Wrong Dummy Asset at the creation of CEA/PO

Hi ,
Require your help in solving the below support issue.
Problem with the following POs  4500118092-4500118092-4500118093  on the Goods Receipt Procedure with the following message "NO DUMMY ASSET FOUND FOR PO".(Reason : wrong dummy asset at the creation of CEA/ PO)
would appreciate your earliest reply.
regards
Prasad

Hi
It`s a custom generated error message.could u pls tell me the possible reasons for the above error.
Regards
Prasad

Similar Messages

  • Problem with the creation of asset master record

    Hi Gurus,
    i am having problem in creation of a new asset master with the use of existing man asset number and different asset sub number. I am trying to create the asset in the same company code but different depriciation area, but the system is not allowing me to do that. Is there a setting in the SPRO by which I can allow the use of creation of the asset number by using the already existing asset number with the new asset sub number. This is actually happening in the system for one type of equipments but not for other.
    Can any one tell me what settings are to be made to allow this for all containers.
    Thanks in advance
    Anoop Sharma

    Hi,
    A sub asset master can be created with AS11 only.
    You cannot create a asset sub number under a main asset number, in the case, where different set of dep areas needs to be maintained.
    When you create a sub asset, all the dep areas will be copied to sub asset's master from main asset master. Since this set of dep areas cannot be different from main asset to sub asset.
    Hopw you understood this.
    Thanks,
    Srinu.

  • Assignment of the asset during the equipment creation

    Hello everyone,
    I am currently working on the PM-AA interface which consists in linking the asset field (ITOB-ANLNR) of an equipment with the asset number given in the purchase order. The goods receipt (MIGO) creates automatically an equipment (thanks to the serial number profile of the materiel).
    As the purchase order contains the asset, I expected that the system would put this value in the corresponding field of the equipment.
    In the customizing, we have made the following changes :
    - equipment is modified synchronously with tha asset modification
    - the assignment of master data fields of assets and equipment includes the asset fields itself
    - the serial number profile is assigned to the material and allow the creation of the equipment during the goods receipt.
    Has someone already experienced this case? What do I have to do to have the asset number saved in the equipment during its creation?

    Hi Paul,
    Thanks for you answer.
    I've already checked these customizing aspects but tjey are not saisfying enough : my customer wants the equipment to be created at the goods receipts in order to save the serial number registered during the reception.
    Furthermore, I'm not sure of the process if I create the equipment formerly : will it take into account the material and serial number that are given during the reception of the goods? And how does the system react with more than one equipment?

  • All the creation dates for my files are wrong?

    I've had this problem for a long time but I finally want to fix it once and for all. All the documents, pictures, and other files on my computer have the same creation date - 1/5/09. When you right click a file it shows the correct creation date but if I just left click it then it shows the wrong date. is there a way i can fix it?

    The creation date of your system will be the same for most of your system documents; there's easy no way to change this information. However, you might also see a more current date, indicating Modified information, and that will be more current.
    There are computer commands that will blank out much of your system data, but that's to be done in cases of major problems. Don't worry about the creation date of your computer/data.
    Post here if you have addtional questions, comments, praise!

  • How can i change the Creation Date of a video (mts-Format)?

    I work with Phohoshop Elements 13 an i use Online-Album (Revel)
    My Problem:
    I would like to change the Creation Date of a Video-File (mts-Format). I don't no why but the date (in Metadata) is wrong and i would like it to change. If i change it in Photoshop Elements the Date (Edit... Change Date...) it seems that the date has changed, but in reality in the Metadata is still the wrong date (see attachment).
    Why this ist important for me:
    The Adobe Revel (Online-Album) takes always the date from the metadata which is wrong.
    Any idea how i can resolve my Problem?
    How i can change the Metadata?

