Availability check against product allocation

Hi gurus,
I'm trying to figure out how depict in a diagram the process of availability check against product allocation.
The process includes the sales order creation in R/3, the availability check in APO (SCM 5.0) ,  returnig the delivery date.
We are also planning a backorder process
I think the diagram is very simple ... just 1 box for the sales order creation, one box for the availability check and 1 exit to the back order processing.
Any help  will bee appreciated
-Italo

Unfortunately there is not a tool to make diagrams in here or do we have..
To depict ATP check against Product Allocations, we can have two big blocks representing R/3 and APO.
Then in each block we can have smaller blocks to represent
a sales order creation(in R3 block) and Product Allocations in Planning area (in SCM block).
You can depict ATP call by making an arrow from sales order block to product allocation block. Then to add further details you
can have a time series(bar graph) showing product allocations for time buckets( say months) getting offset by incoming orders in a separate diagram.
to represent BOP, a block for SD ( in R3 block) and a block for BOP (in APO) and a link between them to trigger BOP process. A line from BOP back to R3 block connecting a smaller blocks "process event" and then connecting to "update".
This update block should be linked to another smaller block in APO  named as "update time series". then this update time series can lead to "delete temporary quantity assignments" block( in APO).
Hope this helps..
Mohan Chunchu

Similar Messages

  • Third Party Drop ship and availability check against Product Allocations.

    Dear All -
    We are facing a situation where we need to create a third party drop ship Sales Order with an item category which still reaches out to APO and confirms against the product allocation quantities. This is not supported by standard SAP.
    Has anyone come across such a requirement and how has it been handled. I would really appreciate any suggestions.
    Regards
    Mandar

    Vladimir,
    I want the drop ship in which when you create SO, before selecting the vendor, system should perform availability check for plants. If material is not available in the plants ( nearest plant) then system should select the vendor who will ship the material to customer directly.
    _pat

  • VMI order check against Product Allocation

    Hi
    We are setting up VMI where we are to plan the supply to one of our customers.
    During our tests we have dicovered that the TLB orders are not checking against Product Allocation.
    An ATP check does takes place when creating the TLB order (we are not using Deployment!!) but check against Product Allocation does not take place!!!
    If we do an online ATP check from R/3 after
    Does anybody knows how to enable check against Product Allocation during TLB order creation ?

    Unfortunately there is not a tool to make diagrams in here or do we have..
    To depict ATP check against Product Allocations, we can have two big blocks representing R/3 and APO.
    Then in each block we can have smaller blocks to represent
    a sales order creation(in R3 block) and Product Allocations in Planning area (in SCM block).
    You can depict ATP call by making an arrow from sales order block to product allocation block. Then to add further details you
    can have a time series(bar graph) showing product allocations for time buckets( say months) getting offset by incoming orders in a separate diagram.
    to represent BOP, a block for SD ( in R3 block) and a block for BOP (in APO) and a link between them to trigger BOP process. A line from BOP back to R3 block connecting a smaller blocks "process event" and then connecting to "update".
    This update block should be linked to another smaller block in APO  named as "update time series". then this update time series can lead to "delete temporary quantity assignments" block( in APO).
    Hope this helps..
    Mohan Chunchu

  • Availabilty check against product allocation

    Hi guys,
    We are planing to implement availabilty check against product allocation for reserving stock for a particular customer then are able to select which sales orders to allocate that stock to at later date.Any suggestions or ideas on how to do this or is their any other senario that best suits this requirement.
    Thanks

    Hi
    Go through this link, it will be helpful.
    http://help.sap.com/saphelp_46c/helpdata/en/93/744d1f546011d1a7020000e829fd11/content.htm
    Regards
    Madhu

  • BAPI to check ATP Against Product Allocation

    My client has a requirement to check the ATP Against allocation when he create Sales Order Thr SAP CRM. Can anyone suggest which BAPI suits this requirement.?
    In brief - I required a Function Module that will return the quantity of material availability based on Product Allocation (from info structure) is needed by CRM to perform the check from CRM custom program. Thanks in advance.

