Alternate routings in 11i

If an item has multiple routings will MRP take in account all of
them for planning purposes and pick the optimal one for that
point in time? If yes...what if a job has been released and
somewhere through the process the plan is regenerated will MRP
pick up on an alternate routing if one exists that will be more
efficient to run? Thanks in advance.

Oracle Master Scheduling/MRP only considers the primary routing, or manually assigned alternate routings in discrete jobs (status UNRELEASED). Only Oracle Advanced Supply Chain Planning can pick the most optimal routing.

Similar Messages

  • How to get the workcentres used in the routing out of 2 alternate routings

    Dear All,
    I would like to know how to get the workcentres used in the routing out of 2 alternate routings.
    I referred PLKO got the Task List Type (PLNTY), Group(PLNNR), Group Counter(PLNAL), Plant(werks).
    I passed this in to PLPO, The problem in PLPO is we don’t have the distinguishing field Group Counter(PLNAL), so I am getting all the ARBID including both alternates.
    How to get the ARBID with respect to Groupcounter 1 alone.
    If a get the ARBID , I can get the ARBPL from CRHD.

    HI,
    Use PLAS Table also.  you have to use PLKO> PLAS> PLPO.
    Pass PLNNR & PLNAL in PLAS and get PLNNR & PLNKN.
    Then pass these into PLPO.
    work centers from CRHD
    Regards,
    Krishna Mohan
    Edited by: Krishna Mohan N on Jan 31, 2008 12:28 PM

  • Alternate Routings

    hi
    How the alternate routings are created ,
    By going sequence view in Routing ,there I have to select alternate sequence am I correct ,
    Alternate sequence is same as Alternate Routing
    Is there any other way to create Alternate Routing?
    Thanx in advance

    Hi Karthik,
    Alternate sequence is different from alternate routings
    If you wnat to create alternate routing just enter into ca01 tcode
    enter material/plant/group no & proceed further as you normally do
    You can find the unique value  against group counter for each routing,whereas group no will remain the same
    Alternate sequence is just to differ from the standard sequence in the same routing
    pls find belwo the details of alternative seq from sap help
    You use an alternative sequence for example, if
    The production flow is different for certain lot-size ranges
    For instance you can machine a work piece on conventional machine or on NC machines. A NC machine has a longer set-up time than a conventional machine. However the machining costs are considerably less. Therefore whether you use NC machines will depend on the lot size.
    The production flow changes under certain business conditions.
    For instance, if you have a capacity problem, you have some production steps performed externally by a vendor.
    Hope this is useful
    Regards,
    SVP

  • Alternate table of AP_INVOICE_LINES_ALL in 11i

    hi 2 all
    I have developed Supplier Statement of Account report in oracle apps r12 and use AP_INVOICE_LINES_ALL table.
    it running fine in R12 , but when i run in 11i , compiler raised error on AP_INVOICE_LINES_ALL table , b/c this table is not
    available in 11i , so plz guide me what is alternate table in 11i ?
    Thanks
    Zulqarnain

    Hi,
    There is no equivalent table of ap_invoice_lines_all of R12 in 11i, this is a new feature/ table structure only in R12. The main table in 11i for AP invoice is ap_invoices_all -> ap_invoice_distributions_all, while in R12 it is ap_invoices_all -> ap_invoice_lines_all -> ap_invoice_distributions_all. The information of the ap_invoice_lines_all in R12 should be available in ap_invoice_distributions_all in 11i.
    For the prepayment, you should be able to get it by using ap_invoice_distributions_all.prepay_distribution_id
    Hope this helps.

