What are the  milestone of any project

what are the  milestone of any project ?????
can u explain each and every step and if there is any sub step invole
  and with few activity work involed in each step
thanks

Hi Hanumant,
In ASAP methodology each step is one of the milestone in the project.
                                                                                ASAP stands for Accelerated SAP. Its purpose is to help design SAP
implementation in the most efficient manner possible. Its goal is to effectively
optimize time, people, quality and other resources, using a proven methodology to
implementation.
ASAP focuses on tools and training, wrapped up in a five-phase process oriented
road map for guiding implementation.
The road map is composed of five well-known consecutive phases:
u2022        Phase 1 Project Preparation
u2022        Phase 2 Business Blueprint
u2022        Phase 3 Realization
u2022        Phase 4 Final Preparation
u2022        Phase 5 Go-Live and support
In today's post we will discuss the first phase.
Phase 1 : Project Preparation
Phase 1 initiates with a retrieval of information and resources. It is an important
time to assemble the necessary components for the implementation. Some
important milestones that need to be accomplished for phase 1 include
u2022        Obtaining senior-level management/stakeholder support
u2022        identifying clear project objectives
u2022        architect an efficient decision-making process
u2022        creating an environment suitable for change and re-engineering
u2022        building a qualified and capable project team.
Senior level management support:
One of the most important milestones with phase 1 of ASAP is the full agreement
and cooperation of the important company decision-makers - key stake holders
and others. Their backing and support is crucial for a successful implementation.
Clear project objectives:
be concise in defining what your objectives and expectations are for this venture.
Vague or unclear notions of what you hope to obtain with SAP will handicap the
implementation process. Also make sure that your expectations are reasonable
considering your company's resources. It is essential to have clearly defined
ideas, goals and project plans devised before moving forward.
An efficient decision making process:
One obstacle that often stalls implementation is a poorly constructed decision-
making process. Before embarking on this venture, individuals need to be clearly
identified. Decide now who is responsible for different decisions along the way.
From day one, the implementation decision makers and project leaders from
each area must be aware of the onus placed on them to return good decisions
quickly.
Environment suitable for change and re engineering:Your team must be willing to
accept that, along with new SAP software, things are going to change, the
business will change, and information technology enabling the business will
change as well. By implementing SAP, you will essentially redesign your current
practices to model more efficient or predefined best business practices as
espoused by SAP. Resistance to this change will impede the progress of your
implementation.
ASAP- Second Phase- Business Blueprint
SAP has defined a business blueprint phase to help extract pertinent information
about your company that is necessary for implementation. These blueprints are in
the form of questionnaires that are designed to probe for information that
uncovers how your company does business. As such, they also serve to
document the implementation. Each business blueprint document essentially
outlines your future business processes and business requirements. The kinds
of questions asked are germane to the particular business function, as seen in
the following sample questions:
1) What information do you capture on a purchase order?
2) What information is required to complete a purchase order?
Accelerated SAP question and answer database:
The question and answer database (QADB) is a simple although aging tool
designed to facilitate the creation and maintenance of your business blueprint.
This database stores the questions and the answers and serves as the heart of
your blue print. Customers are provided with a customer input template for each
application that collects the data. The question and answer format is standard
across applications to facilitate easier use by the project team.
Issues database:
Another tool used in the blueprinting phase is the issues database. This
database stores any open concerns and pending issues that relate to the
implementation. Centrally storing this information assists in gathering and then
managing issues to resolution, so that important matters do not fall through the
cracks. You can then track the issues in database, assign them to team
members, and update the database accordingly.
ASAP Phase- 3 - Realization:
With the completion of the business in phase 2, "functional" experts are now ready
to begin configuring SAP. The Realization phase is broken in to two parts.
1) Your SAP consulting team helps you configure your baseline system, called the
baseline configuration.
2) Your implementation project team fine-tunes that system to meet all your
business and process requirements as part of the fine tuning configuration.
The initial configuration completed during the base line configuration is based on
the information that you provided in your blueprint document. The remaining
approximately 20% of your configuration that was not tackled during the baseline
configuration is completed during the fine tuning configuration. Fine tuning usually
deals with the exceptions that are not covered in baseline configuration. This final
bit of tweaking represents the work necessary to fit your special needs.
Configuration Testing:
With the help of your SAP consulting team, you segregate your business
processes into cycles of related business flows. The cycles serve as independent
units that enable you to test specific parts of the business process. You can also
work through configuring the SAP implementation guide (IMG). A tool used to
assist you in configuring your SAP system in a step by step manner.
Knowledge Transfer:
As the configuration phase comes to a close, it becomes necessary for the
Project team to be self-sufficient in their knowledge of the configuration of your
SAP system. Knowledge transfer to the configuration team tasked with system
maintenance (that is, maintenance of the business processes after Go-live)
needs to be completed at this time.
In addition, the end users tasked with actually using the system for day-to-day
business purposes must be trained.
ASAP Methodology - Phase 4 - Final Preparation:
As phase 3 merges into phase 4, you should find yourselves not only in the midst
of SAP training, but also in the midst of rigorous functional and stress testing.
Phase 4 also concentrates on the fine tuning of your configuration before Go-live
and more importantly, the migration of data from your old system or systems to
SAP.
Workload testing (including peak volume, daily load, and other forms of stress
testing), and integration or functional testing are conducted to ensure the accuracy
of your data and the stability of your SAP system. Because you should have begun
testing back in phase 2, you do not have too far to go until Go-live. Now is an
important time to perform preventative maintenance checks to ensure optimal
performance at your SAP system.
At the conclusion of phase 4, take time to plan and document a Go-live strategy.
Preparation for Go-live means preparing for your end-users questions as they
start actively working on the new SAP system.
ASAP - Phase 5 - Go-live and Support:
The Go-live milestone is itself is easy to achieve; a smooth and uneventful Go-live
is another matter altogether. Preparation is the key, including attention to what-if
scenarios related not only to the individual business processes deployed but also
to the functioning of technology underpinning these business processes and
preparation for ongoing support, including maintenance contracts and
documented processes and procedures are essential.
I hope it will help you,
Regards,
Murali.