    Hi
    Check these 2 Bapi's
    1)CRM_ATP_PROCESS_PARID
    2)CRM_AUC_PROD_ATP_CHECK
    Check if this helps
    Regds.....
    Sumit

  • How to execute availability check against delivery date in purchase order

    Hi all
    In MD04, I know that "available date = delivery date in purchase order + GR processing time" & "GR date = delivery date in purchase order". When I execute availability check in production order, I will get material's committed date = available date. But I hope to get material's committed date = GR date in purchase order.
    For example. delivery date in purchase order is 2012/02/06 and GR processing time is 2 days. After ATP in production order, I will get committed date 2012/02/08. But I hope it show 2012/02/06. How to customize it.
    (The GR processing time must be set 2 days for MRP calculation. it can be changed to 0.) Thanks!!

    Hi Rita,
    One Doubt, If you say that material commited has to be the GR date and you do not wish to wait for GR processing time, then why do you have the GR processing time in first place.
    For ex. My client, we get the stock as per GR in Quality inspection and so we have GR processing time considered for available time in MD04. But since the business considers the Inspection stock as avialble, The stock gets reflected in avialibility check the moment GR is done.
    So please explain your requirement in detail. There could some way to do so. If not the raise an issue with SAP.

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • Check the Product Allocation Settings - /SAPAPO/ATPCQ_CHECK

    Hello,
    I have an issue when I use the Check the Product Allocation Settings (TCODE: /SAPAPO/ATPCQ_CHECK), the system returns ''SYST: Period 000 is not valid in financial year variant J1''. J1 is my calendar and I using this calendar for all another Product Allocation Groups whitout erros. I just have this information by system report.
    I sincerely don't no why some groups have this issue because all groups are using the same setup.
    Anybody have any ideia?
    Thanks,
    -Ralph

    Hi Santosh,
    First thank you for help me, following your instructions I have made a investigation and now I know thatu2019s
    another team doing a test with this calendar in R/3, for FI, and really have differences between systems. Your direction are correctly.
    Thank you very much!
    Ralph Veiga

  • Availability check during production order creation - Missing parts details

    Hai Gurus,
    I have one problem during Availability check when converting Planned order to production order.
    1) A- is the finished material, which has A1 to A7 components.
    2) A2 is the procured item with safety stock and it has safety stock also.
    3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
    4) so when availability is checked during planned order stage , system says no missing parts, when planned order
         is converted to production order system says missing parts for component A2, which is stock and reserved against
         planned order
    5) Checking rule for Production order is maintained as follows,
         a) Include safety stock.
         b) Include reservation.
         c) Include sales requirement
         d) Include deliveries.
         e) Include dependent reservations.(x)
         f) Include production orders.(X)
         g) Check release for stock transport orders only.( A)
    So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
    Waiting for your positive feed back.
    Regards,
    Sekar chand

    Dear,
    What checking rule you have maintained for planned order.???
    As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
    Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
    Regards,
    Alok Tiwari

  • GR quantity check against Production Order in MB31

    Hi Experts,
    How to check GR quantity against Production Order (101) can not be greater than Confirmation quantity for the Production Order in MB31.
    Regards,
    Praful Mankar

    Hi Praful,
    Use user exit MBCF0002, here put condation that check AFEU table (confirmation table) and allow
    that quantity only to do GR
    and it will triger at the time of MB31
    Regards
    Girish

  • Availability Check  in production order

    hi everyone!
    there is a finished product A, whose compoent is B, and A:B=1:1. now, B's stock is 100PC. we created a production order which product A 80PC, and availability check is "all material is availability".
    then we created a new production order, which product A 70PC, and availability check is "all material is availability" too.
    but in fact, B is shortage.
    Therefore, please tell me how I do material availability check?
    thanks!
    DanDan

    Hi Dandan,
    Check RLT mark in OPJJ, (replenishment lead time)
    That use during availability check,during the availability check, the system checks the replenishment lead time.In your case B items for which the delivery date falls after the end of the replenishment lead time, the system assumes that everything can be available.
    Regards,
    R.Brahmankar