    Hi,
    Did you get help ? Or do you have a work around ? I have about 20.000 Pictures and countless videos to organize myself.
    I just ran into the same problem. Except that after a while Adobe will undo the changes I have made to the date.
    Here's a  screen shot I just made of one of the files.
    Look at this one ! This one is really interesting:
    After changing the date to : 1889 . Adobe changed it to 01.01.1970 00:59

  • Wrong Payment term in the Invoice

    We have a problem with one of the vendor Invoice creation. We are getting wrong payment term in the Invoice.
    We have payment term A in the vendor master both company code and Purchasing Org. We have the same payment term A in Purchase order and Contract.
    But when we create invoice using MIRO for the PO we are getting Payment term B. This is happening for only one vendor.
    We know that it can be corrected at the financial document level but want to know how this payment term B is pulled up from cause i checked all the options but nowhere to find from where it is coming.

    Hi Aparna,
    Check the following:
    In MIRO, if you use PO reference to create the IV document,terms of payment will not get copied from vendor master, the terms of
    payment will come from the PO.(if you have the invoice entered without reference to the PO, then the terms of payment are copied from vendor.)
    So when you change the the invoice party in MIRO, new payment terms will not get copied from vendor master, they will come from the PO.
    Please review SAP Note 322430 MIRO: Proposal logic for terms of payment Payment terms are only adopted from the vendor master record Without reference to purchase order
    You enter an invoice without purchase order reference by adding a G/L account line or material line as a first item. If the terms
    of payment key does not contain any value, this is copied from the accounting view of the vendor master record.
    Thanks
    Aravind

  • Error occurs during Asset Master Record Creation.

    Hello SAP Gurus,
    The error occurs during asset master record creation.
    Our fiscal year variant is Z6 (July to June). The asset was acquired in June 15 (previous fiscal year) but was only set up on July 30 (this fiscal year) . When we put the depreciation start date as 15 June the error appeared. While saving the Asset master we are getting below error.
    We tried the same with Post Capitalization of Asset (ABNAN) there also we are getting same error.
    ERROR: - as below
    u2003
    SYST: *You cannot determine the period for rule 02 to 05.08.08 ( todayu2019s date )*
    *Message no. AA613*
    *Diagnosis*The system could not determine a depreciation period on 05.08.08 for period control 02 of the period control method of phase N1 of depreciation key INTERN-00001-0000.
    Procedure
    Maintain the assignment of the periods for the period control entered.
    Proceed
    If the period control you entered is a standard period control, you can assign the periods automatically.Proceed
    Please find enclosed attachment for clear description of the error.
    Please share your experiences regarding this subject.
    Thanking you in anticipation.
    Regards,
    Suresh.
    09986375966

    Hi,
    have you generated the period controls properly? If not, the error is raised correctly by the system.
    To generate period controls go to:
    IMG Asset Accounting -> Depreciation -> Valuation Methods -> Period Control -> Generate Period Controls    / or you can use OA84
    Regards,
    Markus

  • Query relating to the creation of Managed Service Accounts

    Hi Folks
    I am studying for my 70-411 exam and have a query relating to the creation of Managed Service Accounts.
    I have successfully created an MSA account named 'MSATest' on a DC  using:
     new-adserviceaccount -name msatest –dnshostname home-dc-01 -passthru
    and
     add-AdcomputerServiceAccount -identity home-ap-01 -serviceaccount msatest -passthru
    However the guide that I am using now says that I now need to run:  Install-ADServiceAccount on the host computer in the domain to install the MSA in order to make available it available for use by services.
    So on my member server (home-ap-01) I have installed the Active Directory Module for powershell and ran:
    PS C:\Users\administrator.PCECORP> Install-ADServiceAccount -Identity msatest
    Install-ADServiceAccount : Cannot install service account. Error Message: 'An
    unspecified error has occurred'.
    At line:1 char:1
    + Install-ADServiceAccount -Identity msatest
    + ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
        + CategoryInfo          : WriteError: (msatest:String) [Install-ADServiceA
       ccount], ADException
        + FullyQualifiedErrorId : InstallADServiceAccount:PerformOperation:Install
       ServiceAcccountFailure,Microsoft.ActiveDirectory.Management.Commands.Insta
      llADServiceAccount
    PS C:\Users\administrator.PCECORP>
    However this errors, Have I misunderstood the purpose of the Install-ADServiceAccount ?  or am I doing something wrong?
    Thanks in advance for you help.