  • Selection Of BOM & Routing at the time of production order creation

    Hi guys,
    Please clarify how i can go about for the following mentioned scenario
    I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
    At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
    Awaiting for a quick response
    Vijai

    Hi vijai prasad shanmugam ,
                                              In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected  Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
    As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
    But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
    Please Let me know if I can help you in any way regarding this........
    Please reward the points......... in you find the ans helpful.....
    Thanks
    Kaushik

  • PP-Backflushing not posting to correct work centers

    Hello everyone,
    We are having an issue performing a backflush using an alternate production versions. We have created multiple versions for materials that point to a alternate routings and when we choose the alternate version during backflush, it shows the alternate work center(as expected), but in the background it uses the primary work center. We have set up PCC's with a preliminary cost for the alternates but during the MFBF it does not post to them. If during the MFBF I choose post with correction>actual activities>select operations to be changed>change the work center manually for each operation, then save, it will post correctly. The issue with doing this manually is that we are uaing SAP console with RF units and cannot expect our end users to know when to report on the RF unit or when to go directly into MFBF and perform these steps.
    Thoughts anyone,
    Please advise,
    Thanks
    Ray

    Dear Raymond,
    I have come across the same issue,
    Please follow the following steps and revet back,if it does not
    works.
    Since therecan be only one valid standard cost estimate at a
    time for a material,check out this.
    1.Initially create master data (material master, BOM. Rate
    Routing, Production Version, Product Cost Collector) and
    assign REM profile say TT01.(For REM Profile TT01 ,in the
    settings -indicator shud be set  for Post Acitivities-Backflush
    Using Standard Cost Estimate for material)
    2.Execute costing run using CK40N.
    3.Perform production confirmation using MFBF.
    4.Create alternate BOM/Rate Routing when required.
    5.Create new production version with new BOM-Rate Routing
    combination.
    6.Create Product Cost Collector for the new production version
    and create preliminary product costing.
    7.Change REM profile of material from TT01 To TT02 where in
    the TT02 REM profile the setting for Post Activities Using Data
    from Preleminary Costing For Product Cost Collector.
    8.Specify the production version at the time of production
    booking. The material consumption and activity booking will be
    done corresponding to the production version specified.
    I hope this will resolve your problem.
    Please reply to this thread whether it works or not.
    Regards
    Mangalraj.S

  • Change validity end date on activity type

    Is there a way to change the validity end date of an activity typre. Currently it is 9999 we would like to change it to 2011.
    We would like to use a particular activity to cost current standards but dont want to use it for planned estimates that we will create for 2011. I am assuming if the validity ends in 2011 it will resolve the problem. I know we could create alternate routings and different production version but I am trying to avoid that and see if we can find a short cut.
    Your help in this regard will be much appreciated

    Hey Greta,
    I executed the report but it says ,"The deletion could not be carried out, plan records still exict on cost center for activity type." I have deleted every thing from kp26 for that particular combination of activity type and Cost center.
    Any ideas as to what is happening!!
    Regards,

  • Alternative selection of routing in production orders

    in routing there are 4 operations
    operation   descriptions                                      work centre
    0010        ONE SIDE CENTER GRINDING            A
    0020        ROUGH MAJOR DIA.GRINDING            B
    0030         FINISH MAJOR DIA. GRINDING            C
    0040         ROUGH/FINISH THREAD GRINDING     D
    operation 0020 & 0030 having alternate routing for for different work centre sayE & F resp.
    now, i want solution/setting  for automatic selection in the production order of alternate routing of E for B & similarly alternative of F for C resp.
    if anser is not possible then please give other alternative
    regards,
    mangesh

    H Mangesh,
    In R/3 capacity of resources will not be checked while creating both planned order and production order. Thats why you have option of APO-PPDS for more accurate planning across plants with complete capacity check.
    You should design your routing with approperaite work centers to carry out manufacturing tasks and with this lot size criteria only autmatic selection of work centers are possible.
    Otherwise you have to do changes manually in production orders. For this create alternate routings and order dependent parameters checked the indicator "alternate routings are allowed".
    Regards
    TAJUDDIN

  • PRT Usage - three work centers, 2 PRTs, how to make it work?

    Good day.  First time poster here.  I've looked for help and can't seem to find an answer to my question.
    I have three work centers, lets call them 1 2 and 3.
    I have 2 cells, lets call them A and B.
    Cell A can run parts from work center 2 and 3.
    Cell B can run parts from work center 1 and 3.
    So a matrix of possible combinations would look like:
    Cell A               Cell B
    WC 2 part         WC 1 part
    WC 2 part         WC 3 part
    WC 3 part         WC 1 part
    How do I best set this up?  I'm more of an end-user working with a developer, and I know what I want (above), but I have no idea if even this is easily accomplished.
    I will be glad to assign points for helpful answer.  Thanks a bunch!

