Writing Accounting Entry extensions for Standard Costing

Hi All,
Has anyone worked with writing extensions through PL/SQL OR Workflow. Cost Managment User guides does not include so much information. I really need help regarding from where to start, what function to modify/ write, what workflow to modify/ write etc. I need to incorporate PRODUCT CODE.
I found following packages from user's guide. I could not found the package CSTPSCHK onto the server but I found following two onto the server.
CSTSCHKS, CSTSCHKB
Pls tell me the examples OR their experiences if someone has already done some work/ research.
Thanks

closed

Similar Messages

  • Analysis report for standard cost in CK33N

    Hi,
    Analysis report for standard cost
    Using variant Z003 in CK11N.
    Planned cost 3 is the output used for planning and this is adjusted by making changes to the BOM throughout the process
    In CK33 you compare the 2011 cost for the product with the proposed cost for the next year.  For some parts it works and for others it splits the lines,  though the calculation is still correct.
    Regards,
    T.Harish Kumar

    Hi Revital,
    I believe the last option is correct.
    Thanks,
    Gordon

  • Can we use two costing variant for standard cost estimate

    Hi,
    Can we use two costing variant for standard cost estimate of two different materials in the same period ? e.g. Costing variant Z001 for Material code 1000 and Costing Variant Z002 for Material code 2000.
    Here the system is not allowing to change the costing variant in Marking Allowance (t code CK24) for marking and release of Material cost 2000 if the standard cost for Material code 1000 is already marked and released.
    Thanks,
    Bijay

    For a material in a period only one price can be released. Though you cn have two separate costing variants and then calculate standard estimate with that. U can release based on one variant only for a month. Or use MR21 and update the price as per the other variant
    Thanks and Regards

  • Accounting entry problem for cancel billing document

    Hi,
    We have manufacturing process  for SO to DC we follow the proces
    Sales order -> delivery -> VF01 -> J1IIN -> VF02 release to accounting,
    now when we do the above procees in billing document document flow we can see two accounting entry generated ref. to t. code VF01 and billing document number
    now to reverse the above, we are following the procedure
    J1IIN reverse -> VF02 cancel billing document  we get new cancel billing document numbver  then again in VF02 we are releasing the cancel document number,
    but earlier when we do the cancelation procedure only two accounting entries were generating under the original billing document and also under the cancel billing document,   but now as soon as we reverse the invoice in J1IIN  under the original billing document one additional accounting entry is coming which is generated ref. to T. code J1IH  document type JM , and when we cancel and release the billing document there are three accounting entery under Cancel billing document number and additional entry is created ref. to J1IH do. no. JM
    so what can be the problem hiw one entry is generated by J1IH and what is eefect of this.
    regards,
      zafar

    in billing document document flow we can see two accounting entry generated
    Yes this is standard.  One for customer debit and another accounting document for excise.
    thanks
    G. Lakshmipathi

  • Accounting entry settings for variance analysis

    Hi all,
    When we perform variance analysis for a production order, an accounting entry is passed clearing the under or over absorbed portion in production cost centers or in overhead cost centers.
    Could any one tell me where to make this configuration that when variance calculation of order is performed ... the financial entry clearing the over/under absorbed portion is posted automatically.
    I heard that this entry is posted manually. Please kindly enlighten me if what I heard is correct. If so then what activity does KKS2 perform.
    Thanks in advance.
    Regards,
    DSK

    Hi,
    With KKS2 TC,you can only calculate variances and with KO88,will settle variances to FI/PCA and COPA.
    Production variance,account determination is part of OBYC TC.
    Goto OBYC>GBB>AUA/AUF -->product capitalization account
            OBYC>PRD>PRF -->production variance account
    Thanks,
    Anusha

  • No accounting document created for distributed cost center and asset

    Hi experts,
    Why there is no accounting document created during GR for distibuted cost center and asset?
    Thanks

    Sorry guys, there's nothing to do with the config of the account assignment. The postings are ok for single cost center or single asset. SAP system message (info messsage) " Goods receipt for distributed cost center will be non valuated" are given when you are trying to unticked the GR non valuated.
    If someone could explain what is the logic behind that behavior.
    Thanks again.

  • No Accounting Entry Generated for Order SES

    Hi All,
    We have created a Service PO through PR that is being charged to an Maintenance Order. The SES has been created and approved with the Material Document created but no accounting entry is generated. The GR non-valuated is unchecked.
    As our Sandbox was just refreshed, I copied the and created a new PO from the old one and created an SES and the accounting entries were generated. Any ideas why this is happening?
    Thanks

    Is business function LOG_MM_MAA_1 active in your system? Also are you using multiple account assignments?
    Check this note and apply the corrections if required:
    1715475 - MAA2: ML81N/MIRO: false postings for Service PO

  • Can we use two costing variants for standards cost estimate release.

