is disappeared. The user have not removed the profile.
    At last, I tried to install the profile again, it is still not working even the profile is installed. Is there anyone who have the same issue? Thank you very much
    Message was edited by: Ben125

    Sorry that I have made a mistake. A wrong profile is installed.
    Thanks

  • Photoshop elements 12 "valid size not available for this creation"

    I see the message "valid size not available for this creation" when I am in organizer and  I try and go to create a collage, photo book or any of those options.  I have tried to see what other people have done by changing their location to usa/Canada but that didn't work for me.  Can you help me resolve this?  Thanks!

    The error means that Elements is experiencing problems calling up the templates from the media database. You may need to close elements and then rename or delete the following system file and then re-launch the software and wait whilst the database is re-created. find:
    Mediadatabase.db3
    The following link gives further information:
    http://helpx.adobe.com/photoshop-elements/kb/error-valid-size-available-creation.html

  • Valid Size not available for this Creation (Greeting card only) - Elements 10 for Mac

    I purchased Adobe Photoshop/Premiere Elements 10 for my MAC and am getting "VALID SIZE NOT AVAILABLE FOR THIS CREATION" when I try to create a GREETING CARD only.  All other options in CREATE work.
    I have read other forums on here and have tried everything they have said and it still does not work.  I have tried:
    opt, cmd and shift to delete preferences
    uninstalled and reinstalled
    performed updates on both my MAC and the program
    Can anyone PLEASE suggest other solutions to this problem?  Perhaps I am doing something wrong.  Thanks!

    Hi - My file structure is somewhat different than the file structure that you describe in the first part of your note (My system is Windows XP with Service Pack 3).  This is what my file structure looks like: 
        C:/Program Files/Adobe/Elements 10 Organizer/locales/en_US
             >application_swfs
             >Plug-Ins
             >Suppport Files
    No Creation Graphics folder, no Kodak Gallery Folder, no files with the name E9_preview_photocard_1(or2).jpg.
    I perfromed a hard drive search on filename E9_preview_photocard* and found these files under:
         C:\Documents and Settings\All Users\Application Data\Adobe\Photoshop Elements\10.0\Locale\en_us\CreationGraphics\local
    I performed a hard drive search on Kodak Gallery and found the file under:
         C:\Documents and Settings\All Users\Application Data\Adobe\Photoshop Elements\10.0\Locale\en_us\CreationGraphics\Kodak Gallery
    This Kodak Gallery folder contains 10 files, 2 of which appear to be related to Greeting Cards.  These are 5x7_adobe_folded_cards and 5x7_adobe_folded_cards_zoom
    Regarding the 235x120 greeting files, I search and found these under
         C:\Documents and Settings\All Users\Application Data\Adobe\Photoshop Elements\10.0\Photo Creations\photo layouts
    NOW WHAT???
    thanks

  • "Valid size not available for this creation"

    I've installed the Photoshop Elements 10 with the language JP successfully, but Greeting Card does not work at all; "Valid size not available for this creation" (JP: この作品で使用できる有効なサイズがありません) can not be resolved, even though followed the instruction  (http://helpx.adobe.com/photoshop-elements/kb/error-valid-size-available-creation.html). MediaDatabase.db3 is on C:\ProgramData\Adobe\Photoshop Elements\10.0\Locale\ja_jp\. Pls. anybody help me on this !

    Try elvidgeg's solution in this thread:
    http://forums.adobe.com/message/4248143#4248143

  • Creation profile for SA

    All,
    1.Can anyone pls tell me the path for doing creation profile for schedule agreement in SPRO?
    2.Also pls explain abt creation profile?
    Thanks

    Path
    SPRO- Material Management---Purchasing -SCheduling Agreement----Maintain Creation profile ..
    Definition: release creation profile
    An instrument used to determine the period in which releases (types of delivery schedule) are generated against a scheduling agreement and transmitted to the vendor.
    The creation profile controls the creation periodicity of the releases, the aggregation of scheduled quantities starting from the day after release creation, and the implementation of a tolerance check to ensure that releases are only created in the case of major changes to the overall delivery schedule in the system.
    Example
    A release creation profile for a scheduling agreement for which delivery schedule lines have been entered over several years specifies that releases are transmitted weekly from 01.01 to 12.31 of the first year. The release quantities are to be aggregated as follows:
    For a period of 10 days starting from the current date of release creation: no aggregation. From the tenth to the thirtieth day: on a daily basis. From the thirtieth day to the sixtieth day: on a monthly basis.
    Reward if helpful

  • DIP profile settings for quotaion creation?