Similar Messages

  • Anyone tried using Billings 3 in Yosemite - what are the issues, if any?

    Anyone tried using Billings 3 in Yosemite - what are the issues, if any?

    Hi
    Logic Express is essentially the same as Logic Pro, minus a few Instrument plugins and a few Effects Plugins (there are some other slight differences, but nothing that is likely to cause any significant problems).
    You/she will be able to open Pro projects in Express fine, but if any of the 'missing plugins' have been used these will not be found in Express. For Instruments plugs, this might cause a problem because the tracks will not play unless a replacement plugin is selected. For Effects plugins, you might be missing some, but the project should play OK, just sound a little different.
    Should these issues become a problem, one solution would be to use the "Bounce in Place" feature to print these tracks as audio temporarily in Logic Pro.
    Logic Studio (Logic Pro) comes with all the Jampacks, Express does not. If any loops from the Jampacks have been used, you should be OK as long as the project has been "Saved with Assets.. including Imported Audio". This will copy any loops used into the project folder.
    In short, nothing insurmountable.
    HTH
    CCT

  • I have install last update for i pod(ios5) but during installation there was one problem....i have restore my ipod and now i have lost all my buyed music!!Is not possible download it....?What are the details, including any error messages, related to your

    I have install last update for i pod(ios5) but during installation there was one problem....i have restore my ipod and now i have lost all my buyed music!!Is not possible download it....?What are the details, including any error messages, related to your question?

    Have you not got the music on your computer and/or on backups on, for example, external drives or CDs/DVDs ?

  • Rman backup : what are the preconditions if any...?

    hello all,
    I have the following script for executing an rman backup in Unix server :
    rman target=sys/change_on_install nocatalog <<EOF
    RUN
    allocate channel c1 type disk format '/orabackup/rman/b_%u_%s_%p';
    allocate channel c2 type disk format '/orabackup/rman/b_%u_%s_%p';
    allocate channel c3 type disk format '/orabackup/rman/b_%u_%s_%p';
    set limit channel c1 kbytes 400000;
    set limit channel c2 kbytes 400000;
    set limit channel c3 kbytes 400000;
    sql 'ALTER SYSTEM ARCHIVE LOG CURRENT';
    backup incremental level 0 database;
    backup archivelog all delete input;
    copy current controlfile to '/orabackup/rman/contrl01.bak';
    release channel c1;
    release channel c2;
    release channel c3;
    Can any one tell me what are the preconditions/precautions if any to be taken before executing the above script such as whether the database should be open or mounted etc.
    thanks in advance
    thomaskprakash

    database should be open or mounted etc.Definately you would be taking online backups, therefore, database up and running.
    Database must be in archivelog mode.
    Jaffar

  • What are the different type of projects

    i mean how many different type of projects are there in sap implementation..
    what do you mean by,
    enhancement project
    rollout project
    development project
    support project
    is there any thing else other than this?
    please clear my doubt.
    points would be rewarded.
    thank you.