    Hi,
    We have 2 plants (plant 5100 and plant 5200) under company code 5000.
    We have run standard cost estimate(CK11N) for material 98001000027 at plant 5100 using costing variant ZG01 and at plant 5200 using costing variant ZG02. First, we released  standard cost estimate (CK24) for this materia at plant 5100 and set (in marking allowance) costing variant ZG01 and costing version 01. Next time when we are trying to release the standard cost estimate for the same material for plant 5200, it is automatically picking ZG01 as costing variant in marking allowance and it is not allowing to change the costing variant to ZG02 saying Company code 5000: Release already carried out, cancellation not possible, Message no. CK797.
    Is it possible to use two different costing variants for release of standard cost estimate for a material at two different plants at the same company code? If so how?
    Please suggest.
    Thanks,
    Bijay

    Hi,
    Thanks for your reply again.
    What is the benefit of assigning "Single Valuation Variant same to different Plants" ? In costing variant also we can assign maximum only one valuation variant and this valuation variant will default for all the plants, and hence I dont think it is necessary to assign same valuation variant to different plants.
    My  issue is :
    Example: ( Standard Cost Estimate for material 98001000027)
    Plant - 1
    Material Cost                                             Rs.100
    Labour Cost                                               Rs.50
    Overheads (10% of Labour Cost)                  Rs.5
    (say ,through costing sheet - 1)
    Total Standard Cost Estimate                      Rs.155
    Plant - 2
    Material Cost                                             Rs.150
    Labour Cost                                               Rs.100
    Overheads (20% of Labour Cost)                  Rs.20
    (say, through costing sheet - 2)
    Total Standard Cost Estimate                      Rs.270
    Now, Please explain why we cannot have two Standard Cost Estimates for a material at two different plants? If it is possible to have two standard cost estimates for a material at two different plants, how to take care of  overheads (rate of which varies) at two different plants (plant - 1 > 10% and plant- 2>20%) as we can assign maximum one costing sheet to a valuation variant variant?
    How to map the system so as to meet the above requirement?
    Thanks,
    Bijay

  • Subcontracting for standard cost material

    Hi
    We have scenario where 95% of the Semi finished product will be produced in house where we will be using standard BOM, Routing.
    Now in case of Plant Breakdown, the raw materails will be given to the subcontractor and he will perform the process and sent us back the fsemi inished product.
    We are dealing with only One number of  semi finished product here and only one work center. So if one machine fails the entire processing will be done at the sub contractor and will receive the semi finished product.
    In this case how to handle the subcontract charges which occurs rarely only in the event of machine break down.
    For info- we are using std price for that One semi finished product.
    Thanks
    Aravind

    Hi Aravind
    Manage the exceptions in exceptional way.. Its often difficult to set up a process to manage the exceptions
    What you said is an exceptional case.. So, let it be like that.. i.e.
    -Dont have any Split Valuation....
    -Have just one std cost based on BOM+Routing
    -Whenever you subcontract, the difference between (Consumption of Inputs + Sub Con Charges) AND Std Cost will be accounted as PRD... So, let it be like that and treat as overhead in Costing
    br, Ajay M

  • Service entry sheet for shipment cost reversal - Change option is greyedout

    Hi,
    I need to cancel shipment cost document. Which is completely transferred to accounting. First i am trying to reverse the service entry with revoke acceptance . But system is not showing change button neither in toolbar nor under menu. can anybody help on this?

    Hi,
    For cancle the shipment cost you have to fallow these steps
    1- VI02 -Delete the shipcost doc.
    2- VF01 - cancle Billing doc
    3- VT02 - Del TPPL doc.
    4- VL09- Cancle PGI
    5- VL02n Delete Delivery doc
    Hope it will helpfull for you
    Thanks

  • Template allocation for standard cost estimate

    Hi Guys
    Can you please explain me how template function is triggered when we run a std cost estimate? What is the link between two?
    Thanks in Advance
    Regards
    Sejar

    Hi
    Costing template is generally used for Activity Based Costing,
    Please check the following SAP help page for more information
    http://help.sap.com/saphelp_46c/helpdata/EN/c5/b02e8d1a3911d2a57a0060087d1f3b/content.htm
    Regards
    Sachin

  • Invenotry Valuation for BOM or regular items in standard cost

    How SAP defines Inventory Valuation for BOM (Parent, Child) with different Inventory types?  If Parent Items is Inventory and Sales only but Child Items are Inventory and Purchase Items then the inventory value will base on each Item Cost or....
    When you use Inventory Good Receipt the Item Cost grayed out that forced you to use Unit Price in Inventory Master Data file for this transaction and reflected to the Inventory Valuation Report. Is this the way for "Standard Cost" method? 
    For Standard Cost method, the Item Cost will be used from regular SO, Delivery and Invoice only?