  • Availability check & co-product

    Hi gurus,
    I am facing a strange problem for availability check.
    I have a order and a material list. In the material list I have one co-product. (I have activated availability check at order creation & at order release.)
    When I go for availability check I get the message all materials are available when the co-product is in the list with the negative quantity. I get this message even though the components are not available.
    Interestingly, when I delete the negative sign of co-product and convert the quantity into positive quantity I get the pop up for missing part list which is fine for the co-product but the missing part list also ocontains all the other components which are unavailable.
    Is it a problem of system?
    I will reward with points all answers.
    Thanks

    Hi All,
    Even i am facing same problem,in my case :
    For example, we have finished product u2018Au2019 and components in BOM as B, C and D.Then following are the cases:
    1.       If req. quantity for B is negative    -Getting warning message.
    2.       If req. quantity for C is negative    -Getting warning message.
    3.       If req. quantity for D is negative    -Not getting warning message.
    Means if the last component is negative in req. quantity in the BOM, we are not getting the warning message.But if this is positive we are getting the message. I have tested for different scenarios and have changed the quantity sign from top to bottom in the BOM; I am getting the message even if the quantity has negative sign in the middle.please help me in this issue?
    Edited by: Deepak Sharma on Aug 12, 2008 2:39 PM

  • Reg: Error in availability check in production order

    Dear all,
    I am facing a problem during availability check. After creation of production order, when i am clicking 'Materials' it is showing a error message as 'Incorrect check'. When i click log, the error msg is "Order type xxxx, plant xxxx: Checking rule missing (see long text)".
    But in OPJK i checked it. Availabilty check is '2', checking rule is 01, Release material is '1'
    Please help me in this case.

    Hi krishnachandra,
    I think that you still don't assign any checking rule for your Order type.
    FIrst, please check what production order type is. (On production order header: CO03)
    Second, go to OPJK to create new entry and assign appropriate checking rule to that Order type.
    Then go to your production order and check Material to see the result.
    In case you just maintain one entry only with availability check 2 (check availability during order release). You have to release you production order to check material availability check.
    Hope it helpful for you.
    Edited by: dennydang on Jan 11, 2012 4:43 PM

  • Re: Availability check fpr production order after released.

    Prodsuction order is released. Materials pertainig got reserved for the order, goods issue not posted getting error saying availability check when checked the log. Kindly help me to solve my issue. Thanks in advance.

    Hi,
      you might not have defined the proper settings for availability check.
      following is the logic in defining the settings.
    Availability check for a material is carried out only if the material is
    1. A stock item
    2. Not a phantom item
    3. Not a bulk material.
    This can be carried out
    1. during order creation
    2. during order release
    3. when a created order is saved.
    Availability check can be triggered either manually or automatically.
    For this we need to define in checking control(opjk)
    First define a checking group(ovz2) and checking rule and this
    must be assigned to checking scope.(opjj)
    In the checking scope(opjj) we should define
    1. which Mrp elements are to be considered during check
    2. which inventory categories are to be taken into account
    3. whether Replinishment lead time is to be taken into account or not
    4. whether check is also to be carried at storage location level.
    This checking rule must be linked to checking control(opjk)in which you can say
    1.No availability check for the material
    2.Availability check when saving the order
    3.What type of check is to be carried
    whether ATP CHECK or Check against PIR quantities
    4. Whether order should be released or not if there is
    any missing parts.
    The checking group is assigned to material master MRP3 view
    Regards,
    nandha

  • Availability check in Production order at WM Level

    Hi Gurus,
    Some body explain how the availability check can be carried out at WM level for the components for the Production order.
    Components are WM Managed. supply areas are maintained for the back flushing.
    is there any possibility with Standard function or only way to implement this Enhancements?
    Regards,
    Manick.
    Edited by: Manickavasaham S on Aug 14, 2010 1:13 PM

    Hi,
    More specifically for ex.
    Header Mat   A
    Component 1 : B  supplyarea 123
    Component 2  C  Supply area 246
    if the components should be back flushed from supply area '
    component B i have 200 pcs in stock in supply area 123, there are 4 production orders each of 40 pcs.
    when creating the production order system should check the stock of Supply area for creating the TR automatically. If new order is created for 20pcs. Then for B' i have a stock of 40 pcs in the supply area additional. system should not create the TR in this case for the component 'B'.
    Manick.