Automatic timetable generator project

hi all ,
i've been assigned a project -
to create a site for our college that automates the process of generating timetable..using jsp.
i've formulated the list of constraints..
i'm not clear as to what inputs i should get from the user .. n how to use those inputs in my program..
i do not know where to start..
pl help ..
thanks.

Do you need to visualize a pre-defined timetable in a JSP or calculate a complete timetable given some constraints?
The former is rather easy, the later is very, very hard (NP-hard, even).
For displaying, I'd like to point you towards the [JEE tutorials|http://java.sun.com/javaee/reference/tutorials/].
For calculating a timetable, it's probably one of the "if you have to ask, it's too hard for you"-things.

Similar Messages

  • College timetable generator mini project in java

    hi sir/madam
    iam vishal just completed 3-2 recently.i need College timetable generator mini project in java algorithm.its urgent.kindly help me out to do this project. my email id:[email protected]

    Have you googled on it?
    Read the first replies of this thread:
    [http://forums.sun.com/thread.jspa?threadID=636835&start=60]

  • Automatic creation of project from Sales Order?

    hi..
    can someone guide me how to automatically generate PS Projects from SO USING TCODE HBS0?
    i have been able to generate projects automatically when i use tcode VA41 but my need is to do this for RE using sales browser and creation of Sales Order is by Tcode HBS0.
    when i save the sales order, no project is created. ( Note: Material i used is same one i used successfully in VA41+)
    thanks in advance..

    Hi Ramesh,
    Creation of project from sales order in SAP Project system is described as assembly processing.
    In the Project System only networks can be generated directly from a sales document during assembly processing. Indirectly the system can also generate work breakdown structures, when it creates the network.
    1.You start assembly processing by creating a sales document for a material. This sales
       document can be inquiry,quotation, sales order.
    2. The system then
        Configures the material, if necessary
        Creates a network using the standard network as a template
        Configures the network, if necessary
        Schedules the network backwards from the required delivery date
        Checks material availability
        Costs the network and transfers these costs to the sales document.
    3. When you save the sales document, the system saves the network together with the sales
        document. If applicable, it also generates a project definition and work breakdown structure.
        The project number is derived from the sales document number.
    Please refer link mentioned below to know more details
    http://help.sap.com/saphelp_47x200/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/frameset.htm
    Regards
    Tushar

  • Automatic Creation of Project (PS) from SO (SD)

    Hi All,
    I know that you can automatically create a Project in PS upon creation of a Sales Order. My question is if it is possible to limit the creation only at a WBS Element Level.
    The scenario is that the Project we're actually implementing is a Subdivision/Village/Community and the Houses being built inside it are regarded a WBS Elements only in the Project. So that I am querying if it is possible that upon order of a House, only a WBS Element will be created that we could attach to the Project Definition (Represented by the Village/Community)...
    Thanks in advance...
    Joed

    Hi Murugesan,
    Thanks for the speedy reply, i'd like to follow-up on the question since as you've replied, it is possible to crete at WBS Element only... can I refer/attach the SO-created WBS Element to a Project Definition? Since I like to consolidate them to one Project Definition...
    Thanks and Kind Regards,
    Joed

  • I am using FCPX 10.1.3. and want to duplicate my project, and its complete resources, to a different hard drive.  When I click "duplicate", it automatically duplicates the project in its current hard drive.  How do duplicate to a different hard drive

    I am using FCPX 10.1.3. with Yosemite, and want to duplicate my project and its complete resources to a different hard drive.  When I click "duplicate", it automatically duplicates the project in its current hard drive, unlike the previous FCPX that gave you options. How do duplicate to a different hard drive?

    Since projects are now stored in events and events are stored in libraries, you need to create a new l;bray on that different drive or open an existing library on that drive. Then duplicate your project and move it to the new library. It will copy the media. Then use the Consolidate Project File command to round up any external assets; there may or may not be any.
    Russ

  • How automatic po generated in third party sales

    In third party sales an automatic puchase order is generated along with the purchase requisition....kindly help how can i get the automatic po generated
    Regards
    Anindya Das Gupta

    Hi,
    A new PO is created for a 3rd-party sales order item when indicator Create purchase order automatically (V_TVAP-ALEKZ)  is set for  schedule line category and the Event PUR_ORDER_CHANGE_VIA_SD_EVENT is activated (SWFDVEVTY1-ENABLED field is marked). Please see information in note    332475 for more information.
    Kind Regards,
    Suneet

  • The TOC in my generated project is not navigating to the correct subfolders

    The TOC in my generated project (Multiscreen HTML5/Andriod (Desktop) layout) is not opening to the correct sub folders.
    For example, when selecting a Level 1 folder (say the one highlighted in orange), it will jump to a Level 3 list of topics in a completely different level 1 structure (say the list highlighted in green)
    Level 1
           Level 2
                  Level 3
                  Level 3
                  Level 3
           Level 2
                  Level 3
                  Level 3
                  Level 3
    Level 1
           Level 2
                  Level 3
                  Level 3
                  Level 3
           Level 2
                  Level 3
                  Level 3
                  Level 3
    I have looked at the TOC report, everything is fine there, the TOC in roboHelp looks fine as far as I can see.
    I have noooo idea how to fix this!