    Hi,
    Create Routing (ca01) & then enter the operations.
    <b>Eg:Routing 1.</b>
    <b>Cell A can run parts from work center 2 and 3.</b>
    Opr WC      PRT to be assigned
    10   WC2    Cell A
    20   WC3    Cell A
    <b>Routing 2</b>
    <b>Cell B can run parts from work center 1 and 3</b>
    Opr WC      PRT to be assigned
    10   WC1    Cell B
    20   WC3   Cell B
    For the combinations you can create alternate routings & then create a production version (t.code c223), then during production order creation you can choose the appropriate routing.
    create PRT with material type FHMI with PRT view.
    Regards,
    Senthilkumar

  • EBS 11i Disaster Recovery using tape backup on alternate Unix Server.

    Hi,
    I would really appreciate if you could please share with us what is the process to recovery EBS 11i environment to an alternate DR server using the latest tape backup in case any disaster happens to the existing production server.
    I need to prepare and test disaster recovery plan document using the latest tape backups.
    We have single node EBS 11i environment with Apps and DB installed on the same AIX Unix Server.
    We also have full database RMAN backup every night.
    The new alternate DR Unix server will have different hostname and IP address.
    Thanks in advance.
    Regards.

    Please refer to the following docs.
    Business Continuity for Oracle Applications Release 11i, Database Releases 9i and 10g [ID 216212.1]
    Business Continuity for Oracle E-Business Release 11i Using Oracle 11g Physical Standby Database - Single Instance and Oracle RAC [ID 1068913.1]
    Thanks,
    Hussein

  • ASCP Legacy Collections Dropping Routings with Alternate Resources

    SR# 6793428.993, (11.5.10.2)
    How can we load routings with alternate resources from a legacy instance without
    dropping duplicate resources.
    It appears that the last alternate routing is loaded - dropping all the other routings.
    When uploading routings, through legacy collection, having alternate resources, 'duplicate' resources are dropped during ODS Load phase.
    In staging data seems to be ok after Pre-Processing.
    Standard collection with identical routing does not drop thee alternates.
    Requirement is:
    Item has one operation with four (4) scheduled resources A,B,C,D. There is alternate resource E for resource A. So we should have either combination A,B,C,D or E,B,C,D.
    There can be multiple alternate resources for A
    Customer has:
    MSCCLPPB.pls 115.151.11510.4
    The latest release is:
    MSCCLPPB.pls 115.151.11510.17
    The code performing the legacy collection is identical.
    Message was edited by:
    Bob Marchant

    Partha,
    Thanks for the response. What we want to achieve is to be able to run all these lines in parallel, which can certainly be done by using alternate resource. I've infact setup alternate resource for the below scenario but not able to get them running in parallel. Alternate resource will work only in case when primary resource doesn't have any capacity.
    In this below case, ASCP was using 100% capacity for primary while for alternate resource it was suggesting to use anyone of them rather than equally divide the demand on them.
    Let me know if you need more details but I couldn't find anyway to model this scenario in ASCP current configuration.
    Thanks
    Nikhil

  • Alternate BOMs and Routings

    Hello Gurus,
    I had a question. I have created Alternate BOMs and Routings for a Material. How through Configuration/or Material Master settings Can I control, as to when MRP derives result from Primary BOM/Routing or Alternative BOM/Routing.
    Thanks,
    Sachin

    Hi,
    For BOM selection, system will check BOM selection method in material master of MRP4 view.
    BOM selection by Lot size, Date, Production version & Only by prod version.
    Addition to that BOM selection by Selection ID defined in plant parameter. This selection ID consists of BOM priority & Usage.
    Manually you can not control BOM selection.
    For routing selection, system will check Lot size. If lot size not matched with required qty, system avoid the lot size & consider the date.
    In addition to that system will consider Task list type, priority, Usage & Status.
    In Order type dependent parameter(OPL8), you can configure whether system should select routing automatically or manually.
    Regards,
    Dharma