    Hi experts
    I have to create quotation with reference to Plan cost thru ECP.For the same i have to assign DIP profile. So, i need to know what are the settings should be done in DIP profile steps (like in Usage , charaterstics,Sorces, selection criteria etc..) so that i can use it for quotion creation.
    your early replies may help me a lot.
    Thanks in advance

    i am closing this thread

  • Why an Error Message "Valid size not available for this Creation" in Elements 10 Photo Collage

    I have several image editing programs, but I bought Elements 10 specifically to do things the others wouldn't.  I wish to make a photo collage but all I get when I try, after following the instructions in the "help" and "Elements 10 for Dummies" is an error message stating "Valid Size not available for this Creation."  A meaningless phrase anyway because nowhere does it request a "valid size." Please will someone tell me the magiac words to make my lovely collage automaticaslly, or shall I revert to doing it manually on one of my other excellant image editing programs?

    http://helpx.adobe.com/photoshop-elements/kb/error-valid-size-available-creation.html
    If nothing there helps, see post 4 in this thread:
    http://forums.adobe.com/message/4248143#4248143#4248143

  • Elements 9 photo collage - message "valid size not available for this creation"

    Hi There,
    I am trying to creat a photo collage in Elements 9 and always get the message "Valid size not available for this creation.".  Has anybody figured out a fix for this bug????????????
    Thanks
    Roy

    http://kb2.adobe.com/cps/927/cpsid_92734.html

  • Database Validation Failed error while configuring RDBMS profile for audit

    Hi,
    I am using Oracle Access Manager 10.1.4.3.0 with FMW 11g (Oracle internet Directory and Oracle Virtual Directory) on Linux X64.
    While configuring RDBMS profile for OAM Auditing and reporting...
    I am getting "Database Validation Failed" error both in Identity and Access servers
    When I am looking in oblog...I got following in Identity..
    2010/07/17@06:59:28.882658     17384     17422     CONNECTIVITY     DEBUG3     0x00000201     obmessagechannel.cpp:179     "Sending: "     seqno^13     opcode^8     pMsg^{25}st={5}ma=22{4}mi=2{4}sg=0{4}rt=0     
    2010/07/17@06:59:28.882704     17384     17422     NET     DEBUG3     0x00000201     obsocket.cpp:848     "ObSocketOIS::WriteFully"     _sock^19     LocalAddr^10.31.13.129     LocalPort^6022     RemoteAddr^10.31.13.134     RemotePort^41646     
    and in Access..
    2010/07/17@06:39:09.391459     3326     3388     AUDIT     ERROR     0x00001D04     ../dbauditwriter.cpp:410     "The database audit writer was unable to perform the write"     
    2010/07/17@06:39:09.391491     3326     3388     AUDIT     WARNING     0x00001149     /usr/abuild/Oblix/10143hf/palantir/aaa_server/src/audit_handler.cpp:1119     ""Unable to write the audit record"
    Kindly advice...

    Hi.
    Strange !
    Check whether the RFC destiantion LCRSAPRFC is proper. Test the connection and Also check the exchange profile paramteres in the XI.
    Also refer
    http://help.sap.com/saphelp_nw2004s/helpdata/en/c6/6f1741b393f26fe10000000a1550b0/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/f4/67b340be3dff5fe10000000a155106/frameset.htm
    Also check what user is maintained via transaction SLDAPICUST. and carefully enter the password, also check that if user is locked.
    Hope this will help you a bit.
    Regards
    Aashish Sinha

  • Creation of a partner profile for an non sap system

    hi,
    I need to create a partner profile for an non sap system(SQL Server).
    step by step procedure will be useful.

    Hi,
    1>goto SM59 create R/2 connections and give the connection type as 2 and give the receiver address.
    2>create port in we21 tcode.
    3>create partner  profiles in we20 and give the receiver system (LS).
    Regards,
    nagaraj

Maybe you are looking for

  • Help please no sound

    Hi all new to the site so hope you can help. I recently bought my daughter a second hand pc for browsing the internet its all set up fine but I have no sound at all its a compaq presario AMD athlon 64 3200 plus. No sound comes from the monitor or the

  • Error in GUI of Cisco 3850 Switch with Wireless Controller.

    Hi, I have Configured 3850 switch wireless controller. But while accessing the controller through GUI, I faced following errors while configuring it through GUI. Because its complecated to configure it through CLI. Attached are the snaps of error fac

  • Xcelsius 2008 SP3 + SAP BW Integration

    Hi All, We are at BO Enterprise Server Ver 3.1 SP2 Fix Patch 2.5 on OS: AIX 5.3, Xcelsius 2008 SP3.1 and BW 7.0 Xcelsius is unable to connect to BW. Msg we receive is..... "The system you are currently connected to is not BW 7.02 or newer. Please dis

  • Links on Homepage doesn't work.

    Hello, I created some homepage on a R3 backend linked to an iview on a producer. The iview is then remoted in a federated portal role. With some test user, the links in the homepage works correctly. But when I login with my user (which has several ot

  • GUI Bug / Suggestion - View Network Connection Settings

    I'm currently running Windows Server Technical Preview in a VMware Workstation environment.  When I click on the network icon in the system tray, and then proceed to click on "View Network Connection Settings", nothing happens.  Is this a bug? I know