    Check the link:
    http://help.sap.com/saphelp_sm40/helpdata/en/ba/38c93a37c59122e10000000a114084/content.htm
    Implementation Project
    Project to implement business processes in an SAP landscape.
    Create a project structure from the business processes. You can either create a new project structure, or base it on one of the following:
    One or more user or partner templates
    An existing project
    Scenarios and configuration structures delivered by SAP 
    An existing production solution landscape
    Template Project
    A project to create a template.
    A template makes your project structure, or parts of it, with its assigned objects (documentation, test cases, IMG activities), available to other projects.
    You can lock templates, completely or partially, against changes when they are used in other projects. To use templates in other systems, transport them.
    Template projects are especially suited to SAP partner solutions or global rollout.
    Upgrade Project
    A project to upgrade existing systems.
    In an upgrade project you can:
    Upgrade customizing: Upgrade existing functions
    and/or
    Delta customizing: Copy additional functions
    Optimization project
    A project to optimize the flow of business processes, or the use of a software solution.
    You can use optimization projects, for example, in SAP Services.
    Safeguarding project
    A project to resolve a critical situation in the implementation or use of an SAP solution.
    Safeguarding projects show the reasons for a critical situation and coordinate the steps required to resolve the problems.
    Maintenance project
    A project to maintain a solution
    in Change Request Management. The project contains all maintenance activities and urgent corrections of a solution.
    in Check-In/Check-Out Business Processes from the Solution Directory
    Regards
    Edited by: Sravan Prakash.V on Dec 28, 2007 12:25 PM

  • What are the benefits (if any) to transcoding to an intermediate editing format for post-production?

    I have been searching for a definitive answer to this for days and cannot get anything useful.
    My video camera records to AVCHD format which is 24mbps H.264 plus audio (I record audio separately so audio is not a concern). I use the Adobe CC suite on Windows. I do a lot of green-screen work.
    I have read about many intermediate codecs designed for editing video. These include Avid's DNxHD, Apple's ProRes, GoPro's Cineform, MXF OP1a, among others. From what I understand, these formats provide excellent features to help video editors do their work.
    I have been able to edit AVCHD files directly using Premiere Pro and After Affects.
    My question is, what benefits, if any, would I get if I transcoded my content from AVCHD to one of the intermediate formats before I begin editing? Would it speed up Adobe's software? Would it provide better quality in the end? Would it make various effects function better?
    Ultimately, all the video I make is going to be encoded in h.264 for web distribution.
    Please note: I am not asking for the easiest or most obvious workflow (which is to just to work directly with AVCHD files). I want to know if I can gain benefits in transcoding to another format before I being post-production and what those benefits are specifically for each of the various intermediate codecs.
    Thank you.