    Try using  -RestrictToSingleComputer parameter when creating service account with New-ADServiceAccount.
    Gleb.
    Hi Gleb
    Thank you for your help, it is appreciated.  That did the trick.
    All the best.

  • Blocking the filling of a cost center in the creation of a Purchase Order

    Hi All,
    I've some cost center which are obsolete and mustn't be used in the creation of a Purchase Requisition (or Purchase Order).
    Could anyone suggest me how to do it?
    Thanks a lot
    G.
    Edited by: Jeyakanthan A on Jun 2, 2011 1:28 PM

    Hi,
    The transaction me21n uses the authorization object A_S_KOSTL for cost
    center. However, the authorization object A_S_KOSTL is not related to
    the cost center that is displayed in the account assignment view of th
    purchase order item, but its scope is to limit the access to fixed
    assets belonging to the specified cost center (see the note 856248).
    There is no standard authorization object that you can use from
    transaction me21n to validate the cost center that you see in the
    account assignment view at item level. The same can be said about the
    purchase requisition creation (me51n).
    So, I have three options for you to consider.
    First Option:
    There is an existing possibility to perform user defined checks during
    all kinds of postings which finally lead costs in CO. With transaction
    OKC7 you may define a validation which is also processed during
    purchasing. You can explore the possibility of achieving the
    functionality you need by making customizing changes using transaction
    OKC7.
    Second Option:
    You could use userexit enhancement MEREQ001. For further information
    please see note 310154.
    Third Option:
    Also, you may consider instead of an authorization check for cost
    centers you can activate an authorization check for G/L accounts.
    Therefore the following settings are required:
    I. Customizing -> Materials Management -> Purchasing -> Purchase
        Order -> Set Up Authorization Check for G/L Accounts:
        activate the G/L account authorization check for the required
        company code
    II. Transaction FS02 -> View: Control data: enter the authorization
        group
    BR
    Nadia Orlandi

  • At the creation of MCD we got the problem with Request

    Hi All,
    we are all very new to SAP MI,
    At the creation of CD we got the problem with Request
    <i><b>Creation of CD</b></i>
    we gave these entries
    <b>1.Mobile Solution Name        :      CIBERNW
    Version                                    :      1001
    Description                              :      Ciber Netweaver Mobile
    Cmponent Type                       :        APPLICATION
    Runtime Enviroment                 :      JSP</b>
    In SyncBO tab we specified our SyncBO that is <b>ZNWW_EX01</b>
    we selected the check two checkboxs that is
                       <b>->SyncBOs Expect Initial Value
                       ->Data Visible to all</b>
    2.when i am trying to <b>save the MCD</b> it will open one dialog box that is
    <b>"Object can only created in SAP Package "</b> -> Continue
           <b>"Link to Transport "</b> it says
    <b>"Include MCD in Transport Request", "Yes","No"</b>
    when i will go for <b>"Yes"</b>
    it will give one more dialog box that is
    <b>"prompt of workbeanch Request"</b>
    it will give one Request bydefault that is <b>"CNWK900030"</b>
    there we have some option that is
         <b> ->Continue
          ->Create Request
          ->Own Request</b>
    which one we will select ?
    i will go for <b>Continue</b> it will open other dialog box it says
    <b>"Include MiniApp in Transport Request"</b>
    it says <b>"MiniApp must be assigned to a transport request"</b>
    i will go for continue it will the message in the status bar
    <b>"MCD Changed"</b>
    can you please tell me this process is Right or wrong
    if it is wrong can you please tell me the right process
    and it will some default Requests which Request we need to select
    or we need to create the Request where we need to create that
    what is process we need to follow ?
    Thanks and Regards
    Dileep Painnamaneni

