VMI order check against Product Allocation

Hi
We are setting up VMI where we are to plan the supply to one of our customers.
During our tests we have dicovered that the TLB orders are not checking against Product Allocation.
An ATP check does takes place when creating the TLB order (we are not using Deployment!!) but check against Product Allocation does not take place!!!
If we do an online ATP check from R/3 after
Does anybody knows how to enable check against Product Allocation during TLB order creation ?

Unfortunately there is not a tool to make diagrams in here or do we have..
To depict ATP check against Product Allocations, we can have two big blocks representing R/3 and APO.
Then in each block we can have smaller blocks to represent
a sales order creation(in R3 block) and Product Allocations in Planning area (in SCM block).
You can depict ATP call by making an arrow from sales order block to product allocation block. Then to add further details you
can have a time series(bar graph) showing product allocations for time buckets( say months) getting offset by incoming orders in a separate diagram.
to represent BOP, a block for SD ( in R3 block) and a block for BOP (in APO) and a link between them to trigger BOP process. A line from BOP back to R3 block connecting a smaller blocks "process event" and then connecting to "update".
This update block should be linked to another smaller block in APO  named as "update time series". then this update time series can lead to "delete temporary quantity assignments" block( in APO).
Hope this helps..
Mohan Chunchu

Similar Messages

  • Availabilty check against product allocation

    Hi guys,
    We are planing to implement availabilty check against product allocation for reserving stock for a particular customer then are able to select which sales orders to allocate that stock to at later date.Any suggestions or ideas on how to do this or is their any other senario that best suits this requirement.
    Thanks

    Hi
    Go through this link, it will be helpful.
    http://help.sap.com/saphelp_46c/helpdata/en/93/744d1f546011d1a7020000e829fd11/content.htm
    Regards
    Madhu

  • Availability check against product allocation

    Hi gurus,
    I'm trying to figure out how depict in a diagram the process of availability check against product allocation.
    The process includes the sales order creation in R/3, the availability check in APO (SCM 5.0) ,  returnig the delivery date.
    We are also planning a backorder process
    I think the diagram is very simple ... just 1 box for the sales order creation, one box for the availability check and 1 exit to the back order processing.
    Any help  will bee appreciated
    -Italo

    Unfortunately there is not a tool to make diagrams in here or do we have..
    To depict ATP check against Product Allocations, we can have two big blocks representing R/3 and APO.
    Then in each block we can have smaller blocks to represent
    a sales order creation(in R3 block) and Product Allocations in Planning area (in SCM block).
    You can depict ATP call by making an arrow from sales order block to product allocation block. Then to add further details you
    can have a time series(bar graph) showing product allocations for time buckets( say months) getting offset by incoming orders in a separate diagram.
    to represent BOP, a block for SD ( in R3 block) and a block for BOP (in APO) and a link between them to trigger BOP process. A line from BOP back to R3 block connecting a smaller blocks "process event" and then connecting to "update".
    This update block should be linked to another smaller block in APO  named as "update time series". then this update time series can lead to "delete temporary quantity assignments" block( in APO).
    Hope this helps..
    Mohan Chunchu

  • Third Party Drop ship and availability check against Product Allocations.

    Dear All -
    We are facing a situation where we need to create a third party drop ship Sales Order with an item category which still reaches out to APO and confirms against the product allocation quantities. This is not supported by standard SAP.
    Has anyone come across such a requirement and how has it been handled. I would really appreciate any suggestions.
    Regards
    Mandar

    Vladimir,
    I want the drop ship in which when you create SO, before selecting the vendor, system should perform availability check for plants. If material is not available in the plants ( nearest plant) then system should select the vendor who will ship the material to customer directly.
    _pat

  • Check the Product Allocation Settings - /SAPAPO/ATPCQ_CHECK

    Hello,
    I have an issue when I use the Check the Product Allocation Settings (TCODE: /SAPAPO/ATPCQ_CHECK), the system returns ''SYST: Period 000 is not valid in financial year variant J1''. J1 is my calendar and I using this calendar for all another Product Allocation Groups whitout erros. I just have this information by system report.
    I sincerely don't no why some groups have this issue because all groups are using the same setup.
    Anybody have any ideia?
    Thanks,
    -Ralph

    Hi Santosh,
    First thank you for help me, following your instructions I have made a investigation and now I know thatu2019s
    another team doing a test with this calendar in R/3, for FI, and really have differences between systems. Your direction are correctly.
    Thank you very much!
    Ralph Veiga

  • BAPI to check ATP Against Product Allocation

    My client has a requirement to check the ATP Against allocation when he create Sales Order Thr SAP CRM. Can anyone suggest which BAPI suits this requirement.?
    In brief - I required a Function Module that will return the quantity of material availability based on Product Allocation (from info structure) is needed by CRM to perform the check from CRM custom program. Thanks in advance.