    Like almost everything, there's tradeoffs. Transcoding to a really high-end single-file codec like Cineon or Cineform would mean that say the file size could be somewhat larger on disc ... more data to read ... however, LESS work by the other subsystems to get those io oo ii oo oo io io io oi bits changed into "video" on the monitor. There are several articles and tutorials out there on this that give really useful information. And there are a LOT of people that put something out because they personally think this or that codec is THE proper way a professional should work, and any other codec is nearly obscene in use. Right, whatever. They're all tools.
    As shooternz showed ... properly shot AVCHD can be green-screened beautifully, and as there are a LOT of the "pro" cameras in use shooting that wrapper, there are a lot of people that simply process in that. There are others that automatically transcode everything to ProRes 4444 before editing because they feel that gives them the best, safest "space" for their pixels to live. Pick any major codec/wrapper, it will have adherents.
    I've tried just a bit of greening just to play with it ... and got rather intriguing results. It reminded me of starting out trying to do good still portraits on high-key sweep backgrounds without getting "haze" or scatter from too-much-light coming back at the lens while getting the right exposure on the subject and keeping the entire high-key area of the sweep the same white ... it's rather daunting at first. After we mastered it, we could do it at will ... first time every time. Green-screening is a similar thing. Perhaps on steroids, but similar. HOW it's shot is incredibly important to being able to post-process both cleanly and quickly. I've seen quite a few comments about this here and elsewhere ... and though there are clean-up & masking techniques one does need to master, clearly ... one needs clean footage to be able to quickly get clean post work. So many people have noted that after spending so much time working on their masking & color-correction of bits here & there they also got their shooting skills up. And found that suddenly they didn't need anywhere near the clean-up skills or time spent.
    So I'd think off-hand that the AVCHD isn't the most pressing problem here ... that a bit of experience in the absolute tight control of exposure and lighting in the shooting setup may well take care of much of the post problems. And then you can concentrate on those skills you do need ... the fine techniques of this particular process ... to get your work completely polished.
    And listening to shooternz on this isn't a bad thing at all ... his techniques are tight & fast. I've asked him for a number of things and have adopted every one of them.
    Neil

  • What are the affects, if any, of magnets on iphones?

    Are iphones affected by Rare Earth Magnets, or any magnets?

    I suppose strong magnetic fields could cause damage to your iPhone.  However, from personal experience weak magnetic fields won't hurt your iPhone.  I have used a case with a magnetic clasp for about a year and the only side affect is that I need to re-calibrate the compass when I try to use the compass app.

  • What are the roles in CRM implementation Project(all generic extractions)

    Hi Gurus,
    Now I am placed from a support project from BW (CRM) implementation project(all are generic extractions).
    & I am also new to implementation project.
    what are the neccessary steps to be taken when we are implementing BW for CRM.
    Gurus please clarify my doubts.
    1. what are the steps in implementation project in detail(as a developer).
    2. what are the sizes of the cubes,ODS & How to decide them.
    3. what are the neccessary steps for Master data & Transaction data.
    4.How to make the functional specifications for Infoobjects,cubes,ODS,Remote cubes,Multiproviders.
    5.can we change to delta loads to full loads if yes what happens to existing data.
    6.How flat file extraction used in the case of crm& how to do ascii format.
    7.What are the steps to be taken when we are creating Queries & Reports in BW CRM.
    It's very urgent.
    thanks = points.
    Bwcheta.

    1. what are the steps in implementation project in detail(as a developer).
    U have to basically to the techinal design after understnading the functional designs and implemnet the same( creating infoobjects, datatargets, datasources, queries etc.). Then u have to load data and do the unit testing on the same.
    2. what are the sizes of the cubes,ODS & How to decide them.
    Completely the business reqmnet and the data that the client wants to load.
    3. what are the neccessary steps for Master data & Transaction data.
    U have to understand ur master data and transaction data on the basis of whch u have create ur infoobjects and load data in them and finally in the datatarget.
    4. can we change to delta loads to full loads if yes what happens to existing data.
    Sure u can do that by choosing Full update in the infopkg. It will just load the complete data instead of changed records.
    *Hope it helps.

  • HT203987 What are the advantages of upgrading my Mavericks OS to Yosemite?

    What are the advantages--if any--of upgrading my OS Mavericks to OS Yosemite?

    etresoft wrote:
    Barney-15E wrote:
    it should be able to AirDrop to any iOS device and to any 2012 or later Mac (2013 Mac Pro).
    Nope. http://support.apple.com/en-ca/HT204144
    Even that limited list in the Apple support article is incorrect. It says any of those can AirDrop with "a Mac with OS X Yosemite". That is wrong. You are the one that is correct about the Mac support, not Apple.
    Ahh, yes. I was going by this, http://www.apple.com/osx/how-to-upgrade/, but I didn't see the Lightning connector.

  • What are the common errors we get in supporting project

    can any body reply what are the common errors we get in supporting project
    for abapers tickets will get or not.
    what type of tickets generally get regarding reports.