    Inventory value will be base on each Item Cost when you use Standard Cost method.  It will apply to all marketing and inventory document.
    As for BOMs, they are only templates.  You could assign any price lists to them.  Therefore, until the production order created, any cost of BOM would only be a reference.
    Thanks,
    Gordon

  • How to assign search help for custom cost centre field in SRM 7.0

    Hi Experts!!
    We are currently working in SRM 7.0.As per our business requirement, in account assignment tab we need to use a custom
    cost centre field (ZCOST_CENTRE) instead of standard cost centre field.It is observed that for standard cost centre field there is a standard web-dynpro search-help assigned where it will return the F4 search help values from backend.
    Can any one of you please help me how can I assign the search-help for the custom cost centre field. Is there any FM to call the backend cost centre search help for custom field or any other way how can I achieve this?
    Thanks in advance.
    Regards,
    Kalyani

    kalyani,
    i can see your requirement in below way..
    as it just reads: you need to assign the standard cost center help to a z cost center field in component /SAPSRM/WDC_UI_DO_ACC.. which actually is fetched though the component /SAPSRM/WDC_UI_BACKEND_SH
    so, if you see the component controller of SAPSRM/WDC_UI_DO_ACC you will see the component
    USAGE_SH_F4     /SAPSRM/WDC_UI_BACKEND_SH                        
    USAGE_SH_F4     /SAPSRM/WDC_UI_BACKEND_SH     INTERFACECONTROLLER
    so you can replicate the same functionality for your z field.
    but can you clarify one thing.. why are you going for this z field in place of standard field ?

  • Accounting Entries in PP

    Hi all
    I need a/cing entries that get posted in Various stages in PP
    Ur ans is helpful to me
    Thanx
    Srinivasa Rao

    Hi Srinivas,
    Following are the major stages and accounting entries.
    1) Preliminery Costing
        Preliminery Costing automatically gets created.
        There is no accounting entries.
    2) Simultaneous Costing:
        In this stage, the goods are issued to the Manufacturing Order. The Manufacturing Order is debited with the sum of  prices and quantities and the respective inventory accounts are credited. The movement type 261 is being used.
    Through the confirmation of activities, the Manufacturing orders are debited with the sum of prices of activities and quantities and the Cost centers are credited. Here , there shall be no finance entries whereas controlling and profit center accounting shall be getting the entries.
    Goods receipt of the FG or SFG happens, by crediting the Manufacturing order and debiting the inventory accounts.
    3) Final costing:
    At the end of the period this process shall be undertaken.
    Revaluatoin of Activity price
    If there is any need to revalue the activity price, it shall be done. This helps in absorbing the cost centers fully. Here, the accouting entries shall be, Manufacturing Orders shall either be debited or credited and the Cost Centers shall be credited or debited as the case be.
    Actual Overhead Calculation
    Then, actual overhead shall be done so as to bring in actual costs of overheads.
    WIP Calcualtion
    After this WIP is calculated. In this case, the costs incurred over and above the goods receipt shall be computed as the cost of WIP when the  Manufacturing order is not fully delivered or the status of technically complete is not updated. Here, there is only computation and no accounting entries.
    Variance Calculation
    When we undertake this calculation, the system computes the difference between the debits and credits for the Manufacturing orders which are fully delivered or technically completed.  Here also, there shall be no accounting entries.
    Settlement
    Here, accounting entries happens for both the WIP Calculation and variance calculation. In the case of WIP Change account is credited and WIP Inventory account is debited.  For fully delivered or technically complete, Manufacturing Orders are credited or debited and Production variance account shall be debited or credited. Variance gets posted in Finance, Controlling, Profit Center Accounting and Profitability Analysis as well. In the case of Profitability Analysis, the variances are segreated into category wise.
    Here, I have used umbrella term 'Manufacturing Order' for Production order, Process Order and Product cost Collector.
    Trust this helps much!
    Cheers!

  • Scrap costs in Standard Costs without adding scrap factor in BOM

    Running one part number, multiple operations in factory.
    Need to account for Standard Cost including Scrap, but do not want to inflate BOM using a scrap factor.  How can we maintain accurate backflush of matls and capture scrap costs for use in Stds?

    If you do not want to consider the scrap qty. in operations but want to consider it only for costing purpose, then create a costing BOM i.e. usage 6. In this BOM you can maintain the scrap. Also ensure the costing variant which you're using has a priority of costing bom over say production bom or universal bom.
    Discuss this with your costing person as well.

Maybe you are looking for