    Hi
    Check these 2 Bapi's
    1)CRM_ATP_PROCESS_PARID
    2)CRM_AUC_PROD_ATP_CHECK
    Check if this helps
    Regds.....
    Sumit

  • GR quantity check against Production Order in MB31

    Hi Experts,
    How to check GR quantity against Production Order (101) can not be greater than Confirmation quantity for the Production Order in MB31.
    Regards,
    Praful Mankar

    Hi Praful,
    Use user exit MBCF0002, here put condation that check AFEU table (confirmation table) and allow
    that quantity only to do GR
    and it will triger at the time of MB31
    Regards
    Girish

  • Product allocation error while creating a sales order

    Hi Gurus,
    My client is using the availability check against  product allocation functionality in sales order.while I am creating the sales order and entering the material system is throwing the error message product allocation XXX is invalid,after pressing the enter button system has thrown another error "incorrect index structure for table XMVERF_POS/000010" and unable to save the order.
    I have checked the material master and the product allocation is assigned in basic data 1 view,I have also checked the IMG settings it has maintained and assigned to infostructure.Please let me know is there any config settings are missing related to product allocation.
    Regards,
    hari challa.

    Please check if storage location is populated for the material. Also may be this material is a non-stock material and not relevant for storage location check.. If you have any non-stock items in your order and if you are populating the storage location in the order automatically, then this happens. Please check your code and bypass the check for non stock items.
    Hope this helps
    Regards
    Sai

  • Product Allocation S140 Info structure.

    Hello Experts,
    We have configured the setting related Availability check against Product Allocation.
    Everything is fine except for S140 Infostructure.  We are using Flexible Plan.  The Info structure is getting updated whenever we create an order and the qty is confirmed.  How do the other fields gets updated?( Product allocation qty & customer requirements are initial upload by the client.   Order qty is getting updated whenever order is created.   Other fields Def.division, Open product allocation qty and requirements not covered are not getting updated.  formulas have been activated.
    How and when the other fields will be updated?    Aniticipating your answers.    
    Thanks In Advance.

    Yes

  • GATP: Product allocation with SD Scheduling Agreements ?

    Hello experts,
    we want to use Product allocation in APO-GATP (SCM5.0 SP13) to do shipping capacity leveling. The location is fulfilling following DocTypes :
    SD Sales Orders
    SD Scheduling Agreements
    MM Stocktransfers
    Does somebody know if SD Scheduling Agreements can be used with GATP product allocation ? I'm asking since this document type is NOT supported for Rules-Based-ATP (substitution etc.) for example.
    Thanks
    Thomas Schulze

    Hi Thomas,
    Just have a look into the SAP Help:
    Check Against Product Allocations
    You can use the check against product allocations in SAP APO for the following documents:
    ·         Sales orders
    ·         Sales scheduling agreements
    ·         Free-of-charge deliveries
    ·         Stock transport orders
    -> Yes, Scheduling Agreements can be checked against Prodcut allocations !
    best regards,
    Michael

  • ;product allocation

    what is product allocation respective to ATP and how do we do that and  when????
    swetha

    Hi Shwetha,
    Product allocations allow you to allocate and control goods in short supply of stock. Enabling product allocation, checks whether an order requirement can be confirmed according to the products allocated to the customer. During configuration of production allocation, at one step we assign product quantities customer wise. So apart from the regular ATP (available to promise) check which is carried out during order entry, a product allocation check is also carried out using the confirmed quantity from the ATP check. If an ATP check is not carried out, the product allocations are checked using the order requirement.
    You have define to define product allocation determination procedure and it will involve a little contribution from PP guy as well.
    For step by step procedure of configuration please follow the nodes under SPRO> Basic Function> Availability check & Transfer of Requirements--> Availability Check Against Product Allocation.
    Reg,
    KK

  • Product allocation determination procedure error

    We use product allocation determination procedure in material master
    I made SIS(S603)
    when an order item is created and changed and deleted, Quantity of the incoming order is updated in Sales Information System(S603). key figure of S603 is sales organization/material code/sales group
    But sometimes error is occured
    when i check up quantity of the incoming order in s603, quantity is not correct
    (i usually use t-code MC94 or mcsi)
    in my opinionm when an order item or order is deleted, quantity of the incoming order is not updated is SIS, Quantity of the incoming order in s603 is more than confirmed quantity of order in the delivery date of the schedule line.
    What is problem?
    Edited by: SD User SD User on Aug 23, 2010 10:44 AM