  • 11i to R12 Upgrade- Doubt in XLA tables

    Hi All,
         I am migrating the 11i AP reports to R12..
         In the below query I have commented the obselete and changed 11i columns & tables , but I wasnt able to find the alternate column in WHERE clause for 2 columns in xla_ae_lines and 1 in xla_ae_headers.
         I have marked the ones for which I didn't find the alternate column in red
    SELECT  c.check_id,
            to_char(c.check_number) check_num ,
            i.invoice_id,
            i.invoice_num,
            c.amount,
            ael.accounted_dr accounted_dr,
            ael.entered_dr entered_dr,
            &p_flexdata4 c_flexdata4,
            aeh.accounting_date check_date,
            c.doc_sequence_value voucher_number,
            --ael.ae_line_type_code acct_line_type,
            ael.accounting_class_code acct_line_type,
            l3.displayed_field acct_line_type_name,
            ael.code_combination_id code_combination_id,
            ael.description comments ,
            v.segment1 vendor_num,
            v.vendor_name vendor_name,
            vs.vendor_site_code third_party_sub_name,
            c.check_date trx_date ,
            c.check_number trx_number_n,
            c.bank_account_name bank_account_name,
            abb.bank_name,
            aba.bank_account_num
    FROM 
          --ap_bank_accounts_all aba,
          --ap_bank_branches abb,
          ce_bank_accounts aba,
          ce_bank_branches_v abb,
          ap_invoice_distributions_all d,
          ap_invoices_all i,
          ap_invoice_payments_all p,
          ap_checks_all c,
          --ap_accounting_events_all ae,
          --ap_ae_headers_all aeh,
          --ap_ae_lines_all ael,
          xla_events ae,
          xla_ae_headers aeh,
          xla_ae_lines ael,
          xla_transaction_entities xte,
          ce_statement_lines sl,
          --ce_statement_headers_all sh,
          ce_statement_headers sh,
          ce_statement_reconcils_all csr,
          --po_vendor_sites_all vs,
          --po_vendors v,
          --ap_tax_codes AT,
          ap_supplier_sites_all vs,
          ap_suppliers v,
          zx_lines zl,
          rcv_shipment_headers rsh,
          po_releases_all pr,
          po_headers_all ph,
          po_distributions_all pd,
          rcv_transactions rct,
          gl_je_categories jc,
          gl_daily_conversion_types glct,
          fnd_document_sequences fd,
          fnd_document_sequences fd2,
          ap_lookup_codes l1,
          ap_lookup_codes l2 ,
          ap_lookup_codes l3 ,
          ap_lookup_codes l4 ,
          ap_lookup_codes l5 ,
          ap_lookup_codes l6,
          ap_lookup_codes l7,
          ap_lookup_codes l8 ,
          ap_lookup_codes l9 ,
          ap_lookup_codes l10 ,
          ap_lookup_codes l11 ,
          ap_lookup_codes l12,
          ap_lookup_codes l13,
          gl_code_combinations gcc1
    WHERE c.bank_account_id =aba.bank_account_id
          --AND aba.bank_branch_id =abb.bank_branch_id
          AND aba.bank_branch_id =abb.branch_party_id
          AND ael.code_combination_id =gcc1.code_combination_id(+)
          AND l1.lookup_code = c.payment_method_lookup_code
          AND l1.lookup_type = 'PAYMENT METHOD'
          AND l2.lookup_code(+) = d.line_type_lookup_code
          AND l2.lookup_type(+) = 'INVOICE DISTRIBUTION TYPE'
          --AND l3.lookup_code = ael.ae_line_type_code
          AND l3.lookup_code = ael.accounting_class_code
          AND l3.lookup_type = 'AE LINE TYPE'
          --AND l4.lookup_code = aeh.gl_transfer_flag
          AND l4.lookup_code = aeh.gl_transfer_status_code