    <b>SAP Tickets</b> are nothing but problems or issues raised by the end
    customer in a company where end users are running SAP project.
    Once the SAP project is implemented, support phase begins. Support
    team is responsible for solving the tickets/issues in day-to-day
    business.
    For any support project, customer will set up Help Desk. If any
    problem occurs customer will call Help Desk and register the
    issue/Ticket.
    Different companies use different software products to manage SAP
    Tickets. Remember this software is not provided by SAP. It is third
    party software. There are many software products in the market like
    Manage Now et c. You can call these software products as tools.
    All tools will provide the common attributes which are listed below-
    1) Every user will be provided with user name and password to enter
    into the tool
    2) We can see the tickets assigned for a particular user name.
    3) You can list all open tickets by giving the Date Range
    4) You can list all closed tickets by giving the Date Range
    5) You can list out all the open tickets assigned for an User
    6) You can list out all the closed tickets assigned for an User
    7) You can see the description of the Ticket, by entering the Ticket
    Number. You can see who had raised the Ticket, what is the problem.
    What is the severity of the Ticket?
    There are lot many other attributes like you can transfer the Ticket
    to another user etc.
    <b>What is the severity of the problem Ticket?</b>
    When a Ticket is raised, it will be given severity. There are
    following severities. It may vary from company to company.
    Severity 1
    Severity 2
    Severity 3
    Severity 4
    The severity will be decided based on the business critical impacts.
    If there is large impact on the business it
    will be given 1 severity, if it is having least impact then it will be given 4.
    Severity 1 problem tickets should be solved in 8 hours.
    Severity 2 problem ticket should be solved in 16 hours.
    Severity 3 problem ticket should be solved in 15 working days.
    Severity 4 problem ticket should be solved in 30 working days.
    Again the no of days may vary from one company to another.
    All these things will be decided when giving the contract to the IT
    company. The agreement is called as "SLA".
    SLA stands for Service Level Agreement.
    What happens if a particular ticket is not solved by the IT company
    according to the SLA/Contract?
    The Customer imposes fine on IT company as per the contract/SLA.
    <b>Errors in Extraction</b>
    1) RFC connection lost.
    2) Invalid characters while loading.
    3) ALEREMOTE user is locked.
    4) Lower case letters not allowed.
    5) While loading the data i am getting messeage that 'Record
    the field mentioned in the errror message is not mapped to any
    infoboject in the transfer rule.
    6) object locked.
    7) "Non-updated Idocs found in Source System".
    8) While loading master data, one of the datapackage has a red light
    error message:
    Master data/text of characteristic ZCUSTSAL already deleted
    1)extraction job aborted in r3
    2) request couldnt be activated because theres another request in the
    psa with a smaller sid
    3) repeat of last delta not possible
    4) datasource not replicated
    5) datasource/transfer structure not active
    <b>Issues faced during the implementation :</b>
    1. Slippage of milestones
    2. Incorrect or wrong design
    3. Reporting format problems
    4. Data not matching or reconciling problems
    5. Issues discovered during testing leading to redesign
    6. Performance issues
    7. Requirements misinterpretation
    9)check the data same in source system and target system ( i mean
    suppose u are extarcting from r/3 after loading check ur data r/3 and
    bw same or not.
    10)that is abap code, i didnt understand ur question properly.
    11)
    12) generic extarction, if ur businees contect satisfy ur requirement
    u go for generic, suppose u need data from different tables go generic
    with view with 1:1 relation 1:M relation for function module.
    13)v3 update back groud job is in lo
    14)its superior info object, u can find this in master data tab .
    15)
    16)tuning we will go for improve query performance (compression,
    aggregates, partation, index, rollup, precalculated web tneplates.)
    17) rsa7(check with some one)
    18)bw statics for find data base time and olap time and frontend
    time(based on u can improve query performance create like aggra comp ,
    indices etc..)
    19) direct chain only one chain , meta chain if u have more than one chains
    load errors u can solve manually, other than load errors u can wait
    right click and repeat.
    20)
    21) u cn cteate other cube and traansfer, but data space waste.(bec
    structures will be deffi)
    22) u mean data source enhancement.or not(let me know)
    23)rsap0001( for customer exit variables) 001 for transaction data 001
    attributes, 003 text 004 hierchies.
    24)web application design , its like same bex, but report will execute
    in browser.
    25)
    26) arrangement of process are called process type and we can use
    varient and start process for back ground jobs.
    <b>Don't forget to asign points</b>
    regards
    ravish