    Hi,
    Please check consumption period configurations whether s603 info structure are defined or not from the path of ( SD > basic functions > Availability Check and Transfer of Requirements > Availability Check > Availability Check Against Product Allocation
    > Define Consumption Periods). and
    in product allocation control configuration screen, flow according to requirement category flow for schedule line, check whether product allocation is active or not.
    and other needed configuration should be checked again to solve this problem.
    Finally, you can check your product allocation determination procedure from SD > basic functions > Availability Check and Transfer of Requirements > Availability Check > Availability Check Against Product Allocation > Check Settings In Product Allocation. by this way, you can figure basic problem out.
    I hope these will be very useful for you. Please share with us effects
    Regards,

  • BAPI for product allocation Check gATP

    Hi all,
    I read in the SAP documentation that we can use gATP on APO to check order item coming from non R/3 OLTP on product allocations.
    Is someone test it, which BAPI or BAdi do we use?
    Many thanks in advance.

    Hello,
    Following enhancement is available for Product allocation.
    Maintain Enhancement Projects for Product Allocation
    In this IMG activity, you can edit customer exits for the global availability check.
    Product allocations
    The enhancement for the initialization is APOQT001 .
    The user exits for product allocations are divided into two different call sequences:
    Product allocations is the requirements check against the product allocation time series from planning. A complete check is executed for this call sequence.
    The enhancements for product allocations are:
    APOQT010 copy parameters
    APOQT012 product allocations control
    APOQT021 product allocations
    APOQT022 consumption at beginning situation
    APOQT023 order consumption
    APOQT032 results control
    APOQT033 sequence of product allocation procedures
    APOQT007 product allocation assignment of partial deliveries
    APOQT018 adjusting field catalog
    The comparison adjusts the results of product allocations to the results of the other basic methods. This adjustment is necessary when product allocations is not the last basic method executed.
    The enhancements for the comparison are:
    APOQT011 copy parameters
    APOQT014 product allocations control
    APOQT024 consumption
    APOQT034 results control
    APOQT035 sequence of product allocation procedures
    The sequence of the basic methods is configured in the check instructions.
    When comparing, the entries in the table for the product allocation assignment and the temporary quantity assignments (delta records) are adjusted to the final results of the ATP check.
    If the behavior of product allocations is changed by the user exits, the behavior of the comparison must be adapted accordingly in the corresponding user exits!
    Thanks and Regards

  • 3rd party process using product allocation for ATP-check

    Hi all,
    is there anybody out there who can share experience in setting up the 3rd party process using product allocation on APO for ATP-check? As the documentation is not that impressive any help is higly appreceated.
    Thanks
    Michael

    This will not be correct forum to reply to your query.
    Still, try following Hyperlink for some understanding,
    [Third-Party Order Processing by Product Allocation|http://help.sap.com/saphelp_scm70/helpdata/EN/7c/2b7941601b030de10000000a1550b0/frameset.htm]
    Thanks & Regards
    JP

  • ATP check and Check against preliminary planning for prod order

    Hi
        For same material, order type and plant for some orders ATP check is happening and for some orders Check against preliminary planning is happening.I want to know why its happening.
    Regards,
    PradeepM.

    Pradeep,
    What types of orders?  Do you mean SD orders?
    ATP check is defaulted 'on' or 'not on' by the MRP Strategy(OPPS, look for "availability check").  MRP strategy is in turn determined by the MRP strategy group in the plant-level material master.  Assuming, then, that your MRP strategy group contains only one MRP strategy (this is common), then the default check will be set by MRP strategy group.
    ATP check can subsequently be turned on/off other ways in SD, leaving you with either no ATP, or possibly an Availability check against planning.
    So, if you are talking about sales orders, and not PP orders, the most likely place for 'turning off'' the ATP check is with the schedule line category.  A close second culprit is with the requirements class of the SO item.  SD configuration will determine the default requirements type, requirements class, and the default Schedule line category.  Study the sales orders in question in VA03.  Specifically look at the requirements type (procurement tab of SO Item) and the Schedule line category (goto-item-schedule lines).  Then, look at the configuration for
    Schedule line category: OVZ8
    Mapping of requirements type to requirements class :  OVZH
    Requirements class:  OVZ0
    Look at the setting for 'AvC'.  If it is 'on', you will get ATP against product.  If it is off, you will get either an ATP against planning, or no ATP at all.
    If you wish to change the determination of the Requirements type, or the determination of the Schedule line category in SD, you should probably discuss with your local SD functional expert.  A small change here can have many unintended consequences.
    Best Regards,
    DB49

Maybe you are looking for