    Check what is happening in webhelp. Same problem there?
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • IMovie at start load automatic the last project :-(

    It is possible to make so that Imovie does not open in automatic the last project at start? It is annoying.
    Thanks
    PM G5 - DP 1.8   Mac OS X (10.4.4)  

    Thanks Mathew but when I choose the imovies it auto loads my last project. I can load a new one as you say but I have to wait until the previous project loads which can take an age. I just want to go straight into imove and choose between new or old. As you would any other program but maybe I am missing something

  • Automatic employee update project

    Any ideas, please help....
    Preliminary Plan
    I work at the headquarters of a small company of 8 offices and 26 employees. I am the central database system. Right now, information is only accessible through me, by me, from me, and to me via fax, phone, mail, or email. I have several spreadsheets with different information resulting from personal information, cell phone information, laptop information, government vehicle information, contract information, and training information.
    I want to develop a database that will automatically keep track of this information as entered by the user. Whenever there is a change or update, the system will be able to automatically accept this information into the system. Information will come from each workstation in the office that only the managers and I can see. The managers will however only have access to their individual employee information, but I will have access to ALL the employee information. All information created, provided, and maintained between me and the managers will be conducted through RDBMS. Triggers will be used so that information can be updated or inserted through SQL. LAN-to-LAN connections are already in place so that information on the network can be accessible. Preliminary plan is as follows:
    WEEK 2: January 15-21, 2007
    Develop preliminary plan for two sentence concept of BPS
    WEEK 3: January 22-28, 2007
    Finalization of preliminary plan
    Creating the database i.e., connecting, granting privileges, adding systems
    Designing and creating tables, databases which are already in spreadsheet format
    WEEK 4: January 29-February 4, 2007
    Designing and creating tables, databases which are already in spreadsheet format
    Installing, configuring, and securing the database;
    WEEK 5: February 5-11, 2007
    Develop triggers using SQL; test database
    WEEK 6: February 12-18, 2007
    Design, develop, and test user interface application
    WEEK 7: February 19-25, 2007
    Test application again. Test database again. Test project application and database together.
    WEEK 8: February 26-March 4, 2007
    Finalize project details to incorporate into a PowerPoint presentation for submission.
    WEEK 9: March 5-11, 2007
    Demonstrate and present project. Evaluations due.

    Do you need to visualize a pre-defined timetable in a JSP or calculate a complete timetable given some constraints?
    The former is rather easy, the later is very, very hard (NP-hard, even).
    For displaying, I'd like to point you towards the [JEE tutorials|http://java.sun.com/javaee/reference/tutorials/].
    For calculating a timetable, it's probably one of the "if you have to ask, it's too hard for you"-things.

  • ERS for automatic PO generated via GR

    Hi all,
    I am trying to do ERS for a PO which is generated automatically at the time of GR. But I am not able to do it, when i m doing ERS via MRRL, it is showing no documents found. But similarly for the same material and vendor when I manually create a PO followed by GR, I am able to do ERS.
    On analysis, I found that during the automatic generation of PO at the time of GR, the EKRS table is not getting updated but at the time of manual creation of PO, the table EKRS is getting updated.
    I have checked the checkboxes of the vendor master and the NO ERS checkbox is not flagged in the info record , in PO, ERS checkbox is flagged both the time. Kindly help

    Then I would believe that is your problem.    In the typical process when a PO already exists, the ERS indicator is set for each line item.   So when the GR is performed the system knows that it should be treated as an ERS item and populates the EKRS table with the appropriate values. 
    In your scenario the GR is done first.... therefore the system does not know it is an ERS item for that supplier and it does not populate the EKRS table.  
    Regards,
    Sandra

  • Hi i need a code for timetable generaation project

    Hi friends i am doing a project of timetable generation for college but i got confused so please send me the code for it on my email id [email protected] thank you

    Code for time table generation. No problem. Here you go.
    System.out.println("                  Sun  Mon  Tue  Wed  Thu  Fri  Sat ");
    System.out.println(" 9AM:");
    System.out.println("10AM:");
    System.out.println("11AM:");
    System.out.println("12PM:");
    System.out.println(" 1PM:");
    System.out.println(" 2PM:");
    System.out.println(" 3PM:");
    System.out.println(" 4PM:");
    System.out.println(" 5PM:");It is easy to get confused because of the way that "10" has more characters than "9". The trick is to put a space before the 9 so that the numbers will line up correctly.
    You can also put more spaces in between the days of the week if there isn't enough room to pencil in your classes.
    Good luck with your studies!