    Hi Dileep,
    <<Creation of MCD >>
    <<we gave these entries >>
    <b><<1.Mobile Solution Name : CIBERNW
    Version : 1001
    Description : Ciber Netweaver Mobile
    Cmponent Type : APPLICATION
    Runtime Enviroment : JSP>>
    In SyncBO tab we specified our SyncBO that is ZNWW_EX01
    we selected the check two checkboxs that is
    ->SyncBOs Expect Initial Value
    ->Data Visible to all</b>
    Every thing is fine. We need to check Link to <b>SAP MI Home page</b> check box
    <b>2.when i am trying to save the MCD it will open one dialog box that is
    "Object can only created in SAP Package " -> Continue
    "Link to Transport " it says
    "Include MCD in Transport Request", "Yes","No"
    when i will go for "Yes"
    it will give one more dialog box that is
    "prompt of workbeanch Request"
    it will give one Request bydefault that is "CNWK900030"
    there we have some option that is
    ->Continue
    ->Create Request
    ->Own Request
    which one we will select ?
    i will go for Continue it will open other dialog box it says
    "Include MiniApp in Transport Request"
    it says "MiniApp must be assigned to a transport request"
    i will go for continue it will the message in the status bar
    "MCD Changed"</b>
    In SAP when ever we create any object(tables or MCDs) :
    there are two things CUSTOMER NAME SPACE(stored locally in that system only) and FORIEGN NAME SPACE(can be transported)
    CUSTOMER NAME SPACE objects starts with 'Z' or 'Y'
    FORIEGN NAME SPACE objects starts with any other digit other than 'Z' or 'Y'
    So youhave created MCD name CIBERNW which starts with 'C' (its not customer name space with z or y)
    so it will be stored in package(so that this package can be transported to any other system later)
    So what ever you have done is correct.
    You can create your own request also.
    But confirm once that whether you are supposed to store your MCD this that package.
    <b>
    can you please tell me this process is Right or wrong
    if it is wrong can you please tell me the right process
    and it will some default Requests which Request we need to select
    or we need to create the Request where we need to create that
    what is process we need to follow ?</b>
    So this is the concept of request.
    So this request is nothing but....
    When ever we create tables or MCDs we try to save it..so if we are trying to create objects in Foreign name space(i.e without 'Z' or 'Y' inthe beginning) so it will ask to create this object in a package which requires request(transport request)
    All objects are stored in package,( so this package contains many objects like MCD,SYNBOS etc what ever we store in it) so we can transport this package from one system to another system so to transport we need to generate a transport request for that package and them release that transport request.....
    So once the package is released and we try to edit or create new objects in that package it will ask for some new request.....
    Yes we can create our own request and later release it.
    But in your case u can take up the default request and continue.
    If this MCD is for only testing purpose(for our selfs)..means this MCD is just for our testing sake..its better to create it in Customer name space..starts with 'Z' or 'Y'.
    I hope its clear.
    Cheers,
    Karthick

  • How to stop the creation of /home on reboot?

    I assume it's systemd creating /home since I never had this situation with arch init scripts.   Maybe it's something else?
    I will delete /home and upon reboot it will return.
    I do not use /home and do not like standard user hierarchy and am tired of looking at the empty folder every startup.
    If this is indeed systemd (I'm not too familiar with it yet since I only updated to it about a month ago), does anyone know the related .service or .target (etc) doing this?  I tried searching for /home inside the files but so far no luck.  I did 'grep' and there are binary matches but not much I can do about that.  Maybe I'm looking in the wrong place.  /usr/lib/systemd, /etc/systemd/, /usr/lib/udev
    Feels like the appropriate section to post this.  I'm rarely online so was hoping to throw this out there and hope to get an answer in the right direction.  Thanks.
    EDIT:  Sorry if a similar thread exists.. I couldn't find any as it has rather vague keywords.
    Last edited by milomouse (2013-01-19 21:42:45)

    Yeah, the /home folder is empty because I do not use it and no users $HOME are pointing there.  I also have my XDG settings pointing elsewhere, so that can't be it.
    When I get home I'll try modifying the useradd file but not sure if that will do it.  Although, I wonder if it's reading from another system login type file that defaults to /home..
    or perhaps it's just creating a standard filesystem hierarchy.  Hmm!!
    I would resort to deleting it with a script at boot-up but since I don't use /home and it doesn't have a separate partition it writes to my / partition which is a Solid State Drive.
    I know having it created and deleted at each boot may seem trivial but I like to avoid unnecessary writes/deletes on the SSD no matter how insignificant it may seem.
    Also, I just really want to find out where this is coming from.  I do my best to know what my setup is doing and hate not knowing why something keeps happening. 
    So, I'm still probing to where the creation stems from.  I wish there was some system monitor or journalctl would tell me more specifically what systemd is doing.  Maybe I'll delete it and check timestamps and match against systemd service files being ran?  May take some time but at least it's something to try.