  • What are the basic .jar files to be set in web dynpro project classpath

    Hi,
    I am having a problem while customizing the ESS. I used DTR, DC and imported configuration. After that, I created project from one of the DC(say ess/jp/addr). Later when I open an iView from any Web Dynpro component, I am getting lot of errors without even making any modifications.
    I closed the project and reopened it and reload & rebuilt, but it doesn't solved my problem. In my classpath settings I couldn't find any jar files except the jre_lib. Could you please let me know what are the basic jar files we have to set in classpath and where to get them from. We are using NWDS 7.0.06 version.
    Can you please let me know how to solve this or any other way to work around this.
    It's an urgent to be fixed as early as possible, plz help me out.
    Thanks & Regards,
    Raj

    Hi Julien,
    Thanks for your reply.
    We imported the the specified SCAs in our track.
    we are getting the following errors.
    Kind Status Priority Description Resource In Folder Location
    Error The import com.sap.xss.per cannot be resolved CcPerAddressInterface.java NS1_XSSTR_Dessusaddrsap.com/gen_wdp/packages/com/sap/xss/hr/per/us/address/cc line 18
    Error com.sap.pcuigp cannot be resolved (or is not a valid type) for the argument fpm of the method loadConfiguration CcPerAddressInterface.java NS1_XSSTR_Dessusaddrsap.com/gen_wdp/packages/com/sap/xss/hr/per/us/address/cc line 113
    Error com.sap.pcuigp cannot be resolved (or is not a valid return type) for the method getNextPerspective CcPerAddressInterface.java NS1_XSSTR_Dessusaddrsap.com/gen_wdp/packages/com/sap/xss/hr/per/us/address/cc line 127
    Error com.sap.pcuigp cannot be resolved (or is not a valid type) for the argument currentPerspective of the method getNextPerspective CcPerAddressInterface.java NS1_XSSTR_Dessusaddrsap.com/gen_wdp/packages/com/sap/xss/hr/per/us/address/cc line 127
    Error com.sap.pcuigp cannot be resolved (or is not a valid return type) for the method getCAPState CcPerAddressInterface.java NS1_XSSTR_Dessusaddrsap.com/gen_wdp/packages/com/sap/xss/hr/per/us/address/cc line 137
    Error com.sap.pcuigp cannot be resolved (or is not a valid type) for the argument perspective of the method getCAPState CcPerAddressInterface.java NS1_XSSTR_Dessusaddrsap.com/gen_wdp/packages/com/sap/xss/hr/per/us/address/cc line 137
    we manually set below .jar files in classpath settings.
    pcuixssfpm.jar
    pcuixssutils.jar
    logging.jar
    essper.jar
    Is there any alternative to work around.
    Thanks & Regards,
    Raj

  • What are the Things required for BI 7.0 Implementation project

    Hi Friends,
                      Can any one suggest me
    1.What are the Things required for BI 7.0 Implementation project?
    2.System Configurations & Hardware Components?
    3. Any additional steps...
    plz suggest me.
    Regards

    Hi lakshmi,
    http://csc-studentweb.lrc.edu/swp/Berg/articles/PM_2006_upgrade_NW2004s_Bjarne_Berg_v12.ppt#426,3,Why Upgrade u2013 end of supportu2026
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d163a7-0301-0010-d9b0-98f692ea3c60
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/472443f2-0c01-0010-20ab-fbd380d45881
    https://wiki.sdn.sap.com/wiki/x/JYk
    Check the following links.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/84bf4d68-0601-0010-13b5-b062adbb3e33
    check the following
    http://help.sap.com/bp_biv235/BI_EN/html/bw.htm
    business content
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20co-pa%20extraction%203.0x
    https://websmp203.sap-ag.de/co
    http://help.sap.com/saphelp_nw04/helpdata/en/37/5fb13cd0500255e10000000a114084/frameset.htm

  • What are the different Project Type Scenarios in SAP?

    hi experts,
    i am new to SAP,
    want to know how many types of SAP projects are there ?
    What is meant by Enhancement Projects ?
    if any info., helps me a lot to understand.
    thanks in advance
    sasi