  • Automatic Release of Project When Created

    Dear Experts,
    We want to release project automatically when it is created first time, please guide how to achieve this
    Regards
    Shailesh Sontakke

    hi,
    Use the method AT-SAVE in the badi
    PROJECTDEF_UPDATE
    Write the code to set the system status to REL in BAPI
    BAPI_BUS2054_SET_STATUS
    ashis

  • Assign new document type for automatic MRP generated PR

    Dear Experts ,
    I want to have a document type ZMRP  MRP generated Purchase Requisitions ( automatic ).
    Also i want it to have a release procedure .
    Where do i make the said assignment of document type ?
    The same is the case for Purchase requisition for automatically generated PRs  through Maintenence orders .
    Regards
    Anis

    Hello Experts ,
    I have done the assignments , but the system is still picking up the document type NB .
    I may or may not define MRP group in the material master as MRP group is not relevant for my client .
    I want to know , from where does the system still pick the document type NB ?
    Regards ,
    Anis

  • How BPM studio developed(generated) project be deployed onto WebCenter?

    Do as the tutorial of BPM studio, it tells to click run and there is already a test portal that can run and test the Process, I really don't know where the studio put the packaged files on the test portal environment and how it works.
    My question is in our requirement purpose, we will use the the feature that oracle tells BPM can be integrated with WebCenter, so how to deploy the BPM studio developed project on WebCenter? What configuration I need to do?
    Thanks ...

    If you want to run your process inside the portal (webcenter, alui), then you have to install your standalone BPM server with the workspace extension (WE). WE does the Webcenter/ALUI integration: portlets and sso. After your BPM WE configuration you can just import portlet and webservice settings with a pte file generated by the config wizard. You can use Process Community out of the box or setup your own communities.
    Please read carefully the documentation especially paragraph "Integrating Oracle BPM with AquaLogic Interaction":
    http://download.oracle.com/docs/cd/E13154_01/bpm/docs65/config_guide/index.html
    Hope this helps.

  • Does aperture automatically save to projects

    When importing pictures into Aperture, are they automatically stored into the Projects section?  I've created albums with my imported pictures, but am now at a standstill as I keep getting  message of Insufficient volume space to import.  Is this because pictures are being stored in both Projects and Albums? How can I get around this?  I don't really want the pictures in Projects.  I thought that Aperture was supposed to have more storage space than iPhoto, but I'm running into the same problem as with iPhoto. 
    Also, is there any other way to import pictures from off an iPhone other than through Aperture?  Is there a space that I can go to see the phone being connected like when a USB drive is inserted?

    All images in Aperture are stored in projects. The images you see in albums are really only pointers back to the image in its project.  There is no duplication, the image is only stored once in the project.
    You can import using Image Capture also and copy the files from the phone onto your disk. But it sounds like  your disk drive is full.
    regards

Maybe you are looking for

  • 32L4300 mystery video port, any clue what cable?

    Anyone here with a model 32L4300 or any of that related series. On the left side of the set,  the very top input, above the HDMI is a port labeled IN ViDEO 1 (audio). The input is unusual. It's partly plastic (yellow) and it does not look like any ot

  • Period Wise PR Changes report

    Hi experts, We want to have a period wise PR Changes Report, how can we get it. Please help. Regards Ishu

  • Master Report problem with PL/SQL

    Hi Intelligent ones :) Can anyone help? I am trying to generate a Master report by generating a report based on a SQL query. The SQL query generates the detail of the report and the Main part of the report is generated using PL/SQL in "after displayi

  • 5 system landscape for MDM?

    We are in the process to layout infrastructure for release 2 of our transformation project for ECC, MDM, PI, BODS. We are debating on possible solutions 1) typical 5 system landscape like below. DEV->QA->PRD DEV2->QA2 DEV2, QA2 are project landscape

  • About to buy a new Mac Pro

    A few months ago I posted a very simlar question, but can't find it anymore. I'm ready to purchase a new Mac Pro, now I have a 2008 8 Core 2.8GHz with 10 gig ram and was looking at the latest 8 core with a lesser speed of 2.4. GHz and cannot find a b