          AND l4.lookup_type = 'POSTING STATUS'
          AND l5.lookup_code = ae.event_type_code
          AND l5.lookup_type = 'EVENT TYPE'
    --AND l6.lookup_code(+) = aeh.accounting_error_code
          AND l6.lookup_type(+) = 'ACCOUNTING ERROR TYPE'
    --AND l7.lookup_code(+) = ael.accounting_error_code
          AND l7.lookup_type(+) = 'ACCOUNTING ERROR TYPE'
          AND l8.lookup_code = 'Payments'
          AND l8.lookup_type = 'POSTING CATEGORY'
    --AND l9.lookup_code(+) = ael.gl_transfer_error_code
          AND l9.lookup_type(+) = 'POSTING EXCEPTIONS'
          AND l10.lookup_code = 'EVENT'
          AND l10.lookup_type = 'VIEW_ACCOUNTING'
          AND l11.lookup_code = 'LINE'
          AND l11.lookup_type = 'VIEW_ACCOUNTING'
          AND l12.lookup_code = 'APPLIED_TO'
          AND l12.lookup_type = 'VIEW_ACCOUNTING'
          AND l13.lookup_code = 'BANK_STATEMENT'
          AND l13.lookup_type = 'VIEW_ACCOUNTING'
          --AND AT.tax_id(+) = ael.tax_code_id
          AND i.invoice_id = zl.trx_id(+)
          AND zl.entity_code = 'AP_INVOICES'
          --AND jc.je_category_name = aeh.ae_category
          AND jc.je_category_name = aeh.je_category_name
          AND rsh.shipment_header_id = rct.shipment_header_id
          AND d.rcv_transaction_id = rct.transaction_id
          AND pr.po_release_id(+) = pd.po_release_id
          AND ph.po_header_id(+) = pd.po_header_id
          AND pd.po_distribution_id(+) = d.po_distribution_id
          AND ael.currency_conversion_type = glct.conversion_type(+)
          AND c.doc_sequence_id = fd.doc_sequence_id
          AND sh.doc_sequence_id = fd2.doc_sequence_id
          --AND ael.third_party_sub_id = vs.vendor_site_id
          --AND ael.third_party_id = v.vendor_id
          AND ael.party_site_id = vs.vendor_site_id
          AND ael.party_id = v.vendor_id
          AND i.invoice_id(+) = p.invoice_id
          --AND c.check_id = ae.source_id
          --AND ae.source_table = 'AP_CHECKS'
          --AND ae.accounting_event_id = aeh.accounting_event_id
          --AND aeh.ae_header_id = ael.ae_header_id
          AND i.invoice_id = xte.source_id_int_1
          AND xte.entity_code = 'AP_CHECKS'
          AND aeh.ae_header_id = ael.ae_header_id
          AND aeh.application_id = ael.application_id
          AND aeh.event_id=ae.event_id
          AND aeh.application_id = ae.application_id
          AND ae.entity_id=xte.entity_id
          AND ae.application_id = xte.application_id
          AND sl.statement_header_id = sh.statement_header_id(+)
          AND csr.statement_line_id = sl.statement_line_id(+)
          AND c.check_id = csr.reference_id(+)
          AND csr.reference_type = 'PAYMENT'
          AND csr.current_record_flag(+) = 'Y'
          AND decode(ael.source_table,'AP_INVOICE_PAYMENTS', ael.source_id,NULL) = p.invoice_payment_id(+)
          AND decode(ael.source_table,'AP_INVOICE_DISTRIBUTIONS', ael.source_id,NULL) = d.invoice_distribution_id(+)
          AND ael.accounted_dr IS NOT NULL
          AND (v.segment1 = :p_vendor_code
          OR :p_vendor_code IS NULL)
          AND (v.vendor_name = :p_vendor_name
          OR :p_vendor_name IS NULL)
          AND (abb.bank_name = :p_bank_name
          OR :p_bank_name IS NULL)
          AND (c.currency_code = :p_currency
          OR :p_currency IS NULL)
          AND (c.doc_sequence_value = :p_doc_sequence_value
          OR :p_doc_sequence_value IS NULL)
          AND (i.pay_group_lookup_code = :p_paygroup
          OR :p_paygroup IS NULL)
          AND ( c.check_date IS NULL
          OR trunc(c.check_date) = nvl(:p_payment_date, trunc(c.check_date)))
    Thanks and Regards,
    Madonna