    Hi anji,
    Good answer,
    GAP ANALYSIS:
    The gap analysis is the analysis on what the differences between actual system are and what the customer want to develop.
    A through gap analysis will identify the gaps between how the business operates ad its needs against what the package can can't do. For each gap there will be one of three outcomes which must be recorded and auctioned, GAP must be closed and customized software can be developed close the gap, GAP must be closed but software cannot be written therefore a workaround is required, GAP does not need to be closed.
    In simple terms: Gap means small cracks. In SAP world. In information technology, gap analysis is the study of the differences between two different information systems or applications( ex; existing system or legacy system with Client and new is SAP), often for the purpose of determining how to get from one state to a new state. A gap is sometimes spoken of as "the space between where we are and where we want to be." Gap analysis is undertaken as a means of bridging that space.
    Actual gap analysis is time consuming and it plays vital role in blue print stage.
    While implementing the SAP to one company they use ASAP Methodologies to implement it has 5 steps .
    1: project preparation .
    2: Business blue Print .
    3: Realization .
    4: Final preparation .
    5: Golive .
    in Business blue print they give AS IS and TOBE that means what are the different requirements are to be made to reach the customer requirement that is called Gap analysys
    Regards
    Suresh.D
    Message was edited by:
            suresh dameruppula

  • Wiki or Robohelp - What are the benefits of using a wiki vs publishing projects in robohelp?

    What are the benefits of using a wiki vs publishing projects in robohelp? I currently use RH9/RH9 Server and  publish multiple SSL.  The company is looking to stop using Robohelp and replace our online help authoring tool  (RH) with a wiki. Are there any benefits of going to a wiki environment.  What RH features/functions that I have today will i not have by having IT import our robohelp files into a wiki?
    I know that a wiki is not an authoring tool, but someone must think it is and we'll still have all the functionality of publishing multiple SSLs, reports, etc once in the wiki environment.  Any comments - is this the best route?

    Hi,
    There are many differences. The idea of a wiki is to allow anyone to view and/or edit the content. Depending on the wiki system, you can set access control for viewing and editing.
    Wiki's typically have simple syntax (html in a wiki is a serious security risk), allow image embedding, links and attachments. You will need to learn the specific syntax (rather easy, but also very limited).
    What will you lose? This depends on the features available in the wiki system as well as the available plugins. A few downsides:
    - WYSIWYG editor limited, if at all.
    - No snippets
    - No variables
    - Dropdowns (may be possible through plugins)
    - Index
    - Styling based on css classes (mostly supported through HTML which is a security concern)
    - Only one version of your support system: multiple versions require multiple installations/configurations.
    - No searching in attachments.
    - No CBT (Though some wiki's allow comments in the wiki code)
    - No Word/FrameMaker import.
    - You have to create your own CSH calls.
    On the upside:
    - Most wiki systems are free, even for commercial use.
    - The syntax is quite simple, allowing you to quickly write text.
    - Wiki's typically offer good support for syntax highlighting.
    - They are very easy to set up.
    - Most wiki's have plugins to enable comments.
    The greatest downside in my opinion is that you always have the latest version of all files. Whenever you update a page, everyone immediately has the latest version. And if you want to create help for a feature that isn't released yet, you will have to use access control to make sure not everyone sees the (unfinished) help for the unreleased feature. With RoboHelp you have a single source that creates a one way output.
    We use both RoboHelp and wiki's: RoboHelp for customer help and wiki internally to share knowledge. And sharing knowledge is what wiki's are designed for.
    Greet,
    Willam

  • What are the sap basis daily activities  in support project

    Hi Friends, recently i am involved in Support project, could you please tell me what are the daily activities to follow in support project
    thanks&regards
    suresh

    Hi Suresh,
    Few of daily activities in which you as a Basis Consultant should involve are as below:
    - Day to day system administrative issues raised by users e.g. User ID locked or new SAP ID creations etc.
    - Daily watch on background batch jobs. If any job failed due to some reason, work on it to avoid such failure in future with the help of function consultant
    - Watch on system performance
    - Authorizations & Roles definitions & assignements depending upon requirement.
    - System Backup depending upon business requirement
    - Printer setup in SAP
    - Watch on Print spool to avoid failures in SAP doccuments printing
    - Watch on interfaces (IDoc/EDI etc), if any, with external system
    Also talk to your earlier or senior Basis consultant to know more.
    Hope it will help you.
    Regards,
    Anup