  • How do I use AppleScript to Change the Creation Date to the Current Date?

    I sorted my downloads folder by creation date and found that the items were sorted seemingly randomly. On closer inspection, I saw that the creation dates were not the same as the dates that I downloaded the items, so I figures that Snow Leopard was using the date given to it by the server.
    In order to get the items sorted by download date, I figured I'd use Hazel, but it doesn't have a “change creation date” item. It does, however, have an “run AppleScript” item.
    So my question is this: how do I use AppleScript to change the creation date of an item to the current date?

    TC (Techno Cat) wrote:
    Okay, I tried changing the creation date with SetFile, but it kept giving me an error:
    What am I doing wrong?
    Looks like the date and time was not quoted
    Try this Applescript. It will change the creation date of every file in the Downloads folder to the current date and time:
    <pre style="
    font-family: Monaco, 'Courier New', Courier, monospace;
    font-size: 10px;
    font-weight: normal;
    margin: 0px;
    padding: 5px;
    border: 1px solid #000000;
    width: 720px;
    color: #000000;
    background-color: #E6E6EE;
    overflow: auto;"
    title="this text can be pasted into the AppleScript Editor">
    set current_date_and_time to do shell script "date \"+%m/%d/%Y %H:%M\""
    tell application "Finder"
    set filelist to every file of the alias (the path to downloads folder as text)
    repeat with currentFile in filelist
    do shell script "/usr/bin/SetFile -d " & quoted form of current_date_and_time & space & quoted form of POSIX path of (currentFile as string)
    end repeat
    end tell</pre>

  • PO with Dummy Asset

    Dear Guru,
    Could you provide how to set up the PO with dummy asset?
    First, I use account assignment "A" and enter the dummy asset from FI team "DUMMY" but the message occurs as below.
    Message no. MEPO053
    Maximum LVA amount exceeded in the case of at least one asset
    Do I have to configure anything in MM side?
    Thank you very much.
    RD
    Saiyaman

    Hi,
    It doesn't require any setting from MM side. Ask your FI Person to check the following config. setting
    OAY2 - Here check whether LVA has been specified for the asset classes
    OAYK - Here check the amount specified for low value assets

  • I have an educational license yet cant seem to access Market Assets on the Creative Cloud app?

    I have an education license yet cant seem to access Market Assets on the Creative Cloud app, is this a feature I am denied with my current subscription or am I doing something wrong?  Thank you!

    You have Creative Cloud Student and Teacher Edition purchased as redemption code.
    Regards
    Rajshree

  • Wrong Exchange rate on the Contract (ME31K

    Dear Sap Guru
    I am writing to you in order to know if there is a solution to our problem.
    The scenario is quite easy:
    1 u2013 Suppose to insert a wrong exchange rate during the Contract creation (tcode ME31K)
    2 u2013 When you will create the scheduling agreement (ME31L) based on the Contract, the wrong exchange rate will be copied to the SK.
    3 u2013 The GR based on the SK will be valuated to the wrong exchange rate.
    About the point 1 and 3 there is a way to check the difference with the current exchange rate, like a tolerance limit for the Exchange rate?
    About the point 3 is it possible to set the system in order to value the GR based on the current exchange rate instead to use the exchange rate stored in the purchase order.
    Please let me know if you need more information in order to find a solution.
    Regards
    marco

    hi,
    try following sites:
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/3d/60c9d9302611d28dbc0000e82852b4/frameset.htm
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/3a/55b424dae511d3978a006094b969cf/frameset.htm
    Hope it helps..
    Regards
    Priyanka.P
    AWARD IF HELPFULL

Maybe you are looking for