    Hi Cheryl,
         Thank you for the reply..
         It would be nice if you could illustrate with a sample code..
    Thanks and Regards,
    Madonna

  • Inventory Module Upgrade from 11i to R12 - How to Copy Inventory Orgs.

    Hi All,
    We are working on R12 Upgrade project for Item Conversion.
    Requirement is to upgrade and bring all the Item setup and data from 11i to R12.
    As part of setup requirement, there are around 1900 Inventory Orgs in 11i instance. Please let me know what is the best approach / strategy to copy and bring over the 1900 Inventory Orgs.including the Master Org from 11i to R12.
    Your inputs will be highly appreciated.
    Thanks in Advance !
    Regards,
    Nityanand.

    Reporting Set of Books (MRC) in 11i is called as Alternate Currency Ledgers (ALC Ledger) in R12.
    After 11i upgrade, the reporting SOBs (MRCs) will be automatically changed to ALCs in R12.
    Some are primary and some are used as reportingI hope you are talking about MRCs.
    When we upgrade from 11i to r12, all the SOBs would be created as primary ledgers (as per oracle)If they are not MRCs and it is getting upgraded as primay ledger, you may create new ALC for your requirement.
    In that case you may need a datafix from Oracle to fix the old data.
    By
    Vamsi

  • Queries regarding creating Web Services in Oracle EBS 11i[Workaround found]

    Hi,
    We have an E-Business Suite 11i installation(11.5.10.2). In our implementation we are using some of the public APIs to insert & update data in EBS tables. Earlier this was done by calling the required PL/SQL procedures through dblinks.
    Now, we need to do the same by using Web Services. That is we need a Web Service which can be invoked from a different application(SAP) and the Web Service in turn will call the APIs.
    I am new to Web Services/SOA and as far as I could understand from reading the documentation, we need the following:
    1. Install Oracle 10g Application Server with BPEL Process Manager ONLY(Oracle AS Adapter will be installed as part of BPEL PM. The Oracle AS Adapter will connect 10gAS to EBS)
    2. JDeveloper to create and deploy the BPEL process.
    I have a few questions here:
    1. Are the above two points the only prerequisites for what I want to achieve? Do I need to install anything else?
    2. How do I expose the created Web Service? I mean how will the 3rd party application invoke this Web Service?
    Answers and/or links to helpful documents awaited.
    Regards,
    -Sujoy
    Found an alternate and more cost-effective solution. Turns out that the SAP PI/XI engine can use JDBC to connect to the Oracle DB. SAP PI/XI will host the Web Service and will internally access the API through a JDBC connection.
    Edited by: Sujoy on Feb 3, 2011 7:41 PM
    Edited by: Sujoy on May 16, 2012 6:49 PM

    Hi Helios,
    I had checked the note that you are referring to before posting here. It did provide me with a start but otherwise it wasn't a great help (also some of the links are broken) . Since I am quite new to this...I am not sure whether I am proceeding in the right direction. An example/tutorial is what would be pretty useful.
    Thanks anyway!
    -Regards,
    Sujoy

Maybe you are looking for

  • Qosmio X305 will only boot in safe mode or when the graphics card disabled

    Hi All I am having a very concerning issue with my laptop (Toshiba Qosmio X305). It will only boot in safe mode or if I disable the graphics card. Awhile back I upgraded the drivers for the nVidia 9800M GTX from the nVidia website, it worked fine for

  • Posting slideshow  to video.google--size matters

    I posted earlier about compressing a wmv file I had created to email and decided just to post it to video.google. So I posted a slideshow to video.google but no matter what I do, I can't make it "full screen." See here: http://video.google.com/videop

  • Dont have a delta specific field

    Experts, We dont have a single char to mention in "Field Nm".We are using a table for Generic Datasource.Can we create a new field in the table and use it in "Filed Nm". If you have any suggestion.Plz tell me the navigation steps also or provide me t

  • No import in File drop down or Organise Bookmarks in Bookmarks drop down

    Am trying to import bookmarks from Safari on same laptop, there is no Import facility on Firefox. Similarly no Organise Bookmarks either. This is new laptop, I have just downloaded latest Firefox for Mac

  • Portal WebService and Complex Parameter (Array) Response

    Hello Colleagues, i use the function „Create WebService from Portal Service“ in the NWDS. It Works fine for methods that take or give flat Parameters like this: public String getValue(String value) { return value; But I need to use Complex structures